Loading...
HomeMy WebLinkAbout20190751 Ver 1_Into with Maps _20190606Staff Review Does this application have all the attachments needed to accept it into the review process? r Yes r No ID#* 20190751 Version* 1 Is this project a public transportation project?* r Yes r No Reviewer List:* Select Reviewing Office:* Submittal Type:* 401 Application Zan Price:eads\gaprice Asheville Regional Office - (828) 296-4500 Does this project require a request for payment to be sent?* r Yes r No How much is r $240.00 * owed? r $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project • Pre -Application Submittal • More Information Response • Other Agency Comments r For the Record Only (Courtesy Copy) New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Ben Sagara Who is subrritting the information? Email Address: ben.sagara@timmons.com Project Information Project Name: Fern Solar Is this a public transportation project? Yes (' No Is the project located within a NC DCM Area of Environmental Concern (AEC)? C Yes (-- No C Unknown County (ies) Edgecombe Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent PART 1 SUBMITTED - Fern Solar PCN 42.99MB 6.06.2019. pdf PART 2 SUBMITTED - Fern Solar PCN 33.17MB 6.06.2019. pdf PART 3 SUBMITTED - Fern Solar PCN 47.79MB 6.06.2019. pdf PART 4 SUBMITTED - Fern Solar PCN 47.31 MB 6.06.2019. pdf PART 5 SUBMITTED - Fern Solar PCN 28.8MB 6.06.2019. pdf Only pdf or l rz files are accepted. Describe the attachments: On behalf of Fern Solar, LLC, Timmons Group is submitting a Pre -Construction Notification (PCN) for a Nationwide Permit (NWP) 51 and NWP 12 and General Certifications (GC) 4135 and 4139 associated with the Fern Solar project (Site/Project) located in Edgecombe County, North Carolina. In addition, we are requesting authorization of the proposed project under the Tar -Pamlico River Buffer Rules. The package was very large so was submitted in multiple parts. If you want to download the entire package, please use the link below: https://www. sendthisfile.conV25 RwxJ5stQMsrh RzXEG3QkVo rJ By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: Submittal Date: Is filled in autorratically. CIVIL ENGINEERING | ENVIRONMENTAL | SURVEYING | GIS | LANDSCAPE ARCHITECTURE | CONSTRUCTION SERVICES 5410 Trinity Road Suite 102 Raleigh, NC 27607 P 919.866.4951 F 919.859.5663 www.timmons.com June 6, 2019 Ms. Samantha Dailey Regulatory Specialist U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mrs. Karen Higgins NC Division of Water Resources 401 and Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 RE: PCN – NWP 51 and NWP 12, General Certification 4135 & 4139 Fern Solar Edgecombe County, North Carolina Dear Mr. Bailey and Mrs. Higgins: On behalf of Fern Solar, LLC, Timmons Group is submitting a Pre-Construction Notification (PCN) for a Nationwide Permit (NWP) 51 and NWP 12 and General Certifications (GC) 4135 and 4139 associated with the Fern Solar project (Site/Project) located in Edgecombe County, North Carolina. In addition, we are requesting authorization of the proposed project under the Tar-Pamlico River Buffer Rules. The purpose of the Project is to construct a solar energy facility to provide energy services to Edgecombe County, North Carolina. The Project will require access road, utility lines (i.e. underground power lines), sediment basins and other stormwater control structures, and other renewable energy attendant features. Consequently, a total of 0.001 acres of forested wetland, 0.096 acres of emergent wetland, 201 linear feet of intermittent stream, and 72 linear of perennial stream are proposed to be permanently impacted in order to install necessary attendant features including road crossings, utility lines, and stormwater control measures. With the exception of Wetland Impacts 4 and 5, all impacts to jurisdictional features are associated with road and utility line crossings. Wetland Impacts 4 and 5 are associated with the installation of sediment basins. In addition, a total of 215 linear feet of jurisdictional ditch are proposed to be permanently impacted in order to install necessary road crossings and utility lines. Tar-Pamlico River Buffer impacts are also proposed in seven locations, all of which are associated with road crossings. All buffer crossings are less than 150 feet wide (68-foot max) through the Tar-Pamlico River buffers. Therefore, in accordance with the Tar-Pamlico River Riparian Buffer Rules (15A NCAC 02B .0259) Table of Uses, the road crossings are considered an allowable use and mitigation is not required. Please find enclosed for your review the following items: MAPS - Figure 1 – Vicinity Map - Figure 2 – Hydrologic Unit Code Map - Figure 3 – Environmental Inventory Map - Figure 4 – Preliminary Jurisdictional Wetlands and Waters of the U.S. Delineation Map (confirmed April 10, 2019) (also included in Appendix A) - Figure 4 – Preliminary Jurisdictional Wetlands and Waters of the U.S. Delineation Map (also included in Appendix A for updated confirmation) - Figure 5 – NRCS Soil Survey Map - Figure 6 – NCDWR Buffer Map (request submitted May 3, 2019; Field Confirmed May 23, 2019) - Figure 7 – Parcel Map and Property Owner Information - Figure 8 – Preliminary Jurisdictional Waters of the U.S. Impacts Map - Figure 9 – Preliminary Jurisdictional Waters of the U.S. Impacts Map - Schematics - Figure 10 – FEMA Maps Appendix A - Pre-Construction Notification Form - Access Road Additions - Fern Solar Jurisdictional Waters of the U.S. Delineation Package - Agent Authorization Appendix B - North Carolina Division of Mitigation Services, Fern Solar (issued May 28, 2019) - North Carolina Division of Water Resources Buffer Determination (RR O #19-131; issued May 29, 2019) - U.S. Army Corps of Engineers, Jurisdictional Determination (USACE Action Id.: 2018-01804; issued April 10, 2019) Appendix C - U.S. Fish and Wildlife Service (USFWS) Information for Planning and Conservation search (IPaC) April 26, 2019 - North Carolina Department of Natural and Cultural Resources - North Carolina Natural Heritage Program database search Appendix D - Fern Solar Facility Construction Documents (dated May 23, 2019) SUMMARY: Fern Solar, LLC (Applicant) is proposing the development of the Fern Solar project (Site/Project) located in Edgecombe County, North Carolina to produce and provide energy services. Consequently, a total of 0.001 acres of forested wetland, 0.096 acres of emergent wetland, 201 linear feet of intermittent stream, and 72 linear of perennial stream are proposed to be permanently impacted in order to install necessary attendant features including road crossings, utility lines, and stormwater control m easures. With the exception of Wetland Impacts 4 and 5, all impacts to jurisdictional features are associated with road and utility line crossings. W etland Impacts 4 and 5 are associated with the installation of sediment basins. In addition, a total of 215 linear feet of jurisdictional ditch are proposed to be permanently impacted in order to install necessary road and utility line crossings. When feasible, utility line and road crossings share the same location in order to minimize impacts to jurisdictional features. To minimize impacts further, all but three of the road crossings (one stream and two ditch crossings) are utilizing existing road crossing locations which only require replacing and improving existing culverts. The impacts at crossing locations are necessary for Site access and to update the culverts in order to ensure the y will not fail under the load of heavy site development equipment. Impacts have also been minimized by aligning the road and utility crossings through jurisdictional features and their buffers in places where features narrow and as close to perpendicular as possible. In order to avoid impacts to jurisdictional features where road crossings do not already necessitate impacts, utility lines crossing will be jack and bored beneath at sixteen locations. Tar-Pamlico River Buffer impacts are proposed in seven locations in association with road crossings. However, clearing activities associated with road crossings that involve cutting or the removal of woody vegetation above the ground surface are only proposed in three locations. Due to the existing Site conditions, most of the buffer crossings are located in areas that are currently active cropland and do not have woody vegetation above the ground surface. All crossings are less than 150 feet wide (68-foot max) through the Tar-Pamlico River buffers. Therefore, in accordance with the Tar-Pamlico River Riparian Buffer Rules (15A NCAC 02B .0259) Table of Uses, the road crossings are considered an allowable use and mitigation is not required. The proposed Fern Solar project is a single and complete project with appropriate land use control measures in place. Impacts to jurisdictional features have been avoided and m inimized to the maximum extent practicable by incorporating resourceful site planning, including the utilization of the wetland delineation to adjust the layout to avoid and minimize impacts. The proposed impacts are the result of the necessary infrastructure and facility layout, without which, the Project’s goals would not be realized. The Applicant proposes payment into the DMS in-lieu-fee program to satisfy the Project’s compensatory mitigation obligations and has received a letter from DMS stating willingness to accept payment for compensatory mitigation associated with the 273 linear feet of stream impact (Appendix B). To compensate for unavoidable impacts to waters of the U.S., the Applicant proposes payment into the DMS in -lieu-fee program in the amount of 345 warm stream credits to satisfy the Project’s compensatory mitigation obligations. PROJECT HISTORY & EXISTING CONDITIONS: The Site encompasses approximately 1,496.1 acres and is a complex of several individual parcels located in close proximity to each other which are connected by proposed powerline corridors . The Site is located in the Coastal Plain Physiographic Province in the northwestern corner of Edgecombe County, North Carolina, approximately 10 miles north of the Rocky Mount. The Site is dominated by agricultural and pastoral fields and mixed pine and hardwood forests that are maintained for silviculture practices. The largest parcel, around 450 acres, is located at the intersection of Morning Star Church Road and Benson Farm Road. Four parcels, that make up approximately 350 acres, are located northeast of the largest parcel near the intersection of Speights Chapel Road and Oak Forest Lane. Six parcels, that encompass approximately 450 acres, are situated southwest of the largest parcel near Battleboro -Leggett Road. The remaining 3 parcels, approximately 150 acres in total, are situated south east of the largest parcel (see Figure 1: Vicinity Map and Figure 7: Parcel Map). The Site contains jurisdictional wetlands, streams, open waters, and ditches. In addition, there are streams located within the Site that are subject to the Tar-Pamlico River Basin Riparian Buffer Rules. Timmons Group environmental scientists George Bucholz, Dan Cox, Marjorie Howren, and Roy Hunter and environmental technicians Ben Pursglove, Ben Sagara, Hunter Wines, and Melissa Davis conducted wetland delineation for the Site in March and May 2018. A jurisdictional determination by the U.S. Army Corps of Engineers was issued on April 10, 2019 (USACE Action Id: SAW -2018-01804) (included in Appendix A and B). Timmons Group environmental scientist, Ben Sagara, conducted and additional delineation on May 9, 2019 to include additional road access corridors and one location where Project limits increased. A Jurisdictional Determination Package including additional field data stations and updated mapping has been prepared and is included in Appendix A. At this time, we are requesting concurrence of the wetland delineation. A buffer determination was issued by the North Carolina Division of Water Resources (NCDWR) on May 29, 2019 (RRO #19-131). A map of the confirmed determination is included as Figure 6: NCDWR Buffer Map and the confirmation letter is included in Appendix B. Federal Emergency Management Agency (FEMA) flood maps are included for review (Figure 10: FEMA FIRM Maps). A significant portion of Project is located within an area identified flood zones. The Project has been designed to comply with applicable FEMA-approved state and local floodplain management requirements. No changes to flood elevations are anticipated. PROPOSED PROJECT: The proposed solar energy facility project, known as Fern Solar, will consist of an array of solar panels designed to provide energy services to Edgecombe County, North Carolina. Access roads throughout the Site and the extension of utility lines (i.e. underground lines) are required to collect energy that is generated from the solar panels and to connect the Project to existing utility line infrastructure. Other attendant features, such as sediment basins, will be utilized to manage stormwater runoff from the proposed Project. As a result of the development, permanent impacts to forested and emergent wetlands, intermittent and perennial streams, Tar-Pamlico buffers, and jurisdictional ditches for the installation of road crossings, utility lines, and for the construction of stormwater management controls are proposed. Each road crossing is required to gain access to developable areas within the Project limits and have been strategically placed to minimize and/or avoid wetland and stream impacts. Utility improvements, such as underground power lines, are required to provide a network of electrical power service generated by the solar energy facility. There are developable sections within the Site that are completely separated by jurisdictional systems. In order to provide a connected network of electrical power service, some wetland and/or stream systems are required to be crossed by utility lines. Most utility line crossings have been designed in a way to completely avoid jurisdictional impacts by jack and boring beneath at 16 locations where ro ad crossings do not necessitate impacts. In order to minimize jurisdictional impacts, other underground utility lines which must cross jurisdictional features have been aligned alongside roadway access improvements at locations where impacts are necessary. Utility lines in upland locations will be installed via open cut trench method. Tar-Pamlico River Buffer impacts are proposed in seven locations in association with road crossings. However, clearing activities associated with road and utility crossings that involve cutting or the removal of woody vegetation above the ground surface are only proposed in three locations . Due to the existing Site conditions, most of the buffer crossings are located in areas that are currently active cropland and do not have woody vegetation above the ground surface. All crossings are less than 150 feet wide (68-foot max) through the Tar-Pamlico River buffers. Therefore, in accordance with the Tar-Pamlico River Riparian Buffer Rules (15A NCAC 02B .0259) Table of Uses, the road crossings are considered an allowable use and mitigation is not required. Proper sedimentation and erosion control methods will be utilized during all phases of construction and installation as described in accordance with the requirem ents of the North Carolina Department of Environment and Natural Resources: Erosion Control Planning and Design Manual (May 2013) and local codes. Sediment basins will be utilized as the major method to manage stormwater runoff. As a result, there are two sediment basin that requires the placement within a jurisdictional wetland (Wetland Impact 4 and 5: Figure 8: Preliminary Jurisdictional Waters of the U.S. Impact Map, Sheets 5 and 7). The proposed grading and filling associated with the installation of these sediment basins are required to maintain proper stormwater control measures throughout the Site. The proposed Fern Solar project is a single and complete project with appropriate land use control measures in place. Impacts to jurisdictional features have been avoided and minimized to the maximum extent practicable by incorporating resourceful site planning, including the utilization of the wetland delineation to adjust the layout to avoid and minimize impacts. The proposed impacts are the result of the necessary infrastructure and facility layout, without which, the Project’s goals would not be realized. Please see Appendix D: Fern Solar Facility Construction Documents (dated May 23, 2019) for more information regarding the proposed Project. Wetland Impact Table Impact ID Wetland Type Impact Type Impact Area (Square Feet) Impact Area (AC) WI1 Forested Road and Utility Line Installation – permanent 64 0.001 WI2 Emergent Road and Utility Line Crossing – permanent 1,182 0.027 WI3 Emergent Road and Utility Line Crossing – permanent 580 0.013 WI4 Emergent Sediment Basin Grading – permanent 2,068 0.047 WI5 Emergent Sediment Basin Grading – permanent 264 0.006 WI24 Emergent Road and Utility Line Crossing – permanent 125 0.003 Total Wetland Impacts 4,283 0.097 NOTE: Where practicable, road crossings have been aligned along existing crossings and have been aligned as close to perpendicular as possible when crossing jurisdictional features. To avoid additional impacts, utility lines have proposed to be jack and bored or follow necessary road crossing impact locations in order to supplement and complete the electrical power network when there is a separation by jurisdictional features. The proposed grading and filling associated with the installation of this sediment basin is required to maintain proper stormwater control measures on this section of the Site. Stream Impact Table Impact ID Stream Type Impact Type Impact Length (LF) SI6 Perennial – UT to Beech Branch Road Crossing/Culvert Update and Utility Crossing – permanent 41 SI7 Intermittent – UT to Moccasin Creek Road Crossing/Culvert Update – permanent 35 SI8 Intermittent – UT to Swift Creek Road Crossing/Culvert Update and Utility Crossing – permanent 36 SI9 Intermittent – UT to Swift Creek Road Crossing/Culvert Update – permanent 32 SI10 Intermittent – UT to Swift Creek Road Crossing/Culvert Update – permanent 36 SI11 Perennial – UT to Swift Creek Road Crossing/Culvert Update and Utility Crossing – permanent 36 SI12 Intermittent – UT to Swift Creek Road Crossing – permanent 57 Total Stream Impacts 273 NOTE: Where practicable, road crossings have been aligned along existing crossings and have been aligned as close to perpendicular as possible when crossing jurisdictional features. To avoid additional impacts, utility lines have proposed to be jack and bored or follow necessary road crossing impact locations in order to supplement and complete the electrical power network when there is a separation by jurisdictional features. Jurisdictional Ditch Impact Table Impact ID Stream Type Impact Type Impact Length (LF) DI13 Ditch to Beech Branch Road Crossing/Culvert Update and Utility Crossing – permanent 32 DI14 Ditch to Swift Creek Road Crossing/Culvert Update and Utility Crossing – permanent 31 DI15 Ditch to Swift Creek Road and Utility Crossing – permanent 56 DI16 Ditch to Moccasin Creek Road and Utility Crossing – permanent 96 Total Ditch Impacts 215 NOTE: Where practicable, road crossings have been aligned along existing crossings and have been aligned as close to perpendicular as possible when crossing jurisdictional features. To avoid additional impacts, utility lines have proposed to be jack and bored or follow necessary road crossing impact locations in order to supplement and complete the electrical power network when there is a separation by jurisdictional features. Tar-Pamlico River Buffer Impact Table Impact ID Impact Type Allowable Use Mitigation Required Impact Area (sq. ft.) Max Impact Width (ft.) BI17 Road Crossing Yes No 5,351 68 B18 Road Crossing Yes No 4,740 56 BI19 Road Crossing Yes No 4,925 60 BI20 Road Crossing Yes No 4,985 52 BI21 Road Crossing Yes No 4,947 58 BI22 Road Crossing Yes No 4,874 60 BI23 Road Crossing Yes No 4,350 55 Total Buffer Impacts 34,172 N/A NOTE: Impacts have been minimized to the maximum extent practicable by aligning the road and crossings through the buffer as close to 90 degrees as possible. The road crossings are less than 150 feet wide and less than 1/3 of an acre through the Tar-Pamlico River buffers. Therefore, in accordance with the Tar-Pamlico River Riparian Buffer Rules (15A NCAC 02B .0259) Table of Uses, the road crossings and the overhead powerline crossing are considered an allowable use and mitigation is not required. STORMWATER MANAGEMENT: Please see Appendix D: Construction Documents; Sheet C6.0 and C6.1 This Project is located entirely within Edgecombe County, NC and is within the Tar-Pamlico River Basin. A small portion of the Project drains to Beech Branch and the remainder drains to Moccasin Creek -Swift Creek. Therefore, this Project must adhere to the requirements of the Tar-Pamlico Stormwater Rule (15A NCAC 2B .0258). This Project is considered new development as it disturbs greater than one-half acre of land for the establishment of an industrial facility (solar energy facility). The proposed stormwater management plan has been designed to protect the downstream environment. The plan incorporates biologically based stormwater management techniques to manage both water quantity and quality aspects of site runoff. Stormwater management will be accomplished by incorporating engineered SCMs throughout the Project to capture and treat the stormwater runoff from developed areas. The existing land use for the Project area is primarily cropland but also includes small portions of wooded and lawn areas. See the total Nitrogen and total Phosphorus loading calculation on Sheet C6.0 of the Construction Plans (Appendix D). The Post developed loading limit for new development is 4.0 lb/ac/yr for nitrogen and 4.0 lb/ac/yr for phosphorus. As shown in the total nitrogen and total phosphorus loading calculation on Sheet C6.0 of the Construction Documents, post development land cover for the Project area will included managed turf and impervious areas. This Project meets the requirements and could have a total of 128 acres of impervious area and still meet the loading limit. This Project meets the requirements of section 2E of the Edgecombe County Stormwater Management Program for Nutrient Control. This Project meets the criteria 1 and 2 of the exceptions to the peak flow requirement. The overall impervious surface is less than 15% and the remaining pervious portions of the Site are utilized to the maximum extent practical to convey and control the stormwater runoff. AVOIDANCE & MINIMIZATION: Impacts to jurisdictional features have been avoided and minimized to the maximum extent practicable by incorporating resourceful site planning, including the utilization of the wetland delineation to adjust the layout to avoid and minimize impacts. Each road crossing is required to gain access to developable areas within the Project limits and have been strategically placed to minimize and/or a void additional wetland and stream impacts. When feasible (in all but three impact locations; one stream and two ditch crossings) road crossings have been aligned along existing crossings and only require culvert modification. In addition, road crossings have been aligned as close to perpendicular as possible to minimize impacts when crossing wetlands, streams, and riparian buffers. Road crossing locations have been designed to cross jurisdictional features at narrow locations. Utility improvements, such as underground power lines, are required to provide a network of electrical power service generated by the solar energy facility. There are developable sections within the Site that are completely separated by jurisdictional systems. Avoidance measures will be accomplished at most of these sites during the design phase of the Project by electing to utilize the jack and bore method to avoid impacts at 16 locations and still provide a connected network of electrical power service to Project areas which are currently disconnected by jurisdictional features. In order to minimize impacts in other locations where underground utility lines must cross jurisdictional features, the utility lines have been aligned alongside roadway access crossing at locations where impacts are already necessary. Tar-Pamlico River Buffer impacts are proposed in seven locations in association with road crossings. However, clearing activities associated with road crossings that involve cutting or the removal of woody vegetation above the ground surface are only proposed in three locations. Due to the existing Site conditions, most of the buffer crossings are located in areas that are currently active cropland and do not have woody vegetation above the ground surface. Impacts have been minimized to the maximum extent practicable by aligning the road crossings through the buffer as close to 90 degrees as possible . All crossings are less than 150 feet wide through (68-foot max) the Tar-Pamlico River buffers. Therefore, in accordance with the Tar-Pamlico River Riparian Buffer Rules (15A NCAC 02B .0259) Table of Uses, the road crossings are considered an allowable use and mitigation is not required. Proper sedimentation and erosion control methods will be utilized during all phases of construct ion and installation as described in accordance with the requirements of the North Carolina Department of Environment and Natural Resources: Erosion Control Planning and Design Manual (May 2013) and local codes. Aside from impact locations, all work will take place during dry conditions and can be facilitated from high, non-jurisdictional, stable ground. The contractor shall install silt fence, inlet protection, sediment basins, diversion ditches, temporary coffer dams, tree protection, and will only clear as necessary to install devices. All erosion and sediment control measures will be checked for stability and operation following every runoff producing rainfall, but in no case less than once every week. Any needed repairs will be made immediately to maintain all measures designed. An erosion control inspections report is required and will be kept by the owner’s representative. Temporary seeding and permanent seeding plans are included to restore impacted areas. The Project will meet all relative requirements of Best Management Practices and Engineered Stormwater Control Structures as outlined through State and Local Stormwater Rules. Measures will be taken to prevent oil, tar, trash, debris and other pollutants from entering the adjacent jurisdictional features. Any excess excavated materials not utilized as back fill will be placed and contained within upland areas and permanently stabilized to prevent erosion into adjacent jurisdictional features. Therefore, stockpiling of excavated material within jurisdictional waters of the U.S. will be strictly prohibited as part of the construction of this Project. All Project construction activities initiated within jurisdictional waters of the U.S. will be carried to completion in an expeditious manner to minim ize the period of disturbance within the jurisdictional streams. The Applicant has avoided and minimized impacts to the greatest extent practicable given the goal of the Project and the purpose and need. The proposed impacts are required in order for the Project’s goals to be realized. MITIGATION: The Applicant proposes to compensate for unavoidable permanent to 273 linear feet of stream impacts associated with road construction and culvert improvements. Suitable mitigation credits from a private mitigation bank are not available at this time. On May 28, 2019, North Carolina Division of Mitigation Services (DMS) issued a Mitigation Credit Acceptance Letter stating that DMS is willing to accept payment for compensatory mitigation for 273 linear feet of impact associated with the proposed Project (Appendix B). Perennial stream impacts (72 linear feet) are proposed be mitigated for at the standard 2:1 ratio while intermittent stream impacts (201 linear feet) are proposed to be mitigated for at the standard 1:1 ratio. Therefore, to compensate for unavoidable impacts to waters of the U.S., the Applicant proposes payment into the DMS in-lieu-fee program in the amount of 345 warm stream credits to satisfy the Project’s compensatory mitigation obligations. There will be 0.097 acres of permanent wetland impact associated with a road and crossings and for the installation of stormwater control measures . Because impacts to wetlands are less than one tenth of an acre, no wetland mitigation is proposed at this time. THREATENED AND ENDANGERED SPECIES An Endangered Species Project Review was conducted to gain insight regarding the potential presence of Endangered Species Act (ESA) listed species within or in the vicinity of the Project. The following agencies and associated databases were reviewed: • U.S. Fish and Wildlife Service (USFWS) Information for Planning and Conservation search (IPaC) – provides a list of unofficial federal T&E species within the Project Area • North Carolina Natural Heritage Program (NCNHP) – Provides a query of the NCNHP database that checks for documented occurrences for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary The results of the IPaC review lists three ESA species and one proposed threatened species identified as potentially present within the Project area. The results of the NCNHP review identifies one federal and two state listed species which have been found either onsite or within a one-mile radius of the Project area. The results of this review are provided in Appendix C. The following summarizes the results of the review. • USFWS IPaC – Red-cockaded Woodpecker (Picoides borealis) FE / SE • USFWS IPaC – Tar River Spinymussel (Elliptio steinstansana) FE / SE • USFWS IPaC, NCNHP – Yellow Lance (Elliptio lanceolata) FT / SE • USFWS IPaC – Atlantic Pigtoe (Fusconaia masoni) FPT / SE • NCNHP – Eastern Lampmussel (Lampsilis radiata) ST • NCNHP – Bald Eagle (Haliaeetus leucocephalus) Bald and Gold Eagle Protection Act / ST The red-cockaded woodpecker has declined following English settlement due to expansive loss of open longleaf pine forested ecosystems which once dominated the southeast. Red-cockaded woodpeckers only nest in mature pine forests, with live longleaf pine trees being the preferred location for nesting. Red- cockaded woodpeckers are the only woodpecker species which nest in mature live trees, generally over 80 years old. Typical territory for red-cockaded woodpeckers range from 125-200 acres, though some observers have noted territories as small as 60 acres. Because the majority of the Fern Solar site is comprised of agricultural fields, and no tracts of mature pine forest of equal to or greater than 60 acres exist onsite, it is believed that no suitable habitat exists onsite for the red-cockaded woodpecker. The preferred habitat for the Atlantic pigtoe is small to large streams with coarse sand or gravel bottoms and excellent water quality where flows maintain clean, silt-free substrates. The Tar River spinymussel resides in silt-free streams with coarse sand and gravel beds in relatively in fast -flowing, well oxygenated stream reaches with excellent water quality. All surviving populations of the Tar River spinymussel are small to extremely small in size, highly fragmented and isolated from one another, and are in decline. The Tar River spinymussel has very narrow habitat requirements and requires pristine reaches of streams to survive. The Yellow Lance prefers clean, coarse to medium sized sands as substrate. On occasion, specimens are also found in gravel substrates. The Eastern Lampmussel appears to have fairly robust habitat range, inhabiting small streams, large rivers, ponds and lakes, though is usually found in streams with medium to coarse sands. Pollutants and sedimentation appear to be the major contributing factor to the decline of the Atlantic pigtoe , Yellow Lance, and Tar River spinymussel, as these restrict their ability to be mobile, capture necessary nutrients, survive, and/or reproduce. Onsite streams are generally highly altered, incised, and are generally be poor in habitat quality. Onsite streams are often located within agricultural fields an d have little to no woody growth to stabilized streambanks, or they are directly adjacent to and surrounded by agricultural fields with no or minimal vegetated buffering. Onsite streams are degraded and incised, and they are located within a watershed dominated by agricultural fields which increase non-point source pollutants and lower water quality. None of these species have been observed onsite, though the Yellow Lance (EO ID 34945) and Eastern Lampmussel (EO ID 36516) were found within a mile of the Site during a 2004 survey. The Applicant has elected to utilize a jack and bore method to allow utility lines throughout the majority of the Site to cross jurisdictional feature and fully avoids impacts. The applicant is utilizing the jack and bore method in all locations in which large or pristine wetland and stream systems are located on the Site. Impact locations have been strategically placed at locations where streams have already been highly modified and degraded. These impact locations generally have existing road crossings in place (all but two impact locations) thus they only require culvert replacement and will minimize impact . The impact locations are placed at these highly modified streams in order target unsuitable habitat for the protected mussel species in question and to decrease overall impact to biological systems and ecological processes. I t is believed that no suitable habitat exists at jurisdictional impact locations for the Atlantic pigtoe, Yellow Lance, Tar River spinymussel, or Eastern Lampmussel. Although according to the NCNH there was a bald eagle sighting in March of 2011, t he Project Area is not within 660 feet of any known bald eagle nest, nor does in intersect with eagle concentration areas. Additionally, there is no Critical Habitat identified within the Project Area. At this time, we are requesting confirmation that the proposed Project qualifies under the conditions of NWP 51 and 12 and GC 4135 and 4139. Consideration of this Project is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at (804) 200-6567. Sincerely, Timmons Group Ben Sagara Environmental Scientist MAPS U.S.G.S. QUADRANGLE(S):DATE(S):WATERSHED(S):HYDROLOGIC UNIT CODE(S): TIMMONS GROUP JOB NUMBER :PROJECT STUD Y LIMITS:LATITUDE:LON GITUDE: FE RN SOLAR FACILITYEDGECOMBE COUNTY, NORTH CAROLINAFIGURE 1: VICINITY MAP 37460.018 36.010108-77.697936 1,496.1 ACRES WHITAKERS & HARTSEASE2016 03020101UPPER TAR These plans and associated docum ents are the exclusive property of TIM MONS GRO UP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIM MONS GRO UP. Path: Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\Common Shared Exhibits\37460.016-VIC.mxd 5 0 2,800 5,600 8,400 11,200Feet Site limits are approximate.Topographic imagery from USGS. Site Limits ^_ 03010102 030102040301010603010104 03010102 03010204 03010106 03010104 03010107 03010107 03010107 03020102 03020101 03020201 03030002 03020103 03020203 03030004 Legend^_Site Marker Upper Tar (03020101) Hydrologic Unit Code DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE 1 DATE 05/02/2018 DESIGNED BY / DRAWN BY PROJECT NAME A.WILSON FERN SOLAR FIGURE 2:HYDROLOGICUNIT CODE MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY - NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE03 6 Miles Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\Common Shared Exhibits\37460.016-HUC.mxd NOTES:Site marker is approxim ate.HUC from USGS.Topographic basem ap fromEsri Online. H:1 " = 3 Miles W Me Ro RaRa Ra GoA Ro Ro Ro TaB NoBNoA WaB AyB MaA NoB NoB GyCWaB WaBNoB Ra Ra RaGoAGoA AuB RaAaA DpB NoA NoB NoA GoA AaA WaBNoA AaA Ra DgAWaBGoAGoA GoA NoB W Ra WaB TaB Ra NoA NoAW CeB NoB TaB AaA NoB BB WaBWaBAuB NoB Cc CeBRoW CeB BB Cc Ra NoA WkBTaB WaB WaC StB Ra NoA We Ly WaC AaA GoARoWaB WaB WaC WaB MaB CeBCeB WaBNoB GoA GoA AaA BB NoB WkB CeBGoA NoA WaB NoA Ra TaB WaC NoB DgA NoB AaA Ra GoA NoACeB GoA StBGyC NoB Lu CoGoA NoB GoA BB AuB WkB GoA NoA AaA GoANoB DgANoA WaB DpB NoA GoA AaA NoB Ra WeStB AuBGoA NoBGyC NoB AaA StB StB GoA AaA Ro AaA WaB Ra NoA NoA NoA WaC Ra NoB CeB WaB NoB WaB WaCW GoA NoB WaB NoC WWaB GoA CeB WaB TaB AaA GoA AuB NoBGoA NoA MaB TaB TaB NoB NoA GoA WaC WaB WaB GyC AaA GoA WaB Ra DgA MaA DpB Ro NoB Ra Ly NoA CeB Ro GoA Ra WaB Pu AaA WaB Ra AaA AaA GoA GoA Ra NoA Pt MaB WaC Ra StB AaA DpATaB NoB CeB NoB W WaC DpA TaB AaA WaB WkB StB NoB Ro Ro Ra NoA GoA TaBAaANoA BnB AaA AuB WaB WaC Ca StBCeB DgA AuB AaA TaB NoA GoA AaAWaB TaB NoB NoB AaA GyC GoA WaB GoA WkB GoA WaB WaB WaB GoA Ra NoA Ly StB WkB AaADgA Ra MaB NoA MaB NoB WaC CeB AaA StBWaB StB NoB Ro We CeB We TaB StBRo WaB DpB Ly WaB LyGoA DpB Wh TaB AaA AyB AaA Wh CeB Ro StB StB DgAGoA WkB AaA WaBNoA Wh AaA We AaA WkB TaB TaB AaA AaAStB StBWkBDgA AaA AaA AaA StB We TaB DgA AaA We CeB StB DgA AaA AaA TaB StB AaA DgA WkB We DgA DpB DgAWe CeB We WW TaB AaA AaAW AaA Ca Ro Wh W StB CeBCeBTaB We DgA Ro AaA AaADgA AaA WkB AaAStB StB We CeB AaACeB AaA DgA We TaB Ro AaA DgA AaAAaA We WkB AaAWe CeB WkB AaA AaA AaA WkB AaA AaA StB AaA AaA DgA We We AaA AaA AaA We DgA DgAStB CeBStB StB Ro DgA TaB StB StB AaAStB AaA We DgA DgA WkBStBDgAStB We WkB FERN SOLAR FACILITYFERN SOLAR FACILITYEDGECOMBE COUNTY, NORTH CAROLINAFIGURE 3: ENVIRONMENTAL INVENTORY MAP04/30/2018 L. MAJOR L. MAJOR E. VIRTS 1" = 800' 37460.016 1 DATE YOUR VISION ACHIEVED THROUGH OURS.THIS DRAWING PREPARED AT THECORPORATE OFFICE1001 Boulders Parkway, Suite 300 | Richmond, VA 23225TEL 804.200.6500 FAX 804.560.1016 www.timmons.comDRAWN BY DESIGNED BY CHECKED BY SCALE JOB NO. SHEET NO.Site DevelopmentResidentialInfrastructureEnvironmentalTechnologyDATEREVISION DESCRIPTIONPath: Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\Common Shared Exhibits\37460.016-EIM.mxdLeg end Project Stud y L im its - 1,49 6.1 Acres NHD St re am s NWI Wetlan ds All h ydric so ils No t h ydric s oils Partia lly h ydric so ils ³ Note s: Project Limits are approximate.NWI from US Fish a nd Wildlife Service.So ils data from SSUR GO.National Hydro graphy Dataset from U SG S.Ae rial image ry fro m ESRI. 0 1,6 00 3,2 00800Feet 03/22/18Project limits updated. Ma punit Sym bol Ma punit Na m eWWaterMeMeggett loamBBBibb s oilsWkBWickham s andy loam, 0 to 4 perc ent s lopesCeBConetoe loamy s and, 0 t o 4 perc ent s lopesRaRains fine sandy loamAaAAltavista fine s andy loam, 0 to 3 percent slopesNoBNorfolk loamy s and, 2 to 6 perc ent s lopesStBState loamy s and, 0 to 4 perc ent s lopesWaBWagram loamy s and, 0 to 6 perc ent s lopesGoAGoldsboro fine s andy loam, 0 t o 2 perc ent s lopesNoANorfolk loamy s and, 0 to 2 perc ent s lopesWaCWagram loamy s and, 6 to 10 perc ent s lopesGyCGritney fine sandy loam, 6 to 10 percent slopesDpBDuplin s andy loam, 2 t o 5 perc ent s lopesRoRoanoke loamPuPortsmouth fine s andy loamAuBAutryville loamy s and, 0 to 6 perc ent s lopesCaCape Fear loamMaBMarlboro s andy loam, 2 to 6 percent slopesWeWahee fine s andy loamTaBTarboro loamy s and, 0 to 6 perc ent s lopesLyLynchburg fine s andy loamWhWehadkee s ilt loamDgADogue fine s andy loam, 0 to 3 percent slopes Upper Tar Soils 05/13/19Project limits updated. DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR %% %%%%Sheet 2 Sheet 3 Sheet 4Sheet 10 Sheet 9 Sheet 5 Sheet 14 Sheet 11 Sheet 6 Sheet 13 Sheet 12 Sheet 8 Sheet 7 !(A !(C !(E !(F !(G !(H !(I!(K !(L !(N !(O !(R !(P !(S !(T !(U !(V !(W !(X !(Y !(Z !(AA !(AB!(AC!(AD !(AF !(AE !(AH !(AI !(AJ !(AK !(AL !(AM !(M !(B !(J !(AG !(AT !(AW !(BD !(BC !(BB !(AR !(AU !(AV !(AX !(AY !(AZ !(BA !(AN !(AO !(AP!(AQ !(BF !(D !(BE !(O !(AY !(CL !(L ")BZ ")CF ")BU ")CB ")BL ")BJ ")BP ")BX ")CC ")BY ")BH ")BR ")CA ")BG ")BW ")BV ")BK ")BM ")BN ")CJ")CE ")CG ")CH ")CD ")CI ")BO ")BQ")BP ")BI ")BR ")CK Hillcross Ln Battleboro-Leggett Rd Oak Forest Ln Be nson Farm Rd 1 " = 1,000 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE01,000 2,000 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 1 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation Confirmation #: Confirmation Date: COE #SAW-2018-01804 April 10, 2019 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR % AA gM/gM/ gM/gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(A !(C !(B !(D !(E !(AL ")BZ Culvert74737 5 74757477767776 7 5 74 777671 76767574 7 6 7 5 74 76 7676767777 7 7 7 7 7 777 777777 76777575767676757 675 75757 5 7 5 7 4 75 74747373 73737372777 7 77757 5 6 9 03M1-18 03N1-10 03N1-17 03N1-19 03O1-3 03P1-6 03F1-15 03F1-5 03G1-17 03G1-28 03G1-36 03G1-40 03G1-48 03G1-9 03M1-16 FDS-03G1-1 FDS-03G1-2 Oak Forest Ln 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 2 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR%%%%%%A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(F !(G !(H !(I !(J !(K !(L !(AN !(AO !(E !(CL ")BZ ")BL ")BJ ")BK ")BI ")BH ")CK Culvert Culvert Culvert 957 8 777576 74949174737271 70 76747 4 7 3 7 2 7 1 7 5 7475 74 717 0 6968 767576757 372 6 9 68977387767 27473727070 73 717 6 7376 697 6757675 68969696727 67575 75757 4 74747474747473727 3 7 3727271 72716 8 68 757 4 03H1-20 03H1-23 03H1-26 03I1-16 03K1-4 03Q1-3 03Q1-6 03S1-2 03S1-5 03T1-4 03U1-5 03V1-5 03H1-38 03J1-1 03J1-11 03L1-2 03M1-27 03M1-31 03Q1-9 07K1-17 07K1-2 FDS-03Q1-1 FDS-03Q1-2 03N5-2 03N5-7 03M5-10 03P5-4 03L5-5 03L5-23 03Q5-10 03L5-12 03L5-18 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 3 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR A gM/ A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(P !(AM !(AP !(AQ !(BF ")BM ")BN ")BG Culvert Culvert 9 4 8784 9592 9 7 95104941021 0 1 959495 94 9594888799 98 989 7 9 8 9 7 7 4 73 98979897989 7 8 8 9396919896938 6 9710594989 7 97 96 969 7 96 95106105 1 0 09999 9898969797979 7 97969 5 959592918 6 817 5 98989795 07F1-3 07H1-10 07H1-20 07H1-26 07H1-3 07F1-3 07G1-11 07G1-3 07K1-7 FDS-07G1-1 FDS-07G1-2 Sp e i g h t s Ch a p e l Rd D 3 8 9 2 .0 0 -3 7 -1 1 0 U a 03R5-2 03S5-7 07D1-12 07D1-3 07D1-9 07F4-8 07G4-6 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 4 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR gM/ gM/ gM/ gM/ A A gM/ gM/ gM/ gM/ gM/ !(N !(O !(L ")CH 94918274 7 2 73 71747 3 727177 78716 8 7 1 70676 7 857 5 7 3 84757 4 74 74 72717 1 70 686874 7 4 74 7 4 74 7 474 74 74 7 4 74 7 3 72 72 72 07H1-13 07H1-2 07I1-13 07I1-9 07J1-6 FDS-07J1-1 FDS-07J1-2 03Q5-22 03Q5-31 07A4-3 03D5-21 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 5 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR A A gM/ gM/ gM/ gM/ gM/ A gM/ A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/gM/ gM/ gM/ !(O !(R !(AT !(AR !(AU ")CH ")BP Culvert 71 68 67 74 72 71 69 7 2 71 7372 67657473727171 70 727 0687 3 6 6 7 3 727172 727 2 727165 6763 74747473737 4 7 3 73 72 7372727272 7 2 7171 70 7171 6 9 70 69 6 7 6 6 627474717107A1-27 07B1-1 07B1-9 07C1-6 07H1-2 FDS-07C1-1 FDS-07C1-2 FDS-03G5-1 FDS-03G5-1 07A4-3 03F5-8 03B5-17 03D5-12 03A5-10 03B5-2 03C5-26 03D5-21 03G5-6 03G5-1703G5-31 03E5-2 03E5-8 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 6 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR gM/ gM/ gM/ A gM/ gM/ gM/ gM/ gM/ gM/ !(M !(AW !(AV !(AX ")CJ ")BQ ")BO")BO Culvert Culvert Culvert Culvert Culvert Culvert Culvert Culvert Culvert 71 69 68 7 4 72 74 71 7170727171 6974 7 2 7 1 70 7473686773 71727 0 7 070 687371 7171 687474 7473 7273 7 3 717272 7272727272 72727 1 707 1 717069686868 7 474 7474 73 7 1 71 07D1-1 07A1-4 07A1-9 07B2-3 07D1-7 07D1-15 07C2-1 FDS-03A51-1 Battleboro-Leggett Rd 03I5-6 23A1-3 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 7 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR%%%%%%A A gM/ gM/ gM/ gM/ A A A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(S !(AY !(AZ !(AY !(AY ")CG ")BR ")CI 747 2 78757 9 71 8 1 7877747275 74 74 73 6867717 0 7471696868 67 6 8 67 77 76 7370678382 807976 7573 717266 7372 7 268 6882 7372686869696783777 6 77 7575757 4727 2 717 0 69 69 69 686867676667 65 72 7 0 03C1-11 03C1-5 03D1-9 07E1-5 FDS-03D1-1 FDS-03D1-2 FDS-24C1-1 FDS-24C1-2 Moccasin LnFDS-24C1-1 FDS-24C1-2 24A1-3 24B1-20 24B1-2724B1-33 24C1-8 24C1-25 24C1-31 24D1-2 24D1-9 07A2-2 07A2-21 07E1-20 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 8 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR % % % % %%% %%%%%%%%%%%%%%A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(S !(T !(AY !(AZ !(BA !(AY ")BR ")BR 79787782 81 75 72 8 3 7 1 78 77 75677 6 7479 717877 8 0 79 777 5 82 8181808 4 83 8382686 7 80 74737 3 72 69 8368 7 6 7183 8 2 80 7 6 7 5 73726 7 68678 4 83 8282 8179 787 7 777272727 2 717 1 70 70 70 70 6968 67 78 77 7572 67 03C1-11 03C1-5 03E1-10 03E1-20 03D1-9 FDS-03D1-1 FDS-03D1-2 Scott And Beverly Ln 24B1-27 24B1-33 24C1-25 24D1-2 24D1-9 24F1-11 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 9 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR gM/ AA gM/ gM/ gM/ gM/ A gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(V !(W !(X !(Y !(Z ")CF ")BU ")BX CulvertCulvert Culvert C ulv er t 1 0 1 9895918883969485841011009 8 1 0 6 104 10 9 1059 6 91999894898 8 101 98 95 9 4 10297112109 1051048483 8 4 8 3888785 8410510487 8 6 87868987 85 8490 93 8887 8 6 8 2 8 4 8 2 100 100 8 6 8 8 85878384 8 6 8 6 8 3 8 3 8283104 9895 9285908 8 85 84 8583838 4 848 4 8483838383 82 83858 4 84 84 84 83 8 2 82 03Z1-6 30E-4 30F-12 30F-3 30F-9 23P-11 23P-6 23L-4 23M-3 23L-12 23L-21 23L-7 25B1-6 25C1-10 25E1-36 25E1-1 25E1-3 25A1-10 25A1-5 FDS-23M-2-WetFDS-23M-Up FDS-23z-up FDS-07N1-1 FDS-25A1-1 FDS-25A1-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 10 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ AA gM/ gM/ gM/ gM/ gM/ !(U !(X !(Y !(Z !(AA !(AB !(BC !(BB ")CF ")BU ")BV ")BX ")BY ")BW ")AA ")Z CulvertCulvert Culvert C ulv er t 9896958894 8 7 97 91 85 84 87 8 6 83 818 2 81 969493918483 84 83 9 695 86 83868584 87 8 6 85 848 685 8482 83 81 969 5878686 8 3 93908 9 83809 2 9084 8 3 86 8 283 818786 84 8484 8382 82 8484 83 828 3 80797 89588 8 5 84 8 4 8 5 8 5 8383838 4 848 48383 8 2 8 2 8 1 818080 7895 848 4 84 84 838 2 8 2 82 78 03Z1-21 03Z1-34 03Z1-46 03Z1-6 03Z1-39 30F-12 30F-3 30F-9 23P-11 23P-6 23M-3 07M1-1 07M1-17 07M1-4 07O1-7 07P1-13 07P1-2 07P1-28 25C1-10 25D1-10 25D1-33 25E1-13 25E1-19 25E1-36 25E1-1 25E1-3 FDS-03Z1-1 FDS-03Z1-2 FDS-07M1-1 FDS-07M1-2 FDS-07N1-1 FDS-25A1-2 FDS-03V5-1 Battleboro-Leggett Rd FDS-03V5-1 03U5-6 03V5-9 03T5-6 03V5-3 07I4-4 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 11 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR%%% % % % gM/ AA gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A !(AJ !(AK !(BD ")CD ")CE Culvert7877747170 69 7 0 69706969686 9 686968 706971717 0 6 9 7069696 9 7070707 0 70 6871717170 71 7171696969707 0 697069 706 8 68 68696968 686868687 170 7 0 7069 69 6 9 686 8 68 68 6830D-OUT 30D-1 30D-7 30J-3 30J-6 30K-2 30K-5 30B2-4 30A2-5 FDS-30K-1 FDS-30K-2 FDS-30A2-1 FDS-30A2-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 12 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR %%% % % % A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A A A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A gM/ gM/ gM/ A A !(AA !(AC !(AD !(AF !(AE!(AG !(AH !(AI !(BD !(BE ")CB ")CD ")CA ")BY ")Z Culvert Culvert 87849588787774717069918798 8 8 78 77 7585848584 85846969688683 8 2 84908176 74 9 1 8 1 848286858484 8283 8 3 8080101818897858485848384848484 81 81 8181 7 9 807470 69 84 8 1 81 7970 68 03Z1-34 03Z1-46 03Z1-39 30A-1 30A-12 30A-14 23H-3 23I-3 30A-1 30A-6 30A-9 30B-3 30B-8 23G-2 23I-13 23I-18 23I-8 30C-10 30C-16 30C-23 30A-3 30B2-4 30A2-5 FDS-03Z1-1 FDS-23f-2 Up FDS-23h-Wet FDS-30A-1 FDS-30A-2 FDS-30A-3 FDS-03Z1-2 Battleboro-Leggett Rd FDS-30A2-1 FDS-30A2-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 13 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR gM/ gM/ ")CC Culvert 858482858384838 7 8 6 8 6 87 8 3 8184 82858 18887 8 78786 8685 848 48230C-10 30C-2Cool Spring Rd1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Limits - 1,482.3 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Statio n Culvert Perennial Stream (R3 ) Intermittent Stream (R4) %Ditch Conservation Area Palustrine Emergent (PEM) We tlands Palustrine Fores ted (PFO) Wet lands Palustrine Scrub -Shrub (PSS) Wetlan ds Palustrine Open Water (POW) 1' Topographic Contours Major Minor 14 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / V H 1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / V O 937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU84,347 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / V AB 13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / V AI 36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / V BC 519 4,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NV BH 788 2619 NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BQ 1007 NT / NV BR 1695 1928 NT / NV BS 444 NT / NV BT 560 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 158 NT / NV CK 406 NT / NV CL 1568 NT / VTotal3,470,083 177,566 512,819 77,421 8,716 22,152 1,004 2,963 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW = Palustrine Open W ater; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total We tland Area =4,237,890 sq ft 97.29 a cTotal Strea m Length =34,835 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR Sheet 2 Sheet 3 Sheet 4 Sheet 10 Sheet 9 Sheet 5 Sheet 14 Sheet 11 Sheet 6 Sheet 13 Sheet 12 Sheet 8 Sheet 7 !(A !(C !(E !(F !(G !(H !(I!(K !(L !(N !(O !(R !(P !(S !(T !(U !(V !(W !(X !(Y !(Z !(AA !(AB!(AC!(AD !(AF !(AE !(AH !(AI !(AJ !(AK !(AL !(AM !(M !(B !(J !(AG !(AT !(AW !(BD !(BC !(BB !(AR !(AU !(AV !(AX !(AY !(AZ !(BA !(AN !(AO !(AP!(AQ !(BF !(D !(BE !(O !(AY !(CL !(L ")BZ ")CF ")BU ")CB ")BL ")BJ ")BP ")BX ")CC ")BY ")BH ")CA ")BG ")BW ")BV ")BK ")BM ")BN ")CJ ")CE ")CG ")CH ")CD ")CI ")BO ")BI ")BR ")CJ ")CK Culvert Culvert Culvert ")BR Contains UnconfirmedAdditional Area Contains UnconfirmedAdditional Area Contains UnconfirmedAdditional Area Hillcross Ln Oak Fore st Ln Be nson Farm Rd 1 " = 1,000 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE01,000 2,000 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 1 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(A !(AL 75 7 4 77767 5 747 67575 747 2 71 76757 6 76767777 7 7 7 7 7 777 7 7 7 777 767576767574757 3 7 1 69777 7 77737 3 6 9 03F1-15 03F1-5 03G1-17 03G1-28 03G1-36 03G1-40 03G1-48 03G1-9 FDS-03G1-1 FDS-03G1-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 2 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(C !(B !(D !(E !(F !(G !(H !(I !(J !(K !(L !(AN !(AO !(E !(CL ")BL ")BJ ")BK ")BI ")BH ")BZ ")CK Culvert Culvert Culvert Culvert Culvert Culvert 9 5 777 4 9 77 89491877476747 6 7475 74 717 0 6968 7776 74737 372 72716 9 688076737 3 71777076 75 7574 7376 7470 69757576 767 67576 7 6 7 0 96969072727 6 76 7674 7575757 5 7 4 75 7 475 747574747373737373 72 72717271686 8 68 7 7 75757 4 03H1-20 03H1-23 03H1-26 03I1-16 03K1-4 03M1-18 03N1-10 03N1-17 03N1-19 03O1-3 03P1-6 03Q1-3 03Q1-6 03S1-2 03S1-5 03T1-4 03U1-5 03V1-5 03H1-38 03J1-1 03J1-11 03L1-2 03M1-16 03M1-27 03M1-31 03Q1-9 07K1-17 07K1-2 FDS-03Q1-1 FDS-03Q1-2 O a k F o r e s t L n 03N5-2 03N5-7 03M5-10 03P5-4 03L5-5 03L5-23 03L5-12 03L5-18 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 3 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(P !(AM !(AP !(AQ !(BF ")BM ")BN ")BG Culvert Culvert 8 7 868483 95949897959495949395 94 99 98 96959 8 9 7 1 0 5 10 49897 98 97 9795949 5 9 4 95 968893 9797106949897 9696 979 7 93 105 105 1 0 09999 9798989898 979 79796 969 5 9 59898 95 95 07F1-3 07H1-10 07H1-3 07F1-3 07G1-11 07G1-3 FDS-07G1-1 FDS-07G1-2 Oak Fore st Ln Sp e i g h t s Ch a p e l Rd D 3 8 9 2 .0 0 -3 7 -1 1 0 U a 03R5-2 03S5-7 07D1-12 07D1-3 07D1-9 07F4-8 07G4-6 FDS-25Z5-1 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 4 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(N !(L ")CH 75 74 918794927 4 7 2 97947372 989 7 747 3 727181787372 716 8 959 3 9291 7169 686771757697757 4 75 74 74 7272 7 2 717 16874 74 7 4 74 7 474 74 74 7 4 74 7 3 72 72 07H1-13 07H1-2 07I1-13 07I1-9 07H1-20 07H1-26 07J1-6 07K1-7 FDS-07J1-1 FDS-07J1-2 03Q5-10 03Q5-22 03Q5-31 07A4-3 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 5 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(O !(R !(AT !(AR !(AU ")BP Culvert Culvert Culvert Culvert 71 68 67 717 0 747372 71717 0 676573 727473 7473636274736 9 65 747372 6 6 72 71 7272717271696 5 6773 7 4 747474747 4 7 4 727 3 7 3 7 1 717272727272 72 727 2 727 17171 71 706967676 6 7474747473 72727171 07A1-27 07B1-1 07B1-9 07C1-6 07D1-7 FDS-07C1-1 FDS-07C1-2 FDS-03A51-1 FDS-03G5-1 FDS-03G5-1 03F5-8 03B5-17 03D5-12 03A5-10 03B5-2 03C5-26 03D5-21 03G5-6 03G5-1703G5-31 03E5-2 03E5-8 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 6 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(AV ")CJ ")BO")BO ")CJ Culvert Culvert Culvert 71 69 68 7 4 72 73 71 7 2 717 1 707 1 70 71 70 696873 7 27073 7273 72 71 686972716 7747474 7 3 6 872 727 2 7071717071 70 6968 7 1 07A1-4 07A1-907D1-15 Battleboro-Leggett Rd 03I5-6 23A1-3 FDS-25Z2-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 7 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(M !(AW !(AX !(AY !(AZ !(AY !(AY ")CG ")CI ")BR 8 2 8 1 7 8 7 7 747283 8 0 7 4 7 1 77 75 76 7 3 72 7168677473717 0 747 37473696868 67 6 8 67 68 65 7 1 70 716873 66 7372707 2686869777775 75 7 37474727270 69 69 67 686867 68 67 65 72 6 8 6703C1-5 07E1-5 07B2-3 07C2-1 FDS-24C1-1 FDS-24C1-2 Moccasin LnFDS-24C1-1 FDS-24C1-2 24A1-3 24B1-20 24B1-27 24B1-33 24C1-8 24C1-25 24C1-31 24D1-2 24D1-9 07A2-2 07A2-21 07E1-20 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 8 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(S !(T !(AY !(AZ !(BA !(AY ")BR ")BR79787782 81 75 72 8 3 7 1 78 77 75677 6 7479 717877 8 0 79 777 5 82 8181808 4 83 8382686 7 80 74737 3 72 69 8368 7 6 7183 8 2 80 7 6 7 5 73726 7 68678 4 83 8282 8179 787 7 777272727 2 717 1 70 70 70 6968 67 78 77 7572 67 03C1-11 03C1-5 03E1-10 03E1-20 03D1-9 FDS-03D1-1 FDS-03D1-2 Scott And Beverly Ln 24B1-27 24B1-33 24C1-25 24D1-2 24D1-9 24F1-11 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 9 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(V !(W !(X !(Y !(Z ")CF ")BU ")BX CulvertCulvert Culvert C ulv er t 1 0 1 9895918883969485841011009 8 1 0 6 104 10 9 1059 6 91999894898 8 101 98 95 9 4 10297112109 1051048483 8 4 8 3888785 8410510487 8 6 87868987 85 8490 93 8887 8 6 8 2 8 4 8 2 100 100 8 6 8 8 85878384 8 6 8 6 8 3 8 3 8283104 9895 9285908 8 85 84 8583838 4 848 4 8483838383 82 83858 4 84 84 84 83 8 2 82 03Z1-6 30E-4 30F-12 30F-3 30F-9 23P-11 23P-6 23L-4 23M-3 23L-12 23L-21 23L-7 25B1-6 25C1-10 25E1-36 25E1-1 25E1-3 25A1-10 25A1-5 FDS-23M-2-WetFDS-23M-Up FDS-23z-up FDS-07N1-1 FDS-25A1-1 FDS-25A1-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 10 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(U !(X !(Y !(Z !(AA !(AB !(BC !(BB ")CF ")BU ")BV ")BX ")BY ")BW ")AA ")Z CulvertCulvert Culvert C ulv er t 9896958894 8 7 97 91 85 84 87 8 6 83 818 2 81 969493918483 84 83 9 695 86 83868584 87 8 6 85 848 685 8482 83 81 969 5878686 8 3 93908 9 83809 2 9084 8 3 86 8 283 818786 84 8484 8382 82 8484 83 828 3 80797 89588 8 5 84 8 4 8 5 8 5 8383838 4 848 48383 8 2 8 2 8 1 818080 7895 848 4 84 84 838 2 8 2 82 78 03Z1-21 03Z1-34 03Z1-46 03Z1-6 03Z1-39 30F-12 30F-3 30F-9 23P-11 23P-6 23M-3 07M1-1 07M1-17 07M1-4 07O1-7 07P1-13 07P1-2 07P1-28 25C1-10 25D1-10 25D1-33 25E1-13 25E1-19 25E1-36 25E1-1 25E1-3 FDS-03Z1-1 FDS-03Z1-2 FDS-07M1-1 FDS-07M1-2 FDS-07N1-1 FDS-25A1-2 FDS-03V5-1 Battleboro-Leggett Rd FDS-03V5-1 03U5-6 03V5-9 03T5-6 03V5-3 07I4-4 FDS-25D5-1 FDS-25D5-2 25D5-1 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 11 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(AJ !(AK !(BD ")CD ")CE Culvert7877747170 69 7 0 69706969686 9 686968 706971717 0 6 9 7069696 9 7070707 0 70 6871717170 71 7171696969707 0 697069 706 8 68 68696968 686868687 170 7 0 7069 69 6 9 686 8 68 68 6830D-OUT 30D-1 30D-7 30J-3 30J-6 30K-2 30K-5 30B2-4 30A2-5 FDS-30K-1 FDS-30K-2 FDS-30A2-1 FDS-30A2-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 12 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR !(AA !(AC !(AD !(AF !(AE!(AG !(AH !(AI !(BD !(BE ")CB ")CD ")CA ")BY ")Z Culvert Culvert 87849588787774717069918798 8 8 78 77 7585848584 85846969688683 8 2 84908176 74 9 1 8 1 848286858484 8283 8 3 8080101818897858485848384848484 81 81 8181 7 9 807470 69 84 8 1 81 7970 68 03Z1-34 03Z1-46 03Z1-39 30A-1 30A-12 30A-14 23H-3 23I-3 30A-1 30A-6 30A-9 30B-3 30B-8 23G-2 23I-13 23I-18 23I-8 30C-10 30C-16 30C-23 30A-3 30B2-4 30A2-5 FDS-03Z1-1 FDS-23f-2 Up FDS-23h-Wet FDS-30A-1 FDS-30A-2 FDS-30A-3 FDS-03Z1-2 Battleboro-Leggett Rd FDS-30A2-1 FDS-30A2-2 1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 13 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/25/2018 DESIGNED BY / DRAWN BY PROJECT NAME L. WHEELER FERN SOLAR ")CC Culvert 858482858384838 7 8 6 8 6 87 8 3 8184 82858 18887 8 78786 8685 848 48230C-10 30C-2Cool Spring Rd1 " = 150 'H: FIGURE 4:PRELIMINARYJURISDICTIONALWATER OF THEU.S. DELINEATIONMAP REVISIONS MM/DD/YY#DESCRIPTION 2 05/10/2019 Updated Per Updated Project Limits. 3 Per NCDWR Site Visit.05/23/2019 These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-WETD_20190510.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Project Study Limits - 1,496.1 Acres Unconfirmed Additional Areas - 13.7 Acres ")X Stream Identifier !(X Wetland Identifier gM/Wetland Flag A Field Data Station CulvertPerennial Stream (R3 )Intermittent Stream (R4)Ephemeral Stream (R6) %Ditch Conservation Area Palustrine Emergent (PEM) Wet landsPalustrine Forested (PFO) WetlandsPalustrine Scrub-Shrub (PSS) WetlandsPalustrine Open Water (POW) 1' Topographic Con tours MajorMinor 14 of 14 1 02/07/2019 Per COE confirmation. PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / V E 24,398 849 NT / VF2,921 NT / V G 8,673 NT / VH1,739 NT / V I 3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / V U 102,647 NT / VV35,224 NT / V W 1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / V AH 7,782 NT / VAI36,342 17,273 NT / V AJ 9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / V AV 4,387 NT / VAW48,444 NT / V AX 31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NV BI 941 NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub W etland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal W etlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total W e tla nd Area =4,256,190 sq ft 97.71 acTotal Stre a m Le ngth =33,057 lf Resource Identification Confirma tion U.S.G.S. QUADRANGLE(S):DATE(S):WATERSHED(S):HYDROLOGIC UNIT CODE(S): TIMMONS GROUP JOB NUMBER :PROJECT STUD Y LIMITS:LATITUDE:LON GITUDE: FE RN SOLAR - GE ENEXEDGECOMBE COUNTY, NORTH CAROLINAFIGURE 5: NR CS SOIL SURVEY MAP 37460.018 36.010685-77.696913 1,496.1 ACRES WHITAKERS & HARTSEASE2016 03020101UPPER TAR These plans and associated docum ents are the exclusive property of TIM MONS GRO UP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIM MONS GRO UP. Path: Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\Common Shared Exhibits\37460.016-NRCS.mxd 5 0 2,500 5,000 7,500 10,000Feet Site limits are approximate.Topographic imagery from USGS. Site Limits DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR %% %%%%%Sheet 2 Sheet 3 Sheet 4 Sheet 10 Sheet 9 Sheet 5 Sheet 14 Sheet 11 Sheet 6 Sheet 13 Sheet 12 Sheet 8 Sheet 7 !(A !(C !(E !(F !(G !(H !(I!(K !(L !(N !(O !(R !(P !(S !(T !(U !(V !(W !(X !(Y !(Z !(AA !(AB!(AC!(AD !(AF !(AE !(AH !(AI !(AJ !(AK !(AL !(AM !(M !(B !(J !(AG !(AT !(AW !(BD !(BC !(BB !(AR !(AU !(AV !(AX !(AY !(AZ !(BA !(AN !(AO !(AP!(AQ !(BF !(D !(BE !(O !(AY !(CL !(L ")BZ ")CF ")BU ")CB ")BL ")BJ ")BP ")BX ")CC ")BY ")BH ")CA ")BG ")BW ")BV ")BK ")BM ")BN ")CJ")CE ")CG ")CH ")CD ")CI ")BO ")BI ")BR ")CJ ")CK Culvert Culvert Culvert ")BR Hillcross Ln Oak Forest Ln Be nson Farm Rd 1 " = 1,000 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE01,000 2,000 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 1 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR AA gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(A !(AL 7574767575 7 4 72 7 1 7 7 7 6 7371 74 7 7 77 76767 6 7777 7 7 77 7677 7 7 777777 7676 767 6 75767675757475757 47369 77777 7 7 7 777 7 7 7 7 3 736 9 03F1-15 03F1-5 03G1-17 03G1-28 03G1-36 03G1-40 03G1-48 03G1-9 FDS-03G1-1 FDS-03G1-2 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 2 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR%%%%%%%A A gM/ gM/ gM/ gM/ gM/ gM/ gM/gM/ gM/gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(C !(B !(D !(E !(F !(G !(H !(I !(J !(K !(L !(AN !(AO !(E !(CL ")BL ")BJ ")BK ")BI ")BH ")BZ ")CK Culvert Culvert Culvert Culvert Culvert Culvert 95 78777 6 7 4 94918774757476747170 75 7476757574 7 675 767572 71 757474737 372 72716 9 68 97 757273777069 687674 76 70777576 76 767676756 9 9696969572777675 7 6 7675757574 75757575757575757575757 5 7 4 75 7 4 74747475 7473747 47373 737371727372 727171 71 706 9 6868 7 5 75 757 4 72 03H1-20 03H1-23 03H1-26 03I1-16 03K1-4 03M1-18 03N1-10 03N1-17 03N1-19 03O1-3 03P1-6 03Q1-3 03Q1-6 03S1-2 03S1-5 03T1-4 03U1-5 03V1-5 03H1-38 03J1-1 03J1-11 03L1-2 03M1-16 03M1-27 03M1-31 03Q1-9 07K1-17 07K1-2 FDS-03Q1-1 FDS-03Q1-2 O a k F o r e s t L n 03N5-2 03N5-7 03M5-10 03P5-4 03L5-5 03L5-23 03L5-12 03L5-18 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 3 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR A gM/ A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A !(P !(AM !(AP !(AQ !(BF ")BM ")BN ")BG Culvert Culvert 8 8 8 7 8 6 84839594959 4 98971021 0 1 9 5 95949 8 9 7 9 9 98 979595 94 9 493 98 9798 9 7 9796 9 4 10499979 6 93103 98 9 8 9796 9 7 9 7 93 1 0 5 106 105 1 0 59499989898 989898989896979797979 79696 969 6 9 5 959 6 9595 9592 92989797 07F1-3 07H1-10 07H1-3 07F1-3 07G1-11 07G1-3 FDS-07G1-1 FDS-07G1-2 O a k Fore st Ln Sp e i g h t s Ch a p e l Rd D 3 8 9 2 .0 0 -3 7 -1 1 0 U a 03R5-2 03S5-7 07D1-12 07D1-3 07D1-9 07F4-8 07G4-6 FDS-25Z5-1 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 4 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR gM/ gM/ gM/ gM/ A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(N !(L ")CH 74 73 7 5 7 2 9190878482 74 71716867 94919 3 92 989797959 4 927574 73 72 7675757474 73 7 2 7172718 8 7870 6 8 72 70 6 9 93969797949 2 9292 72 757 5 74 74 7471 71 71 70 6874 74 74 74 7 4 74 74 74 7 3 72 72 07H1-13 07H1-2 07I1-13 07I1-9 07H1-20 07H1-26 07J1-6 07K1-7 FDS-07J1-1 FDS-07J1-2 03Q5-10 03Q5-22 03Q5-31 07A4-3 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 5 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR A A gM/ gM/ gM/ gM/ A A gM/ A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/gM/ gM/ gM/ !(O !(R !(AT !(AR !(AU ")BP Culvert Culvert Culvert Culvert 68 67 71 667 4717 0 747372 7171 70 73 72 737272717473747 3 74 7 3 69 65 736766 72 7 1 687273 7 4 726766 6 5 63 74747473 73747374 7371 71717172727272 7272 72 727272 7271 717 1 71 7069 6969676 7 6 5 627 4 74 7 4 7 4 74 7 1 7 1 07A1-27 07B1-1 07B1-9 07C1-6 07D1-7 FDS-07C1-1 FDS-07C1-2 FDS-03A51-1 FDS-03G5-1 FDS-03G5-1 03F5-8 03B5-17 03D5-12 03A5-10 03B5-2 03C5-26 03D5-21 03G5-6 03G5-1703G5-31 03E5-2 03E5-8 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 6 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR gM/ gM/ gM/ gM/ gM/ A !(AV ")CJ ")BO")BO ")CJ Culvert Culvert Culvert 72 71 68 74 71 72 70727172 71 7 1 706968737271 70 7 4 737 4 7 3 72 696 8 69 73 69 6968 6 77371 717071 69 70747272 7272727 2727271 726870 7170 71 69 70 7 068 71 07A1-4 07A1-907D1-15 Battleboro-Leggett Rd 03I5-6 23A1-3 FDS-25Z2-2 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 7 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR%%%%%%%%%gM/ gM/ A A gM/ gM/ gM/ A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(M !(AW !(AX !(AY !(AZ !(AY !(AY ")CG ")CI ")BR8178777475 7 3 83 8 2 777674 72 74 73 72 77 75 71707 4 7 1 75 7 2 727 1676967737 2 7 4 73696869686867 80 717373 7 2 68 66 72706873727268686 9 676 879 77 757575 75747 4 7373727272727 2 7070 70 696969696969 68686 7 686 8 68 67 65 72 6 9 686 703C1-5 07E1-5 07B2-3 07C2-1 FDS-24C1-1 FDS-24C1-2 Moccasin LnFDS-24C1-1 FDS-24C1-2 24A1-3 24B1-20 24B1-2724B1-33 24C1-8 24C1-25 24C1-31 24D1-2 24D1-9 07A2-2 07A2-21 07E1-20 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 8 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR % %%% %%% %%%%%%%%%%%%%%%%%%%%%%%%%%%A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(S !(T !(AY !(AZ !(BA !(AY ")BR ")BR7978777484 82 81 7877747 9 75 76717267807983827 77 5 8 3828180 73727 2 718 4 8 3 8 4 83 82 8 1 81 80 7 1 70 68678 0 7 573 72717370 66787 769 68 766 780767573 6868678483 838382828282 82 8 1 79 79 7878 77 77757 5 75 7272727 2 7170 7 0 7 0 7 0 70 6968 68 6767 6667 77 7 2 03C1-11 03C1-5 03E1-10 03E1-20 03D1-9 FDS-03D1-1 FDS-03D1-2 Scott And Beverly Ln 24B1-27 24B1-33 24C1-25 24D1-2 24D1-9 24F1-11 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 9 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR gM/ AA gM/ gM/ gM/ gM/ A gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ !(V !(W !(X !(Y !(Z ")CF ")BU ")BX CulvertCulvert Culvert C ulv er t 1 0 6105104 981011 0 0 1 0 1 9895941059392861048591898 8 9998959492 98 9 7 9 5 9 4 10396919 0 1051 0 4 84 8 3 86 84 113 112 8 4 8 3 85 848988 86 83 87 83 85 8485 8384 838685 8 382 1 0 9 10810799 9 7 102 1 0 1 8887 82111 878 68382110100 99 9986 8587878584 8 2858 4 8 3 838210910 4 102999896 8 595 938 887 8 6 8 4 8 38385848485858483 848483838383 8 4 8484 8 2 8 282 03Z1-6 30E-4 30F-12 30F-3 30F-9 23P-11 23P-6 23L-4 23M-3 23L-12 23L-21 23L-7 25B1-6 25C1-10 25E1-36 25E1-1 25E1-3 25A1-10 25A1-5 FDS-23M-2-WetFDS-23M-Up FDS-23z-up FDS-07N1-1 FDS-25A1-1 FDS-25A1-2 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 10 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ AA gM/ gM/ gM/ gM/ gM/ A A gM/ !(U !(X !(Y !(Z !(AA !(AB !(BC !(BB ")CF ")BU ")BV ")BX ")BY ")BW ")AA ")Z CulvertCulvert Culvert C ulv er t 989695918894 92 1 0 0 8 7 8786 84 8 2 81969594929 190 96 9 5 87 86 86 83 84 83 85 84 8 2 81 84 83 85 8486848684848387858682 8 4 8 3 84 83 82 8 1 81 809793 908 9 8 3 8 0 938 6 86 8 285 828 4 8384828281 78 99 9998969595 8 887 838 3 8584 8584 848585 8 5 85 838484 8 483838382 8 2 82828 2 8 1 8 1 808 1 7980 80 7 8 8 4 8 4 8 4 8 4 8 4 838 2 8 2 8 2 8 2 82 03Z1-21 03Z1-34 03Z1-46 03Z1-6 03Z1-39 30F-12 30F-3 30F-9 23P-11 23P-6 23M-3 07M1-1 07M1-17 07M1-4 07O1-7 07P1-13 07P1-2 07P1-28 25C1-10 25D1-10 25D1-33 25E1-13 25E1-19 25E1-36 25E1-1 25E1-3 FDS-03Z1-1 FDS-03Z1-2 FDS-07M1-1 FDS-07M1-2 FDS-07N1-1 FDS-25A1-2 FDS-03V5-1 Battleboro-Leggett Rd FDS-03V5-1 03U5-6 03V5-9 03T5-6 03V5-3 07I4-4 FDS-25D5-1 FDS-25D5-2 25D5-1 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 11 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR%%% % % % gM/ AA gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A !(AJ !(AK !(BD ")CD ")CE Culvert777472717069 69 6 8 7170696870 69 7 0 6969686968 696875707869 6869696 9 69 706970 7070707 0 7170707171717171 717 169 69697070 69 7 0 69 6 8 68 69696968696 9 6969 68 68 6969 6 9 6 8 68686870 7 0 707069 69 686 8 6 8 6 8 68 30D-OUT 30D-1 30D-7 30J-3 30J-6 30K-2 30K-5 30B2-4 30A2-5 FDS-30K-1 FDS-30K-2 FDS-30A2-1 FDS-30A2-2 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 12 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR %%% % % % A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A A A A A gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ gM/ A gM/ gM/ gM/ A A !(AA !(AC !(AD !(AF !(AE!(AG !(AH !(AI !(BD !(BE ")CB ")CD ")CA ")BY ")Z Culvert Culvert 84 75 74 7776 87 85 989573 72827877747170699 8 9 1 8 8 8 7 8 4858485848584 706 9 84 81 808 1 80 69688886759 5 92 909185838382 78817986 84 8081 978 8858484858484848484848484848482 8381 7979706969 688684 8 1 81 03Z1-34 03Z1-46 03Z1-39 30A-1 30A-12 30A-14 23H-3 23I-3 30A-1 30A-6 30A-9 30B-3 30B-8 23G-2 23I-13 23I-18 23I-8 30C-10 30C-16 30C-23 30A-3 25E1-19 30B2-4 30A2-5 FDS-03Z1-1 FDS-23f-2 Up FDS-23h-Wet FDS-30A-1 FDS-30A-2 FDS-30A-3 FDS-03Z1-2 Battleboro-Leggett Rd FDS-30A2-1 FDS-30A2-2 1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 13 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/03/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR gM/ gM/ ")CC Culvert 8584828187 86 868384 838 6 83 8183 8484 8 2858887 87 87 878786 8585 85848 48286 30C-10 30C-2Cool Spring Rd1 " = 150 'H: FIGURE 6: NCDWRBUFFER MAP REVISIONS MM/DD/YY#DESCRIPTION 1 05/23/2019 Per NCDWR Site Visit. These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAREDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0150300 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WetlandDelineation\37460.018-NCDWR_Buffer_Map.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Project Study Limits - 1,496.1 Acres ")X Stream Identifier !(X Wetland Identifier Culvert Perennial Stream (R 3) Intermittent Stream (R4) Ephemeral Stream (R6) %Ditch Palustrine Emergent (PEM ) Wetlands Palustrine Forested (PFO ) Wetlands Palustrine Scrub-Shr ub (PSS) Wetlands Palustrine Open Water (POW) 50' Tar-Pamlico Riv er Buffer Conservation Area 1' Topographic Contours Major Minor 14 PFO(sq ft)PSS(sq ft)PEM(sq ft)POW(sq ft)R3(lf)R4(lf)R6(lf)Ditch(lf)A 222,920 NT / VB1,702 NT / VC5,949 NT / VD77322,712 NT / VE24,398 849 NT / VF2,921 NT / VG8,673 NT / VH1,739 NT / VI3,172 2,833 NT / VJ3,408 NT / VK3,253 NT / VL162,062 38,776 183,222 NT / VM9,117 NT / NVN24,791 81,331 NT / VO937,168 NT / VP29,943 NT / VR9,241 NT / VS62,653 NT / VT31,266 NT / VU102,647 NT / VV35,224 NT / VW1,362 60,587 NT / VX27,886 NT / VY18,067 NT / VZ49,576 NT / VAA505,853 22,089 4,314 NT / VAB13,316 NT / VAC16,546 NT / VAD184,456 9,860 NT / VAE20,136 NT / VAF13,900 NT / VAG3,932 NT / VAH7,782 NT / VAI36,342 17,273 NT / VAJ9,099 NT / VAK59,961 NT / VAL172,654 NT / VAM82,331 NT / VAN27,852 11,164 23,877 53,564 NT / NVAO35,277 NT / VAP5,286 NT / VAQ1,511 NT / VAR14,741 NT / NVAT71,948 NT / VAU13,208 NT / VAV4,387 NT / VAW48,444 NT / VAX31,104 NT / VAY484,942 NT / VAZ12,380 NT / VBA20,559 NT / VBB17,583 NT / VBC5194,735 NT / VBD1,336 NT / VBE15,902 NT / VBF4,246 NT / VBG3456NT / NVBH7882619NT / NVBI941NT / NV BJ 194 NT / NV BK 785 NT / NV BL 180 NT / NV BM 428 NT / NV BN 856 NT / NV BO 3443 NT / NV BP 471 NT / NV BR 515 3123 NT / NV BU 246 NT / NV BV 519 NT / NV BW 2590 NT / NV BX 1080 NT / NV BY 1728 NT / NV BZ 92 NT / NV CA 1207 969 NT / NV CB 130 NT / NV CC 937 NT / NV CD 538 NT / NV CE 795 1466 NT / NV CF 58 NT / NV CG 540 NT / NV CH 391 NT / NV CI 1192 NT / NV CJ 385 NT / NV CK 397 NT / NV CL 1568 NT / VTotal3,488,383 177,566 512,819 77,421 8,716 20,192 0 4,149 * T=Tidal; NT=Non-tidal; V=Vegetated; NV=Non-Vegetated; PFO=Palustrine Forested Wetland; PSS=Palustrine Scrub-Shrub Wetland; PEM=Palustrine Emergent Wetland; POW= Palustrine Open Water; EIW= Estuarine Intertidal Wetlands; R3= Upper Perennial Streams; R4=Intermittent Streams; R6 = Ephemeral Streams ResourceDescriptionNotes* Total Wetland Area =4,256,190 sq ft 97.71 a cTotal Stre am Length =33,057 lf Resource Identification Confirmation U.S.G.S. QUADRANGLE(S):DATE(S):WATERSHED(S):HYDROLOGIC UNIT CODE(S): TIMMONS GROUP JOB NUMBER :PROJECT STUD Y LIMITS:LATITUDE:LON GITUDE: S S S B AC G J M I F W Y O P AD D D AB AA K N X C A E Q Q L Z T V R AB AB O H H H I U E P P ABAAW K PPrice RdWildflo w er L n Grove Ch RdL arkLnSevenBridges RdGreenAcres Ln Falli ngLeaf LnN C 9 7West WellsRd New HopeCh RdCro wnviewLn N C 9 7 West Spei ght sChapel RdHi llcros s Ln GoldenValleyLnFieldstoneLn SpeightsChapelRdNC 97 W est Battleboro-LeggettRd P rice RdMoccasinLnBeacon Tower LnDunbarWoodsRd Battleboro-LeggettRd DunbarWoodsRdSevenBridgesRdBattleboro-Leggett Rd Battleboro-LeggettRd Elmwood LnNewHopeChRdNC 97 West Benson Farm Rd D 3 8 9 2 .0 0 -3 7 -1 1 0 U a B attleboro-LeggettRdSeven Bridges RdMorning Star Ch RdBattleboro-LeggettRd NC 97 West SevenBridgesRdFoxcr o f t L nL e g g e tt R d Battleboro-LeggettRd M orning Star C h R d O akForestLn White Oak SwampRd S peightsChapelRdTreat mentPlantRdWrentreeLnN e w Hope Ch R dBenson Farm Rd SwiftC reekLnSevenBridgesRd Goose Hollow LnM o rning S tar Ch Rd Spei ght s Chapel RdMarriottRd SevenBridgesRdSpeightsChapelRdBattleboro-Leggett RdMorningStarChRd Cool Spring RdFE RN SOLAR FACILITYEDGECOMBE COUNTY, NORTH CAROLINAFIGURE 7: P ARCEL MAP 36.010108-77.697936 1,496.1 ACRES WHITAKERS & HARTSEASE2016 03020101UPPER TAR These plans and associated docum ents are the exclusive property of TIM MONS GRO UP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIM MONS GRO UP. Path: Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\Common Shared Exhibits\37460.016-Parcel Map.mxd 5 0 3,500 7,000 10,500 14,000Feet Site limits are approximate. Legend Project Study Limits - 1,496.1 Acres Edgecombe County Parcels La be l ownerAADCOX MARK K et alBADCOX ROBERT STEPHENCANDERSON CALVIN CDBOSEMAN JOEL MEBRAKE HELEN BROW N et alFBULLUCK JERRY P et alGBULLUCK JOHN GARYHBULLUCK W ALTER PHILIP et alIBULLUCK W ILEY WARREN JR et alJCASSANOVA ALICE MARIE BENSONKCRAVEN GARRY W et alLCREEKSIDE PROPERTIES AND FARMS INCMFLYE BRUCE LEA et alNFOXCROFT FARMS LLCOHARRELL FLOYD W et alPHENDRICKS GEORGE ROBERT et alQHUNTER MICHAEL D'ANGLO et alRKING DORRANSMARROW JAMES CHALMERS JR et alTMELVIN JONATHAN LUTHERUPHILIPS BURT TYREEVRAMIREZ JOSE LUIS VASQUEZ et alWSEGURA SARAH BXSHAW GAIL MYSTEWART GEORGE M JRZTHOMAS THERESAAATHOMPSON ARCHIE T JR et alABTHOMPSON WILBUR et alACWARD LEROY et alADWHEELER HILMA RAY Pa rce l Information PROPERTY OWNERS 3882-36-1316 BULLUCK JERRY P et al P O BOX 273 BATTLEBORO NC 27809 3882-32-3627, 3882-61-7569, 3882-54-9599, 3882-45-6499, 3882-45-6898, 3882-65- 4387, 3882-66-1224 BULLUCK WALTER PHILIP et al 5970 MORNING STAR CHURCH RD BATTLEBORO NC 27809 3892-99-4574 CRAVEN GARRY W et al 5000 OLD GREENSBORO RD THOMASVILLE NC 27360 3882-98-0552, 3892-15-8962 HARRELL FLOYD W et al 6434 NC 42 E TARBORO NC 27886 3892-43-2498, 3892-53-5188, 3892-62-8026 HENDRICKS GEORGE ROBERT et al 3122 BATTLEBORO LEGGETT RD BATTLEBORO NC 27809 3882-13-0975 MARROW JAMES CHALMERS JR et al P O BOX 519 TARBORO NC 27886 3892-59-1518, 3893-52-1218 OAK FOREST PLANTATION LLC et al 3133 SPEIGHTS CHAPEL ROAD WHITAKERS NC 27891 3882-66-9501, 3882-77-4399, 3882-77-8095 PHILIPS BURT TYREE BOX 132 BATTLEBORO NC 27809 3892-67-7234, 3892-48-8151 THOMPSON WILBUR et al 20202 WALLSTONE CT SPRING TX 77388 Property Name APN Address Bulluck Walter Philip - 1 3882-61-7569 Battleboro-Leggett RD Battleboro, NC 27809 Bulluck Walter Philip - 2 3882-32-3627 5202 Battleboro-Leggett RD Battleboro, NC 27809 Bulluck Walter Philip - 3 3882-54-9599 Morning Star Church RD Battleboro, NC 27809 Bulluck Jerry P 3882-36-1316 Battleboro-Leggett RD Battleboro, NC 27809 Bulluck Wiley Warren Jr - 1 3882-45-6499 Battleboro-Leggett RD Battleboro, NC 27809 Bulluck Wiley Warren Jr - 2 3882-45-6898 Morning Star Church RD Battleboro, NC 27809 Bulluck Wiley Warren Jr - 3 3882-65-4387 5804 Morning Star Church RD Battleboro, NC 27809 Bulluck Wiley Warren Jr - 4 3882-66-1224 5706 Morning Star Church RD Battleboro, NC 27809 Philips Burt Tyree - 1 3882-66-9501 Morning Star Church RD Battleboro, NC 27809 Philips Burt Tyree - 2 3882-77-4399 SR 1415 Battleboro, NC 27809 Philips Burt Tyree - 3 3882-77-8095 Morning Star Church RD Battleboro, NC 27809 Harrell Floyd Wayne - 1 3892-15-8962 Morning Star Church RD Battleboro, NC 27809 Harrell Floyd Wayne - 2 3882-98-0552 Morning Star Church RD Battleboro, NC 27809 Thompson Archie T 3893-52-1218 SR 1409 Battleboro, NC 27809 Thompson Archie T Jr 3892-59-1518 Speight's Chapel RD Battleboro, NC 27809 Thompson Wilbur - 1 3893-80-8370 Speight's Chapel RD Battleboro, NC 27809 Thompson Wilbur - 2 3892-48-8151 Speight's Chapel RD Battleboro, NC 27809 Thompson Wilbur - 3 3892-67-7234 Speight's Chapel RD Battleboro, NC 27809 Hendricks George Robert - 1 3892-62-8026 3122 Battleboro-Leggett RD Battleboro, NC 27809 Boseman Joel/Hendricks George Robert - 2 3892-53-5188 3019 Battleboro-Leggett RD Battleboro, NC 27809 Edgecombe County, NC GIS Parcel Database Hendricks George Robert - 3 3892-43-2498 3122 Battleboro-Leggett RD Battleboro, NC 27809 Hendricks George Robert - 4 3892-31-9482 Battleboro-Leggett RD Battleboro, NC 27809 Brake Helen 3892-32-2849 3738 Battleboro-Leggett RD Battleboro, NC 27809 Marrow James Chalmers Jr 3882-13-0975 2419 Cool Spring Road Battleboro, NC 27809 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR %% %%%%%PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGU PGU PGU PGU PGUPGUPGU PGU PGU PGU PGU PGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGUPGU PGU PGUPGU PGU PGUPGUPGU PGUPGUPGUPGUPGUPGU PGU PGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGUPGUPGU PGUPGUPGUPGUPGUPGU PGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGU PGUPGUPGUPGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGUPGUPGUPGU PGU PGUPGUPGUPGUPGUPGUDOLDOLDOL DOL DOL DOL DOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOLDOLDOL DOLDOL DOLDOLDOLDOLDOLDOLDOL DOL DOL D OL DOL DOL DOLD O L DOL DOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL D O LDOLDOL DOL DOLDOLDOLDOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOLDOL DOLDOL DOLDOLDOLDOLDOLD O L DOL DOL DOLDOL DOL DOL DOL DOL DOLDOLDOL DOLDOL DOL DOLDOLDOLDOLDOLDOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOLDOLDOL DOL D O L DOLDOL DOL DOLDOLDOLDOLD O L DOLDOLDOLDOLDOLDOLDOLD O L DOLD OL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOLDOLDOL DOLDOLDOL DOLDOLDOLDOL DOL DOLDOLDOLDOL DOLDOLDOLDOLDOLDOL DOLDOLDOLDOLDOLDOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOL D O L DOLDOLDOLDOL DOL DOLDOLDOLDOLDOLDOLDOL DOLDOLDOLD O LDOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLD O L DOLDOLDOLDOLDOLDOLDOLDOLDOL DOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOLDOLDOL DOL DOLDOLDOLDOLDOLSheet 9 Sheet 10 Sheet 11 Sheet 6 Sheet 4 Sheet 5 Sheet 2 Sheet 3 Sheet 7 Sheet 8 Hillcross Ln Oak Forest Ln Be nson Farm Rd !(1 !(3 !(2 !(4 !(5 ")10 !(17 !(18 !(19 !(20 !(21 !(22 1 " = 1,000 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE01,000 2,000 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 1 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLARPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGU PGU PGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGUPGUPGU PGU PGU PGU PGU PGU PGU PGU PGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL")6 ")6 !(17 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 2 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR %%%% % % % % %PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUDOL DOL DOLDOL DOLDOL DOL DOLDOLDOLD O L DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL")15 Battleboro-Leggett Rd 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 3 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLARPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUP GUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGUDOLDOLDOLDOLDOLD OL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLD O L DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLD O L D O L D O L DOL D OL D OL D O L DOLDOLDOLDOLDOLDOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL!(1 !(3 !(2 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 4 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGUPGUPGU PGU PGU PGUPGUPGUPGUPGUPGUPGUDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL D O L DOLDOLDOLDOLDOLDOLDOLDOL DOL D O L D O L D O L DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOLDOLDOLDOLDOLDOLDOLDOL")7 ")7 !(18 !(4 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 5 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR % % % % % % %%%% % %%%%%%%%%%%%%%%%%%%%%%%%%PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGUPGUPGU PGUPGUPGUPGUPGUPGUPGUDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL ")16 Scott And Beverly Ln 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 6 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLARPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOL DOL DOL DOL DOL DOLDOLDOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL DOL ")9 ")9 !(20 !(5 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 7 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLARDOLDOLDOLDOLDOLDOLD O L D O L D O L D O L DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL")12 !(19 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 8 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR%%PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGU PGUPGU DOL DOLDOL DOLDOLDOL DOL DOLDOLDOLDOLD O L DOL DOL D O L D O L DOL DOL DOL D O L DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOL D O L D O L D O L D O L D O L DOLDOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOL DOL ")10 ")10 !(23 O a k F o r e s t L n 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 9 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR%%%%%%%PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUDOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL")13 ")13 ")14 ")11 ")11 !(21 !(24 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 10 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLARPGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGUPGU PGU PGUDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL D O L D O L DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL DOL DOL DOL DOL DOL DOL DOL DOLDOLDOLDOLDOLDOLDOLDOLDOL DOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOLDOL")8 ")8 !(22 D 3 8 9 2 .0 0 -3 7 -1 1 0 U a 1 " = 100 'H: FIGURE 8:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE0100200 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 11 of 11 DRAWING DESCRIPTION PROJECT NAME & LOCATION SHEET NUMBERSCALE DATE 05/21/2019 DESIGNED BY / DRAWN BY PROJECT NAME A. MEHFOUD FERN SOLAR FIGURE 9:PRELIMINARYJURISDICTIONALWATERS OF THEU.S. IMPACTS MAP- SCHEMATICS REVISIONS MM/DD/YY#DESCRIPTION These plans and associated documents are theexclusive property of TIMMONS GROUP andmay not be reproduced in whole or in part andshall not be used for any purpose whatsoever,inclusive, but not limited to construction, bidding,and/or construction staking without the expresswritten consent of TIMMONS GROUP. PROJECT NUMBER37460.018FERN SOLAR FACILITYEDGECOMBE COUNTY,NORTH CAROLINA1001 Boulders Parkway, Suite 300Richmond, VA 23225TEL 804.200.6500www.timmons.com[ PLANS PRINTED AS 11X17 ARE HALF SCALE01,000 2,000 SCALE (FEET) Y:\804\99999-GEENEX_Solar\37460.018-Fern_Solar\GIS\WTIM\37460.018-WTIM - Schematics.mxd 1. Waters of the U.S. within theproject study limits have beenlocated using submeter, BluetoothGPS antennas by TimmonsGroup.2.Waters of the U.S. have notbeen confirmed by the U.S. ArmyCorps of Engineers.3. Project limits are approximate.4. Topography based on USGSLiDAR.5. Cowardin StreamClassifications are based solelyon field observations. No formalStream assessment methodologywas completed to determine theseCowardin Classifications. Legend Site - 1,496.1 Acre s DOLDOL DOLProject Area / LOD ")X Stream/Ditch Imp act !(X Wetland/Buffer Im pac t ProposedCulverts Ditch Impacts Permanent Stream Im pa ct Culvert Perennial Stream (R 3 ) Intermittent Stre am (R 4) Ephemeral Stream (R 6) %Ditch Conservation Are a Permanent Wetlan d Im pa ct Palustrine Emerg ent (P EM ) We tla nd s Palustrine Fores ted (P FO ) We tla nds Palustrine Scrub -Sh rub (P S S) We tla nd s Palustrine Open Wa ter (PO W ) Buffer Impacts 50' Tar-Pamlico River B uffer Solar Panels Access Road ProposedGrading Topo1ft_clip2bnd y Ditch (lf)Impa ctTemporaryPermanentTemporaryPermanentTemporaryPermanentPermanent Ace ra ge (sq. ft)Ma x W idth (lf)1 6421,182358042,06852646 4173583693210361136125713 3214311556169617 5351 68184740561949256020498552214947582248746023435055241250 sq ft 4,283 sq ft 0 sq ft 0 sq ft 34,172 sq ft0.00 a c 0.10 a c 0.00 a c 0.00 ac 0.78 a c ImpactBufferImpacts Table 215 lfTotal0 lf 273 lf W etla nd (sq. ft)Stre a m (lf)Impact Conversion ImpactImpact ID 409 sq ft Sheet 1 of 1N/A FLOOD HA ZARD INFORMATION SPECIAL FLO ODHAZARD AREAS OTHER AREAS OFFLOOD HAZARD OTHERAREAS GENERALSTRUCTURES Without B as e F lood Ele vation (BFE) With BF E or De pth Regulator y Floodway Are as Determine d to b e Outside the 0.2% Annual Chance F loodp lain Non-accred ited Levee , Dike, or Flood wall Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X HTTP://FRIS.NC.GOV/FRIS THE INFORMATION DEPICTED ON THIS MAP A ND SU PPOR TINGDOCUMENTATION AR E ALSO AVAILAB LE IN DIGITAL F ORM AT AT NORTH CAROL INA FLOODPLAIN MAPPING PROGRAM FLOOD INSURANCE RATE MAPNORTH CAROLIN A PANEL MAP NUMBE R SEE FIS REPOR T FOR ZONE DESCR IPTIONS AND INDEX MAP Cross Sections with 1% Annual ChanceWater Sur face Ele vation (BFE) Coast al Transect OTHERFEATURES Profile Base line Hydrogr aphic Fe ature Limit of Study Limit of Moderate Wave Action (LiMWA ) Jurisdiction Boundar y Accred ite d or Provisionally Accre dite dLevee, Dike , or F loodwall Coast al Transect Baseline SCAL E 1 inch = 5 00 fee t Map Projection:North Carolina State Plane Projection Feet (Zone 3200)Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) PANEL LOCATOR LOGO LOGO NOTE S TO USER S For information a nd que stions about this map , av ailable products associated with this FIRM inc luding historic ve rsion s of this FIRM, ho w to order produ cts or the Na tiona l Flo od Insurance Program in g eneral,plea se call the FEMA Map Information e Xch ange a t 1-877-FEMA-MAP (1-877 -33 6-2627) or v isit the FEMA Ma p Service Center web site at ht tp://msc.fema.go v. An accomp anying Flood In surance Study re port, Lette r o f MapRevision (LOMR) or Letter of Map Ame ndmen t (L OMA) re vising portions of this p anel, and d igital versions of th isFIRM may be available. Visit th e North Carolina Floodplain Mapp ing Program web site at h ttp://www.nc flood maps.co m,or conta ct th e FEMA Map Se rvice Cent er. Commun ities a nnexing land on ad jacent FIRM p anels must o btain a curren t co py o f the ad jacent pa nel as we ll asthe curren t FI RM Inde x. These may be ord ered dire ctly from the Ma p Service Cente r a t the nu mber lis ted abo ve. For community and cou ntywide map dat es refer to the Flo od Insurance Stu dy repo rt for this ju risd ic tion. To d etermin e if f lood insurance is available in the commu nity, contact your Insuranc e agen t or call th e NationalFlood In surance Pro gra m at 1-80 0-6 38-6620. Base map info rma tion sho wn on th is FI RM was provided in digital f ormat by the No rth Carolina Flo odplainMapping Prog ra m (NCFMP). The source o f this information can be determined from the me tadata ava ila ble in th edigital FL OOD data bas e and in the Technical Sup port Data No tebook (TSD N). ACCREDI TED LEVEE NOTES TO USERS: If an a ccre dited levee n ote app ears on this pa nel check with your localcommunity to obtain more informat ion, such as the e stimated level of protectio n prov ided (wh ic h may excee d the1-p ercent-ann ual-chance leve l) and Emergency Action Plan, o n the levee system(s ) shown as p rovid ing pro tection.To mitigate flood risk in residual risk areas, property owners and reside nts a re enc ouraged to con sider flo odinsurance and floodp ro ofing or other protective meas ure s. For mo re informa tion on flood insu ran ce, interestedparties sh ould visit the FEMA Web site at ht tp://www.fema.g ov/b usiness/nf ip/index.s htm. PRO VISI ONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredit ed Levee (PAL) noteappears on this panel, ch eck with yo ur local community to obtain more informat ion, such as the e stimated level ofprotection p rovid ed (which may e xceed th e 1-percen t-a nnual-chan ce level) and Eme rge ncy Action Plan , on thelevee system(s) shown as p rovid ing pro tect ion. To mainta in a ccre ditat ion, the levee owner or commun ity isrequired to sub mit the data and d ocumentation n ecessary to comp ly with Section 65.10 of the NFIP re gula tions.If the community or owne r d oes not provide the ne cessa ry data and do cumentation or if the d ata and document ationprovided indicate s the levee system does not comply with Section 65.10 req uireme nts, FEMA will revise the floo dhazard and risk informa tion for this area to re flect de-accreditation of the levee syste m. To mit igate floo d risk inresidual risk areas, property owners and residen ts a re enco uraged to con sider floo d in surance an d flo odproofingor o ther protective me asu res. For more information o n flo od in surance, interested pa rties sho uld visit the FEMAWebsite at http://www.fema.gov/busin ess/nfip/in dex .shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: Fo r some coastal flo odin g zo nes the AE Zon ecategory ha s be en divided by a L imit of Moderate Wa ve Action (L iMWA). Th e LiMWA re pre sen ts th e approximatelandward limit of the 1 .5-foot breakin g wave. The effects of wave hazards betwee n the VE Zone and th e LiMWA(or be tween th e sh ore line and the LiMWA for areas where VE Zone s are n ot id entif ied) will be similar to, but lesssevere than those in the VE Zone. COASTAL BARRIER RESOURCE S SYSTEM (CBRS ) NOTE This map may include approxima te boun daries of th e CBRS for inf ormatio nal purpos es o nly. Flo od insurance is n otavailable within CBRS areas for structures that are n ewly built o r substantially imp roved o n or after the date(s)indica ted on the map . For more information see http ://www.f ws.go v/ha bitat conserva tion /coa stal_barrier.html, theFIS Report, o r call the U.S. Fish a nd Wild life Se rvice Custome r Service Ce nter at 1-800 -3 44-WILD. CBRS Area Other wise Protected Are a Channel, Culver t, or Storm Sewer 0.2% Annual Chance Flood Haz ar d, Areas of 1% Annual Chance Flood with Ave rage De pth Less Than One Foot or W ith Drainage Are as of Less Than One Sq uare MileFuture Conditions 1% Annual Chance F lood HazardArea with Reduced Flood Ris k due to Le veeSee Notes Zone X Zone X Zone X 3882 1:6,00 0 %,012 18.2 !(8 2380000 FEET820000 FEET 2380000 FEET830000 FEET 2390000 FEET 830000 FEET 2390000 FEET 820000 FEET This digit al Flood In surance Ra te Map (FIRM) wa s p rod uce d through a uniquecooperative p art nership betwe en the State of No rth Caro lina and t he FederalEmergency Mana gement Agency (FEMA). The Sta te o f North Carolina hasimplemented a long term approach to floodplain man ageme nt to decrease thecosts ass ociated with floo ding . This is demo nstrate d by the Sta te's co mmit mentto map floo d ha zard are as at t he loc al level. As a part of this effort, the St ate o fNorth Carolina has joined in a Cooperating Technical State a gre ement withFEMA to produce and main tain this digita l FIRM. NATIONAL FLOOD INS URANCE PROGRAM 73.3 7 4 .3 7 3 .8 7 3 . 9 74.9 74.874.4 74.074.074.074.0CoolSpringRdBattleboro-Leggett Rd E v e r g r e e n H e ig h ts L n Scott & Beverly Rd Benson Farm Rd MorningStarChurchRdMornin g StarCh u rchRdZO NE AE ZONE AE ZO NE AE ZO NE AE ZONE AE EDGECOMBE COUN TYUNINCORPORATED AREAS370087 i791 i762 i050 i060 i055 i250 i205 i225 i195 i200 < MoccasinSwamp <BeechBranch Beech Branch DH94 55 DH94 56 77°41'0"W 77°41'0"W 77°41'30 "W 77°41 '30"W 77°42'0"W 77°42'0"W 77°42'30 "W 77°42'30 "W 36°1'0"N 36°1'0"N 36°0'30"N 36°0'30"N 36°0'0"N 36°0'0"N Halifax Nash Wilson Pitt Martin Ber tie 3897 4807 3896 4806 4816 3895 4804 4824 3863 3873 3883 3893 4803 4813 4823 4833 4842 486238623872388238924802481248224832 3871 3881 3891 4801 4811 4821 4831 4841 4851 4861 4871 48803880389048004810482048304840485048604870 3765 3775 3785 379 5 4705 4715 4725 4735 474 5 4755 4764 4784 3779 3789 379 9 4709 4719 4729 4739 474 9 4759 4768 478837883798470847184728473847484758 3787 3797 4707 4717 4727 4737 474 6 4766 47863776378637964706471647264736 3774 3784 379 4 470 4 4714 4724 4734 474 4 4754 3762 3783 379 3 4703 4713 4722 474 23782379247024712 378 0 4700 3876 3886 3850 3860 3870 3887 3875 3885 3874 3884 3894 3851 3861 375 9 3769 375 8 3768 3778 3737 3747 3757 3767 3777 375 6 3766 I 0 500 1,000250Feet 0 150 30075Meters BM5 510 D Nor th C arolina Geodetic Sur vey be nch mark BM5 510 ?BM5 510z National Geod etic Sur ve y be nch markContractor Est. NCFMP Sur vey bench mar k Panel Contains: COMMUNIT Y CID PANE L SUFFIX 3882370087 K 372 038 8200K EDGECOMBE COUNTY EFFECTIVE DATE06/0 2/2015 FLOOD HA ZARD INFORMATION SPECIAL FLO ODHAZARD AREAS OTHER AREAS OFFLOOD HAZARD OTHERAREAS GENERALSTRUCTURES Without B as e F lood Ele vation (BFE) With BF E or De pth Regulator y Floodway Are as Determine d to b e Outside the 0.2% Annual Chance F loodp lain Non-accred ited Levee , Dike, or Flood wall Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X HTTP://FRIS.NC.GOV/FRIS THE INFORMATION DEPICTED ON THIS MAP A ND SU PPOR TINGDOCUMENTATION AR E ALSO AVAILAB LE IN DIGITAL F ORM AT AT NORTH CAROL INA FLOODPLAIN MAPPING PROGRAM FLOOD INSURANCE RATE MAPNORTH CAROLIN A PANEL MAP NUMBE R SEE FIS REPOR T FOR ZONE DESCR IPTIONS AND INDEX MAP Cross Sections with 1% Annual ChanceWater Sur face Ele vation (BFE) Coast al Transect OTHERFEATURES Profile Base line Hydrogr aphic Fe ature Limit of Study Limit of Moderate Wave Action (LiMWA ) Jurisdiction Boundar y Accred ite d or Provisionally Accre dite dLevee, Dike , or F loodwall Coast al Transect Baseline SCAL E 1 inch = 5 00 fee t Map Projection:North Carolina State Plane Projection Feet (Zone 3200)Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) PANEL LOCATOR LOGO LOGO NOTE S TO USER S For information a nd que stions about this map , av ailable products associated with this FIRM inc luding historic ve rsion s of this FIRM, ho w to order produ cts or the Na tiona l Flo od Insurance Program in g eneral,plea se call the FEMA Map Information e Xch ange a t 1-877-FEMA-MAP (1-877 -33 6-2627) or v isit the FEMA Ma p Service Center web site at ht tp://msc.fema.go v. An accomp anying Flood In surance Study re port, Lette r o f MapRevision (LOMR) or Letter of Map Ame ndmen t (L OMA) re vising portions of this p anel, and d igital versions of th isFIRM may be available. Visit th e North Carolina Floodplain Mapp ing Program web site at h ttp://www.nc flood maps.co m,or conta ct th e FEMA Map Se rvice Cent er. Commun ities a nnexing land on ad jacent FIRM p anels must o btain a curren t co py o f the ad jacent pa nel as we ll asthe curren t FI RM Inde x. These may be ord ered dire ctly from the Ma p Service Cente r a t the nu mber lis ted abo ve. For community and cou ntywide map dat es refer to the Flo od Insurance Stu dy repo rt for this ju risd ic tion. To d etermin e if f lood insurance is available in the commu nity, contact your Insuranc e agen t or call th e NationalFlood In surance Pro gra m at 1-80 0-6 38-6620. Base map info rma tion sho wn on th is FI RM was provided in digital f ormat by the No rth Carolina Flo odplainMapping Prog ra m (NCFMP). The source o f this information can be determined from the me tadata ava ila ble in th edigital FL OOD data bas e and in the Technical Sup port Data No tebook (TSD N). ACCREDI TED LEVEE NOTES TO USERS: If an a ccre dited levee n ote app ears on this pa nel check with your localcommunity to obtain more informat ion, such as the e stimated level of protectio n prov ided (wh ic h may excee d the1-p ercent-ann ual-chance leve l) and Emergency Action Plan, o n the levee system(s ) shown as p rovid ing pro tection.To mitigate flood risk in residual risk areas, property owners and reside nts a re enc ouraged to con sider flo odinsurance and floodp ro ofing or other protective meas ure s. For mo re informa tion on flood insu ran ce, interestedparties sh ould visit the FEMA Web site at ht tp://www.fema.g ov/b usiness/nf ip/index.s htm. PRO VISI ONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredit ed Levee (PAL) noteappears on this panel, ch eck with yo ur local community to obtain more informat ion, such as the e stimated level ofprotection p rovid ed (which may e xceed th e 1-percen t-a nnual-chan ce level) and Eme rge ncy Action Plan , on thelevee system(s) shown as p rovid ing pro tect ion. To mainta in a ccre ditat ion, the levee owner or commun ity isrequired to sub mit the data and d ocumentation n ecessary to comp ly with Section 65.10 of the NFIP re gula tions.If the community or owne r d oes not provide the ne cessa ry data and do cumentation or if the d ata and document ationprovided indicate s the levee system does not comply with Section 65.10 req uireme nts, FEMA will revise the floo dhazard and risk informa tion for this area to re flect de-accreditation of the levee syste m. To mit igate floo d risk inresidual risk areas, property owners and residen ts a re enco uraged to con sider floo d in surance an d flo odproofingor o ther protective me asu res. For more information o n flo od in surance, interested pa rties sho uld visit the FEMAWebsite at http://www.fema.gov/busin ess/nfip/in dex .shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: Fo r some coastal flo odin g zo nes the AE Zon ecategory ha s be en divided by a L imit of Moderate Wa ve Action (L iMWA). Th e LiMWA re pre sen ts th e approximatelandward limit of the 1 .5-foot breakin g wave. The effects of wave hazards betwee n the VE Zone and th e LiMWA(or be tween th e sh ore line and the LiMWA for areas where VE Zone s are n ot id entif ied) will be similar to, but lesssevere than those in the VE Zone. COASTAL BARRIER RESOURCE S SYSTEM (CBRS ) NOTE This map may include approxima te boun daries of th e CBRS for inf ormatio nal purpos es o nly. Flo od insurance is n otavailable within CBRS areas for structures that are n ewly built o r substantially imp roved o n or after the date(s)indica ted on the map . For more information see http ://www.f ws.go v/ha bitat conserva tion /coa stal_barrier.html, theFIS Report, o r call the U.S. Fish a nd Wild life Se rvice Custome r Service Ce nter at 1-800 -3 44-WILD. CBRS Area Other wise Protected Are a Channel, Culver t, or Storm Sewer 0.2% Annual Chance Flood Haz ar d, Areas of 1% Annual Chance Flood with Ave rage De pth Less Than One Foot or W ith Drainage Are as of Less Than One Sq uare MileFuture Conditions 1% Annual Chance F lood HazardArea with Reduced Flood Ris k due to Le veeSee Notes Zone X Zone X Zone X 3891 1:6,00 0 %,012 18.2 !(8 2390000 FEET810000 FEET 2390000 FEET820000 FEET 2400000 FEET 820000 FEET 2400000 FEET 810000 FEET This digit al Flood In surance Ra te Map (FIRM) wa s p rod uce d through a uniquecooperative p art nership betwe en the State of No rth Caro lina and t he FederalEmergency Mana gement Agency (FEMA). The Sta te o f North Carolina hasimplemented a long term approach to floodplain man ageme nt to decrease thecosts ass ociated with floo ding . This is demo nstrate d by the Sta te's co mmit mentto map floo d ha zard are as at t he loc al level. As a part of this effort, the St ate o fNorth Carolina has joined in a Cooperating Technical State a gre ement withFEMA to produce and main tain this digita l FIRM. NATIONAL FLOOD INS URANCE PROGRAM i379962.96 1 .971.971.770.167.371.4i3799 W o l f P o i n t Ln Battleboro-Leggett Rd BattleboroLeggettRd Patties LnFoxcroftLnDunbar Woods Rd Lar k LnNewHopeChurchRdNe wHopeChurchRdZONE AE ZO NE AE ZONE AE ZONE AE ZO NE AE ZONE AE ZO NE AE EDGECOMBE COUN TYUNINCORPORATED AREAS370087 i117 i613 i597 i508 i568 i095 < BeechBranch<Beech Branch Key Branch 77°39'0"W 77°39'0"W 77°39 '30"W 77°39'30 "W 77°40'0"W 77°40'0"W 77°40'30 "W 77°40'30 "W 35°59'30 "N 35°59 '30"N 35°59 '0"N 35°59 '0"N 35°58'30 "N 35°58 '30"N Halifax Nash Wilson Pitt Martin Ber tie 3897 4807 3896 4806 4816 3895 4804 4824 3863 3873 3883 3893 4803 4813 4823 4833 4842 486238623872388238924802481248224832 3871 3881 3891 4801 4811 4821 4831 4841 4851 4861 4871 48803880389048004810482048304840485048604870 3765 3775 3785 379 5 4705 4715 4725 4735 474 5 4755 4764 4784 3779 3789 379 9 4709 4719 4729 4739 474 9 4759 4768 478837883798470847184728473847484758 3787 3797 4707 4717 4727 4737 474 6 4766 47863776378637964706471647264736 3774 3784 379 4 470 4 4714 4724 4734 474 4 4754 3762 3783 379 3 4703 4713 4722 474 23782379247024712 378 0 4700 3876 3886 3850 3860 3870 3887 3875 3885 3874 3884 3894 3851 3861 375 9 3769 375 8 3768 3778 3737 3747 3757 3767 3777 375 6 3766 I 0 500 1,000250Feet 0 150 30075Meters BM5 510 D Nor th C arolina Geodetic Sur vey be nch mark BM5 510 ?BM5 510z National Geod etic Sur ve y be nch markContractor Est. NCFMP Sur vey bench mar k Panel Contains: COMMUNIT Y CID PANE L SUFFIX 3891370087 K 37 20 389100K EDGECOMBE COUNTY EFFECTIVE DATE06/0 2/2015 FLOOD HA ZARD INFORMATION SPECIAL FLO ODHAZARD AREAS OTHER AREAS OFFLOOD HAZARD OTHERAREAS GENERALSTRUCTURES Without B as e F lood Ele vation (BFE) With BF E or De pth Regulator y Floodway Are as Determine d to b e Outside the 0.2% Annual Chance F loodp lain Non-accred ited Levee , Dike, or Flood wall Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X HTTP://FRIS.NC.GOV/FRIS THE INFORMATION DEPICTED ON THIS MAP A ND SU PPOR TINGDOCUMENTATION AR E ALSO AVAILAB LE IN DIGITAL F ORM AT AT NORTH CAROL INA FLOODPLAIN MAPPING PROGRAM FLOOD INSURANCE RATE MAPNORTH CAROLIN A PANEL MAP NUMBE R SEE FIS REPOR T FOR ZONE DESCR IPTIONS AND INDEX MAP Cross Sections with 1% Annual ChanceWater Sur face Ele vation (BFE) Coast al Transect OTHERFEATURES Profile Base line Hydrogr aphic Fe ature Limit of Study Limit of Moderate Wave Action (LiMWA ) Jurisdiction Boundar y Accred ite d or Provisionally Accre dite dLevee, Dike , or F loodwall Coast al Transect Baseline SCAL E 1 inch = 5 00 fee t Map Projection:North Carolina State Plane Projection Feet (Zone 3200)Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) PANEL LOCATOR LOGO LOGO NOTE S TO USER S For information a nd que stions about this map , av ailable products associated with this FIRM inc luding historic ve rsion s of this FIRM, ho w to order produ cts or the Na tiona l Flo od Insurance Program in g eneral,plea se call the FEMA Map Information e Xch ange a t 1-877-FEMA-MAP (1-877 -33 6-2627) or v isit the FEMA Ma p Service Center web site at ht tp://msc.fema.go v. An accomp anying Flood In surance Study re port, Lette r o f MapRevision (LOMR) or Letter of Map Ame ndmen t (L OMA) re vising portions of this p anel, and d igital versions of th isFIRM may be available. Visit th e North Carolina Floodplain Mapp ing Program web site at h ttp://www.nc flood maps.co m,or conta ct th e FEMA Map Se rvice Cent er. Commun ities a nnexing land on ad jacent FIRM p anels must o btain a curren t co py o f the ad jacent pa nel as we ll asthe curren t FI RM Inde x. These may be ord ered dire ctly from the Ma p Service Cente r a t the nu mber lis ted abo ve. For community and cou ntywide map dat es refer to the Flo od Insurance Stu dy repo rt for this ju risd ic tion. To d etermin e if f lood insurance is available in the commu nity, contact your Insuranc e agen t or call th e NationalFlood In surance Pro gra m at 1-80 0-6 38-6620. Base map info rma tion sho wn on th is FI RM was provided in digital f ormat by the No rth Carolina Flo odplainMapping Prog ra m (NCFMP). The source o f this information can be determined from the me tadata ava ila ble in th edigital FL OOD data bas e and in the Technical Sup port Data No tebook (TSD N). ACCREDI TED LEVEE NOTES TO USERS: If an a ccre dited levee n ote app ears on this pa nel check with your localcommunity to obtain more informat ion, such as the e stimated level of protectio n prov ided (wh ic h may excee d the1-p ercent-ann ual-chance leve l) and Emergency Action Plan, o n the levee system(s ) shown as p rovid ing pro tection.To mitigate flood risk in residual risk areas, property owners and reside nts a re enc ouraged to con sider flo odinsurance and floodp ro ofing or other protective meas ure s. For mo re informa tion on flood insu ran ce, interestedparties sh ould visit the FEMA Web site at ht tp://www.fema.g ov/b usiness/nf ip/index.s htm. PRO VISI ONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredit ed Levee (PAL) noteappears on this panel, ch eck with yo ur local community to obtain more informat ion, such as the e stimated level ofprotection p rovid ed (which may e xceed th e 1-percen t-a nnual-chan ce level) and Eme rge ncy Action Plan , on thelevee system(s) shown as p rovid ing pro tect ion. To mainta in a ccre ditat ion, the levee owner or commun ity isrequired to sub mit the data and d ocumentation n ecessary to comp ly with Section 65.10 of the NFIP re gula tions.If the community or owne r d oes not provide the ne cessa ry data and do cumentation or if the d ata and document ationprovided indicate s the levee system does not comply with Section 65.10 req uireme nts, FEMA will revise the floo dhazard and risk informa tion for this area to re flect de-accreditation of the levee syste m. To mit igate floo d risk inresidual risk areas, property owners and residen ts a re enco uraged to con sider floo d in surance an d flo odproofingor o ther protective me asu res. For more information o n flo od in surance, interested pa rties sho uld visit the FEMAWebsite at http://www.fema.gov/busin ess/nfip/in dex .shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: Fo r some coastal flo odin g zo nes the AE Zon ecategory ha s be en divided by a L imit of Moderate Wa ve Action (L iMWA). Th e LiMWA re pre sen ts th e approximatelandward limit of the 1 .5-foot breakin g wave. The effects of wave hazards betwee n the VE Zone and th e LiMWA(or be tween th e sh ore line and the LiMWA for areas where VE Zone s are n ot id entif ied) will be similar to, but lesssevere than those in the VE Zone. COASTAL BARRIER RESOURCE S SYSTEM (CBRS ) NOTE This map may include approxima te boun daries of th e CBRS for inf ormatio nal purpos es o nly. Flo od insurance is n otavailable within CBRS areas for structures that are n ewly built o r substantially imp roved o n or after the date(s)indica ted on the map . For more information see http ://www.f ws.go v/ha bitat conserva tion /coa stal_barrier.html, theFIS Report, o r call the U.S. Fish a nd Wild life Se rvice Custome r Service Ce nter at 1-800 -3 44-WILD. CBRS Area Other wise Protected Are a Channel, Culver t, or Storm Sewer 0.2% Annual Chance Flood Haz ar d, Areas of 1% Annual Chance Flood with Ave rage De pth Less Than One Foot or W ith Drainage Are as of Less Than One Sq uare MileFuture Conditions 1% Annual Chance F lood HazardArea with Reduced Flood Ris k due to Le veeSee Notes Zone X Zone X Zone X 3892 1:6,00 0 %,012 18.2 !(8 2390000 FEET820000 FEET 2390000 FEET830000 FEET 2400000 FEET 830000 FEET 2400000 FEET 820000 FEET This digit al Flood In surance Ra te Map (FIRM) wa s p rod uce d through a uniquecooperative p art nership betwe en the State of No rth Caro lina and t he FederalEmergency Mana gement Agency (FEMA). The Sta te o f North Carolina hasimplemented a long term approach to floodplain man ageme nt to decrease thecosts ass ociated with floo ding . This is demo nstrate d by the Sta te's co mmit mentto map floo d ha zard are as at t he loc al level. As a part of this effort, the St ate o fNorth Carolina has joined in a Cooperating Technical State a gre ement withFEMA to produce and main tain this digita l FIRM. NATIONAL FLOOD INS URANCE PROGRAM73.373.371.473.373.373.97 3.3 7 3 .8 71.773.371.973.572.473.1Scot t & Bever l y Rd Battleboro-Leggett Rd G l e n r i d g e L n N e w i n g t o n L n Benson Farm RdZO NE AE ZONE AE ZONE AE ZONE AE ZO NE AE EDGECOMBE COUN TYUNINCORPORATED AREAS370087 i038 i730 i635 i667 i695 i050 i044 i613 i730 i635 i667 <SwiftCreek M o c c a si nSwamp S w iftC reekS w i ft Creek 77°39'0"W 77°39'0"W 77°39'30 "W 77°39'30 "W 77°40'0"W 77°40'0"W 77°40'30 "W 77°40 '30"W 36°1'0"N 36°1'0"N 36°0'30"N 36°0'30"N 36°0'0"N 36°0'0"N Halifax Nash Wilson Pitt Martin Ber tie 3897 4807 3896 4806 4816 3895 4804 4824 3863 3873 3883 3893 4803 4813 4823 4833 4842 486238623872388238924802481248224832 3871 3881 3891 4801 4811 4821 4831 4841 4851 4861 4871 48803880389048004810482048304840485048604870 3765 3775 3785 379 5 4705 4715 4725 4735 474 5 4755 4764 4784 3779 3789 379 9 4709 4719 4729 4739 474 9 4759 4768 478837883798470847184728473847484758 3787 3797 4707 4717 4727 4737 474 6 4766 47863776378637964706471647264736 3774 3784 379 4 470 4 4714 4724 4734 474 4 4754 3762 3783 379 3 4703 4713 4722 474 23782379247024712 378 0 4700 3876 3886 3850 3860 3870 3887 3875 3885 3874 3884 3894 3851 3861 375 9 3769 375 8 3768 3778 3737 3747 3757 3767 3777 375 6 3766 I 0 500 1,000250Feet 0 150 30075Meters BM5 510 D Nor th C arolina Geodetic Sur vey be nch mark BM5 510 ?BM5 510z National Geod etic Sur ve y be nch markContractor Est. NCFMP Sur vey bench mar k Panel Contains: COMMUNIT Y CID PANE L SUFFIX 3892370087 K 372 038 9200K EDGECOMBE COUNTY EFFECTIVE DATE06/0 2/2015 FLOOD HA ZARD INFORMATION SPECIAL FLO ODHAZARD AREAS OTHER AREAS OFFLOOD HAZARD OTHERAREAS GENERALSTRUCTURES Without B as e F lood Ele vation (BFE) With BF E or De pth Regulator y Floodway Are as Determine d to b e Outside the 0.2% Annual Chance F loodp lain Non-accred ited Levee , Dike, or Flood wall Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X HTTP://FRIS.NC.GOV/FRIS THE INFORMATION DEPICTED ON THIS MAP A ND SU PPOR TINGDOCUMENTATION AR E ALSO AVAILAB LE IN DIGITAL F ORM AT AT NORTH CAROL INA FLOODPLAIN MAPPING PROGRAM FLOOD INSURANCE RATE MAPNORTH CAROLIN A PANEL MAP NUMBE R SEE FIS REPOR T FOR ZONE DESCR IPTIONS AND INDEX MAP Cross Sections with 1% Annual ChanceWater Sur face Ele vation (BFE) Coast al Transect OTHERFEATURES Profile Base line Hydrogr aphic Fe ature Limit of Study Limit of Moderate Wave Action (LiMWA ) Jurisdiction Boundar y Accred ite d or Provisionally Accre dite dLevee, Dike , or F loodwall Coast al Transect Baseline SCAL E 1 inch = 5 00 fee t Map Projection:North Carolina State Plane Projection Feet (Zone 3200)Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) PANEL LOCATOR LOGO LOGO NOTE S TO USER S For information a nd que stions about this map , av ailable products associated with this FIRM inc luding historic ve rsion s of this FIRM, ho w to order produ cts or the Na tiona l Flo od Insurance Program in g eneral,plea se call the FEMA Map Information e Xch ange a t 1-877-FEMA-MAP (1-877 -33 6-2627) or v isit the FEMA Ma p Service Center web site at ht tp://msc.fema.go v. An accomp anying Flood In surance Study re port, Lette r o f MapRevision (LOMR) or Letter of Map Ame ndmen t (L OMA) re vising portions of this p anel, and d igital versions of th isFIRM may be available. Visit th e North Carolina Floodplain Mapp ing Program web site at h ttp://www.nc flood maps.co m,or conta ct th e FEMA Map Se rvice Cent er. Commun ities a nnexing land on ad jacent FIRM p anels must o btain a curren t co py o f the ad jacent pa nel as we ll asthe curren t FI RM Inde x. These may be ord ered dire ctly from the Ma p Service Cente r a t the nu mber lis ted abo ve. For community and cou ntywide map dat es refer to the Flo od Insurance Stu dy repo rt for this ju risd ic tion. To d etermin e if f lood insurance is available in the commu nity, contact your Insuranc e agen t or call th e NationalFlood In surance Pro gra m at 1-80 0-6 38-6620. Base map info rma tion sho wn on th is FI RM was provided in digital f ormat by the No rth Carolina Flo odplainMapping Prog ra m (NCFMP). The source o f this information can be determined from the me tadata ava ila ble in th edigital FL OOD data bas e and in the Technical Sup port Data No tebook (TSD N). ACCREDI TED LEVEE NOTES TO USERS: If an a ccre dited levee n ote app ears on this pa nel check with your localcommunity to obtain more informat ion, such as the e stimated level of protectio n prov ided (wh ic h may excee d the1-p ercent-ann ual-chance leve l) and Emergency Action Plan, o n the levee system(s ) shown as p rovid ing pro tection.To mitigate flood risk in residual risk areas, property owners and reside nts a re enc ouraged to con sider flo odinsurance and floodp ro ofing or other protective meas ure s. For mo re informa tion on flood insu ran ce, interestedparties sh ould visit the FEMA Web site at ht tp://www.fema.g ov/b usiness/nf ip/index.s htm. PRO VISI ONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredit ed Levee (PAL) noteappears on this panel, ch eck with yo ur local community to obtain more informat ion, such as the e stimated level ofprotection p rovid ed (which may e xceed th e 1-percen t-a nnual-chan ce level) and Eme rge ncy Action Plan , on thelevee system(s) shown as p rovid ing pro tect ion. To mainta in a ccre ditat ion, the levee owner or commun ity isrequired to sub mit the data and d ocumentation n ecessary to comp ly with Section 65.10 of the NFIP re gula tions.If the community or owne r d oes not provide the ne cessa ry data and do cumentation or if the d ata and document ationprovided indicate s the levee system does not comply with Section 65.10 req uireme nts, FEMA will revise the floo dhazard and risk informa tion for this area to re flect de-accreditation of the levee syste m. To mit igate floo d risk inresidual risk areas, property owners and residen ts a re enco uraged to con sider floo d in surance an d flo odproofingor o ther protective me asu res. For more information o n flo od in surance, interested pa rties sho uld visit the FEMAWebsite at http://www.fema.gov/busin ess/nfip/in dex .shtm. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: Fo r some coastal flo odin g zo nes the AE Zon ecategory ha s be en divided by a L imit of Moderate Wa ve Action (L iMWA). Th e LiMWA re pre sen ts th e approximatelandward limit of the 1 .5-foot breakin g wave. The effects of wave hazards betwee n the VE Zone and th e LiMWA(or be tween th e sh ore line and the LiMWA for areas where VE Zone s are n ot id entif ied) will be similar to, but lesssevere than those in the VE Zone. COASTAL BARRIER RESOURCE S SYSTEM (CBRS ) NOTE This map may include approxima te boun daries of th e CBRS for inf ormatio nal purpos es o nly. Flo od insurance is n otavailable within CBRS areas for structures that are n ewly built o r substantially imp roved o n or after the date(s)indica ted on the map . For more information see http ://www.f ws.go v/ha bitat conserva tion /coa stal_barrier.html, theFIS Report, o r call the U.S. Fish a nd Wild life Se rvice Custome r Service Ce nter at 1-800 -3 44-WILD. CBRS Area Other wise Protected Are a Channel, Culver t, or Storm Sewer 0.2% Annual Chance Flood Haz ar d, Areas of 1% Annual Chance Flood with Ave rage De pth Less Than One Foot or W ith Drainage Are as of Less Than One Sq uare MileFuture Conditions 1% Annual Chance F lood HazardArea with Reduced Flood Ris k due to Le veeSee Notes Zone X Zone X Zone X 3893 1:6,00 0 %,012 18.2 !(8 2390000 FEET830000 FEET 2390000 FEET840000 FEET 2400000 FEET 840000 FEET 2400000 FEET 830000 FEET This digit al Flood In surance Ra te Map (FIRM) wa s p rod uce d through a uniquecooperative p art nership betwe en the State of No rth Caro lina and t he FederalEmergency Mana gement Agency (FEMA). The Sta te o f North Carolina hasimplemented a long term approach to floodplain man ageme nt to decrease thecosts ass ociated with floo ding . This is demo nstrate d by the Sta te's co mmit mentto map floo d ha zard are as at t he loc al level. As a part of this effort, the St ate o fNorth Carolina has joined in a Cooperating Technical State a gre ement withFEMA to produce and main tain this digita l FIRM. NATIONAL FLOOD INS URANCE PROGRAM77.473.876.17 6 .6 75.77 5 .2 74.8 7 4 .3 SpeightsChapelRdHil lcross L n O ak Forest LnZO NE AE ZONE AE ZONE AE ZONE AE EDGECOMBE COUN TYUNINCORPORATED AREAS370087 i762 i880 i897 i868 i834 i815 i791 <SwiftCreek SwiftCreek SwiftCreek77°39'0"W 77°39'0"W 77°39'30 "W 77°39'30 "W 77°40'0"W 77°40'0"W 77°40 '30"W 77°40 '30"W 36°3'0"N 36°3'0"N 36°2'30"N 36°2'30"N 36°2'0"N 36°2'0"N 36°1'30"N 36°1'30"N Halifax Nash Wilson Pitt Martin Ber tie 3897 4807 3896 4806 4816 3895 4804 4824 3863 3873 3883 3893 4803 4813 4823 4833 4842 486238623872388238924802481248224832 3871 3881 3891 4801 4811 4821 4831 4841 4851 4861 4871 48803880389048004810482048304840485048604870 3765 3775 3785 379 5 4705 4715 4725 4735 474 5 4755 4764 4784 3779 3789 379 9 4709 4719 4729 4739 474 9 4759 4768 478837883798470847184728473847484758 3787 3797 4707 4717 4727 4737 474 6 4766 47863776378637964706471647264736 3774 3784 379 4 470 4 4714 4724 4734 474 4 4754 3762 3783 379 3 4703 4713 4722 474 23782379247024712 378 0 4700 3876 3886 3850 3860 3870 3887 3875 3885 3874 3884 3894 3851 3861 375 9 3769 375 8 3768 3778 3737 3747 3757 3767 3777 375 6 3766 I 0 500 1,000250Feet 0 150 30075Meters BM5 510 D Nor th C arolina Geodetic Sur vey be nch mark BM5 510 ?BM5 510z National Geod etic Sur ve y be nch markContractor Est. NCFMP Sur vey bench mar k Panel Contains: COMMUNIT Y CID PANE L SUFFIX 3893370087 K 372 038 9300K EDGECOMBE COUNTY EFFECTIVE DATE06/0 2/2015