HomeMy WebLinkAboutNCC190532_Email RE Reprieve During DEQ Network Issues_20190531Georgoulias, Bethany
From: Lucas, Annette
Sent: Friday, May 31, 2019 11:54 AM
To: BryanHarris@Harriseng.net
Cc: McCoy, Suzanne; Georgoulias, Bethany; Lucas, Annette
Subject: FW: [External] RE: eN01 Certification
Attachments: Letter of Approval.pdf, NCG01-eN01-Certification- Form- Dicken South (signed).pdf,
2019-05-20 Kent Dickens South NOV.pdf
Dear Bryan:
Thank you for your patience with the network issues that are affecting the e-NCI form and many of our other digital
systems in DEQ.
This email serves as a temporary reprieve from the permit requirement on Page 1 of the NCG01 Permit that does not
allow you to commence the construction activity until after receipt of your Certificate of Coverage (COC). Please retain a
copy of this email on site until you receive your COC through our digital process.
After DEQ's network is restored, I will send you an email and request that you submit an a-NOI form for this project
within 72 business hours to receive you COC.
Please let me know if you have questions.
Sincerely,
Annette
Annette Lucas, PE
Stormwater Program Supervisor
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
919 707-3639 office
annette.lucasancdenr.aov
deg.nc.gov/SW
512 N. Salisbury Street, Office 640-L, Raleigh, NC 27604
1612 Mail Service Center, Raleigh, NC 27699-1612
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
From: Bryan Harris [mailto:BryanHarris@Harriseng.net]
Sent: Friday, May 31, 2019 9:28 AM
To: McCoy, Suzanne <suzanne.mccoy@ncdenr.gov>
Subject: [External] RE: eN0l Certification
• I email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
rt.s am nc. ov
Suzanne,
I see that the NOI site is still experiencing some difficulties, would it be possible to receive our certificate of coverage
without the electronic submittal, attached is the signed form and this is the same form you have already received.
Bryan A. Harris
Director; Civil Engineering Division @
John W. Harris, P.E.
Consulting Engineer, Inc.
From: McCoy, Suzanne <suzanne.mccov@ncdenr.gov>
Sent: Tuesday, May 28, 2019 13:35
To: bryanharris@harriseng.net
Subject: eNOI Certification
Attached is the signed certification to upload with the new application.
Suzanne McCoy
Stormwater Program Administrative Specialist
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
1612 Mail Service Center, Raleigh, NC 27699-1612
919-707-3640
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
rtmerH of Enriro rjW n� q�allYy
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.