Loading...
HomeMy WebLinkAbout20041912 Ver 1_Complete File_20041129MEMORANDUM TO: John Dorney Regional Contact: Michael Horan Non-Discharge Branch WQ Supervisor: KPn Srhi,stPr Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Enloe High School County. Wake Project Number ' 04 1912 County2 Recvd From APP' Region Raleigh Received Date 11/29/04 Recvd By Region Project Type campus expansion Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim.. Supp. Basin Req. Req. NBR Buffers F V _0N F- 27-33-(10) r -CF-NSW 30,402. 0.09 F- Mitigation Wetland MitigationType Type Acres' Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y 0 N Recommendation: 0 Issue 0 Issue/Cond 0 Deny Provided by Region: Latitude (ddmmss) 354650 Longitude (ddmmss) .783610 Comments: cc: Regional Office Central Office Page Number 1 O?O? W AT ?RpG j r Q ? Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources February 10, 2005 Wake County Board of Education Attn: Clint Jobe 1551 Rock Quarry Road Raleigh, NC 27609 Subject Property: Enloe High School UT to Crabtree Creek [03-04-02, 27-33-(10), C NSW] Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 04-1912 Wake County Approval of Neuse River Riparian Buffer Protection Rules Minor Variance [15A NCAC 2B .0233(9)(b)] Dear Mr. Jobe: You have our approval, in accordance with the conditions listed below, to impact approximately 4,071 square feet (ft2 ) of Zone 2 of the protected buffers to demolish and reconstruct the new Concessions/Bathroom Building (out of Zone 2) and reconnect the sidewalk and to have heavy equipment in Zone 2 to construct the West Campus addition and the permanent mulch path at the subject property as described within your variance request dated November 29, 2004 and received by the Division of Water Quality (DWQ) on November 29, 2004. This letter shall act as your Minor Variance approval as described within 15A NCAC 2B .0233(9)(b). In addition to this approval, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control regulations. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner(s) must be given a copy of this variance approval and is thereby responsible for complying with all conditions. This approval requires you to follow any conditions listed below. The Additional Conditions of the Certification are: 1. No Zone 1 Impacts No impacts (except for the "exempt" uses as identified within 15A NCAC 2B .0233) shall occur to Zone 1 of the protected riparian buffers unless otherwise approved by the DWQ. No impervious surfaces shall be added to Zone 1, unless otherwise approved by the DWQ. 2. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B .0233(5). 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733.1786 / FAX 919.733-6893 / Internet: httD://h2o.enr.state.nc.us/ncwetlands y` N Carolina Noaturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Wake County Board of Education Page 2 of 3 2/10/05 3. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 4. Protective Fencing The Riparian Buffer Zone 1 and along the construction corridor of Zone 2 approved under this variance shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233. 5. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. ' b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 6. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enr.state.nc.us/su/Forrns Documents.htm. Requests for appeals of this decision shall be made to the Office of Administrative Hearings. If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. This approval and its conditions are final and binding unless you ask for a hearing. This Minor Variance Approval shall expire five (5) years from the date of this letter. a Wake County Board of Education Page 3 of 3 2/10/05 This letter completes the review of the Division of Water Quality under the Neuse River Riparian Buffer Protection Rules [15A NCAC 2B .0233(9)(b)]. Please call Ms. Deborah Edwards at (919) 733-9502 if you have any questions or require copies of our rules or procedural materials. Sincerely, AWK/dae Enclosures: Certificate of Completion ?J (6? Alan W. Klimek, P.E. cc: Mike Horan, DWQ Raleigh Regional Office File Copy Central Files Andy Padiak-CLH design, pa, MacGregor Park, 125 Edinburgh South, Suite 310, Cary NC 27511 LCi?_ LVV?6 co?-6, C?,,e4cs_ i-L, rlco_? s. J J r t- MEMORANDUM TO: John Dorney Non-Discharge Branch Regional Contact: Michael Horan WQ Supervisor: Ken SrhiistPr Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Enloe High School County Wake Project Number 04 1912 County2 Recvd From APP Region' Raleigh Received Date 11/29/04 Recvd By Region Project Type' campus expansion Certificates Stream' Permit Wetland Wetland Wetland Stream Class Acres Feet Type TYPe; Impact Score Index Prim. Supp. Basin Req. Req. NSW 30,402. 0.09 F NBR Buffers WT _0N 27-33-(10) F -c F_ P7_0 _N F- Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y O N Recommendation: 0 Issue 0 Issue/Cond 0 Deny Provided by Region: Latitude (ddmmss) 354650 Longitude (ddmmss) 783610 cc: Regional Office Central Office age Number 1 Facility Name Enloe High School County Wake Project Number 04 1912 Regional Contact: Michael Horan Date: Comments (continued from page 1): cc: Regional Office Central Office Page Number 2 Triage Check List Date: IAIaolo'i Project Name: Enloe Vk-5, TMr,agn-.,'j-s DWQ#: oy --Ig la County: eke To: ? ARO Kevin Barnett ? WaRO Tom Steffens and Kyle Barnes ? FRO Ken Averitte ? WiRO Noelle Lutheran ? MRO Alan Johnson ? WSRO Daryl Lamb RRO Ivfike Her- Zrt -_ K v 1.; From: Telephone : (919) q33 -9i 4a(o The file attached is being forwarded to jtour for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps Minimization/avoidance issues Buffer Rule euse Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: 1t\ aa, " pro .. p? cam. rc ,or a,?to.S? 6A?411'/e I rear wJ j ?; k0?s r_ Go4tv, #A rhAL 4tell-j ?G V? 1til e ? 5 u ?+2 c? 4 ?t b w.11?. ? S Csu're?c?-l.a . ?+e, w ,raay hove- 6 een tQ?vbu S ? ? ;-ln ? c,eKh c}'G?e. 6 p A bw k (" T13" o? q1?,?.s? ?ctso, taut e.?.? ?t???,•??? p (rn 1 ?n e? awe 0 ?o p as i?.t cM e.-o v?? c1 c?t?/Y?1?+? . W i Q ?dnSk.. e?e.? 1?ve, c..-?? boo- ? ?.?.???,?. , o•- ,So w- oM?ter be ts- L.)Gt c?avtce wa k / '/, I CLH design, p.a. MacGregor Park, 129 Edinburgh South, Suite 310 Cary, North Carolina 27911 Phone: (919) 319-6716 Fax.- (919) 319-7916 November 15, 2004 TO: Mr. John Dorney 4401 Reedy Creek Road Raleigh, North Carolina 27607 FROM: Andrew Padiak - CLH Design, PA RE: ENLOE HIGH SCHOOL CC: 1148 Dear Mr. Domey: Please find the attached three (3) 11 "x 17" plan sets, photographs of buffer encroachment areas, photograph key map and the completed Pre-Construction Notification Application for the above referenced project. This campus is described as the West Campus and East Campus separated by a stream buffer. The proposed work at this high school consists of the following: West Campus Improvements: East Campus Improvements: The West Campus Addition - 149,303 sf East Campus Gymnasium - 21,531 sf Press Box and Ticket Booth - 848 sf Parkin Improvements Concession/Bathroom Building - 3,044 sf Equipment Building - 569 sf Parkin Improvements This campus is in dire need of renovation and is very deficient in classroom space and parking. The site had 18 single mobile trailers being used for classroom space that were replaced with three modular classroom buildings in the student parking lot located south of the stadium. This was done this past spring to move the single mobiles out of the way for the purpose of the improvements described in the table above. Once the improvements listed above are complete, the modular buildings are to be removed from the student parking lot. The project includes the construction of two underground stormwater storage systems as described in the stormwater analysis (included with this submittal). The underground systems effectively reduce the one, two and 10 years post development runoff rate to below predevelopment conditions at the three analysis points where the runoff leaves the property. To orchestrate this plan, we need to encroach into Zone 2 of stream buffer in two locations: Encroachment 'A': The existing bathroom building that resides in Zone 2 is to be demolished. The new Concessions/Bathroom Building is located outside of the riparian buffer. We propose to re-connect the sidewalk system and chain link fence to the existing sidewalk and fence located in Zone 2. Transmittal to NCUHNR I1-1-04.doc NC Division of Water Quality November 15, 2004 Page 2 There will be a reduction in impervious area in Zone 2 as a result of this work. The area of buffer impact is 2,006 sf. The stormwater runoff collected by the roof leaders and the floor drains for the new concessions bathroom building will be released into the stream buffer through a level spreader. Encroachment 'B': In order to construct the West Campus Addition, the contractor will need to have access around the south side of the proposed building as well as tying in the proposed grade to existing grade. The required handicap accessible route along the proposed building encroaches into Zone 2 will be a 3" mulch path. The proposed West Campus addition is designed as 3 stories tall to meet the required square footage of the WCPSS program. The addition is constrained on all sides. The addition has the minimum separation allowed by building code to the existing west campus building to the west. The baseball field, drastic elevation drop and the required fire vehicle access route on the north side of the addition restricted the addition in that direction. The existing soccer field and elevation drop restricted the addition from the east. The face of the proposed addition is a few feet outside of the 50-foot riparian buffer along the south. With careful consideration for the perimeter restrictions in this proposed addition envelope, we have no other choice but to request approval to encroach into the buffer during construction. In order to meet WCPSS program requirements and with consideration for the perimeter restrictions, we need to encroach into Zone 2 in order to construct the West Campus Addition. We have considered all options and we have no other practical alternative. In addition, we feel that we have effectively mitigated this impact by the minimization of grading and providing sufficient proposed plantings in the affected area of Zone 2. Stormwater Management: The post-development runoff rate is being reduced to below the pre-development runoff rate because of the installation of two underground detention systems. Underground Detention 'A' is located on the north end of the new 215-space parking lot near Bertie Drive. Underground Detention 'B' is located to the west of the proposed East Campus Gymnasium. Please refer to sheet C3.6 and the attached stormwater analysis. Sediment and Erosion Control: A sediment and erosion control plan is currently under review by Land Quality. The plan has been designed to meet all applicable state requirements and specifications. We trust that this submittal is sufficient for your review. Please contact me at 319-6716 with any questions or comments. Sincerely, Andrew Padiak, PE r Project Manager Transmittal to NCDENR 11-1-04.doc CLH design, p.a. MacGregor Park, 125 Edinburgh South, Suite 310 Canj, North Carolina 27511 Phone: (919) 319-6716 Fax: (919) 319-7516 November 15, 2004 TO: Mr. John Dorney 4401 Reedy Creek Road Raleigh, North Carolina 27607 FROM: Andrew Padiak - CLH Design, PA RE: ENLOE HIGH SCHOOL oa V@"'WOB 1 1' NUV 2 9 2004 CC: 1148 nFrlR - WATER QUALITY &H WETLANDS 94D sToRmWAT r< W &H Dear Mr. Dorney: Please find the attached three (3) 11 "x17" plan sets, photographs of buffer encroachment areas, photograph key map and the completed Pre-Construction Notification Application for the above referenced project. This campus is described as the West Campus and East Campus separated by a stream buffer. The proposed work at this high school consists of the following: West Campus Improvements: East Campus Improvements: The West Campus Addition - 149,303 sf East Campus Gymnasium - 21,531 sf Press Box and Ticket Booth - 848 sf Parkin Improvements Concession/Bathroom Building - 3,044 sf Equipment Building - 569 sf Parkin improvements This campus is in dire need of renovation and is very deficient in classroom space and parking. The site had 18 single mobile trailers being used for classroom space that were replaced with three modular classroom buildings in the student parking lot located south of the stadium. This was done this past spring to move the single mobiles out of the way for the purpose of the improvements described in the table above. Once the improvements listed above are complete, the modular buildings are to be removed from the student parking lot. The project includes the construction of two underground stormwater storage systems as described in the stormwater analysis (included with this submittal). The underground systems effectively reduce the one, two and 10 years post development runoff rate to below predevelopment conditions at the three analysis points where the runoff leaves the property. To orchestrate this plan, we need to encroach into Zone 2 of stream buffer in two locations: Encroachment 'A': The existing bathroom building that resides in Zone 2 is to be demolished. The new Concessions/Bathroom Building is located outside of the riparian buffer. We propose to re-connect the sidewalk system and chain link fence to the existing sidewalk and fence located in Zone 2. Transmittal to NCDENR I 1-1-04 NC Division of Water Quality November 15, 2004 Page 2 There will be a reduction in impervious area in Zone 2 as a result of this work. The area of buffer impact is 2,006 sf. The stormwater runoff collected by the roof leaders and the floor drains for the new concessions/bathroom building will be released into the stream buffer through a level spreader. Encroachment 'B': In order to construct the West Campus Addition, the contractor will need to have access around the south side of the proposed building as well as tying in the proposed grade to existing grade. The required handicap accessible route along the proposed building encroaches into Zone 2 will be a 3" mulch path. The proposed West Campus addition is designed as 3 stories tall to meet the required square footage of the WCPSS program. The addition is constrained on all sides. The addition has the minimum separation allowed by building code to the existing west campus building to the west. The baseball field, drastic elevation drop and the required fire vehicle access route on the north side of the addition restricted the addition in that direction. The existing soccer field and elevation drop restricted the addition from the east. The face of the proposed addition is a few feet outside of the 50-foot riparian buffer along the south. With careful consideration for the perimeter restrictions in this proposed addition envelope, we have no other choice but to request approval to encroach into the buffer during construction. In order to meet WCPSS program requirements and with consideration for the perimeter restrictions, we need to encroach into Zone 2 in order to construct the West Campus Addition. We have considered all options and we have no other practical alternative. In addition, we feel that we have effectively mitigated this impact by the minimization of grading and providing sufficient proposed plantings in the affected area of Zone 2. Stormwater Management: The post-development runoff rate is being reduced to below the pre-development runoff rate because of the installation of two underground detention systems. Underground Detention 'A' is located on the north end of the new 215-space parking lot near Bertie Drive. Underground Detention 'B' is located to the west of the proposed East Campus Gymnasium. Please refer to sheet C3.6 and the attached stormwater analysis. Sediment and Erosion Control: A sediment and erosion control plan is currently under review by Land Quality. The plan has been designed to meet all applicable state requirements and specifications. We trust that this submittal is sufficient for your review. Please contact me at 319-6716 with any questions or comments. Sincerely, Andrew Padiak, PE Project Manager Transmittal to NCDENR 11-1-04 k OFFICE USE ONLY: Date Received Request # State of North Carolina Department of Environment and Natural Resources Division of Water Quality Variance Request Form - for Minor Variances Protection and Maintenance of Riparian Areas Rules NOTE. This form may be photocopied for use as an original. Please identify which Riparian Area (Buffer) Protection Rule applies. Neuse River Basin: Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 02B .0233) ? Tar-Pamlico River Basin: Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 0213.0259) ? Catawba River Basin: Protection and Maintenance of Existing Riparian Buffers (15A NCAC 0213.0243) Part 1: General Information (Please include attachments if the room provided is insufficient.) 1. Applicant's mobFr i8u,4? i dual, etc. who owns the properly): Wake County, 2. Print Owner/Signing Official (person legally responsible for the property and its compliance) Name: Clint Jobe Title: 0_;-t1,4---ger Die clue-REAM Er7*7r vekvicEt Street address: 1551 Rock Quarry Road City, State, Zip: Raleigh North Carolina 27609 Telephone: et9=5 - 1919 - G6 * - SG c f Fax: 40 6 PQ41 9rS- .9rG- 8288 3. Contact person who can answer questions about the proposed project: Name: Andy Padiak Telephone: 919-319-6716 Fax: 919-319-7516 Email: apadiak@clhdesignpa.com 4. Project Name (Subdivision, facility, or establishment name - consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Enloe High School Version 2: November 2002 Project Location: Street address: 128 Clarendon Crescent Road City, State, Zip: Raleigh North Carolina 27610 County: Wake Latitude/longitude: 6. Directions to site from nearest major intersection (Also, attach an 8'/z x 11 copy of the USGS topographic map indicating the location of the site): Heading east on New Bern Avenue, turn left on Clarendon Crescent Road. High School will be on the right. 7. Stream to be impacted by the proposed activity: Stream name (for unnamed streams label as "UT to the nearest named stream): Crabtree Creek Stream classification [as identified within the Schedule of Classifications 15A NCAC 2B .0315 (Neuse) or.0316 (Tar-Pamlico)]: Neuse 8. Which of the following permits/approvals will be required or have been received already for this project? Required: Received: Date received: Permit Type: CAMA Major CAMA Minor 401 Certification/404 Permit On-site Wastewater Permit NPDES Permit (including stormwater) Non-discharge Permit Water Supply Watershed Variance Others (specify) Part 2: Proposed Activity (Please include attachments if the room provided is insufficient.) Description of proposed activity [Also, please attach a map of sufficient detail (such as a plat map or site plan) to accurately delineate the boundaries of the land to be utilized in carrying out the activity, the location and dimension of any disturbance in the riparian buffers associated with the activity, and the extent of riparian buffers on the land. Include the area of buffer impact in ft2.]: See attached letter for description of encroachment areas. Encroachment A: 2006 sf.; Encroachment B: 2065 sf. 2. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced or reconfigured to better minimize or eliminate disturbance to the riparian buffers: See attached letter. 3. Description of any best management practices to be used to control impacts associated with the proposed activity (i.e., control of runoff from impervious surfaces to provide diffuse flow, re-planting vegetation or enhancement of existing vegetation, etc.): See attached letter. 4. Please provide an explanation of the following: Variance Request Form, page 2 Version 2: November 2000 a (1) The practical difficulties or hardships that would result from the strict application of this Rule. See attached letter. (2) How these difficulties or hardships result from conditions that are unique to the property involved. See attached letter. (3) If economic hardship is the major consideration, then include a specific explanation of the economic hardships and the proportion of the hardship to the entire value of the project. n/a Part 3: Deed Restrictions By your signature in Part 5 of this application, you certify that all structural stormwater best management practices required by this variance shall be located in recorded stormwater easements, that the easements will run with the land, that the easements cannot be changed or deleted without concurrence from the State, and that the easements will be recorded prior to the sale of any lot. Part 4: Agent Authorization If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual or firm): CLH Design, Pa Andrew Padiak Mailing address: 125 Edinburgh South, Suite 310_ City, State, Zip: Cary North Carolina 27511 Telephone: 919-319-6716 Fax: 919-319-7516 Email: apadiak@clhdesignpa.com Part 5: Applicant's Certification I, 13(i-1p7u,v So SE Fv4. WAs CoaNi?i 4,96 o Fhk jp t nit or type name of person listed in Part I, Item 2), certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans and that the deed restrictions in accordance with Part 5 of this form will be recorded with all required permit conditions. I. J AL-C, ?3 n 9,9 E 19 Q 0,4- P" 9W Signature: Date: Title: Variance Request Form, page 3 Version 2: November 2000 Y - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- / -/ /- ? x \ ? - - - - - - - - - - - - - -- CONSTRUCTION CCCUMENTS CLH DESIGN, P.A. INSET E SEE 1. gY9.Lb \ SHEET C3.5 A uI jY,?. I x II I IIII t6 _.. C) \ 260 -J \ M II I \ . ?/ I 1 ? - /?- 263.00 \\ I ° 2.65 RIM ?? \ \ II ? ?? \ ENLOE I ti i \ \ HIGH SCHOOL Q? I 263.00 263.00 A\ CAMPUS RENOVATIONS L 126 CIARENDON CRESCENT Yxea,YCxrxw+wxam•o sv.?a / 262.65 N \ II x I 4 ^R $? GONGE55ION5 1 D 1` I I TOILET 263 BUILDINO II I ? I ? 2 .00 ? 263.00 D?I??p 1 III II ?? 263.00 N 262.60 EXISTING NUV 2 9 2004 x RIM PARKING II ? ? I p.Nn • YlAT ER QUALITY I I // ` 60 WETLA;dOSAPIDSTOWXNATEREMNCH RIM \ 5T5G 2.40 63.G0 2EOP5 ` .._. ENCROACHMENT 'A' ORAPiQC SCIIE.?wrsn :au as SITE GRADING PLAN Y?.Yo C3.5 ENCROACHMENT 'A' x I x I \ II I \ r x I II II x I l x I I X - - - - - X 'X \88-----BB-----BB? _ / ? tINYMN?rIr[YIMw[fpus 15 TB - - AB / TREE FENCE INSTALLED ' UNDER MOBILE PROJECT '""""'""°"""""" V ?. - CLH DESIGN, P.A. Y.. - wi m ma 210 / / ' C c . c.wo. znu rmw: ((r1r air-ane r ulr a o-mTa .: ( T Fk?ST/Nc' P I-or -DB-4 A OX ENLOE HIGH SCHOOL CAMPUS RENOVATIONS la CANENDON CRESCENT REICH, NORTH WOUNAMIO Sp-76a 00®R M Nw a[ ®o MOOi•VIq[ 101 CRAPffiC SCALE Icc?4?".m?n."'?'iLLY [I ¢0•p1l[ • •? ([rQT SITE LANDSCAPING 1 PLAN ? ?? C6.4 l I \? ? r- -? 1 I( II A1/ PUS AMMON •15731' I y I y /I I 0 I I N I - J NEW/ADDITIO WE$T GAMPU Ff?E=251.33% 351.33 ? r 256.83 ? U / I / 1 2 3 / / ENCROACHMENT ' B' iT11rNU0Miwf v mauswmmw`.aq¦os E j? CONSTRUCTION DOCUMENTS R CLH DESIGN, P.A. x.<cnR ew 191 WiuDUryE 9ouW aal. uo nom, x«u n..w. zml Pemr ((GrY 9Ye0e nc (wa Jau-r,Ne ug IN Y4 *N GRAPHIC SCALE L¦?L ENLOE HIGH SCHOOL CAMPUS RENOVATIONS imaAneuoa caa R E:a, Na WIaIMMIC sr-36a m[G[ nµw [? JG 11N G[ m11[1 SITE GRADING PLAN C3.5 2' t- L H STRIP 'ttPl 5QD ?- OG-3 500 LIM NATURALIZED SEEDING HD-4 VL- ?'-/?Kyyp,Y GpNGR?? WP SpD J' 1 GM 3 ?, aiarm•rar v VL-•10 msW"°"i?am 'awr..+o=a• VL-19 • IH-8 1 CONSTRUCTON CXUMENTS r, G/f CLH DESIGN, P.A. izs ta?e?ne s.?w NEW ADDITION C?. No C„ .M„ HEST GAMPUS Ilk EEE=257.33' 66-I0 ;'//lift Y ? 41/ NATURALIZED yfzmkl SEEDING GO GR? n , Y JG 3 MUL j I ENLOE 'I7 k HIGH SCHOOL y ' Illfff RIPARIAN REVE6ETATION CAMPUS RENOVATIONS E? NoR?Na s:a SEE SHEET G1.3 MU?GH sp r k WALK wl HGSTEELE DGINGLGH \ I BB -Ila sae ENCROACHMENT V IFS ? N FW ?R?IQ 0. GHdPIEC SCd18 n[ .a SITE LANDSCAPING t•mI PLAN ?w•• a ? ?? C6.4 1 A9AEY Rf RTnE ,N T SQNT BEIM AC dO B LEY M VICLNTN NL4P (NOT TO SCALE) k? rASYmfwly. n oa•? / ZEE E.T TABL LINE E- u? Lcwnl xARiw xv L xv tl@ p gg yy? I y.€ I I? •gB?BI ?$SABI F'??€I 5????I ??`d 44 ?}F e???t RFF F? I I ".?Rg b9R R R B $ 8 ( OLxs a TX=WFT? I ? - - - - - - ------- om•c loocwt Een naAa Ea E AItAK OEL EDG RfE mrxal®roleo EEW DOK c sRaRAaEEf)f '? ? RQAeOUM ?eARRnd ssu?imca?i ? / gy,111, 'L _ ""BT ... T, emAM¢ I I l r I W IEAm C ?ALOM f? ?+ 1 ¢o CURVE TABLE Cw,E LEwnl RAE- ILIA A- cNn In ncal ?• ?. ? ,? p 1581 >S.a >'uSMav.i2 ?9I ,)MID N AraA' An?xL fb LN 6'LM M'ATP L.'Rb'.IY l'1I! ??TMY ?I4 1 l / ?.IIJIN Ma1d M0aaY ? I Alf,hr it'1 X?tl 3114 d Ai?A 2 t 'AQEMWGIOT a? ,? b\ / Y o 4:: Hri cYM --C 0" ki ,GI I I II GYM .A Jr 00 AIOH' 8LDC EttA ? 'AREA C? 1:1 ? 1° / IRA!' Q I ? ?Q?\ wlw.. ivs%rAnac.Ec •\ en ie naiaA f? j? ? -P ?a?rezo E//)yI C? / I Mild ? r I ? a.?Rrom I t h ? ro?i rol,o xala. robeaY dbeeeY *> ?1? ATwaalare ..A rnAa>? I / ? Iwa+d rvae•r ••••,••P• ? / Mr cT ro,.ear w.n.. ?.o,.we Ma, draµ.eaar \ \ / Rn? sI M"Ie.nw RnURE\\ 1? add r SOFnmL \ 1 \ Wi"n";' ?Y.I?.ARR ?-MWE IV SITE DATA nAOrzT. *•? eaa ?.f?Rr u wee w?u ?rcnwa¢wwmi 'wea cdrACr? a? ? •,;? ?. iAmA.e rfn ma?aacT rcoAm m?? aceTiero ?I rA.»aov], ? M j TucTALM? ?? ??, f]R R,RAY ALA pane R,eMUe? TLfRl1S M1W LAlIVB ?.e! D1 A4 tJOAlf,.a(rtll lLA A.f AcglClvl,RxKb ATSA ]eyn!! fl A4 ?RRAJm „OMN)IIP.M elOAr..T Du A4 f RwMnie n¢A, .w f Q6Tro MaYI/Ie.6TRN. bID? 00IW GRi W/N VfIL O]Ie RS WiRe1.2Ri (lAVM1M [4L bJM RY DEIRe VEIL TIGleB NAObI [IlDM lade wwn Amrcw Iw- (9 rr-r rrt n»m?eml wo raRmma ws aw Raaem [OmbMUlifR14M fd+a N•r RR [OlIMEIDRq ,11 er Nv rw vm eAm wRl nrveue as ea mr ETAO?ID TRM. R[iA? Ma R.aeYm xs rAl. aAOa NLllb10llPafAE !.!? MaIPI RTAlIr t w mnAroovw i i wc.wroea?llI I?is?Rl?i AA>E,1i 0•!AT b W 1 PARKING DATA TABLE o.MaT. ReLYI..n 1gIVA[PrbldWT(IM.AV C?'lVrrlIR1CR. iewnmd m?i?Y.?e saw?a b f ?'^*?°,'eAAg1T„?,e °f?? MT W.e AObCCro11eY.1Yl1 (g6TMGtt.M P AMLf1G IR.Oeli1 '?m?bd MoAw.l M ITT LVRG IM.'M ILL Mf Rl1WA? ??1?V a !>mnre.N.ln WtA A<[O.ILtpA W ??? !] NDIM IIAtN 1O bwM n MT IIFM ?? 4v?beA LwoV.e M ???R?M? (/Iae? !m 1.?°_NUq A? ? TTK ARIXNnR AIL Yo?.u.l-Wr..em n ITi.°°i ?? aA ieafeflrwsis bbYY?y?ynr?? RUOfm PI. Ala ?bbl.`wbTE n Ii. RNVQ Gs?ly MLbM?e?u MTX I :r b?a?fMZT. ?MroY bW,o.? tc enNAt Aro. MM TILT *a+?mL s aia,sa er ACxeAY:Art W oA.s ?I e erw.n ?r?r?w Rm xAnl,.m>we ea.m ??? a•sAa rolRmsaAUaee s.Ire mm r IRm:. w sAm Ma.ea m aw'v? W CTes -0 PMC® /M]! YI[G I Ie11® rorAl.rne>M wwr:, ,?o .'nx CNP10 Dl A4ZEA 4 .es0 .-A I /N/YLl 1 ? ? ,/3 ps ?A Y'J,?A yo1 p ?/7? ? _u?d f WfIM! wer?IIf n'weaYaMUV.i M ? I 4 / ? V°?Ym/?LI•A o ? eni nriw ew"'°A°me`O°me , / c A (6) wnrr.> ' e u?vcoo.dsen ?ro''0 . TENNIS COURTS / xalty TNeAY / MaldbaeaY M'.MdlaseflY _. AV,[I•?O?VI ? ?? WMfeub?M47 ```WM?A JMMIA.. MIDI -y 1 mM AIO?R mbfrOM?TI M ? VI'AtVR ?alaenMOw ld.rVeYO M? ? A]e0..? ?•?? 1 M AmroV I e??msm Mal [T N'.el6Y I 1 tyl 'Mil gin..,. munounUUL CAMPUS RENOVATIONS 128 CLARENDON CRESCENT RALEIGH. NORTH CAROLINA V510 SP" D NOV 2 9 0,04 DENR-WATERC ALITY 1•)ETWOSAtti0STOZ?fr'i TER ER ICH !we•..mrol.rAxY mar KEY NOTES cx?eEnc scue MM!!b.] I oA CPY Rf?wm1A•DMA ?nlGiY.M TtNll' bal)NAIfAWLR O caescw ra ersen? +e bLlMl..1n. eAT3 ro [. rM>.sm V A11d1 Oc IaemrmlRreErl w 00 wmACnatm.Mrlu tn.?Time tA1GY1 me a vA.Arz ramw-inx Rae MAaI MMwr. E folm/tm.>WL eeR f.R l.icrl Lrlalr..«m.cccw.v, Me wee ®MMl1A4 A.H6 rz )EROT) t Mr.ma t'n 3FMI V rl ,r t" ?J}',. r fi=tea }:. r Ilk f ~ r,? { ?'??. ? .k J ? `#? 1?': 2?C ? ` r^ t ?; fir y ? 'S=,?t ?? • ? ?q {?r? '?.»i y V il.. i ? ?,)ak? `i ? , J?;?t a ?????jr?? r #}1r? ?? • .,.? aJ a? ? •1f ; 'i' , ? tz'4 J 't ???? 7 +?? r ?r,Ir r .k r "? ?.?'? ...c 1 ,i? r t?_:{j?x r+'+• .; ?' I } s !t? /'k1'..? ? 'tt ? 1 ? . »b'? i ? ?? 'f• ? 'SQL ?? Y 1"1 ?t}t,^r 5r I ? "b .. ! i{?vr J1R M 1? J D4 M, :? 12??i. r:. ?r,r,,?,y '. •.`'?,,- ???,yJ?rr:bn .^ r k ?? ? ?' k ?? .al' 9 r e A t r ^ ?'?.. C',??? "'`? ??"?X ? r ,j '? ?Y., ? ,y??? v4? k? ,?'w. f y '-a p ? ! 1? 1. J'#?' ? ?r ,4G•? r"? ? ?-r p'- 1 '?! ^ r f ? fir V ?v s a.,? «,.+_. ?t.K' k." ? ? • „tidy, ? ..+??*? 't ? ? ?? 1r ?-? ? h,t.?.? r! .:" ... rr 'r ?v'-'y,.•?'°"'. "'^^. r!•-,+??r?`?r,."r?a1 ? ?L' ?yL ,,.j y I ? ???,. 4?,fUr'r. r"'Yz _. ??t^t ,,."G--Y.e?"••'4:+- a $'? +? ?? ,?,,,.?i k}y. a,? L ?? .?:wj a. ?'' ,1.r '--;'! r .: {, ti..e?? f? r rr rr..,e ?yr? .? ,,?.. '?'^ ^??""` ?•Rv e-!--t„+s. r"' r` ,e,,,t "? i ...ql .r'S<? t ?y s/1 ?'^. r a r s k>? t ? ? T`" ? 7?, +A•, p,•'+-1 ? Di ?'6 '?Y,??? '•` ?:. L'' "•`a?? C,,"'?•4Y 4 ? 4 ?-??Mf„ ? F? t.s.2 •}} ?/y??V ? ?:? f .. F ,? ,`? ira?` ? ? "?M,.?? '.x, ,1??ddd ? ? 6 ?? . .`-`' Y.??;,,.4'? :.?1.j?/y? ,F. ?r?`'p?:V ? ?? ? ?' ?. :ra?? rj... . ( t .1? ?? 'rr??"?.._ ??YL.-:fi? ?J `b ?i*s_'4 ? ? ? ? „' '? q, . e;.. r, 3"'r -? ,.f ??r ,?r'??r ti r "^"? `,? P ? r ? ?`?1 {i ? !e+-? ti ?,v'1'? .. ? ?r. ??%".. ? ?b ? ,.. a y=' ? ? ?`} ?v ::. 1.-'r,,,: f ?r._•> tli?..?(?., r'c.+.r,?np .5.? +..?? ? (? .? ,t f ?? r ?, c; i ? . Cry ? ' _ " ? ?y.? -, '' '+? ? b^ ,._? , rix ?? ? ?` v _.. L. k - t? ? "'?>_Z t? r1 -? ? _'v k ? i ? ?, ..r r. k \t? r6t?+1?"? r,V n r«? :`l'? ?,,, fitJ?, y r ??`F'? ....!-•+y ?? ?{v IL . ks l.? ,?,1•'w..-w' ?. ,..'4 M �� � .. �t � h���i r 4�i+^r . Llrf,� �. '�g,Y,i y i(*•„MMe, !�t Y.a� ;ti'• .. �� naf. i i.. . ,�� y>`� bs�" ! ; d 'i,.• v 'w ��!.: r'4 I.�� 7; :G� 1 * # �f �'na~`.i�♦�±•� aA ♦ w � '0.116My� !.•.�. pp+d1..1� .ilk`.» � p � j, 'pi K1 C •11., ~( 1 .� " !4 J ;'fit j i_; '. ••a � *^+�, J�"ii-Y �,. "' R'.. �, j t �+ R''• S � ~ :% i yi ,,*�'w ab `��� r��' ,'�`[� 4 Sa�.'�,a"w'I ir'� /* MM•i rr'" f �...'Sr���"�r yCp�i: ♦y �;+i,. " �.�!��'"a�a �au � �'`., �� A"i ,i �% t`M \��,x•• A'♦ ,�1 '•„*. {�r#'..� '..ai �' 1 1r- ���'� jjrM"`.. `I'i a ! 4�a. .. �` r ���0 N�, !•h,V `k! y tM�,dk,�}F ,i' rr"r •M "�. y. ,.� �a}, ,�;. :.: �► ! sqa..^�f+�, , i,; .}'.,.is�:r , ,�, 1 ;'�,r�.i � ,., ,u1 .as�Myr r' ,C�.� ",v " �p�`*+/�V%�y �',��^: Yl {,,...� ti" �� Y !.- a}j• � , S ,.4(! a/�+� it � ', t �+�;�.�"w ",;• , �a i„'T.7�„„ H�A .. ,,M1„� r �!"�yl� ,Ir 3 ..� .,;,� t 11,liM y�yti t:� � . w re +i+'• .. ;:e� .. �3i , � '� I � T'.N+� �"" ��++�so- ` u '8 a` '* t ° A! �� �' 11 '1"� ry;3't � +"'!' � � S,� '.� >, ' r.�; r • �' i �y� „s, � "� �o- �,.w 'ty :F HR t a �, 't5'1t "�L.. r ., �i.�. `• '�4'.sCr� '.11 i^” •'"A '.�" ,:,.i'M, �'.}tr"''.,.�.t�w a:.,'+•r �' ,. •.y„�, ."y NY,, i�.n. ,r "'. ,.,*'„y '. Nr �l Y f^ a� ,�� ...1 ���!'., ". �. ♦ �...'ti^�•1 i+,t 5 �,9hi' twM� y'I.p�n 4 'a"'' Y �''-1'.W. f," ,•-"i,� ,"� •JdS„�` �2"^�".� +l��µ s '� �� •'"i"'., rt. `sqµ, 'v ,•. ,jy,�, y 0"�?4� ^„�..� ._,i:; �,” �'� .. r :`a,�x i..♦a ".'"�' ,�:�� y F, �.;,, rr -y '�"�4 ,�Nuk��u V("�G 11u�"r ,�,. '.'�i, r � r t F 1 y # k �x.� � Y. � .Y 9 w,N.�.��" � • . , '. .. � _ � ..�' �j � :�t'! �•�?f^� �i�.”' °.,. y "r'f"t h ., r t f` L qN Ma • tG � � t :� I ���e y i ti ;.� � `- u ""�„fi"' �.�+'.•�m,�am��, per' '�'�"�j,,t .h''"„ car"•' "»� `_, _ _V r , ' ! 5+.� µ ' t^.,,� „ V + • �� Zz 14” �. �"uNti . o ,.... _ dfGn.. „+u 4♦p' •"+. n..:! .{ r •" f 1. > �i �'.! ""'� y � , •C �Zsi�" +Fr ��` �_. d � e..t`�.�r A: S:j; a,:w�� .. ,�,,��.ii.'wi !•"q �t .� ,� l.� �"r«.,.� � ��� ��, ti� ir�I 1 �� ! d ♦ ��.?ti t .�. M.. i ;t � `TG�t, .e,�„p, t � 4 • �i 1 �� +1� Sr. �� �,y♦t ,M'. .� �� lam•°. � '�" a' t '+` .�^",X•+'. M. 1' ,w� �. � �q� �J"Ir �. � 6� � '� �1 {t � `'i '.yi '!'4�` ♦ �!•t } g{� > ►kll° .4 �� x.^` t {./c r� �# r,�nf' ," � ��� ''�'Y::.'a i t "'fit ''�"' x r �'I"� . ,, �"`,� �.,,,C� •��„�"'t�' ► �j �. � 4' � � � �1 ' �� 1 .,�^•-' „� :, . � l�l! �l•ttL��iit x �„�fi:.� ,�.M. � J }• �aA, r.� { S„ ` �' A t } iy t +► • i t � 4 "±� � r . a �•� � 3 . y 7 A . •,�.i n �,.. rte, `+q.•, i. t{tx x`' 'dal ,!J� r ,'.�.�(I '�4'4v •�,v ro, � .,R/•,r, �': t`i. , .. j f , � �,�{�� �/ �� +t p�;�rvd'� �,�.. /' ;G �� tom' _ ,,1 • , � ` t 4, , �► } � ;��d o I�r.�,y,��,,,, { e Idjr.'” t��•• .11s �.%.~+� � ? ����,: #fit ' �� It' ��"'r � �ti,�`#`,� :.r •! .... f 1 -- ``..:.,>, � sti•1! rr:! �__ � �'"�"�fr _ }I�'.���°P°u�SSS°S.�I�'� r/i► �J� ,,e�",a�"'F,'�'.^� w."� � .t, _ ., _ .re�.�.. r,. i t .f " w- r a k w n 401, w " A r*J ??NJ ? ? '? ddM ,? ? ? 1. i? ?• "iv,?!.?? ?h :: ? VIM ? ? ?? A''' » .rlR,io' ^'.? «.,yR,h .M,?"y7a"ed, »?'?' 'h1YlyAl ? "'i. ' • ? ..rr." ? ?., .. . w Fwd ? °d??'^ 1,,, ... ?, . !' i. M?. , , .-? ? a+- ?"*`'. ? ., ' #?'??,,,,. 1 ??.?' ` , ,r a ,a '.y: w:' a . r \,;'.• ''+ . w "'y. „., !;. .? + "C`, - yG+. ^"` : ,. ?' ,?R? 76, y VIP, Ilk, • ? '.Y`, "w.. .? n" ? ?"n ?'fid k;lewi'R x ^?d'w4 `i .9M . 1 ra ?.. ?? An d/ ". 4 » * •,. y N. a.?.a f c.` m `1L, ^' as + gyp,. " ,"g1°-a<i wv w, wi d » f', • r.; 7r .u. ,k.. -rvn '? W,M.'1' liow Yw ?wa?r '"? ,Yr ,n?y+? » ? *.Yw T`?`? t"d'? • V••?'??` r `g d M » _'? ? ? ?S "1? ?.' .? ~??", ? + .,, ?" ? * Syr, ? * ? tr+. R v, tt . MrY" ?' ,r. tuw w? "??A ?,,..,y. rr r? n • i R e, r ? µ. T aG ,, < ?..«,r ;?'? ? CAF ' $' .. ¦ M?`!7$:e.^ n Y r w w i ?.. r ? .raw. » f W ? ,,,, „?„ °'???'IR ' : w. hf. 41,W" at ?, ti. ;Mt•,t y.fir ?? a ?..• ?•? 1't sf :. T, -'}" ""a.? ? M` .?, w- w. .u[ 7' " ..T?" r?rriwrNiN .a ,r-? 7 4,t ? I M Ii NN ,.r wi s'? a .. "' - '+ w ..+N , t ? ?. ? Mer "•s.? •? a i? ?y .q t ! 67, ? 't.r e?"'.C.. ? r_. •? n; w ?`?i ? yr.r ?" to +"r M . " \ ??•??, ? ?4 ?+•Y?'?`..?" ` Kid ? \?ti ? .t f ^v^w` ;. 4M`"???. ' ??.,, !'" ?,'!? o. _., '?; \ -mow, .?s "+?n. ":11!9W ?.* rnrrrir?rrMi WINt 4. Ar- w *40 look M ? s wy?•'\r a ? ?. ',.... +? . C., :`"ti ,?,;Y ,..4, i, ?,?'i,?., .r #'' a .7 ^' • t '' ?L p .. ?a ? ,. `« •,F„?,? f w' rya,,.?,?p?, ?4. 1??", !r+?w , ? ,. , ,:.v y:.. • ,.? ? ?+ " -- .,{,?. ?. .' ? ' ? w ,::h,.. ' ?'? '' • ? ? te -.,,;A„ +1! ? ?,,? ""?'' ""?'"VW 5.+;*?+: ,. ,,?, „ .... ? , ? ,? ? Iw Y ??pp? ,.. rr m F v r? 'a'ft a. .Gi\-' ir:'?• •v. ?i.+I '? •J?` ? `. •,Rta _,.:!^ '..«"+ ? r*.?, r . ~ ?? ^•M .,. : •. , 1! ''? ,' • . - ? .r?,w. ?t,?? ems" • ` ? } ? ? _ -'II"•1a y ... ?. ?^ "if I?1?Y ham'+? ?b YM ?. ?`.'4? ?,?? ,+y; y • 14 or* ?. F t . ,,,??? ,?'.? ? ? '?+i?y . ? ;w.' .- ? t ? ???4 . , Y`j ? ? .r ??., r ooyy'•','??,?w\a??, ,?yl ?, a...N-• ?1 -411 A w ,r r ?•. ? "? .,"v*,?' IIN/ IPA, rrP'?.? ; Y 1l -N* .,'iP 7'k' r\"?y, ,!n •, t° y _ vi S 4„?'"'``,? ,ti ", „?",.? 1.,.•y'•?wwr,: ? 4?!'.3?"\?w?\?•?..??^?,?n??T`„1 "*So?"! ?._?'i,. ?F#r 4 ?.'^l'G'r^"?'n'y. ? w r p wR y ? 4 44;v , p 66+6 4 j Js . T ,a +. 1 .. ,. t.. .. a...`r ri?? R A`c%,.r?I•`,. M+r,,+F,+»?r,?.. !,.' . J:ii ? ? DESIGN CALCULATIONS CIVIL/SITE WORK ENLOE HIGH SCHOOL RALEIGH, NORTH CAROLINA NOVEMBER 2004 '?I\- 1. CLH design, p.a. MacGregor Park, 125 Edinburgh South, Suite 310 Cary, North Carolina 27511 Phone.' (919) 319-6716 Fax.' (919) 319-7516 irt?l' ?; ;13 t_zi:4*b 1---??1r1:f?7-i! .? DATE 10/7/2004 PROJECT NAME PROJECT NO d /( CJ Enloe High School 1148 u LOCATION BY Raleigh, North Carolina ARP Trap Number: A Site Conditions Initial Final Disturbed Area: 2.70 2.70 ac Additional Drainage Area: 0.00 0.00 ac Total Drainage Area: 2.70 2.70 ac Runoff Coeff [Cc]: 0.66 0.83 50-yr Rainfall Intensity [I]: 9.00 9.00 in/hr 50-yr Discharge [025]: 16.04 20.17 cfs 2-yr Rainfall Intensity [I]: 5.74 5.74 in/hr 2-yr Discharge [Q2]: 10.23 12.86 cfs Max Required Sed. Storage Vol: Dist. Ac. x 1800 = 4860 4860 4860 cf Required Surface Area: Basin Volume: 0.01 ac/cfs = 4456 5603 5603 sf Bottom Elevation of Basin: Elevation Interval of Basin: 239 ft 1.00 ft Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 239.0 3151 0 0 0 240.0 4176 1.0 3664 3664 241.0 5299 2.0 4738 8401 242.0 6475 3.0 5887 14288 Top of Req. Sediment Pool (per Surface Area): 241.26 ft Top of Req. Sediment Pool (per Volume): 240.25 ft Principle Spillway Design: Weir Elevation: 242.00 ft Weir Width: 6.72 ft Use Weir Width: 7 50-yr Water Surface Elevation: 243.00 ft Weir Capacity: 21.00 cfs Freeboard: 1.00 ft Embankment Elevation: 244.00 ft 1148-SED-TRAPI.XLS LATEST PRINTING: 11/3/200410:12 AM Page 1 of 3 DATE 1017/2004 PROJECT NAME PROJECT NO /j o? Enloe High School 1148 11 LOCATION BY ° Raleigh, North Carolina ARP Trap Number: B Site Conditions Initial Final Disturbed Area: 1.45 1.45 ac Additional Drainage Area: 0.00 0.00 ac Total Drainage Area: 1.45 1.45 ac Runoff Coeff [Cc]: 0.63 0.77 50-yr Rainfall Intensity [I]: 9.00 9.00 in/hr 50-yr Discharge [Q25]: 8.22 10.05 cfs 2-yr Rainfall Intensity [I]: 5.74 5.74 in/hr 2-yr Discharge [Q2]: 5.24 6.41 cfs Max Required Sed. Storage Vol: Dist. Ac. x 1800 = 2610 2610 2610 cf Required Surface Area: 0.01 ac/cfs = 2284 2792 2792 sf ',Basin Volume: Bottom Elevation of Basin: 256 It Elevation Interval of Basin: 1.00 It Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 256.0 1884 0 0 0 257.0 2487 1.0 2186 2186 258.0 3142 2.0 2815 5000 Top of Req. Sediment Pool (per Surface Area): 257.47 ft Top of Req. Sediment Pool (per Volume): 257.15 ft Principle Spillway Design: Weir Elevation: 258.00 ft Weir Width: 3.35 ft Use Weir Width: 4 50-yr Water Surface Elevation: 259.00 ft Weir Capacity: 12.00 cfs Freeboard: 1.00 ft Embankment Elevation: 260.00 ft 1148-SED-TRAPI.XLS LATEST PRINTING: 11/3/200410:12 AM Page 2 of 3 DATE € ?-? 0 . 10/7/2004 PROJECT NAME PROJECT NO /J Enloe High School 1148 LOCATION BY Raleigh, North Carolina ARP Trap Number: C Site Conditions Initial Final Disturbed Area: 2.26 1.58 ac Additional Drainage Area: 0.00 0.00 ac Total Drainage Area: 2.26 1.58 ac Runoff Coeff [Cc]: 0.41 0.87 50-yr Rainfall Intensity [I]: 9.00 9.00 in/hr 50-yr Discharge [Q25]: 8.34 12.37 cfs 2-yr Rainfall Intensity [I]: 5.74 5.74 in/hr 2-yr Discharge [02]: 5.32 7.89 cfs Max Required Sed. Storage Vol: Dist. Ac. x 1800 = 4068 2844 4068 cf Required Surface Area: Basin Volume: 0.01 ac/cfs = 2317 3437 3437 sf I Bottom Elevation of Basin: 244 ft Elevation Interval of Basin: 1.00 ft Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 244.0 2882 0 0 0 245.0 3423 1.0 3153 3153 246.0 3951 2.0 3687 6840 247.0 4449 3.0 4200 11040 Top of Req. Sediment Pool (per Surface Area): 245.03 ft Top of Req. Sediment Pool (per Volume): 245.25 ft Principle Spillway Design: Weir Elevation: Weir Width: Use Weir Width: 50-yr Water Surface Elevation: Weir Capacity: Freeboard: Embankment Elevation: 246.00 ft 4.12 ft 5 247.00 ft 15.00 cfs 1.00 ft 248.00 ft 1148-SED-TRAPI.XLS LATEST PRINTING: 11/3/200410:12 AM Page 3 of 3 Riprap Velocity Dissipator Pad #1 Enloe High School Raleigh, NC Project No: 1148 Outlet of 6" floor drain and roof leader collection for Concessions Building Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 6 in. D-o = 0.5 ft. Q-10 = 1.0 cfs V= 2.9 fps d-50 = 0.40 ft. Figure 8.06 a L-a = 5 ft. Figure 8.06 a Step 3. 3*D-o = 1.5 ft. Use: 3 ft W = 5.5 ft. Use: 6 ft Step 4. d-max 0.6 ft. Stone Diameter (1.5*d-50) d-max 7.2 in. Class B Rip-Rap Step 5. Thickness = 0.9 ft. Apron Thickness With Filter Fabric (1.5*d-max) Thickness = 11 in. Use: 12 in TERMINOLOGY: Q10= 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) BACKGROUND: REFERENCE: Piprap Velocity Dissipator Pad #2 Enloe High School Raleigh, NC Project No: 1148 Outlet of 30" Outlet Barrel from Underground Storage System'A' at A8 Design Storm: 10-year Use the E&S Control Planning & Design Manual, Section 8.06. (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 30 in. D-o = 2.5 ft. Q-10 = 26.2 cfs V= 8.3 fps d-50 = 0.50 ft. Figure 8.06 a L-a = 18 ft. Figure 8.06 a Step 3. 3*D-o = 7.5 ft. Use: 8 ft W = 20.5 ft. Use: 21 ft Step 4. d-max 0.75 ft. Stone Diameter (1.5*d-50) d-max 9 in. Class I Rip-Rap Step 5. Thickness = 1.1 ft. Apron Thickness With Filter Fabric (1.5*d-max) Thickness = 14 in. Use: 15 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Riprap Velocity Dissipator Pad #3 Enloe High School Raleigh, NC Project No: 1148 Outlet of 12" Storm at F5 - South Side of West Campus Addition Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 12 in. D-o = 1 ft. Q-10= 2.4 cfs V= 4.5 fps d-50 = 0.35 ft. Figure 8.06 a L-a = 8 ft. Figure 8.06 a Step 3. 3*D-o = 3 ft. Use: 3 ft W = 9 ft. Use: 10 ft Step 4. d-max 0.525 ft. Stone Diameter (1.5*d-50) d-max 6.3 in. Class B Rip-Rap Step 5. Thickness = 0.8 ft. Apron Thickness With Filter Fabric (1.5*d-max) Thickness = 9 in. Use: 10 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Riprap Velocity Dissipator Pad #4 Enloe High School Raleigh, NC Project No: 1148 Ou tlet of 15" Storm at E12 - Southeast Corner of West Campus Addition Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR. 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 8.4 cfs V= 5.3 fps d-50 = 0.40 ft. Figure 8.06 a L-a = 12 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. Use: 4 ft W = 13.25 ft. Use: 14 ft Step 4. d-max 0.6 ft. Stone Diameter (1.5*d-50) d-max 7.2 in. Class B Rip-Rap Step 5. Thickness = 0.9 ft. Apron Thickness With Filter Fabric (1.5*d-max) Thickness = 11 in. Use: 12 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) Riprap Velocity Dissipator Pad #5 Enloe High School Raleigh, NC Project No: 1148 Outlet of 30" Storm at H4 - Underground Storage System B Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 30 in. D-o = 2.5 ft. Q-10 = 14.7 cfs V= 8.3 fps d-50 = 0.50 ft. L-a = 15 ft. i Step 3. 3*D-o = 7.5 ft. W = 17.5 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. Figure 8.06 a Figure 8.06 a Use: 8 ft Use: 18 ft Stone Diameter (1.5*d-50) Class I Rip-Rap Apron Thickness With Filter Fabric (1.5*d-max) Use: 14 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) b, STORMWATER IMPACT ANALYSIS ENLOE HIGH SCHOOL ADDITIONS AND RENOVATIONS WAKE COUNTY PUBLIC SCHOOLS RALEIGH, NORTH CAROLINA Nov 10?9@9%4 2 9 2004 DENR - WATER QUAIM faMs W 13 STflr ` SR AUGUST 2004 ??,?rF1+ra '?.t'• y Aaa?\ lr CLH design, p.a. MacGregor Park, 125 Edinburgh South, Suite 310 Cary, North Carolina 27,511 Phone: (919) 319-6716 Fax: (919) 319-7516 Hyd'rograph Summary Report Page 1 Hyd? No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 ISCS Runoff 26.86 1 724 82,536 ---- ------ ------ AREA A PRE-DEV 2 SCS Runoff 23.92 1 720 57,665 ---- ------ ------ AREA B PRE-DEV 3 SCS Runoff 36.33 1 716 63,635 ---- ------ ------ AREA C PRE-DEV 4 Combine 68.62 1 717 203,836 1, 2, 3 ------ ------ PRE-DEVELOPMENT FLOW 6 SCS Runoff 31.36 1 724 93,919 ---- ------ ------ AREA A POST-DEV 7 SCS Runoff 29.74 1 720 69,231 ---- ------ ------ AREA B POST-DEV 8 SCS Runoff 36.33 1 716 63,635 ---- ------ ------ AREA C POST-DEV 9 Combine 77.94 1 717 226,785 6, 7, 8 ------ ------ POST DEVELOPMENT FLOW WITH 11 SCS Runoff 19.32 1 718 45,105 ---- ------ ------ AREA A TO DETENTION 12 Reservoir 12.97 1 722 45,067 11 245.82 8,166 ROUTE TO DETENTION A 13 Reach 8.87 1 731 44,936 12 ------ ------ REACH TO ANALYSIS POINT A 14 SCS Runoff 17.50 1 724 56,964 ---- ------ ------ AREA A TO BYPASS DETENTION 15 Combine 25.34_ 1 726 101,900 13,14 ------ ------ COMBINED FLOW AT POINT A 17 ' SCS Runoff 8.68 1 718 17,422 ---- ------ ------ AREA B TO DETENTION 18 Reservoir 3.68 1 724 17,372 17 254.17 4,386 ROUTE TO DETENTION B 19' Reach 2.79 1 735 17,302 18 ------ ------ REACH TO ANALYSIS POINT B 20 SCS Runoff 21.33 1 720 48,936 ---- ------ ------ AREA B TO BYPASS DETENTION 21 SCS Runoff 2.19 1 718 5,436 ---- ------ ------ AREA B ACROSS CC DRIVE 22 Combine I 24.62 1 720 71,674 19, 20, 21 ------ ------ COMBINED FLOW AT POINT B 24 Combine 67.97 1 717 237,210 8, 15, 22, ------ ------ POST-DEVELOPMENT FLOW WITH Proj. file: 1148-Revised Stormwat r.&Wrn Period: 1 yr Run date: 11-05-2004 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 41.10 1 724 121,274 ---- ------ ------ AREA A PRE-DEV 2 SCS Runoff 37.34 1 720 86,438 ---- ------ ------ AREA B PRE-DEV 3 SCS Runoff 48.60 1 716 86,090 ---- ------ ------ AREA C PRE-DEV 4 Combine 102.39 1 717 293,802 1, 2, 3 ------ ------ PRE-DEVELOPMENT FLOW 6 SCS Runoff 46.52 1 724 135,456 ---- ------ ------ AREA A POST-DEV 7 SCS Runoff 44.24 1 720 100,748 ---- ------ ------ AREA B POST-DEV 8 SCS Runoff 48.60 1 716 86,090 - - ------ ------ AREA C POST-DEV 9 Combine 113.68 1 717 322,294 6, 7, 8 ------ ------ POST DEVELOPMENT FLOW WITH 11 SCS Runoff 23.49 1 718 55,570 ---- ------ ------ AREA A TO DETENTION 12 Reservoir 16.10 1 722 55,529 11 246.25 9,863 ROUTE TO DETENTION A 13 Reach 11.15 1 730 55,380 12 ------ REACH TO ANALYSIS POINT A 14 SCS Runoff 28.40 1 724 86,331 ---- ------ ------ AREA A TO BYPASS DETENTION 15 Combine 38.13 1 725 141,711 13,14 ------ ----- COMBINED FLOW AT POINT A 17 ' SCS Runoff 12.12 1 718 24,292 ---- ------ ------ AREA B TO DETENTION 18 Reservoir 5.40 1 723 24,234 17 254.81 6,272 ROUTE TO DETENTION B 19 - Reach 4.15 1 734 24,152 18 ------ ------ REACH TO ANALYSIS POINT B 20 SCS Runoff 30.90 1 720 69,950 ---- ------ ------ AREA B TO BYPASS DETENTION 21 SCS Runoff 4.36 1 717 9,208 ---- ------ ------ AREA B ACROSS CC DRIVE 22 Combine 36.71 1 719 103,309 19, 20, 21 ------ ------ COMBINED FLOW AT POINT B 24 Combine 99.66 1 717 331,111 8, 15, 22, ------ ------ POST-DEVELOPMENT FLOW WITH Proj. file: 1148-Revised Stormwa r.turn Period: 2 yr Run date: 11-05-2004 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 89.48 1 723 255,069 ---- ------ ------ AREA A PRE-DEV 2 SCS Runoff 83.16 1 720 187,624 ---- ------ ------ AREA B PRE-DEV 3 SCS Runoff 86.76 1 715 157,891 ---- ------ ------ AREA C PRE-DEV 4 Combine 215.55 1 717 600,585 1, 2, 3 ------ ------ PRE-DEVELOPMENT FLOW 6 SCS Runoff 97.27 1 723 276,481 ---- ------ ------ AREA A POST-DEV 7 SCS Runoff 92.48 1 719 208,643 ---- ------ ------ AREA B POST-DEV 8 SCS Runoff 86.76 1 715 157,891 ---- ------ ------ AREA C POST-DEV 9 Combine 231.45 1 717 643,014 6, 7, 8 ------ ------ POST DEVELOPMENT FLOW WITH 11 SCS Runoff 35.75 1 718 86,791 ---- ------ ------ AREA A TO DETENTION 12 Reservoir 26.16 1 722 86,739 11 247.56 14,403 ROUTE TO DETENTION A 13 Reach 18.47 1 729 86,541 12 ------ ------ REACH TO ANALYSIS POINT A 14 SCS Runoff 66.34 1 723 190,615 ---- ------ ------ AREA A TO BYPASS DETENTION 15 Combine 82.79 1 724 277,157 13,14 ------ ------ COMBINED FLOW AT POINT A 17- SCS Runoff 23.00 1 718 46,890 ---- ------ ------ AREA B TO DETENTION 18 Reservoir 14.68 1 722 46,750 17 257.33 11,774 ROUTE TO DETENTION B 19 Reach 9.79 1 729 46,640 18 ------ ------ REACH TO ANALYSIS POINT B 20 SCS Runoff 62.32 1 719 140,700 ---- ------ ------ AREA B TO BYPASS DETENTION 21 SCS Runoff 12.64 1 717 23,878 ---- ------ ------ AREA B ACROSS CC DRIVE 22 Combine 78.46 1 719 211,219 19, 20, 21 ------ ------ COMBINED FLOW AT POINT B 24 Combine 205.70 1 717 646,266 8, 15, 22, ------ ------ POST-DEVELOPMENT FLOW WITH Proj. file: 1148-Revised Stormwa r.&turn Period: 10 yr Run date: 11-05-2004 10 r \ // ??`, ?? OG?+ rLi'-, ?' 'l ?r 2350 .•_ __J f?? j ' o I'./•r ? t,J I ? /? ?/? ???.$???' ? +' ?. \ x,11{?I fI •??1 ? •??-??"??• •?.t ? . ?Y 1 I• Yom- _ `N ' ? ??% ''4?r '` •- ' :1l`__ j,,{II ,,r .',? u wNas? y? J3!i. r ? .. ? ? , ? ? , :.. ? ? ??. gyn. ,'?' `.t? 1• '- AOL- 44 ?)+1 L+ons'Park_ ?-? I . ? y??•?? ? ??\ ?? ?? ppgyel6/ r I i I . • /'''?I /-?? ?C Ke '==F- " Ili 2 `? n \ `1\ Jam. , % 1 I f r? i--i?? r•? ?,p.'?''tA !lx / ! NV.y J 3L3A1iL '..Ili ?! s- _ ??= L ^ r J {ct , \,,?ft?\' - t : 4 •rr /jl ?!; ?.'?/ '? ??Q? ?'i? i f 1012 r `°,' r a % g6Ra 6t d / ( f • f g? ,4 t,. d3 { lr 1 Y`f? ?/ i ?rCem- 14 LOh 1I woo, Ij?6il I52nL(?r'.( t f ?)?w8dl?t? m v t? 1- ??r ?? t? Hos -A i JrYHi k ?cii ` V ?? ?' ? . ?_ ? ? V ? - .: f l !,mot i? .??:--.,?? 1.7. 1W ??? ?.;??? ?f 11 ? ? ? *?»?,,. _.. '?\ "i• ?' - ,- G ??7 .i?3 --aa??bra,ry?l?1?.i,: ? ?.??; ??• ? ;??-?1}.v._.I?? _ •?i?C -- ,`Q??? ??! ?r_? ??-?-? ,11 f- IN177 7- a - ERy+t tiAYEr lf1 ?? s U }'? .??- /`% ?•i {...? t + 2 rte. 00 Q?I Hfsr `il` ?OOJ ?Q<< r % -rte ,/ 'll -y1tv'.';'J R R?leigh COOntry Clu?_ ower±,,! dl--? 3C'?'?? 1 ?:??s• .?..., )2\ r?` HSch rCem -R.diq, 1 III +? ?!) /, ace ?-+ -- J!a I R?' I( `! y? iil : oe Sch j'!,po4 j?\?Ch j i? £? ?+N g ?r b ? ? "' ?{,!-? ,???IF- ,`??? f i •.'/ . 2s?? ?` ? ???326?\,Cern` a ?'i ' n ? I `'S_a_ l "Co eabyry Ch ?Q I 50 i o `, yr ?% •f` g's Y? / 1. - rreoGoael / ,;?5?-t ti y C ntei 1Ngrt d'ate??? n{k?1uI' Park ' ?200 v {??, i? 3 ! v n?. 1? 7-_ (?C>> S0 d8?? 1 Di3 Sol ai ?6d1 ?, I , m + $ m X10 t 'g£ /1??r j ?? u?vorR s ?? ! i .er h DRAINAGE AREA 'A' DRAINAGE AREA: 2827ac IMPERVIOUS AREA: &.73ac WOODED AREA: 428ac LAkN AREA: I4.92oc j r ` HYDRAULIC LENGTH 2881b8ft HYDRAULIC HEIGHT b5ft AGENCY REVIEW DOCUMENTS l ?? 1 NOT FOR CONSTRUCTION REVIEW AND COMMENTS r / AAA\N\ - ANALYSIS POINII ° AwursIs r9u?rV ? N)BUC Q J CID Watershed Data Analysis Design Pre-Development Post-Development Post-Development Point Event Qpre without Detention with Detention ??? ??? l 6f?? 11 V ???? I / I Q post a post K DRAINAGE AREAS' A 1-yr 26.86_cfs 31.36 cfs 25.34_cfs 2-yr 41.10 cfs 46.52_cfs 38.13 cfs DRAINAGE AREA: 2231ac 1 o r }i?( % //% \? \ I6 10-yr 89.48_cfs 97.27 cfs 82.79_cfs IMPERVIOUS AREA: W SJ3ac II ((??(l? / \? r 6?I OODED AREA: 5.95a- p LAIUJ B 1-yr 23.92 cfs 29.74_cfs 24.62_cfs HYDRAULIC. LENGTH 171530ft o 4.24 cfs 36.71_c HYDRAULIG HEIGHT bbft 2-yr 37.34_cfs 44.24- fs 10-yr 83.16 cfs 92.48_cfs 78.46 cfs 0 \ JIB ? I-// 1 c 1yr 36.33_cfs 36.33 cfs n1a ?lo ?? ?? I (I ° I DRAINAGE AREA'C 2-yr 48.60_cfs 48.60 cfs n1a o ° 10-yr 86.76_cfs 86.76_cfs Na DRAINAGE AREA: 13.57ac IMPERVIOUS AREA, 7.71ac Pre-Development Post-Development Post-Development ?\ ( WOODED AREA: I.72ac A ZI Flow Flow Flow o ° LAWN AREA: 4.14ac without Detention with Detention ?° HYDRAULIC LENGTH 535.29ft o HYDRAULIG HEIGHT 30ft r 0 PRQECr MS 1-yr 68.62 cfs 77.94_cfs 67.97_cfs MAW BY 2-yr 102.39_cfs 113.68_cfs 99.66 cfs r ISSN[ DATEr 10-yr 215.55_cfs 231.45 cfs 205.70_cfs ` aEUSws MAW -- DATE Area: -- - ^ ° ocwor Pre-development 22.17 acres 1 Post-development 25.98-acres I ?? l nu aurMC 6 NOT TO BE scum FIR W IXNS TED. IS l KWOSES. R GD ME scNE WHEN o y ? ruMArm, IS FOR m+mk rya ONLY. Wawa 00010" &ARM, wows 911ET DU o ? o \ STORMWATER IMPACT ANALYSIS 0 as PRE-DEVELOPMENT &? CONDITIONS 0 0\° - ?° ° ° o°sfEr xuauz C_1 ANALYSIS POW 'c' "" 5- 1 .r , - Watershed Data Analysis Design Pre-Development Post-Development Post-Development Point Event 0pre without Detention with Detention Q post 0 past A 1-yr 26.86 cfs 31.36 cfs 25.34 cfs 2-yr 41.10 cfs 46.52_cfs 38.13 cfs 10-yr 89.48_cfs 97.27_cfs 82.79 cfs B 1-yr 23.92_cfs 29.74_cfs 24.62_cfs 2-yr 37.34 cfs 44.24_cfs 36.71 cfs 10-yr 83.16_cfs 92.48_cfs 78.46_cfs C 1-yr 36.33_cfs 36.33 cfs Na 2-yr 48.60 cfs 48.60 cfs nla 10-yr 86.76 cfs 86.76 cfs n/a Pre-Development Post-Development Post-Development Flow Flow Flow without Detention with Detention 1-yr 68.62_cfs 77.94_cfs 67.97_cfs 2-yr 102.39 cfs 113.68 cfs 99.66 cfs 10-yr 215.55_cfs 231.45_cfs 205.70_cfs Impervious Area: Pre-development 22.17 acres Post-development 25.98-acres ° G w r r r ? e DRAINAGE AREA V DRAINAGE AREA: 2231gc IMPERVIOU5 AREA: lblgc HOODED AREA: 5.950- LAWN AREA: b.49ac HYDRAULIC LENGTH I11530ft HYDRAULIC HEIGHT bbft GRAPHIC SCALE 200 0 100 200 400 ,o \111 "R X // I °I m r 1 f r. r ftft* ft/ I/ I? anuft e 800 DRAINAGE AREA 'A! DRAINAGE AREA: 2b.21ac IMPERVIOUS AREA: 10.4ac HOODED AREA: 4.2bac LAIN AREA: 1359ac HYDRAULIC LENGTH 2551bbft HYDRAULIC HEIGHT bbft YY ? ( IN FEET ) 1 inch = 200 ft. e i DRAINAGE AREA 'C 6 PONT'N DRAINAGE AREA: 13510c IMPERVIOUS AREA: 1.110c HOODED AREA, L12ac LAWN AREA: 4.14ac HYDRAULIC LENGTH 535.29ft HYDRAULIG HEIGHT 30ft ° ?1 J 0 1 l yyl{IA{LFi, ° to ° 0(10 C \ " "'Y ? ? os ° ANALY55 PONT'O AGENCY REVIEW DOCUMENTS NOT FOR CONSTRUCTION REVIEW AND COMMENTS {10BUC I. 8 ?CD nALH Nxm PRG= NO, DRAW BY CHECKED BY 159E DATE REIASCF, YARC DATE DESMPTX)N 11115 ORA"IG IS 10T TO H SCALED 11R CONSIRUCUM PURPOSES 1HE SCALE. WEN Po"TD, IS FCi GV4U?& RUEF"(X 01LY. s¢r nnE STORMWATER IMPACT ANALYSIS POST-DEVELOPMENT CONDITIONS SHM "MR (' r-2 (I?(5?/ir 5 ?v l1P ( li// ? F d A\r 1 f l' t 11 77- _, l._ _? `?. `?""'i _ ?.r ??'• ? ? r¢ ?f ? ?? ? PT ?? . ?yy ?. r- ?TI?? r U?o is z .? n ,.._. ?cn •. ..?•,. ,K- ' ?k .ri. r? ralb a. W .i°? "rP?".]N 9t -av `r " `,7 k+t?. +V . 4 t, Any •a.'? .? 1 a ; ?' ?' .. ? ? 1•S r 1: t ? ? _ ? ' a p .y pF 'b. ? ? ? X wv- hIx , 't+ i Y pce.? ?- 7 W_: p• s? r g,, Fj F 'F. t..r r';,9`$,, +p• N ,j ' •?fy g•?? '., '" *. ra 'PIA, ='.2- Wi?' +:4? i ..?` ? ,, t? • ' a S ?.?. ` '? . a , ? y •r ogo ? e -+?i ? ti? ???c???l ' ?? r. ? t ? ?,,?'' ? ?Rt ? 7t ? ? r . 1A7Y1 n tJ_ 'x . 1 ? ? - J r ? '; *r12 •'2ap.` '? $ }1' 4?..ti? C * I Y ? ! ??',r ' 4I?Tf?i++.: ? ^ ?? ? •r ??xs ;,• t 'Iy t :J ` T k y T W, ?. y A t >? .? ?.. _p+ ? ,? ? .N • .9 ?? ? ? ?jj .mot ? ;-C ?.. ?.?+? ? ??? '? • y ?e t ? ?--r?-?-.'.,° -.?=}'A? ?. •°h\? 5C Li 6 ?e`? +.,f??r? t', r }ri :.. r . ? •avy? ?? Y I , r ?`. f n ,\ - •:t Y '.? fi i! ;t lea Y?.y •- r _ t? 1 ?,yfkIL-Ev ,, • +qrl y n 7 . , b 67- A fY b 1" I t ! ? / / ? a \ r.. « o J • 1 ? . t 'r 'r f o } ti, Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 AREA A PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 27.93 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Peak discharge = 26.86 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 72 2880 ft 15.21443 min Type II 484 Hydrograph Volume = 82,536 cuft 1 - SCS Runoff -1 Yr - Qp = 26.86 cfs 30 25 20 15 C? 10 Time (hrs) / Hyd. 1 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 5 0 .2 21.6 24.0 Hydrograph Plot Hyd. No. 1 AREA A PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 27.93 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 41.10 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 72 2880 ft 15.21443 min Type II 484 Hydrograph Volume = 121,274 cult 50 4( 3( 2( 1( .0 Time (hrs) / Hyd. 1 1 - SCS Runoff - 2 Yr - Qp = 41.10 cfs 1 I I I I ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 -'Hydrograph Plot Hyd. No. 1 AREA A PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 27.93 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 89.48 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 72 2880 ft 15.21443 min Type II 484 Hydrograph Volume = 255,069 cult 100 8( U) 6( v 4( 2( 1 - SCS Runoff -10 Yr - Qp = 89.48 cfs I I I I ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 Time (hrs) / Hyd. 1 .0 Hydrograph Plot Hyd. No. 2 AREA B PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 22.31 ac Basin Slope = 3.9% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 23.92 cfs Time interval = 1 min Curve number = 70 Hydraulic length = 1715 ft Time of conc. (Tc) = 8.45426 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 57,665 cuft 2-SCS Runoff-1 Yr-Qp-23.92 cfs 25 20 - cn 15 ? 10 0 Time (hrs) / Hyd.2 0.0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 5 0 .2 21.6 24 . -' Hydrograph Plot Hyd. No. 2 AREA B PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 22.31 ac Basin Slope = 3.9% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 37.34 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 70 1715 ft 8.45426 min Type II 484 Hydrograph Volume = 86,438 cult 2 - SCS Runoff - 2 Yr - Op = 37.34 cfs 7.2 9.6 12.0 14.4 16.8 19.2 21.6 .0 Time (hrs) / Hyd. 2 Hydrograph Plot Hyd. No. 2 AREA B PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 22.31 ac Basin Slope = 3.9% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 83.16 cfs Time interval = 1 min Curve number = 70 Hydraulic length = 1715 ft Time of conc. (Tc) = 8.45426 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 187,624 cult 100 8( 6( v 4( 2( 0 Time (hrs) / Hyd. 2 2-SCS Runoff- 10 Yr - Qp = 83.16 cfs 1 I I I ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 -'Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 AREA C PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.57 ac Basin Slope = 5.6% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Peak discharge = 36.33 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 82 535 ft 2.98538 min Type II 484 Hydrograph Volume = 63,635 cult 3 - SCS Runoff - 1 Yr - Qp = 36.33 cfs C? 0 Time (hrs) / Hyd. 3 '7V 30 20 10 0 0.0 2.2 4.4 6.6 8.8 11.0 13 .2 15.4 17.6 19 .8 22 i Hydrograph Plot Hyd. No. 3 AREA C PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 13.57 ac Basin Slope = 5.6% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 48.60 cfs Time interval = 1 min Curve number = 82 Hydraulic length = 535 ft Time of conc. (Tc) = 2.98538 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 86,090 cult 3 - SCS Runoff - 2 Yr - Op = 48.60 cfs v 2 4 6 8 10 12 14 c? -- -- 20 Time (hrs) / Hyd. 3 Hydrograph Plot Hyd. No. 3 AREA C PRE-DEV Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.57 ac Basin Slope = 5.6% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 86.76 cfs Time interval = 1 min Curve number = 82 Hydraulic length = 535 ft Time of conc. (Tc) = 2.98538 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 157,891 cuft 100 8( cn 6( to- U 0 4( 2( 3-SCS Runoff - 10 Yr - Qp = 86.76 cfs I I I I 0 2 4 6 8 1 0 12 14 16 18 2 Time (hrs) / Hyd. 3 . * Hydrograph Plot Hyd. No. 4 PRE-DEVELOPME NT FLOW Hydrograph type = Combine Storm frequency = 1 yrs Inflow hyds. = 1, 2, 3 Hydraflow Hydrographs by Intelisolve Peak discharge = 68.62 cfs Time interval = 1 min Hydrograph Volume = 203,836 cuft 4 - Combine -1 Yr - Qp - 68.62 cfs 80 60 4 CY 2 8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 / Hyd. 2 / Hyd. 3 / Hyd. 4 wu_ .0 2.4 4. 0 0 0 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 PRE-DEVELOPMENT FLOW Hydrograph type = Combine Storm frequency = 2 yrs Inflow hyds. = 1, 2, 3 Peak discharge = 102.39 cfs Time. interval = 1 min Hydrograph Volume = 293,803 cult 150 10( _ cn w C? 5( 4 - Combine - 2 Yr - Qp = 102.39 cfs 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 / Hyd. 2 /" Hyd. 3 / Hyd. 4 Hydrograph Plot Hyd. No. 4 PRE-DEVELOPMENT FLOW Hydrograph type = Combine Storm frequency = 10 yrs Inflow hyds. = 1, 2, 3 Hydraflow Hydrographs by Intelisolve Peak discharge = 215.55 cfs Time interval = 1 min Hydrograph Volume = 600,585 cult 250 20( co 15( C1 10( 5( 4 - Combine - 10 Yr - Qp = 215.55 cfs O i i i i JJ l-r 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 1 / Hyd. 2 / Hyd. 3 / Hyd. 4 Hydrograph Plot Hyd. No. 6 AREA A POST-DEV Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 28.27 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 31.36 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 74 2880 ft 15.21443 min Type II 484 Hydrograph Volume = 93,919 cuft 6-SCS Runoff-1 Yr-Qp-31.36 cfs - N V -* V 30 20 10 0 U.U 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 6 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 6 AREA A POST-DEV Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 28.27 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Peak discharge = 46.52 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 74 2880 ft 15.21443 min Type II 484 Hydrograph Volume = 135,456 cult 6-SCS Runoff -2Yr-Qp=46.52 cfs c? 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 6 -' Hydrograph Plot . F Hydraflow Hydrographs by Intelisolve Hyd. No. 6 AREA A POST-DEV Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 28.27 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Peak discharge = 97.27 cfs Time interval = 1 min Curve number = 74 Hydraulic length = 2880 ft Time of conc. (Tc) = 15.21443 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 276,481 cuft 6 - SCS Runoff -10 Yr - Qp = 97.27 cfs 100 8c 6C U 40- 20- 01 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 6 4 . Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 AREA B POST-DEV Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 22.31 ac Basin Slope = 3.9% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Peak discharge = 29.74 cfs Time interval = 1 min Curve number = 73 Hydraulic length = 1715 ft Time of conc. (Tc) = 8.45426 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 69,231 cuft 7-SCS Runoff-1 Yr-Qp-29.74 cfs 30 25 20 15 CY 10 i 5 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 7 Hydrograph Plot t Hyd. No. 7 AREA B POST-DEV Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 22.31 ac Basin Slope = 3.9% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 44.24 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 73 1715 ft 8.45426 min Type II 484 Hydrograph Volume = 100,748 cuft 50 4( rn 3( v 2( 1( 7 - SCS Runoff - 2 Yr - Qp = 44.24 cfs I ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 Time (hrs) / Hyd. 7 .0 Hydrograph Plot Hyd. No. 7 AREA B POST-DEV Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 22.31 ac basin Slope = 3.9% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydratlow Hydrographs by Intelisolve Peak discharge = 92.48 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 73 1715 ft 8.45426 min Type II 484 Hydrograph Volume = 208,643 cult 100 8( N 6( v 0 4( 2( 0 Time (hrs) / Hyd. 7 7-SCSRunoff -10Yr-Qp-92.48 cfs I I I I ).0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 .2 21.6 24 s Hydrograph Plot t Hydraflow Hydrographs by Intelisolve Hyd. No. 8 AREA C POST-DEV Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.57 ac Basin Slope = 5.6% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Peak discharge = 36.33 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 82 535 ft 2.984521 min Type II 484 Hydrograph Volume = 63,635 cuft 8 - SCS Runoff - 1 Yr - Qp = 36.33 cfs 40 30 20 Q 10 0 0.0 2.2 4.4 6.6 8.8 11.0 13.2 15.4 17.6 19.8 22.0 Time (hrs) / Hyd. 8 Hydrograph Plot Hyd. No. 8 AREA C POST-DEV Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 13.57 ac Basin Slope = 5.6% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 48.60 cfs Time interval = 1 min Curve number = 82 Hydraulic length = 535 ft Time of conc. (Tc) = 2.984521 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 86,090 cuft 50 4( 3( v 2( 1( 8 - SCS Runoff - 2 Yr - Op = 48.60 cfs I I I I 0 2 4 6 8 1 0 12 14 16 18 2i Time (hrs) / Hyd. 8 I, Hydrograph Plot Hyd. No. 8 AREA C POST-DEV Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.57 ac Basin Slope = 5.6% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 86.76 cfs Time interval = 1 min Curve number = 82 Hydraulic length = 535 ft Time of conc. (Tc) = 2.984521 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 157,891 cult 8-SCS Runoff -10Yr-Qp-86.76 cfs 100 80 U) 6( v 4( 2( I I I I 0 2 4 6 8 1 0 12 14 16 1,9 2 Time (hrs) / Hyd. 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 POST DEVELOPMENT FLOW WITHOUT DETENTION Hydrograph type = Combine Peak discharge Storm frequency = 1 yrs Time interval Inflow hyds. = 6, 7, 8 = 77.94 cfs = 1 min Hydrograph Volume = 226,785 cult 9 - Combine -1 Yr - Op = 77.94 cfs V vv 60 40 20 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 6 / Hyd. 7 / Hyd. 8 / Hyd. 9 l Aydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 POST DEVELOPMENT FLOW WITHOUT DETENTION Hydrograph type = Combine Peak discharge = 113.68 cfs Storm frequency = 2 yrs Time interval = 1 min inflow hyds. = 6, 7, 8 Hydrograph Volume = 322,294 cuft 150 10( CO) C3 5( 9 - Combine - 2 Yr - Qp = 113.68 cfs 0 _ 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 6 / Hyd. 7 / Hyd. 8 / Hyd. 9 i' ~Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 POST DEVELOPMENT FLOW WITHOUT DETENTION Hydrograph type = Combine Peak discharge = 231.45 cfs Storm frequency = 10 yrs. Time interval = 1 min Inflow hyds. = 6, 7, 8 Hydrograph Volume = 643,014 cult 250 20( u) 15( 10( 5( 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 6 / Hyd. 7 / Hyd. 8 / Hyd. 9 9 - Combine - 10 Yr - Qp = 231.45 cfs I I Hydrograph Plot Hyd. No. 11 AREA A TO DETENTION Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 5.00 ac Basin Slope = 1.8% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 19.32 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 96 985 ft 7.391977 min Type II 484 Hydrograph Volume = 45,105 cult 20 1! ? Q 1( Time (hrs) / Hyd. 11 11 - SCS Runoff - 1 Yr - Qp = 19.32 cfs i 1 0 2 4 6 8 1 0 12 1 4 i f 1 19 21 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 11 AREA A TO DETENTION Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 5.00 ac Basin Slope = 1.8% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Peak discharge = 23.49 cfs Time interval = 1 min Curve number = 96 Hydraulic length = 985 ft Time of conc. (Tc) = 7.391977 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 55,570 cuft 25 21 ? 1! v ? 1( 11 - SCS Runoff - 2 Yr - Qp = 23.49 cfs i i 1 0 2 4 6 S 1 0 12 14 16 1R 2 Time (hrs) / Hyd. 11 • Hydrograph Plot Hyd. No. 11 AREA A TO DETENTION Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 5.00 ac Basin Slope = 1.8% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 35.75 cfs Time interval = 1 min Curve number = 96 Hydraulic length = 985 ft Time of conc. (Tc) = 7.391977 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 86,791 cult 11 - SCS Runoff - 10 Yr - Qp = 35.75 cfs 40 30 CD 20 0 10 Time (hrs) / Hyd. 11 0 2 4 6 8 1 0 0 12 14 16 18 20 Hydrograph Plot Hyd. No. 12 ROUTE TO DETENTION A Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 11 Max. Elevation = 245.82 ft Hydraflow Hydrographs by Intelisolve Peak discharge Time interval Reservoir name Max. Storage = 12.97 cfs = 1 min = DETENTION A = 8,166 cuft Storage Indication method used. Hydrograph Volume = 45,067 cult 20 1: ? C? 1( 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 11 / Hyd. 12 12 - Reservoir -1 Yr - Qp -12.97 cfs i 0 HYd ro9raph Plot s Hydraflow Hydrographs by Intelisolve Hyd. No. 12 ROUTE TO DETENTION A Hydrograph type = Reservoir Peak discharge = 16.10 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 11 Reservoir name = DETENTION A Max. Elevation = 246.25 ft Max. Storage = 9,863 cuft storage indication method used. Hydrograph Volume = 55,529 cuft 12 - Reservoir - 2 Yr - Qp -16.10 cfs 25 20 cn 15 10 16.8 Time (hrs) / Hyd. 11 / Hyd. 12 0.0 2.4 4.8 7.2 9.6 12.0 14 .4 19 5 0 .2 21.6 24.0 Hydrograph Plot Hyd. No. 12 ROUTE TO DETENTION A Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 11 Max. Elevation = 247.56 ft Storage Indication method used. Hydraflow Hydrographs by Intelisolve Peak discharge = 26.16 cfs Time interval = 1 min Reservoir name = DETENTION A Max. Storage = 14,403 cuft Hydrograph Volume = 86,739 cuft 12 - Reservoir -10 Yr - Qp = 26.16 cfs U) U' °7V 30 20 10 0 U.U 2.4 4.8 1.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 11 / Hyd. 12 Hydrograph Plot Hyd. No. 13 REACH TO ANALYSIS POINT A Hydrograph type = Reach Storm frequency = 1 yrs Inflow hyd. No. = 12 Reach length = 1020.0 ft Manning's n = 0.200 Side slope = 2.0:1 Rating curve x = 0.369 Ave. velocity = 0.95 Modified Aft-Kin routing method used. Hydraflow Hydrographs by Intelisolve Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. = 8.87 cfs = 1 min = Trapezoidal = 2.1% = 5.0 ft = 3.0 ft = 1.363 = 0.0736 Hydrograph Volume = 44,936 cult 13 - Reach -1 Yr - Op = 8.87 cfs 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 12 / Hyd. 13 t Hydrograph Plot } Hyd. No. 13 REACH TO ANALYSIS POINT A Hydrograph type = Reach Storm frequency = 2 yrs Inflow hyd. No. = 12 Reach length = 1020.0 ft Manning's n = 0.200 Side slope = 2.0:1 Rating curve x = 0.369 Ave. velocity = 1.01 Hydraflow Hydrographs by Intelisolve Peak discharge = 11.15 cfs Time interval = 1 min Section type = Trapezoidal Channel slope = 2.1 % Bottom width = 5.0 ft Max. depth = 3.0 ft Rating curve m = 1.363 Routing coeff. = 0.0777 Modified Aft-Kin routing method used. Hydrograph Volume = 55,380 cult 13 - Reach - 2 Yr - Qp = 11.15 cfs 20 1! Cn ? C? 1( c Time (hrs) / Hyd. 12 / Hyd. 13 0 i i ) ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 ` t Hydrograph Plot Hyd. No. 13 REACH TO ANALYSIS POINT A Hydrograph type = Reach Storm frequency = 10 yrs Inflow hyd. No. = 12 Reach length = 1020.0 ft Manning's n = 0.200 Side slope = 2.0:1 Rating curve x = 0.369 Ave. velocity = 1.15 Modified Att-Kin routing method used. Hydraflow Hydrographs by Intelisolve Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. = 18.47 cfs = 1 min = Trapezoidal = 2.1% = 5.0 ft = 3.0 ft = 1.363 = 0.0880 Hydrograph Volume = 86,541 cuft 13 - Reach - 10 Yr - Qp = 18.47 cfs 30 25 20 15 C3 10 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 5 0 .2 21.6 24 Time (hrs) / Hyd. 12 / Hyd. 13 0 i Hydrograph Plot Hyd. No. 14 AREA A TO BYPASS DETENTION Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 23.27 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Hydraflow Hydrographs by Intellsolve Peak discharge = 17.50 cfs Time interval = 1 min Curve number = 69 Hydraulic length = 2880 ft Time of conc. (Tc) = 15.21443 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 56,964 cuft 20 1! _ N ? C? 1( 0 Time (hrs) / Hyd. 14 14 - SCS Runoff - 1 Yr - Qp = 17.50 cfs i 1 i I ).0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 .2 21.6 24 t. ` Hydrograph Plot Hyd. No. 14 AREA A TO BYPASS DETENTION Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 23.27 ac Basin Slope = 2.4% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 28.40 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 69 2880 ft 15.21443 min Type II 484 Hydrograph Volume = 86,331 tuft 14 - SCS Runoff - 2 Yr - Op = 28.40 cfs 30 25 20 (Al 15 C3 10 .0 Time (hrs) / Hyd. 14 0.0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 5 0 .2 21.6 24 Hydrograph Plot - Hydraflow Hydrographs by Intelisolve Hyd. No. 14 AREA A TO BYPASS DETENTION Hydrograph type = SCS Runoff Peak discharge = 66.34 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 23.27 ac Curve number = 69 Basin Slope = 2.4% Hydraulic length = 2880 ft Tc method = KIRPICH Time of conc. (Tc) = 15.21443 min Total precip. = 5.38 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 190,615 cuft 14 - SCS Runoff - 10 Yr - Qp . 66.34 cfs 80 60 40 C? 20 Time (hrs) / Hyd. 14 0.0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 0 .2 21.6 24.0 < I ` Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 15 COMBINED FLOW AT POINT A Hydrograph type = Combine Peak discharge = 25.34 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 13, 14 Hydrograph Volume = 101,900 cult 15 - Combine -1 Yr - Qp = 25.34 cfs 30 25 20 rn 15 C? 10 0 Time (hrs) / Hyd. 13 / Hyd. 14 / Hyd. 15 i i ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 ? 0 .2 21.6 24 a Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 15 COMBINED FLOW AT POINT A Hydrograph type = Combine Peak discharge = 38.13 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 13,14 Hydrograph Volume = 141,711 cuft 15 - Combine - 2 Yr - Qp = 38.13 cfs w ? rn a C3 ,0 Time (hrs) / Hyd. 13 / Hyd. 14 / Hyd. 15 YV 30 20 10 0 0.0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 i Hydrograph Plot Hyd. No. 15 COMBINED FLOW AT POINT A Hydrograph type = Combine Storm frequency = 10 yrs Inflow hyds. = 13, 14 Hydraflow Hydrographs by Intelisolve Peak discharge = 82.79 cfs Time interval = 1 min Hydrograph Volume = 277,157 cult 15 - Combine - 10 Yr - Qp = 82.79 cfs 100- 80- 60- a 60 a 40- 20- 01 1 Time (hrs) / Hyd. 13 / Hyd. 14 / Hyd. 15 0.0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24.0 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 17 AREA B TO DETENTION Hydrograph type = SCS Runoff Peak discharge = 8.68 cfs Storm frequency = 1 yrs Time interval = 1 min Drainage area = 4.13 ac Curve number = 78 Basin Slope = 4.8% Hydraulic length = 957 ft Tc method = KIRPICH Time of conc. (Tc) = 4.955859 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 17,422 cuft 17-SCS Runoff-1 Yr-Qp-8.68 cfs 10 Q 0 Time (hrs) / Hyd. 17 I 1.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 8 6 4 .2 21.6 24 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 17 AREA B TO DETENTION Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 4.13 ac Basin Slope = 4.8% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Peak discharge = 12.12 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 78 957 ft 4.955859 min Type II 484 Hydrograph Volume = 24,292 cuft 17- SCS Runoff-2 Yr- Qp- 12.12 cfs 0• . JI 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 17 Hydrograph Plot Hyd. No. 17 AREA B TO DETENTION Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 4.13 ac Basin Slope = 4.8% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 23.00 cfs Time interval = 1 min Curve number = 78 Hydraulic length = 957 ft Time of conc. (Tc) = 4.955859 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 46,890 cult 25 2( U) v ? 1( c 0 Time (hrs) / Hyd. 17 17 - SCS Runoff -10 Yr - Qp = 23.00 cfs i I i I ).0 2.3 4.6 6.9 9.2 11.5 13 .8 16.1 18 .4 20 .7 23 i ` s Hydrograph Plot Hyd. No. 18 ROUTE TO DETENTION B hiydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 17 Max. Elevation = 254.17 ft Hydraflow Hydrographs by Intelisolve Peak discharge = 3.68 cfs Time interval = 1 min Reservoir name = DETENTION B Max. Storage = 4,386 cuft Storage Indication method used. Hydrograph Volume = 17,372 cult 18 - Reservoir -1 Yr - Qp = 3.68 cfs c? U.U 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 17 / Hyd. 18 I, Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 18 ROUTE TO DETENTION B Hydrograph type = Reservoir Peak discharge = 5.40 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 17 Reservoir name = DETENTION B Max. Elevation = 254.81 ft Max. Storage = 6,272 cuft Storage Indication method used. Hydrograph Volume = 24,234 cuft 18 - Reservoir - 2 Yr - Qp = 5.40 cfs 01 J, i 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 17 / Hyd. 18 Hydrograph Plot Hyd. No. 18 ROUTE TO DETENTION B Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 17 Max. Elevation = 257.33 ft Hydraflow Hydrographs by Intelisolve Peak discharge = 14.68 cfs Time interval = 1 min Reservoir name = DETENTION B Max. Storage = 11,774 cult Storage Indication method used. Hydrograph Volume = 46,750 cuft 25 2( rn 1; v- ? 1( c 0 Time (hrs) / Hyd. 17 / Hyd. 18 18 - Reservoir -10 Yr - Qp = 14.68 cfs i 1 i I 31.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 .2 21.6 24 t ; Hydrograph Plot Hyd. No. 19 REACH TO ANALYSIS POINT B Hydrograph type = Reach Storm frequency = 1 yrs Inflow hyd. No. = 18 Reach length = 750.0 ft Manning's n = 0.200 Side slope = 2.0:1 Rating curve x = 0.509 Ave. velocity = 0.85 Hydraflow Hydrographs by Intelisolve Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. = 2.79 cfs = 1 min = Trapezoidal = 4.0% = 5.0 ft = 2.0 ft = 1.346 = 0.0872 Modified Att-Kin routing method used. Hydrograph Volume = 17,302 cult 19 - Reach -1 Yr - Qp = 2.79 cfs A V 0 Y 3 2 1 0 u.u 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 18 / Hyd. 19 Hydrograph Plot Hyd. No. 19 REACH TO ANALYSIS POINT B Hydrograph type = Reach Storm frequency = 2 yrs Inflow hyd. No. = 18 Reach length = 750.0 ft Manning's n = 0.200 Side slope = 2.0:1 Rating curve x = 0.509 Ave. velocity = 0.93 Hydraflow Hydrographs by Intelisolve Peak discharge Time interval Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. = 4.15 cfs = 1 min = Trapezoidal = 4.0% = 5.0 ft = 2.0 ft = 1.346 = 0.0958 Modified Att-Kin routing method used. Hydrograph Volume = 24,152 cult 19-Reach -2Yr-Qp-4.15 cfs 6 U) cj C? 1 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 18 / Hyd. 19 .0 2.4 4.8 7.2 9.6 12.0 14 4 5 4 3 2 0 i t Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 19 REACH TO ANALYSIS POINT B Hydrograph type = Reach Peak discharge = 9.79 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 18 Section type = Trapezoidal Reach length = 750.0 ft Channel slope = 4.0% Manning's n = 0.200 Bottom width = 5.0 ft Side slope = 2.0:1 Max. depth = 2.0 ft Rating curve x = 0.509 Rating curve m = 1.346 Ave. velocity = 1.21 Routing coeff. = 0.1221 Modified Aft-Kin routing method used. Hydrograph Volume = 46,640 cuft 19 - Reach - 10 Yr - Qp = 9.79 cfs 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 18 / Hyd. 19 i Hydrograph Plot Hyd. No. 20 AREA B TO BYPASS DETENTION Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 14.07 ac Basin Slope = 3.8% Tc method = KIRPICH Total precip. = 3.00 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 21.33 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 75 1715 ft 8.496916 min Type II 484 Hydrograph Volume = 48,936 cult 20 - SCS Runoff -1 Yr - Qp = 21.33 cfs 25 20 cn 15 C? 10 Time (hrs) / Hyd. 20 0.0 2.4 4.8 7.2 9. 6 12.0 14.4 16.8 19 5 0 .2 21.6 24.0 Hydrograph Plot Hyd. No. 20 AREA B TO BYPASS DETENTION Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 14.07 ac Basin Slope = 3.8% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 30.90 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 75 1715 ft 8.496916 min Type II 484 Hydrograph Volume = 69,950 tuft 20-SCS Runoff - 2 Yr - Qp = 30.90 cfs A r% 0 'YV 30 20 10 0 U.U 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 20 ` Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 20 AREA B TO BYPASS DETENTION Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 14.07 ac Basin Slope = 3.8% Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Peak discharge = 62.32 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 75 1715 ft 8.496916 min Type II 484 Hydrograph Volume = 140,700 cult 20 - SCS Runoff - 10 Yr - Qp = 62.32 cfs C'1 U„ 60 40 20 0 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 20 Hydrograph Plot a Hydraflow Hydrographs by Intelisolve Hyd. No. 21 AREA B ACROSS CC DRIVE Hydrograph type = SCS Runoff Peak discharge = 2.19 cfs Storm frequency = 1 yrs Time interval = 1 min Drainage area = 4.11 ac Curve number = 61 Basin Slope = 2.1 % Hydraulic length = 435 ft Tc method = KIRPICH Time of conc. (Tc) = 3.712589 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 5,436 cult 2.5 2.1 cn 1.! Q a 1.( 0.: 0.( 0 Time (hrs) / Hyd. 21 21 - SCS Runoff - 1 Yr - Qp = 2.19 cfs I i I ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 Hydrograph Plot Hyd. No. 21 AREA B ACROSS CC DRIVE Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 4.11 ac Basin Slope = 2.1% Tc method = KIRPICH Total precip. = 3.60 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 4.36 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 1 min 61 435 ft 3.712589 min Type II 484 Hydrograph Volume = 9,208 cult 21 - SCS Runoff - 2 Yr - Op = 4.36 cfs r Q 0 Time (hrs) / Hyd. 21 J 3 I 0.0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 Hydrograph Plot Hyd. No. 21 AREA B ACROSS CC DRIVE Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 4.11 ac Basin Slope = 2.1 % Tc method = KIRPICH Total precip. = 5.38 in Storm duration = 24 hrs Hydraflow Hydrographs by Intelisolve Peak discharge = 12.64 cfs Time interval = 1 min Curve number = 61 Hydraulic length = 435 ft Time of conc. (Tc) = 3.712589 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 23,878 cuft 15 1( N U Q ( .0 Time (hrs) / Hyd. 21 21 - SCS Runoff -10 Yr - Qp = 12.64 cfs i I ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 Hydrograph Plot Hyd. No. 22 COMBINED FLOW AT POINT B Hydrograph type = Combine Storm frequency = 1 yrs Inflow hyds. = 19, 20, 21 Hydraflow Hydrographs by Intelisolve Peak discharge = 24.62 cfs Time interval = 1 min Hydrograph Volume = 71,674 cult 22 - Combine - 1 Yr - Qp = 24.62 cfs 25 2( = N y- C? C3 V l I i ) i I 5 ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 .0 Time (hrs) / Hyd. 19 / Hyd. 20 / Hyd. 21 / Hyd. 22 Hydrograph Plot Hyd. No. 22 COMBINED FLOW AT POINT B Hydrograph type = Combine Storm frequency = 2 yrs Inflow hyds. = 19, 20, 21 Hydraflow Hydrographs by Intelisolve Peak discharge = 36.71 cfs Time interval = 1 min Hydrograph Volume = 103,309 cult 22 - Combine - 2 Yr - Qp = 36.71 cfs 40 3( _ U) CJ 2( 1( I I I i I I ).0 2.4 4.8 7.2 9.6 12.0 14 .4 16.8 19 .2 21.6 24 .0 Time (hrs) / Hyd. 19 / Hyd. 20 Hyd. 21 / Hyd. 22 'Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 22 COMBINED FLOW AT POINT B Hydrograph type = Combine Peak discharge = 78.46 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 19, 20, 21 Hydrograph Volume = 211,219 cuft 22-Combine -10Yr-Qp=78.46 cfs 80 6( cn U 4( 2( I I j II ).0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 .2 21.6 24 0 Time (hrs) / Hyd. 19 / Hyd. 20 / Hyd. 21 / Hyd. 22 yHydrograph Plot Hyd. No. 24 POST-DEVELOPMENT FLOW WITH DETENTION Hydrograph type = Combine Storm frequency = 1 yrs Inflow hyds. = 8, 15, 22 Hydraflow Hydrographs by Intelisolve Peak discharge = 67.97 cfs Time interval = 1 min Hydrograph Volume = 237,210 cult 24 - Combine -1 Yr - Qp = 67.97 cfs 80 6( N C1 4( 2( 1 I I I N - ).0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19 .2 21.6 24 0 Time (hrs) / Hyd. 8 / Hyd. 15 / Hyd. 22 / Hyd. 24 Hydrograph Plot Hydraflow Hydrographs by Intelisolve a Hyd. No. 24 POST-DEVELOPMENT FLOW WITH DETENTION Hydrograph type = Combine Peak discharge = 99.66 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 8, 15, 22 Hydrograph Volume = 331,111 cult 100 8( cn 6( U 4( 2( 06-- 1 1 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 8 / Hyd. 15 / Hyd. 22 / Hyd. 24 24 - Combine - 2 Yr - Qp = 99.66 cfs 1 I I I Hydrograph Plot • Hyd. No. 24 POST-DEVELOPMENT FLOW WITH DETENTION Hydrograph type = Combine Storm frequency = 10 yrs Inflow hyds. = 8, 15, 22 Hydraflow Hydrographs by Intelisolve Peak discharge = 205.70 cfs Time interval = 1 min Hydrograph Volume = 646,266 cult 20( cn 15( U 0 10( 5( 250 0.0 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 24.0 Time (hrs) / Hyd. 8 / Hyd. 15 / Hyd. 22 / Hyd. 24 24 - Combine - 10 Yr - Qp = 205.70 cfs I I I i 0 i