HomeMy WebLinkAboutNCS000250_NCDOT Beaufort Co Construction Inspection_20190516Site Visit Evaluation: Construction Site No. 1
Site/Project Name:
Date and Time of Site Visit:
Bridge 249 over Duck Creek on SR 1336 in Beaufort County
5/16/19 at 1:00 PM
Site/Project Address:
Operator:
Project M 17BP.2.R.65
Dane Construction
Project Type (Commercial, Industrial, Residential, CIP, Roadway,
etc.): Bridge replacement
NCG Permit ID Number:
Disturbed Acreage:
NCS000250
.2 miles
NCG010000
Recent Enforcement Actions (Include Date):
None
Name of M54 Inspector(s) evaluated:
Justin Reliford
Name(s) and Title(s) of Site Representative(s) Present During the
Site Visit:
Name
Title
Justin Reliford — Brad Wright
NC DOT SEPI Inspector — Dane Contracting Forman
Observations
Site Documentation/Training
Does the site have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it site -specific?
Andy Blankenship, PE and his Supervisor, Ben Dewit of NCDOT-REU assisted in answering all questions asked during the
inspection, and all parties were knowledgeable of this MS4 program, NCS000250, and the NCG01000 requirements.
Does the site have approved erosion and sedimentation control plans onsite? Are they representative of current site conditions?
Yes, the E&S plan was on site, and all questions were answered knowledgeably, as well as all revisions viewed were presented
by tablet while onsite during the inspection.
What type of stormwater training do site employees receive? How often?
Justin Reliford, and Brad Wright are Level II trained and certified for the E&S program. The documentation was present and
viewed during the visit. Andy Blankenship again presented the updated project documentation on his tablet, as the info would
not load for the others when attempted.
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Level II training which is renewed as required.
Did the MS4 inspector appear knowledgeable about MS4 and NCG010000 requirements for construction sites?
Yes.
Did the MS4 inspector appear knowledgeable about erosion and sedimentation control/stormwater pollution prevention BMPs?
Yes.
Date(s): DATE
Page 1 of 2
Site Visit Evaluation: Construction Site No. 1
Inspection Procedures
Does the MS4 inspector's process include the use of a checklist?
Yes
Does the MS4 inspector's process include taking photos?
Yes, as needed.
Does the MS4 inspector's process include reviewing approved plans (erosion and sedimentation control and/or SWPPP)?
Yes
Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge?
Yes
Did the MS4 inspector miss any obvious violations? If so, explain:
Not that I observed.
Does the M54 inspector's process include presenting the inspection findings to the site contact in writing?
Yes
Does the MS4 inspector's process include providing construction stormwater educational materials to the site contact?
Yes
Compliance/Enforcement
What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in?
None
If compliance issues were identified, what timeline for correction/follow-up was provided?
N/A
Notes/Comments/Recommendations
The roadway fill slope was not completed prior to the moratorium stopping all in water work. Andy Blankenship stated that a
request to stabilize the slope is pending with DMF and WRC.
I advised the contractor to carefully and quietly place the RipRap if they were to be granted authorization to proceed, in order to
minimize any potential impact to the fish of this high quality water resource.
Slic���9
4dit Date(s): DATE
Page 2 of 2