Loading...
HomeMy WebLinkAbout510028_Other_20190530Facility No. �)-nnaj� Farm Name \AHD& T06PJ&'�,j— Date Permit COC OIC NPDES (Rainbreaker PLAT Annual Cert Daily Pipe ) Lagoon Name, S forspillway 1 2 3 4 5 6 7 -Design Freeboard 1 Last Recorded in Observed freeboard Sludge Survey Date Sludge Depth ft Liquid Trt. Zone ft 5r Ratio Sludge to Treatment Volume ifs 0.45 Date out of compliance/ POA? aropiv ------- Actual Flow Actual Diam. Soil Test Date aa4011k pH Fields ktil tl f Lime Needed 'ref-Iff 4t, Lime Applied Cu -1 Zn -I Needs S (S-125) Needs P Crop Yield Wettable Acres WUP Weekly Freeboard 1 in Inspections 120 min Insp. Weather Codes 1;71lz Verify PHONE NUMBERS and affiliations Date last WUP RRO.31Ialiq tea-(}foy FRO or Farm Records Date last WUP at farm Lagoon # App. Hardware Top Dike Stop Pump Start Pump Conversion- Cu -13000= 108 lb/ac; Zn -I 3000= 213 lb/ac 34, LP4re-1V)oa) Transfer Sheets RAIN GAUGE Dead box or incinerator Mortality Records Check Lists Storm Water Window I Max Rate I Max