HomeMy WebLinkAboutNCG210448_Compliance Inspection Report_20190605Permit: NCG210448
SOC:
County: New Hanover
Region: Wilmington
Compliance Inspection Report
Effective: 08/01/18 Expiration: 07/31/23 Owner: Diversified Biomass Company DBA American
Property Exports
Effective: Expiration: Facility: Diversified Biomass Company dba American Properl
606 Sunnyvale Dr
Contact Person: Jason R Thompson Title:
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 06/05/2019 Entry Time: 10:30AM
Primary Inspector: Brian P Lambe
Secondary Inspector(s):
Wilmington NC 28412
Phone: 910-793-1460
Certification: Phone:
Exit Time: 11:15AM
Phone:
Reason for Inspection: Complaint Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG210448 Owner - Facility: Diversified Biomass Company DBA American Property Exports
Inspection Date: 06/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Complaint
Inspection Summary:
A complaint was recieved from an adjacent property owner that crushed concrete has crossed property lines. The site
currently is covered by NCG210000 (210448)Lumber and wood products. Any concrete product must be covered by a
general permit NCG070000 or the site will neccesitate an individual permit to cover both industrial activities.
Owner was unavailable during inspection. Mr. Thompson followed up with a phone call inviting inspection of sampling data
and SPPP.
Regardless of property lines, the crushed concrete will need to be pulled off of any watercourse to establish a buffer zone.
Buffers should be established for the mulch operations. The front section of the mulch operation is very neatly organized and
maintained. The back section may need to have buffers re-established in some portions, but is also well maintained.
Page 2 of 3
Permit: NCG210448 Owner - Facility: Diversified Biomass Company DBA American Property Exports
Inspection Date: 06/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Complaint
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
❑ ❑
# Does the Plan include a General Location (USGS) map?
❑
❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑
❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
❑ ❑
# Does the facility provide all necessary secondary containment?
❑
❑ ❑
# Does the Plan include a BMP summary?
❑
❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
❑ ❑
# Does the facility provide and document Employee Training?
❑
❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑
❑ ❑
# Is the Plan reviewed and updated annually?
❑
❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
❑ ❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment:
Analytical Monitorinq Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Comment:
Page 3 of 3