Loading...
HomeMy WebLinkAbout250039_2019 Inspection_20190522Ii ype or visit: ® compliance inspection U Operation Review U Structure Evaluation U Technical Assistance I Reason for Visit: • Routine O Complaint 0 Follow-up O Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: _'- Sn�-- Departure Time: County: Farm Name: _A► U M 5 r r) i 1_`. C Owner Email: Owner Name: 1 0b2✓ �' `/ 1 A t`` \ Phone: Mailing Address: Physical Address: > TAA Facility Contact: �k�o; ckk 1�/1 tl�tTitle: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Phone: Integrator: S tv_, Certification Number: Certification Number: Longitude: b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Region: 'J-;(LQ ❑ Yes dNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [—]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes Z o ❑ Yes 7No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE Page I of 3 21412015 Continued jDate of Inspection: ,lion & Treatment capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [(No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 0 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑Yes 7o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [� No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [3No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [] No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN> 10%or 10lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Accceept`a'ble Crop Window 0 Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYPe(s) ''Jj . S i '� 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ["No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 1 EJ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes d'No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑'/No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [;No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections 22. Did the facility fail to install and maintain ❑ Sludge Survey No a rain gauge? ❑ Yes � ❑ N ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [—]Yes ❑ No VNA ❑ NE Page 2 of 3 21412015 Continued ,r: X5 - Date of Inspection — ,cility fail to calibrate waste application equipment as required by the permit? ❑ Yes E , o ❑ NA ❑ NE racility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes u1 No ❑ NA ❑ NE appropriate box(es) below. Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No rNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? to YES answers and/or any ❑ Yes / No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ENE ❑ Yes [No ❑ Yes dNo ❑ Yes yo ❑ Yes o ❑ Yes No or any Ise drawings of facility to better explain situations (use additional pages as necessary). L�1 2Z y , q , l, Cam+ by k� odo) 9 3-2S-ILA &re.a,- &Y- ftw o[ ", 5V-0,C) Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE C.o V-rfS'PDrJ w, \ C rt �j, -, r � 4 1- aCvy eske 4 5 ,1 Phone: a5z: 991-2231 Date: 7 21412015