Loading...
HomeMy WebLinkAboutNCG030656_Compliance Eval Inspection_20190422Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY April 22, 2019 KSM Castings USA, Inc Attention: Mark Bradley 120 Blue Brook Drive Shelby, North Carolina 28150 Subject: Compliance Evaluation Inspection KSM Castings USA INC NPDES Stormwater Certificate of Coverage- NC Cleveland County, North Carolina Dear Mr. Bradley: ROY COOPER Govemor MICHAEL S. REGAN Secretary S. DANIEL SMITH Micron Director RECEIVE[ R� - 7 I vsED APR g a 2019 LAND QUALITY MINING PROGRAM d LI!Y ",n,iNrnlr� '-n�R�rty: RE(,EI\/F-f) MAY 02 2019 DENR-LAND QUALITY STORMWATER PERMITTING Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the KSM Castings Facility in Shelby North Carolina on April 18, 2019 by Mooresville Regional Staff. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Sincerely, ____m'z" "__ J nes Moore sslstant Regional Engineer Enclosure c: Stormwater Permitting Branch State of North Carolina I Enwonmental Quality I Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 281 l5 704 663 1699 T Compliance Inspection Report Permit: NCG030656 Effective:.11/01/18 Expiration: 05/31/21 Owner: Ksm Castings USA Inc Sac: Effective: Expiration: Facility: KSM Castings USA, Inc. County: Cleveland 120 Blue Brook Dr Region: Mooresville Shelby NC 28150 Contact Person: Keith Weaver Title: Phone: 704-466-0065 Directions to Facility: Traveling west on Hwy 74 west of Shelby, turn right onto Plato Lee Road. Entrance to facility is approximately 1.8 miles from Hwy 74 on the left. System Classifications: Primary ORC• Certification: Phone: Secondary ORC(s): On -Sift Representative(s): Related Permits: Inspection Date: 04/18/2019 Entry Time: 11:05AM Exit Time: 12:30PM Primary Inspector: Kenny Llywelyn Phone: Secondary Inspector(s): Christopher Graybeal Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG030656 owner - Facility: Ksm Castings USA Inc Inspection Date: 0411812019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Based on the inspection the site was in compliance. This was the first stormwater inspection for this facility since it was built. Page 2 of 3 r permit: NCG030656 Owner - Facility: Ksm Castings USA Inc inspection Date: 0411812019 Inspection Type: Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ 1111 # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? . ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Analytical Monitoring -Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ 110 ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ■ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 110 ❑ ❑ Comment: We advised during the inspection to inspect all outfalls at least once a year during a dry period to look for ilicit discharges onsite. Page 3 of 3