HomeMy WebLinkAbout510028_Other_20190530Facility No. �)-nnaj� Farm Name \AHD& T06PJ&'�,j— Date
Permit COC OIC NPDES (Rainbreaker PLAT Annual Cert Daily Pipe )
Lagoon Name, S forspillway 1 2 3 4 5 6 7
-Design Freeboard 1 Last Recorded in
Observed freeboard
Sludge Survey Date
Sludge Depth ft
Liquid Trt. Zone ft 5r
Ratio Sludge to Treatment Volume ifs 0.45
Date out of compliance/ POA?
aropiv
-------
Actual Flow
Actual Diam.
Soil Test Date aa4011k
pH Fields ktil tl f
Lime Needed 'ref-Iff 4t,
Lime Applied
Cu -1 Zn -I
Needs S (S-125)
Needs P
Crop Yield
Wettable Acres
WUP
Weekly Freeboard
1 in Inspections
120 min Insp.
Weather Codes
1;71lz
Verify PHONE NUMBERS and affiliations
Date last WUP RRO.31Ialiq tea-(}foy FRO or Farm Records
Date last WUP at farm Lagoon #
App. Hardware Top Dike
Stop Pump
Start Pump
Conversion- Cu -13000= 108 lb/ac; Zn -I 3000= 213 lb/ac
34, LP4re-1V)oa)
Transfer Sheets
RAIN GAUGE
Dead box or incinerator
Mortality Records
Check Lists
Storm Water
Window I Max Rate I Max