Loading...
HomeMy WebLinkAbout20190755 Ver 1_PCN Form Submission_20190610DWR MOM— of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20190755 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Donna Fbod:eads\drhood Information for Initial Review 1a. Name of project: Replacement of Bridge #120137 over Dutch Buffalo Creek 1a. Who is the Primary Contact?* Larry Thompson - NCDOT Division 10 1b. Primary Contact Email:* Ihompson@ncdot.gov Date Submitted 6/10/2019 Nearest Body of Water Dutch Buffalo Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Version# * 1 Reviewing Office* Mooresville Regional Office - (704) 663-1699 1c. Primary Contact Phone:* (704)983-4400 Latitude: Longitude: 35.338139-80.446004 FA. Processing Information U County (or Counties) where the project is located: Cabarrus Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: B-5375 WBS # (?) 17BP.10.R.145 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? t' Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* C Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? C Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? C Yes t No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? C Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No F. Applicant Information 1d. Who is applying for the permit? [J Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes C No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 10 2b. Deed book and page no.: N/A 2c. Responsible party: 2d. Address Street Address 716 Main Street Address Line 2 City State / Frwinee / R�gion Albemarle NC Fbstal / Zip Code Q�untry 28001 USA 2e. Telephone Number: 2f. Fax Number: (704)983-4400 (704)982-3146 2g. Email Address:* * r Yes C No r Yes C No Ithompson@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (i appropriate) 1c. Nearest municipality/ town: R. Pleasant 2. Project Identification 2a. Property Identification Number: WA 2c. Project Address Street Address SR 1132 (Miami Church Road) at Dutch Buffalo Creek Address Une 2 City Mt. Pleasant Fbstal / Zip Cide 28124 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Dutch Buffalo Creek 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050304 4. Project Description and History 2b. Property size: 2.3 State / Province / Region NC (Duntry USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Emsting conditions include SR 1132 (Miami Church Road), agricultural land, residential property, undeveloped forest, and the disturbed/maintained right-of-way. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) t1SGS figure from B-5375 NRTR Final.pdf 799.07KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) B5375_Cabarrus_Bridge 137_Figure1_SoilsMap.pdf 2.11 MB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 152 4h. Explain the purpose of the proposed project:* To remove Bridge #120137 and replace with a new, modern bridge structure. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Erosion and sedimentation control measures will be installed. Bridge demolition will include the removal of the bridge deck and the removal of the piers and the top portion of the bridge abutments, leaving the footer and approximately one foot of the masonry abutment to match the excavation elevation and temporary impacts to 80 linear feet to Dutch Buffalo Creek may result. Bridge replacement construction using heavy equipment from the upland roadway approaches. No deck drains are proposed on the bridge and runofffrom the bridge will be routed to catch basins located at each quad of the bridge and discharged to the stream floodplain. The proposed bridge will be built on the same alignment with a temporary off -site detour. 4j. Please upload project drawings for the proposed project. B-5375_HYD_SMP.pdf B-5375_Permit_Plans_2019-06-05.pdf 178.95KB 1.49MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: See attached NRTR prepared by Three Oaks Engineering for information on the delineation. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Sd1. Jurisdictional determination upload JD figure from B-5375 NRTR Final.pdf B-5375 NRTR Final.pdf 6. Future Project Plans Nathan Howell Three Oaks Engineering 557.91 KB 2.88MB r Unknown 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Open Waters r Pond Construction 3. Stream Impacts r Buffers U 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * [3urrypef. of 3g. S. width * 3h. Impact (?) isdiction* length* i1 Bridge replacement Temporary Other Dutch Buffalo Creek Perennial Both 50 80 Average (feet) (linear feet) 31. Total jurisdictional ditch impact in square feet 0 31. Total permanent stream impacts: 31. Total temporary stream impacts: 0 80 3i. Total stream and ditch impacts: 80 3j. Comments: Temporary impacts Mich may result are associated with the demolition of the eAsting bridge and the construction of the proposed bridge. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Replace bridge in -place was incorporated to minimize impacts. The bridge span length was e:Qended to avoid impacts. Riprap protection of the bridge abutments is being placed outside of the jurisdictional stream boundary of the perennial stream (aka, Dutch Buffalo Creek) where possible to avoid impacts. Work will be conducted from the upland roadway approaches. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for Construction and Maintenance Activities will be employed. Demolition and construction methods from the upland roadway approaches will be used to minimize potential temporary demolition related impacts and avoid construction related impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Minimal temporary impacts of 80 linear feet to Dutch Buffalo Creek may occur and no part of the stream bed will be impacted. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Project is located in the Yadkin -Pee Dee River Basin and is not subject to NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r' No Comments: Stormwater runoff from the proposed bridge Wil be routed to catch basins on all quadrants of the bridge. No deck drains are proposed. Please see attached Stormwater Management Plan for details on the minimization of water quality impacts. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r' No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* r^ Yes r No Comments: The Categorical Exclusion prepared for the project has been reviewed and approved by the NCDOT. See Miscellaneous for signed Categorical Exclusion Approval. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?.* r Yes r No 3b. If you answered "no," provide a short narrative description. Project involves the replacement of an existing bridge and is not anticipated to affect future development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No Sg(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r Yes r No r Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* C Yes r No C Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? C Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NCNHP data and site specific surveys conducted by Brandon Phillips, CHMM of STV Engineers, Inc. on 10-5-18 for SchweiniKs sunflower and 5-24-19 for northern long-eared bat (NLEB). No endangered species were observed. Bridge not suitable for NLEB due to water overtopping the bridge. See attached NRTR and NCNHP site specific information. Consultation Documentation Upload NCNHP_17bp10r145_bridge _137_cabar_04302019.pdf 999.6KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r^ Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* C Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* See attached "No Archaeological Survey Required Form" and "Historic Architecture and Landscapes No Historic Properties Present or Affected Form." 7c. Historic or Prehistoric Information Upload 16-02-0046NHPARevised.pdf 4.32MB B-5375 No Archaeological Survey Required Form.pdf 713.3KB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit Coordination Wth FEMA. 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM maps Miscellaneous Comments Please see attached site photographs. Project was formerly identified as R.145 and changed to B-5375. A temporary 0.01 acre easement is required in the southeast quadrant of the bridge, which lies within a NC Agricultural Development and Farmland Preservation (ADFP) Trust Fund easement. Miscellaneous attachments not previously requested. B-5375 Photopages.pdf Pages from Signed_B-5375_ Final _CE_052119.pdf Signature * W By checking the box and signing below, I certify that: 12.25MB 513.26KB • I have given true, accurate, and complete information on this form; . I agree that submission of this PCN form is a 'transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a Witten signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Larry Thompson Signature Date 6/10/2019