Loading...
HomeMy WebLinkAbout20041934 Ver 2_Complete File_20050801O?O? W AT ?9QG Yjiul r O 'C i o - ?, g - ps Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 23, 2006 DWQ Project # 04-1934 Wake County Mr. Grey Methven Centex Homes 2301 Sugar Bush Road, Suite # 400 Raleigh, NC.27612 Subject Property: Payton Hall, Phase # 2 APPROVAL OF STORMWATER MANAGEMENT PLAN Dear Mr. Methven: On November 17, 2005, the Division of Water Quality (DWQ) received the revised storm water management plan prepared by your engineer, Mr. Ron Hendricks of Piedmont Land Design. This Plan has been reviewed and satisfies the storm water management conditions of the Neuse River Buffer Rules Permit Certification issued on October 28, 2005. The structural storm water practices as approved by DWQ as well as drainage patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. Storm water easements shall be recorded for a distance of at least 10 feet on each side of all storm water conveyances on all lots containing these structures including future access for maintenance. The storm water easements shall allow for the ability to maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Samuel A. Aghimien at 919-733-3574. Sincerely, Cyndi B. Karoly DWQ, 401 Oversight/Express Permitting Unit CBK/saa cc: DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Ron Hendricks, Piedmont Land Design, 8522-204 Six Forks Road, Raleigh, NC. 27615 Filename: 04-1934 Stotmwater Approval Payton Hall, 1-23-06 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786/ FAX 919-733-6893/ Internet http://h2o.enr. state. ne,us/newctlands None Carolina Natura!!if An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper iage Check Dist . Date; Se6t IV ?? e d'r' Name: DWQ#: O -=193 County: To: ? ARO Kevin Barnett. ? WaRO Tout Steffens and Kyle Barnc [] FRO Ken Averitte ? WiRO Noelle Lutheran ? p Alan Johnson El WSRO Daryl Lamb O Mike Horan R Y d' Telephone : (919) From: p your ev do. our for . The file attached. Is being forwarde aluation. Please call if you nee&o Lance. . Stream length impacted- Stream determination Wetland determination and distance to blue-Ego surface'.waters on USFW topo maps ' ation/ay ' ance issues Buffer Rules ease Tar-Pamlico,'Catawba, Randleman) ? Pond fill ?• Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? Cumulative impact concern . Comments: ?S?SuP? A4 /CA- j ® Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com August 1, 2005 S&EC Project # 9772.W1 To: NC-Division of Water Quality Attn: Cyndi Karoly 2321 Crabtree Blvd. F9 Suite 250 J IIJI ????? Raleigh, NC 27604 - 2005 AU G ? From: Chris Flowers Soil & Environmental Consultants, P.A. DENR-YVATtRQUALITY 11010 Raven Ridge Road vi-rTwDSAlioSTOFjAIATERBRAILIi Raleigh, NC 27614 Re: Peyton Hall Phase 2 Wake County, NC On behalf of the owner, Centex Homes, Attn: Grey Methven, please find attached a complete application and supplemental information requesting written concurrence from the N.C. Division of Water Quality (DWQ) that the activities proposed below comply with the Neuse River Riparian Buffer Rules. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name Peyton Hall Phase 2 Project Type Residential Development Owner / Applicant Centex Homes, Attn: Grey Methven Count Wake Nearest Town Raleigh Waterbod Name Rock Creek 03-04-02, 27-28 Class C, NSW IMPACT SUMMARY Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact (linear feet): 0 Total Buffer Impact (square feet) 3,134 Attachments: Pre-construction Notification (PCN) Application Form Agent Authorization Form Figure 1, Raleigh East, NC - USGS Map Figure 2, Wake County Soil Survey Map Overall Site Plan Inset Maps (3 Sheets) Stonnwater Basin worksheets (3 bundles) Impervious Surface Calculations Level Spreader Guidance Document Previously Approved 401 Permit Charlotte Office: Greensboro Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive Concord, NC 28025 Greensboro, NC 27455 Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 Office Use Only: Fonn Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing II. Applicant Information F] Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification El Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NA 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: F-1 11. . Check Owner/Applicant approval(s) Information requested for this project: ?D 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Co as ?f ent Area of Environmental Concern (see the top of page 2 for furth U6 , mi AuG 1 ' 2005 gRptICN S? osso? np?R Name: Centex Homes Mailing Address: Attn: Mr. Grey Methuen 2301 Sugar Bush Rd Suite 400 Raleigh, NC 27612 Telephone Number: (919) 781-1952 Fax Number: (919) 571-8346 E-mail Address: U i 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Chris Flowers Company Affiliation: Soil & Environmental Consultants Mailing Address: 11010 Raven Ridye Rd Raleigh, NC 27714 Telephone Number: (919) 846-5900 Fax Number: (919) 846-9467 E-mail Address: cflowers a,sandec.com Page I of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Peyton Hall, Phase 2 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA, not a DOT project 3. Property Identification Number (Tax PIN): 1735143505 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): Peyton Hall Phase 2 Directions to site (include road numbers/names, landmarks, etc.): From Raleigh take US 64 east to New Hope Rd. (SR 2036). Take New Hope Road north to Wedgewood Drive. Turn right on Wedaewood Drive. Take the first left onto Stonewall Drive. Stonewall currently stubs at the property boundary. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.826675 ON 78.560619 °W 6. Property size (acres): +\-42 7. Name of nearest receiving body of water: Rocky Creek (27-28: C, NSW) 8. River Basin: Neuse (03-04-02) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/adinin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site is currently undeveloped. The majority of the surrounding properties are residential subdivisions. Page 2 of 8 10. Describe the overall project in detail, including the type of equipment to be used: The overall project is the development of the second phase of a residential subdivision. The project will involve the construction stormwater devices to comply with the bypass option described in the attached level spreader guidance document dated 10/10/01. 11. Explain the purpose of the proposed work: The purpose of the project is to meet the demand for residential property in Wake County. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Previous permits have been issued to cover impacts from the existing phase of the subdivision. The 401 was issued on January 12, 2005 (DWQ # 04-1934). Please see the attached copy of the previously approved 401. A road crossing which is depicted on the attached site plan and inset maps was covered under the previous permit. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future permits are anticipated. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Impacts to Neuse River Buffers will result from the construction of 3 proposed stormwater basins. The bypass outfalls of the basins will extend into Zone 1 and 2 of the Neuse Buffers and a dissipater pad will be Page 3 of 8 implemented to diffuse the energy of the overflow during storm events. The three basins will impact a total of 1,833 square feet of Zone I of Neuse Buffers and 1,251 feet of Zone 2 of Neuse Buffers. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Type of Wetland Located within Distance to Area of Site Number Type of Impact (e.g., forested, marsh, 100-year Nearest Impact (indicate on map) herbaceous, bog, etc.) Floodplain Stream (acres) es/no linear feet N/A N/A N/A N/A N/A N/A Total Wetland Impact (acres) 0.0 3. List the total acreage (estimated) of all existing wetlands on the property: +/- 0.5 ac 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Intermittent? Stream Width Length Impact indicate on ma Before Impact linear feet acres NA NA NA NA NA NA NA Total Stream Impact (by length and acreage) NA NA Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name Wate Type of Waterbody Area of Site Number e) (if ap applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact indicate on ma ocean, etc. acres NA NA NA NA NA Total Open Water Impact (acres) 0.0 ac; 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact acres : 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact linear feet): 0 7. Isolated Waters Do any isolated waters exist on the property? ? Yes No Page 4 of 8 Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. There are no isolated wetlands on the property so there are no impacts to isolated wetlands proposed. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NA Current land use in the vicinity of the pond: NA Size of watershed draining to pond: NA Expected pond surface area: NA VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. All of the impacts resulting from the installation of the stormwater basin outfalls are considered "allowable" according to the Neuse Buffer Rules. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of Page 5 of 8 aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetiands/strmgide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. All of the impacts resulting from the installation of the stormwater basin outfalls are considered "allowable" according to the Neuse Buffer Rules, therefore no mitigation is proposed. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 0 Amount of buffer mitigation requested (square feet): 0 Amount of Riparian wetland mitigation requested (acres): 0 Amount of Non-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? Page 6 of 8 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ? 2.. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. I I Zone* Impact Multiplier Required (square feet) Mitip-ation 1 1,833 3 (2 for Catawba) 0 2 1,251 1.5 0 Total 3,084 1 0 * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 2. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. NA, the activity is considered "allowable". XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The proposed project will result in impervious surface area below 30% therefore no stormwater plan is proposed for approval. Please see the attached impervious surface calculations. The proposed project will comply with the diffuse flow requirements of the Neuse Buffer Rule. The bypass option described within the attached Level Spreader Design Options document is proposed to be used. This option will require disturbance to the buffer to install the bypass conveyances. Page 7 of 8 XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project will tie into the City of Raleigh's existing sanitary sewer network. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwet]ands. If no, please provide a short narrative description: We have reviewed the "DRAFT Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetland Programs" document prepared by the NC Division of Water Quality on October 3, 2002, version 1.6. The draft states that most residential subdivisions are unlikely to cause cumulative impacts. Of the three criteria of private projects that can clearly result in cumulative impact Peyton Hall Phase 2 only meets one. The project is not relatively large for a residential development in Wake County, the project will involve no commercial development, however the project will occur in an otherwise relatively undeveloped landscape. Some of the current regulations protecting water quality associated with this project include the 401, 404, C, NSW rules. We anticipate that you will advise us if a qualitative or quantitative impact analysis is required. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ApplicantrAgent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 U7/29/U5 12.46 FAX 9195718846 Centex Homes vie ..or cvvo Lu: of rAA Id 002 1002 moil & environmental Consultants, PA 11010 Raven Wide Road • RAWSk Noeh CU01iaa 27616 • Fho= (919) 846-5900 - Fad: (919) 946-9467 www.SandFr-' .rpm AGENT AUTHORIZATION FORM project Name/ Attr4- Field Office: Re: Wetlands Related Consulting and Permitting To Whom It May Conce= S&EC Project # I, the current ro owner, hereby designate and authorize Soil & Environmental Consultants, PA to actin my behalf as my agent in the processing of permit Applfrz;tions, to furnish upon request supplem ental information in support of applications, etc. from this day forward. The _ 7q day of oki-lAd Thus notification supersedes nny previous caorrespoalda zce concerning the agent for this project NOTICE.- This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the propestyWhen accompanied by 6&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. Print Property Owns Name Property s cc: Ms, Cyndi Karoly cc.- Mr. Chris Flowers XCDENR - DWQ Soil & Environm=tal Consultants, PA 2321 Crabtree Boulevard Meigh, NC 2760 a^r„ttone orsrc; 236 Lcllu p Court Sui[o C ?rcnsbom Qfi?c . Concord, NC 28025 3817-E LawndaIa Drive Phony (704) 720-94405 Cmne: w3 ,) 540-8234 Fax: (704) 724-9406 Phone: 36) F= (3336) 540`R235 The Department of the Army U.S. Army Corps of Estgineers, WRmington District P.O. Box 1690 Wilmington, NC 28102 r ??Y t { MM 1113Y - j ?? 1 ? ; 1 1: tn 1 ' L'j i• ,? j ,-? ? '!?. ?? , - reek- .? • • ? ?%j r-- '?'? IT 0. ?? ?, -_? ? bura?d ? a Park .p0 ?.l • ? ' --) ? •,? ? ? --? •'? in 1 -t ?'. P•. ? , ./r1••? ? \? /, ' L/ ..\. \?< c ?? bfv?`• C% ?} •?L?r T . earl•"f' f.'. ?y , J _r _ ! ?. ?/' '' • ?-'""^h _ i ?• . c • ? // r Cam--- 10 t - ? -fi -- --+Y_ ,- •. / ,?? , ?c\3? r ?- \ ass • •lCi' 1 u?= •? ,? r \ `-_` ?,y,..? ?J /-- ? ) 41 ? r` /4 i , !``I \ ' ? _r ?? - ? • ? ?' ? t r!' ? ' r:e ?__ ?.? \? .,-• '?' T 1''l _ , ?-- 1 ' ?/ I '? ? r . v? r I .ri ? -\ , NI ? ?• _ 1 . ?; ? ?,' :; 10 P oject No. ure 1 - USGS Ma Fi ? 7 p g PA Soil & Environmental Consultants Peyton Hall Phase 2 , Project Mgr.: Centex Homes 11010 Raven Ridge Rd.- Raleigh, NC 27614 CF Wake Count County NC (919) 846-5900 • (919) 846-9467 dEC P S , .com age: www. Web an Scale: 1" = 2,000' July 27, 2005 Raleigh EastQuadrangle pc rir???` M a ( LO D s WkE 1 LwC2 ME y LoD / - ?LoD y ? z 1 Lof3 W Ir I WTC i WkE ?1M1'o\ AP32 \ o LWC , WmC2 LOU VVIIIC v° WmC2 v WrnC2 P AUC2 \ WkE' lWC2 S ?' ?F ` WmC2. WmB2 F LwC r0? ??© \ q4c CU Wm'-2 is WmC2. da \ \ a / L°D`: n LoC ?c? ; 1 /Wm o ? Me LoC ,' G LwB2 it ?E w is \ m r v Y 'mB2 _ APB2 ' ° n / , ... LWC ---?- -v. LWC2 • CIB3 a? WmB2 DuL WmB2 j )"> PPG CeB2 © l wmBi LW11.1 wrnD APB2 Cm 1 ' Me 1 LWC2 Loo G?-. AGB2 - W C- LwL32 wr r PQ? ?? WmB2 LwC2 0 1 wyC ' Q?? 1 ?? ?? LNC2 WkC APB2 WkE LoC 94<? i LwC3 LoD:? [bU APC2. - - DuC , Lo[3 wo QrF' - I ?... LOB ?- - A°C2 \ W E PQG? ?a LoC 95q `? t a / AUD - - - _ Q- 9 WkE \ + 'b :WkE kF AJB2 ""kC k. Wk k \ AoG1? 00 Q r -- -- - - ?? - -- - -- - \L -: IL . L J_ Z LoC fi 1 APB2 APC2 0\ WkC V?kE 4r _ w4E q r j !y ??(Ap- - - - 4 r q W i _ LoB - WkC °0' m APC2 APB2 APC2 \ C WkE LoC, - 0 N62 ' ?PB2 , A13 APB2 LoC f Mc v LoD Me . WkC / v AIXW LoC WkE T og _ V° h C2UC2. APC2 / v ALC2. ? : / Me WkC 4G / Lot P ! UC _ APB2 Vv ?' \ ? S e Y`/ r - APB2 - ---- ApB { r A w ! \?1 !APBP PQ ApB2 \1 [ '/" n APC LoC =LoC APB2 1 LoE3 v ? APB r e ^\ ?.f7 Me4 loQ n / APB WkC LoE3 LoC ? 11 Apu/ i AAC2 Me )/ - l Mr LoC 1 °D ?' U ?: L \ APES APCI j f B2 9 , M6 DuE3 n , LoC AP32 j , WkC . <a - LoC . o 1 APC2 /APC2 Gj ry j APC2 ApB2 G ' vv v+ r L6[3 , // \ <Q Pp 0ti :r { APC2 ApB2 -Cn PQ W4'C Dub /.... APC2 APC2APL3 APB2 Project 9772 W No. Figure 2 - Soil Survey Map - - -- --- Soil & Environmental Consultants, PA r ,. Project Mgr.: Peyton Hall Phase 2 11010 Raven Ridge Rd.- Raleigh, NC 27614 CF Centex Homes (919) 846-5900 - (919) 846-9467 -- Scale: Wake County, NC Web Page: www.SandEC.cem ? . ,. 1" = 1,320' July 27, 2005 Wake County Soil Survey November, 1970 N I'10NV:)lNON 'H9 13"1'v , ? ? ? b? 3l\ IZICi Ci00M39Ci3M , Q C NV CtOIVN MOOV NTIIts . N O I I5'Vc - ?-1'V ?lO1J?? o .. o o Q N fV Cf ix .?`J 0 Q U ( o.c- coco o F-- O z ! 6L -' W \II ? ? 4 } I 1 I \ \ \ W I I I ? ? ?? I? ? 1 1 \\? ? t o !!rr I N I ? _ v = 3 E z v 1 v I :yl i?i'h1t v v I/ r , ?% 1111` r7 r-7 v \??? •i?l/1;?'.('ll ? - ?? / ?\\'`' \\\ III ? / 11 II P % ? ? -? , • ? \ I X11 ? ?j?' /lll l? l I`? 11111 l l l 1 I , _ L,?? wvw??III I rrli 1 'tON -// // l?'- ?o?jE.? G oE --??, v?? i? ll IIIII 11 II? V1, I ?i ?? vvvvvvvv v vv v ,t , > ?? 61 111 1 1 j \? \ \?.? \\\ \\ \ ? 1 U ? I ? Ili 111, tl'??? M1? .? ? ? 4 ??? r° II III I r, 1? I1111111,?,:` I ?> \?? I ,, i 11, / ?/?alll fl 11'11 I TIM. I ? \\\\ \) 1 ? I ? -.. ?? 1 ??II IIII 11111 ?.ti?lj 3 ? 1 \\\\ \\ / \ ?\ `?? '` ?1i:\\\h !?IIIIIIII 111 / li\I'1 WC7 ( 11111 111 ? _ ?? V ' ? II'?IIIII Il/llll; ll,i p I i?llll / l/ / ? ? y?? ? aIJ'a ?li?ll?ll'?(?(II f ? I W WY i >? I I ? o A N W Z O F? N - - - - D'dSC']JU'J2 G1jC? SDJO\ ?N??•?S:GciGJ A a b °? w o *NI"iOZ V;) H1.NON 'H913'1'V? SI?INa WoMaGOaM CND c0%71? MoOlVaN 1'1115 i I aS%VHcl - 111VH NO-LAaal 0 o 0 z ?C O z /17\ a? N 3¢ W a 0 N f? - 6r, p asoa,?bua-?Hd?a ?S?sbuirnoa(1\:)Hd\s U a 'VN 11ON'vr0 HINON 'H91 M 1YS . MAINCI C1OOM39C MM CIN'd CIO'VN MOCIIV V401-111.5 o 11 m1SVHc1 - 1 1'VH NOIAaci ? w m o F-;3 a. IL a U) F- ? ? oC w \\ LL. \ \\\ ?n o Qw r,' - \ \\ \\ LL, Z O Z r1 I11 z 0- 0 0 CL XU° U Z?w it ?w V :2 \ °° I'll w L.L N V) ?E z r-, O O \ OD-lwaaJ w.- N CL LL. -.-- Wto 1???\\\\? \ \ Joao ? I \ a \ \ N \ zsZ ? ? V 1 1 ? 1 avz m? qV6 ° I 1 ? ? ? \\ ?Q \ \ \ 1? ? ? 5; 9s 1 I \ I ? \ \m \\ \ n \ b ? II I \ \ \ \ \\ \ \ \ ? ? \ \ - ?, .L / / \\?\\ OFFER I 1 I \ \ \ \ \ \ \ ? ti?? s? ' - ? oN / \\ 9 .SOP 1 ` I 1. / PR???pM \DE \ I i • ? \\I \I II I Q \ \ ?? - - I j \ M?F ?? \\??\\\ \I I II I `I ? 1? 1 I I ? , ?? \\ / ?' ``?\ 11 I II I \\ \\\I 1 I ? I I I I I ?, asz ``,,-- \ 1 1 I I ?, ' ~\\ \ \I 1\ \1 \\\ \\ I ? II ? j I j I I I Q \? \ 1 1 ` \ I I I I I I I \• \ V /\ \\ ?? 1 ? \ \\ I I ? I l j III 1 V ? ?? \ 1 \ \ I I ? I I III 1 i Q' ??? \ ``1 \ '\\ \ 1111 I I I I III ` ?/? _ / \\\ \\\ ? \\ \ \\ \I I I ?? I j j i III I ' ` \ I I I I I I? ?'??\ \\ \\ \ \ I I Ili I I I I IIII ?? .? ?`_\` \\ \ \\ ? \ \ 1 I I ( I I I III/ y \ ??,\ \ \ \\ \ ` \ \\ I I ? ,IIII I I I ? I/ ?, v v I I I , I I I ?, \ 1 \ \ I I III I I I l 11 i ? \ ?` \ \ ? III •? I I 1 ?/ \ ` \ \\ \\ \ \\ I I i I I I I j I/ j?/ / ???, \ \ \ I I I I I I I I,r/ / 1 \ \ \ \ I i II I I II 1???/? \?.• \1 \\• \\ I\? I i ? I?I? I ? ?11I?r111??/? ujdg? :c - S0, 'OZ unF. Z ?f? - 6r.,p'asoqJ6ua-3Hd\,a)"S\s6ulMpaQ\?Hd\s1aafo,d\ ? = m VNIH.L'SON 'HSIal Vlai M^I?ia aoOMmedZm o I I S'?f Hcl - -1'?f # NOIAac4 o u -in F n.0- Do Cot- 0 x op O ?0 z SON XUp 0W I a yd ? , ??i i I I I I i I 1 1\ ®I \ \ \ 1 I II ? I I I1// / / / // / )III j ! l / I I I 1 \ \ \ 0 \ \\ \.? \ ` 1 II`` I I it (?///l' /// ; ?Illll r 1/ I I I i I I \ \ \ \ \ , ,I ? \ 1. ,I? I I . I ?G1/ ? "{ /• ? /?I 1 I , I , / I , i I I ? \. \. ?? \ ?. \ ?? ; I? I I ?I jlll/' ?' //•/?/? / ! i I ( i I I I I I ? \ \ ? ? \ \??j \ \ \\ ?\ II II III ? I III / Ij (/' ?'/'/' /' '/'?'/lJ? 111 1 ? I I II ` 1 11 11 \ \ \\ \\ \ LAI \\ \ \ \ I I1. i1i?11 //y ! I 1 1 1 1 \ \ I I / / f 1 \ \ 1I i 1 \ I I ,ll II / / /I / 1 1 1 1 1 \ \ \ ® \ \ I I III III / / / / I \ \ 1 1 1 1 \ \ W \ ` \ ' \ ? \I I ? I I 1111 111 / /?/ //? / / // ( ? I 11 \ \ \\ 1 1 1 1 \ \ \ \ \ \ I I 1 1 !rill 11 ?i / • / / ?? I I I 1 1 1 1 1 \ \- ? \ `. \ 1 I I I I?I 1 141 11 1 1111 / / / j ( 1 1 1 1 1 1\ \ 1 1 1 ? \ \ I I/ I I I 11?1111Illtli/? /! I ?I I 1 1 1 1 1 \ 1 \ 1_ \ - ? \ \ / 1 I IIr (1111 III I I (/ ( i I I I 1 1 1 1 1 \ \ ?? ? ?- \ \ \ ( I I I 1 1 1 1 1 ., _r ?\ 1 1 \\ \ \ \ \ / / j I?I Illi 11111101P 111011, 111 II I i I 1 1? ??T 1 1 1 1 \ Jill I Ill 1111'11 I l t l l i 1 1. -1 1 1 1 1 1 1 1 .? \\ 1\ \ \ l i / v' // /?ii%j 11111111111 I 1J I I I 1 i 1 1 1 1 1 1 1 10 ?\ \ \ \ \\ I / / °"O ?/S ./ / /?i / / 1111 111111 I I I I I 1 1 1 1 1 1 1 1 ?? \ \ \ \ \ sy0 4? /// /// 1111'111111 V I I I I 1 1 1 1 1 1 1 1 1 p \ \ \ \ 1 I / / / yea dy tip ?// /111 11111 I ? 1 I i I I 11 1 1 1 ` 1 1 1 \ \\ ?\ \ \\ ! / / / •OS, ?i? / j1/ 111111 ?/ I I I I 1 1 1 1 1 1 1 \ \ \ \ \ \ N \\ C5\\ \ \\ ? ? \\ \` / / f0 / \ \ \ \ \ d Q m\ \ P\ PI 1 ? N I v 1 .? ? I 1 ? 1 1 1 1 // \? / ?/ % ? I ? ? I? "? P / / P% 1 IP 1 11 1111 11 ? 11 m/ / I 1 P / 1 I ? 11 1 .P I i I \ \\ \\ ? ? / P / II P 11 / 11` \\ \ 1 \ • I I I 1 ` \ \ ? ? 1 I ? ? / / \I \\ 1 11 I I 1 1 1 I I P I/ /\ // \ I I v / y \ I ? I I ( I // / w Lli I cn w ¢ ¢ 3 "g D.. N v UW L Cw9 z U, q I 0 W J W "-i o w M (n a - >- Z N W N (n v 3 W (LI o J J Q W In I Z W ?? 0d- ?m FE Ha t?DW .:.,D7', :6 -- 50, ' LO ?rf ? 81'.I - 5?;,pasoga6ua-OHd?a?!S?s6u!??,oaQ?OHd?S??a(o?d\ ?? ?g 1VN1 10NVO HINON 'HSIGI' m l?I?a COOMM9asM A m? o Z z, H QNV CIOVIS MOCiv3Nloills W w o w -in =6=4 a. EL fn - -' P-?---_ \ ' Fes-. ;F- \ \ ??- '?\ `\ \ \ \\ \\ \ \ \ \ \ \ 2 3: LLJ LLI Z \?\ \\??\?\ \\\ \\\ \ \ \ I I i C%4 LL- 0 W 1 \? \ \ \ \ \\ \w \ \ \ \ I re) C? 20 ??? ._?_ ? ?? - ?? Nit' \ NtD \\ \ \ \ \\ \? \\ \\ \ \ \ \ \ \ \ `m a. \?`? ` ?\ \\ ?? \? \\ \\\\ \ \\ \\\?W?\\\\ \\\? \ \ \ \ \ \\ \ \? • \ \ \ `` \ \ co7L \ \\ \\\\ \\\ \ \ \ - `\ \ \ \ \ \ Z9Z \ `?? \ \\ \ \v\\ \\\\\ \\\? \ \\ \ \ \\ -? o \ \ 9 \ \.. \ \\ \ \\ \ owN\ \\\\\ \ \ iY??? \\ ?\ \\\ \\ \\\ \\\\\ \\ \ \\\\\? \\ \\6a\\ \ \ \99 ?? ?\ ??\ \ \\ \\\ \\? \\\\\\ \ \ ?a 11 \\ \ 1 \ ( , \ ?? \ \\\\\ \\\\ \ \\\ \\\\ \ \\ zV)Li \0-\ 1 \ \? \ \ O? \ - \\ `?? \ \ \` \\\\\ \\\ \\\\?\\\\ \ \\N\ O-? n'1 \1 \ \? V \ \ \\ `\_ ?? ?? \\ \\ \\\\\\\\\\ \\\?\\\\\\ \\ -ul \ v \ r1?, \ \ ?? v `? \ \ \\ \ \ \ \ ?\ \ \\ \ \ ??? \ \\ .\ \a0 \\` \\?0 0\ \ \\\\\\\\ \\\\\\\\. \\ \ \ \\\ ? \ \\ \ \\ \ \\ \\ \ \ 111 1 II 1 ? II I II II ? \ 90- - ., \ \ \ \ \ \ \1 ?11 1111 II 1 11\,,1 1 l l i \ `\\ \` -- `? - - ---------- \\?\? \\ \ \ I I 1 \ \ 1 11 1111\ }1111 \ '- \ o - - ------- \\ C4? ?\ \\ 1 11l ! \ \\1\\?11 \1}111 \\\I? \\ \ ?? ? \?\\ \\ \ 1 , I \ \.\1 1}11 11} -\ ----? \ \ \ \ \ \ \ \ ? \ / \ \' 1 1141 1 1 \ \ \ 1 \ 11 1 II \ r?\\ - - _ \\ \\ \ \\ \ \ \ \ \ \\ \ 1 ?,11 i?lj III ?? \ ?\\\ \ \ \ \ \ ,\\ \ \? \\ \\ \\\\ \\ IIII ? ? I ? ?.? \ \ \ ? \ \ I\ \ \ \ \ \ \ \? IIII III ? ? \ _ -- \ \ I \ \ \ 1\ \\\ \\ \1 IIII III ?? \ \ \ ? I \ \ ?\ \ \ \\ \ 1}I I III \ \ \ \ \ \ \ 1 \ \ 1• III I \ \ \ \ \ \ \ \ \ \ \ \ Irllll I I I -A lp - \ ? \ \\ \ \I \ \ 1 1 / l / /??il ? r l ? _ - \\ \ ` `\ \ \ \ j \ '1 lI /1 ? 11 / 11 I .' • •?1 i ! 1 / _ _ I y 1 !f \ \ ? \ I J l l / / / rl/111 ,Ilf ?_--- \ \ \ \ I 1 j I / l l /I 1! 1 1 1 1 1 1 -t m _ \\ \ \ \ \ ?\ \\ \ 11 1 I 1 / 1111 ,Ilfl \z \\ \ \ \\ \ \ \ \ \ \ \ \\ \ \ 111111 III I !? _ ? \ \ ? \ \\o ?"n \ \ \ \ \ \\ \ \ \\ \ \, \? \ \\ 1` 111111 ? 11 1 I I ` • \ \ \ \ ? . m ? \\ \ \ \ , \ \ \ \ \\ \ \ \ \ 1111 111 } 1 \ \ \ -\ \ \ \\\ \\ \ \ \\ \ \ \ \ \ 1 111111\ j 1 I I I \ \ \ \ \ \ \ \ \ 1 II 11 II ?2\` \ \ \ \ \ \\ \ \\ \\ \ \ \ 1 \ 1 1 ,'ll l i l IIII I ? \ \ \ o \ \ \\ \ \\ \ \\ \ \ \'\ 1 1 } I ?III1 IIII \ 1 \ \ \ \ \ ? \ \ \ 1 1 1 11••1111 11' \\ \ \ \ \ \\ \ \ \\ \\ 1 1 1 1 1 1 I 'IIII I1I I \ \ \ \ \ \ \ \ 1 1 1 1 1 1/1111111/ \? \ ? \ \ \ \ \ \ ? 1 1 1 1 1II,? It1 1111 \? \\ \ ? \\ \ \ \\ \\ \ ? \ i i 1 I 1 1 1 tl`?i111 1,11;, \\ \ \ \ \ 1 ! ? 1 I I }}`1111 \ \ \ / \ \ \ \ \\ \ \ 1 I // / i DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: TbN I-??Lr? we I Contact Person: 'D4Nnjy oFk W sa, ? Phone Level Spreader ID:. ( IMSIN ., 31 Level Spreader Length (0 ft. Drainage Area 2.047 ac Impervious Area 1. t 5 ac Maximum Filter Strip/Buffer Slope 2 t % grass Max. Discharge from a 10 Year Storm 1.54 cfs Max. Discharge to Level Spreader 0.03 cfs Filter Strip/Buffer Vegetation Pre-treatment or Bypass Method 'Iyf1;n(ft0(? II. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader) *# (on-site and off-site drainage to the level spreader) *# (6% for forested, leaf littler cover, 8% for thick ground cover)' To 15y f7A*55 SY:5Tr_-&A (thick ground cover or grass, canopied forest with leaf litter roundcover Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials U Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. /A Pre-Form Scour Holes are on flat slopes only Vt. No structures are located in protected buffers' oil I.y FV5 Pf C AF' Af'204) C Fog F31FASS swrie -t . If bypass method specified in the Draft Level Spreader Design Option Document: 'DLq Bypass method is specified (if applicable) and plan details and calculations are provided tALF+ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. VLR No structures are located in protected buffers. ( OtILI FE9 t; 54V r- Af tu A ?? ?,A<y Ix. 4 Plan details for the bypass and outlets are provided. SYSt??) " 1 * t. d? The operation and maintenance agreement includes annual erosion and vegetation repair. 45 ?*_ The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. 0Vtlatt464v- Ta t,EVEt- SFPaAVE;R IS FRor?1 -?U? from ?lF4r I' e f RO?t fA? LL . 4c BI"A 4yS7?wI t 's QCLOV tDsD Tt2- ?(?** OfegA IOA 4 F1AtArV4AAkF_ A44-540M"T TD FiG F>,c?cwr?b W1-11`4 -tqE CITY 6jr- TAL Ee 141+. IL EXTENDED DRY DETENTION BASIN #3 CALCULATIONS Drainage Area = DA = 2.06 ac Impervious Area = 1.15 ac % Impervious Cover: I = 55.8% 1" Rainfall Event = Rv = 0.05 + 0.0091 = 0.05 + 0.009(55.8) = 0.552" Volume = Rv(DA) = 0.552" (2.06 ac)(1712")(43,560 sf/1 ac) = 4129 cf (V01)Runoff= 4,129 cf 1" Elev. 247.30 (V01)2-Year= 9,974 cf 2-Yr Elev. 249.86 (V01)to.Year= 17,949 cf 10-Yr Elev. 251.32 (Vol)too.Year= 28,693 cf 100-Yr Elev. 251.77 (Vol)rotai = 34,105 cf Berm Elev. 253.00 Freeboard 1.23' BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated. Volume cf 0 0 245.5 0 0 0.5 800 246 200 200 1.5 2,810 247 3,135 3,335 2.5 3,460 248 3,815 7,150 3.5 4,170 249 4,550 11,700 4.5 4,930 250 5,340 17,040 5.5 5,750 251 6,190 23,230 6.5 6,630 252 7,095 30,325 7.5 7,560 253 3,780 34,105 Use 4'x 4' RTCB with (4) 8" openings Weir Elevation = 251.40 Qwoir = Q100- (Q10)max = CwLh100 312 Qweir = 12.37 cfs - 1.54 cfs = 10.83 cfs Cw = 3.0 L = 16' ht00 = 0.37' 100-Year Elevation = 251.4 + 0.37' = 251.77 Pipe size to drain temporary pool in 2 days Q = (4129 cf/48 hr)(1 hr/3600 s) = 0.024 cis Try 0.75" diameter pipe Average head = h = 1.872 - 0.0313'= 0.87' Q = CdA(2gh)0.5 = 0.6(0.0031)[2(32.2)(0.87)]^0.5 Q= 0.014 cfs -Therefore use 0.75" diameter pipe (Qto)max = 0.6(0.0031)[2(32.2)(2.91)]^0.5 = 0.025 cfs PHC_Detention 3.xis nrv RaRin U3 6/30/2005 PLD I. . BASIN # 3 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 2 -YR To= 2.65 MIN -- USE 5.00 MIN MPOST = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) Q, = C(I,,)A = 7.26 CFS OFF-SITE RUNOFF TO POND On = C(I)A = 0.07 CFS TOTAL RUNOFF TO POND (POST) Q, = O(I,)A = 7.33 CFS RUNOFF AWAY FROM POND (POST) QAWAY = 0(I„)A = 1.71 CFS MAXIMUM RELEASE 0aoow = Opre - ?0away = 1.26 CFS COMPUTE DEPTH OF RUNOFF (Q.) P„= 3.60 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.20 Q' _ (P,; 0.2S)Z/(Pn+0.8S) On' = 1.86 IN PHC_Detention 3.xis 2-YR DESIGN STORM - 613012005 '(PRE) Qn = C(IJA = (PRE) On = 0(In)A = (PRE) QAWAY = C(In)A = 2 YR - 24 HR PRECIP la =.2S = 0.44 DAON = 2.00 ACRES DAOFF = 0.06 ACRES DAAWAY = 0.51 ACRES DA= 2.06 ACRES H = 26 FEET L = 460 FEET CPOST = 0.63 (58%) CPRE = 0.20 COFF = 0.20 CAWAY = 0.58 (50%) CN = 82 (58%) 2.31 CFS 2.37 CFS 0.59 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK Tp = VOLUME/1.390p = Q'DA/1.39Qp Tp = 22.3 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + 0 AWAY O)Tp S„ = 8,127 CF+25% = 10,159 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME C ACCUMULATED VOLUME CF 0 3,005 247.30 0 0 3,460 , ... 248.00 2,263. 2,263 1.70 4,170 249.00 3,815 6,078 2.70. 4,930.._,. 250.00 10,628 3.70 5,750 251.00 5,340 15,968 _ 4.70 - _6,630 252.00 - _ 190---.-.- - 22,158 5.70 7,560 253.00 7,095 29,253 2 -YR STORM ELEV. = 249.86 STAGE DISCHA RGE Op = 7.33 CFS WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 0.46 (CFS) 0 0 0 0.5 1.09 - 0.41 1.5 3.27 0.90 2.5 5.45 1.20 3.5 7.64 1.44 4.5 v.r .v.. ,. 9.82. :.. ......... .. -. .. 1.64 .._ :.. _. ,.. ., _. 20 0 1 1 .82 6.5 1418 ._ W 1.99 7.5 16.36 2.14 8.5 ,18.55 _-. .: , . _ ... .. _... 2.28. -- 9.5 20.73 2.42 16-.5 22.91 2.55 2 -YR STORM PEAK = 1.21 CFS PHC_Detention 3.xls 2-YR DESIGN STORM - 613012005 5.5 ' ORIFICE K= 1.23 Op = CdA(2gh)os Cd = 0.6 A= 0.16 g = 32.2 IF HW/D<t, Op = K(stage)' S PLD CHAINSAW ROUTING TABLE Q, = 7.33 CFS MAX RELEASE = 1.26 CFS Tp = 22.3 MIN dT = 5 MIN vi TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 5 0.9 0.00 0 0 0 3 10 3.1 0.26 0.26 0.08 0.07 4 15 5.6 0.90 1.16 0.36 0.30 5 20 7.1 1.58 2.74 0.83 0.57 6 25 7.1 1.97 4.71 1.34 0.82 7 30 5.5 1.88 6.59 1.81 0.99 8 35 4.1 1.36 7.95 2.11 1.08 9 40 3.1 0.92 8.87 2.31 1.14 10 45 2.3 0.58 9.45 2.44 1.18 11 50 1.7 0.34 9.79 2.52 1.20 12 55 1.3 0.16 9.95 2.55 1.21 13 60 1.0 0.02 9.97 2.56 1.21 14 65 0.7 -0.07 9.90 2.54 1.21 15 70 0.5 -0.15 9.75 2.51 1.20 16 75 0.4 -0.20 9.56 2.46 1.19 17 80 0.3 -0.24 9.32 2.41 1.17 18 85 0.2 -0.26 9.06 2.36 1.15 19 90 0.2 -0.28 8.78 2.29 1.13 20 95 0.1 -0.29 8.49 2.23 1.12 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For 0 < t < 1.25 Tp For t > 1.25 Tp STORAGE CALCULATED USING THE FOLLOWING FORMULA: q = Op [1 - cos (-I T01 2 Tp q= 4.34 Op et-, ?(vlp)j STORAGE = [INFLOW(cfs) - OUTFLOW(cfs)1 ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 1.21 CFS (WATER ELEVATION - 249.86) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 1.26 CFS FOR A 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 3.xls PLD 2-YR DESIGN STORM - 613012005 BASIN # 3 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 10 -YR Tc = 2.65 MIN -- USE 5.00 MIN (INPOST = 7.22 IN/HR ON-SITE RUNOFF TO POND (POST) 0„ = C(I,JA = 9.10 CFS OFF-SITE RUNOFF TO POND 0„ = C(I,JA = 0.09 CFS TOTAL RUNOFF TO POND (POST) 0, = C(I,JA = 9.19 CFS RUNOFF AWAY FROM POND (POST) OAWAY = C(I,JA = 2.14 CFS MAXIMUM RELEASE 00", = Qpre - AO„ay = 1.58 CFS COMPUTE DEPTH OF RUNOFF (Q.) '(PRE) On = C(QA = (PRE) On = C(IJA = (PRE) QAWAY = C(I,JA = Pn= 5.38 IN 10 YR - 24 HR PRECIP ESTIMATE SOIL STORAGE S=1000ICN-10= 2.20 1,=.2S= 0.44 0' = (P,-0.2S)21(P„+0.8S) On. = 3.42 IN PI-IC-Detention 3.xls 10-YR DESIGN STORM - 613012005 DAON = 2.00 ACRES DAOFF = 0.06 ACRES DAAWAY = 0.51 ACRES DA= 2.06 ACRES H = 26 FEET L = 460 FEET CPOST = 0.63 (58%) CPRE = 0.20 COFF = 0.20 CAWAY = 0.58 (50%) CN = 82 (58%) 2.89 CFS 2.98 CFS 0.74 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK TP = VOLUME/1.390P = Q'DA/1.390P TP = 32.7 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + 0 AWAY Q)TP Sn = 14,932 CF+25% = 18,665 CF STAGE STORAGE WATER LEVEL SURFACE AREA SFL ELEVATION FD INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 3,005 247.30 0 0 0.70. 3,460. 248.00 _ 2,263 2,263: _ 1.70 4,170 249.00 3,815 6,078 2.70 4,930__ . 250.00 4,550 10,628 3.70 5,750 251.00 5,340 15,968 ..252.00 22,158 5.70 7,560 253.00 7,095 29,253 10 -YR STORM ELEV. = 251.32 JIAUt UlbL;HA KUt UP= 9.19 (;FS WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 0.46 (CFS) 0 0 0 05 .._ _.. ,.e__.. .. „_.. _ 1.09 __._ _.. _ _-...._. _LL. , .,..,._. 0.41_.. 1 5 3.27 0.90 2.5 5.45 1.20 3.5 7.64 1.44 4.5 9.82 . 1.64 5.5 12.00 1.82 6.5 14.18 _ 1.99 7.5 16.36 2.14 8.5 ... 18.55 228 . . 9.5 20.73 2.42 10.5 T' 22.91 2.55 10 -YR STORM PEAK = 1.54 CFS 5.5 " ORIFICE K = 1.23 OP = CaA(2gh)os Ca = 0.6 A= 0.16 g = 32.2 IF HW/Dc1, Op = K(stage)' 5 PHC_Detention 3.xls 10-YR DESIGN STORM - 613012005 PLD CHAINSAW ROUTING TABLE 0, = 9.19 CFS MAX RELEASE = 1.58 CFS Tp = 32.7 MIN dT = 5 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 5 0.5 0.00 0 0 0 3 10 2.0 0.16 0.16 0.05 0.04 4 15 4.0 0.58 0.73 0.23 0.19 5 20 6.2 1.14 1.88 0.58 0.45 6 25 8.0 1.72 3.59 1.05 0.68 7 30 9.0 2.19 5.78 1.62 0.93 8 35 9.1 2.43 8.21 2.17 1.10 9 40 8.1 2.39 10.61 2.70 1.24 10 45 6.7 2.06 12.67 3.08 1.34 11 50 5.5 1.60 14.26 3.38 1.41 12 55 4.5 1.22 15.48 3.61 1.46 13 60 3.7 0.91 16.39 3.77 1.49 14 65 3.0 0.65 17.04 3.87 1.51 15 70 2.5 0.45 17.49 3.95 1.53 16 75 2.0 0.28 17.77 3.99 1.54 17 80 1.7 0.15 17.91 4.01 1.54 18 85 1.4 0.03 17.95 4.02 1.54 19 90 1.1 -0.06 17.89 4.01 1.54 20 95 0.9 -0.13 17.76 3.99 1.54 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For0<t<1.25Tc Q= -0-p-[1 -cos rit)] 2 Tp For t > 1.25 Tp Q = 4.34 Op e1-' 30 (VTD)1 STORAGE CALCULATED USING THE FOLLOWING FORMULA: STORAGE = [INFLOW(cfs) - OUTFLOW(cfs)J' DTIME(min)' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 1.54 CFS (WATER ELEVATION - 251.32) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 1.58 CFS FOR A 10-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 3.xls PLD 10-YR DESIGN STORM - 613012005 X m N 0 D_ m U) m D ? I ? O CO ? D C) U) z> N S CJ CC) D? W O z CIO CIO ?I ^? l J O z N N N N A A U1 _N J b U co U O rn N J 1 1 I I A C N _ O I O O { O D D '< (A ;u V) V) C C N ,-O C W O O D t m m o D m m °z °z o z F N mo r co ;00 O (A -? m O ov oA ?x ?A v'O III m ? I I' i I, X i II i I u m U I is u 0 N n O O O m m x 1 ' 1 Z 0 m 0 FTI? I co C7 D D C/) C/) z-?z 1 N cclz4tz O C?.1 X C7 Z#z:;u O C) /I V/) 1^'I J O z 9 m I O I A U N Z N N n V O O O .9 m N N N N A A cn (A V b ? -W W V O W N V I 1 I I C N _ O I( O O -?11 { O fD?* ? D f -D1 (A w ;o c C: U) .Zl .Z1 C N D D ;u c 00 D n mm TI (O m 00 zz 0z o z O?zM3 N M O mk s 0 yC??mm V) p A 0 ?A 3'r ?m? CZ) X C C3 (A N w 0 DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: E Contact Person: o Phone Number: Level Spreader ID:. SIN4) Level Spreader Length 10 ft. Drainage Area le. (A ac. Impervious Area 2.63 ac. Maximum Filter Strip/Buffer Slope I?}t _ % grass Max. Discharge from a 10 Year Storm _ F1.1 4 cfs Max. Discharge to Level Spreader _ 0.09 _ cfs Filter Strip/Buffer Vegetation C-- VY RQuSN- ( 1=A%M F_,yT) Pre-treatment or Bypass Method 2??T104 II. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader) +*, (on-site and off-site drainage to the level spreader) ** (6% for forested, leaf littler cover, 8% for thick ground cover)' To ByPAs S%Jv-T-_NA (thick ground cover or grass, canopied forest with leaf litter groundcover) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. ifa requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials -mac{ } Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. /A Pre-Form Scour Holes are on flat slopes only Utz No structures are located in protected buffers' 04L-1 FFS :R PF [ZAr AFV-°^1 (r-OV- 51FA6s SysrEM . If bypass method specified in the Draft Level Spreader Design Option Document: 1704 Bypass method is specified (if applicable) and plan details and calculations are provided tn' I+ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. T2LR No structures are located in protected buffers. ( 04LI FES t? YAP pip kp,?„A ??y PA 'D1.E4 Plan details for the bypass and outlets are provided. S`(ei e"') 1 „" I * ?k The operation and maintenance agreement includes annual erosion and vegetation repair. 14 The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. I FJA rIo Ftt FIP4r ? CF RAtCFALL. 4 . ?f s 41eT?w1 k s FRvt?p Fr?- L kZC+EF_ s-V0V_M5. Wl-rq THE CITY 6j:- T_4L C-_(4 q. 6/30/2005 EXTENDED DRY DETENTION BASIN #4 CALCULATIONS Drainage Area = DA = 12.68 ac Impervious Area = 2.83 ac % Impervious Cover : I = 22.3% 1" Rainfall Event = Rv = 0.05 + 0.0091 = 0.05 + 0.009(22.3) = 0.251 Volume = Rv(DA) = 0.251" (12.68 ac)(1712")(43,560 sf/1 ac) = 11539 cf (VOI)Runott = 11,539 cf 1 " Elev. 273.30 (V01)2-Year = 18,703 cf 2-Yr Elev. 276.90 (VO1)1o-Year= 33,118 cf 10-Yr Elev. 278.80 (VOI)1oo-Yoar= 54,300 cf 100-Yr Elev. 279.30 (Vol)Twa, = 63,858 cf Berm Elev. 280.50 Freeboard 1.2' BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 269.5 0 0 0.5 970 270 243 243 1.5 2,380 271 2,675 2,918 2.5 2,970 272 3,295 6,213 3.5 3,620 273 3,970 10,183 4.5 4,320 274 4,700 14,883 5.5 5,080 275 5,485 20,368 6.5 5,890 276 6,325 26,693 7.5 6,760 277 7,225 33,918 8.5 7,690 278 8,185 42,103 9.5 8,680 279 9,200 51,303 10.5 9,720 280 9,990 61,293 11 L-1 10,260 280.5 2,565 63,858 Use 4'x 8' RTCB with (4) 8" openings Weir Elevation = 278.80 Qweir = Q1oo- (Qlo)max = cwLh,oo 3,2 Qweir = 45.32 cfs - 19.54 cfs = 25.78 cis Cw = 3.0 L = 24' h,00 = 0.5' 100-Year Elevation = 278.8 + 0.5' = 279.30 Pipe size to drain temporary pool in 2 days Q = (11539 cf/48 hr)(1 hr/3600 s) = 0.07 cis Try 1.25" diameter pipe Average head = h = 3.872 - 0.0521'= 1.85' Q = cdA(2gh)0.5 = 0.6(0.0085)[2(32.2)(1.85)]1\0.5 Q = 0.06 cis - Therefore use 1.25" diameter pipe (Q1o)max = 0.6(0.0085)[2(32.2)(4.65)]^0.5 = 0.09 cis PHC_Detention 4.xls n,,, Poem im PLD BASIN # 4 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (0P) Design Storm = 2 -YR T,= 2.65 MIN -- USE 5.00 MIN (In)POST = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) On = C(IJA = 15.85 CFS OFF-SITE RUNOFF TO POND On = C(I,JA = 11.02 CFS TOTAL RUNOFF TO POND (POST) 0n = C(IJA = 26.87 CFS RUNOFF AWAY FROM POND (POST) OAWAY = c(I,JA = 3.28 CFS MAXIMUM RELEASE Oa m = Opre - Away = 15.62 CFS COMPUTE DEPTH OF RUNOFF (0.) Pn= 3.60 IN ESTIMATE SOIL STORAGE S = 1000/CN - 10 = 3.51 0' = (P,; 0.2S)2/(Pn+0.8S) On'-- 1.31 IN PHIC_Detention 4.xis 2-YR DESIGN STORM - 613012005 '(PRE) On = C(I,JA = (PRE) On = C(I,JA = (PRE) QAWAY = c(In)A 2 YR - 24 HR PRECIP 1,=.2S= 0.70 DAON = 5.85 ACRES DAOFF = 6.83 ACRES DAAWAY = 0.98 ACRES DA= 12.68 ACRES H = 26 FEET L = 460 FEET CPOST = 0.47 (36%) CPRE = 0.20 COFF = 0.28 (11%) CAWAY = 0.58 (50%) CN = 74 (36%) 6.74 CFS 17.77 CFS 1.13 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK Tp = VOLUME/1.390p = Q'DA/1.390P TP = 21.0 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + A AWAY Q)Tp S,= 14,176 CF+25%= 17,721 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 3,830 273.3 0 0 0.70 274.0 2,852 2,852 1.70 5,080 275.0 4,700 7,552 2.70 .51890 276.01 5,485 13,038 3.70 6,760 277.0 6,325 19,363 4.70. .. 7,690... 278.0. _ 7,225. 26,588 5.70 8,680 279.0 8,185 34,773 6.70 9,720 _ 280.0 9,200 43,973 ,. _ .. , 7.20 10,260 280.5 4,995 48,968 2 -YR STORM ELEV. = 276.90 S1AUL U bUHA KUt UP= 26.s7 U-6 WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 1.54 (CFS) 0 0 0 0.5 0.32 1.46 1.5 0.97 7.57 2.5 1.62 11.82 3.5 2.27 14.85 4.5 _... _. ., . 2.92 .. _ .. 17.36 5.5 3 57 19.55 6.5. _ ... . 4.22 21.51 7.5 4.86 23.32 . 8.5 b.51 24.99 9.5 6.16 26.56 10.5 6.81 28.04 2 -YR STORM PEAK = 15.09 CFS 18.5 " ORIFICE K= 4.12 OP = CdA(2gh)os Cd = 0.6 A= 1.87 g = 32.2 IF HW/D<1, Op = K(stage)15 PHC_Detentlon 4.xls 2-YR DESIGN STORM - 613012005 PLD CHAINSAW ROUTING TABLE 0, = 26.87 CFS MAX RELEASE = 15.62 CFS Tp = 21.0 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 2.3 0.00 0 0 0 3 8 8.5 0.56 0.56 0.14 0.40 4 12 16.4 1.95 2.51 0.62 2.17 5 16 23.3 3.42 5.93 1.36 6.69 6 20 26.7 3.98 9.92 2.13 10.25 7 24 25.5 3.95 13.87 2.83 12.82 8 28 20.6 3.05 16.92 3.31 14.28 9 32 16.1 1.52 18.44 3.55 14.98 10 36 12.6 0.26 18.70 3.60 15.09 11 40 9.8 -0.61 18.10 3.50 14.85 12 44 7.7 -1.21 16.89 3.31 14.27 13 48 6.0 -1.59 15.30 3.06 13.51 14 52 4.7 -1.81 13.49 2.77 12.64 15 56 3.6 -1.91 11.58 2.43 11.54 16 60 2.8 -1.89 9.68 2.09 10.07 17 64 2.2 -1.73 7.95 1.77 8.73 18 68 1.7 -1.56 6.38 1.45 7.28 19 72 1.4 -1.33 5.05 1.17 5.54 20 76 1.1 -1.01 4.05 0.95 4.24 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For0<I<1.25TP For t > 1.25 TP STORAGE CALCULATED USING THE FOLLOWING FORMULA: Q= Q?[t -cos n91 2 Tp Q = 4.34 Op e[-1 301 vrPq STORAGE _ [INFLOW(cfs) - OUTFLOW(cfs)1 ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 15.09 CFS (WATER ELEVATION - 276.9) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 15.62 CFS FOR A 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 4.xls 2-YR DESIGN STORM - 613012005 PLD BASIN # 4 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 10 -YR Tc = 2.65 MIN -- USE 5.00 MIN (I„ )POST = 7.22 IN/HR ON-SITE RUNOFF TO POND (POST) Qn = C(IJA = 19.86 CFS OFF-SITE RUNOFF TO POND On = C(IJA = 13.81 CFS TOTAL RUNOFF TO POND (POST) Qn = C(QA = 33.67 CFS RUNOFF AWAY FROM POND (POST) OAWAY = c(IJA = 4.11 CFS MAXIMUM RELEASE Q.kw = Opre - AOaway = 19.57 CFS COMPUTE DEPTH OF RUNOFF (On.) Pn= 5.38 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 3.51 Q' = (P,; 0.2S)2/(Pn+0.8S) On' = 2.67 IN PHC_Detention 4.xls 10-YR DESIGN STORM - 613012005 '(PRE) Qn = c(QA = (PRE) On = C(In)A = (PRE) QAWAY = c(In)A = 10 YR - 24 HR PRECIP 1a =.2S = 0.70 DAON = 5.85 ACRES DAOFF = 6.83 ACRES DAAWAY = 0.98 ACRES DA= 12.68 ACRES H = 26 FEET L = 460 FEET CPOST = 0.47 (36%) CPRE = 0.20 COFF = 0.28 (11%) CAWAY = 0.58 (50%) CN = 74 (36%) 8.45 CFS 22.26 CFS 1.42 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK Tp = VOLUME/1.39Qp = Q'DA/1.39QP TP = 34.2 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + A AWAY O)Tp Sn = 28,927 CF+25% = 36,159 CF STAGE ST(1RAGF WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 3,830 273.30 0 0 0.70 4,320 274.0 2,852 2,852 1.70 5,080 275.0 4,700 7,552 2.70 5,890. 276.0.. 5,485 13,038 3.70 6,760 277.0 6,325 19,363 4.70 7,690 _. 278.0 7,225 26,588. 5.70 8,680 279.0 8,185 34,773 6.70 9,720. 280.0 9,200 43,973.: - 7.2 10,260 280.5 4,995 48,968 10 -YR STORM ELEV. = 278.80 SIAGtUISGHA HGE Up= 33.67CF5 WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 1.54 (CFS) 0 0 0 0.5. - 0.32. _......._ , .. __.._ ---1.46 1.5 0.97 7.57 2.5 1.62 11.82 3.5 2.27 14.85 _.4.5. ,.. .. :.: 2.92 -....... - ., 17 ...........36 5.5 3.57 19.55 6.5?.__ .__..._ ._:..422 7.5 4.86 23.32 8.5 5.51 24.99 9.5 6.16 26.56 -- 10.5 - --- __ _... 6.81 -, - -- -. . _-.28.04 10 -YR STORM PEAK = 19.54 CFS 18.5 " ORIFICE K = 4.12 Op = CaA(2gh)o.s Ca = 0.6 A= 1.87 g = 32.2 IF HWIDci, Op = K(stage)' S PHC_Detention 4.xls 10-YR DESIGN STORM - 613012005 PLD CHAINSAW ROUTING TABLE 0, = 33.67 CFS MAX RELEASE = 19.57 CFS Tp = 34.2 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 1.1 0.00 0 0 0 3 8 4.3 0.27 0.27 0.07 0.19 4 12 9.2 1.00 1.27 0.31 0.91 5 16 15.1 2.00 3.26 0.79 3.22 6 20 21.3 2.86 6.13 1.40 6.94 7 24 26.8 3.44 9.56 2.07 9.98 8 28 31.0 4.04 13.60 2.79 12.70 9 32 33.3 4.40 18.00 3.48 14.80 10 36 33.4 4.45 22.44 4.13 16.42 11 40 31.3 4.08 26.53 4.69 17.78 12 44 27.4 3.25 29.78 5.09 18.65 13 48 23.6 2.11 31.89 5.35 19.21 14 52 20.2 1.05 32.94 5.48 19.49 15 56 17.4 0.18 33.12 5.50 19.54 16 60 14.9 -0.52 32.60 5.43 19.40 17 64 12.8 -1.07 31.53 5.30 19.12 18 68 11.0 -1.51 30.02 5.12 18.71 19 72 9.5 -1.85 28.17 4.89 18.22 20 76 8.1 -2.10 26.07 4.63 17.64 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For0<I<1.25Tp For t > 1.25 Tp STORAGE CALCULATED USING THE FOLLOWING FORMULA: 0 = 0Q. (1 - cos (-n t)] 2 Tp 0 = 4.34 Op e1-1 30 ( utp)1 STORAGE _ (INFLOW(cfs) - OUTFLOW(cfs)) ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 19.54 CFS (WATER ELEVATION - 278.8) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 19.57 CFS FOR A 10-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 4.xls PLD 10-YR DESIGN STORM - 613012005 I II O O N n m ? ? o y? v v m ' X \ z : ? I / j I Dm' C 0 m 0 z -? 0' 0 W cc) \ \ D ; C/) 0 z U) \ / •,0 M Z \/ 0 co m 1 co N S-0 r" :Iu O 0 AO f*Nf*?? Oo ° ? f*? x if co I I N N N N 4 -4 u 91 F ? W ID W U 00 00 / ? I I I I I C N i ZO I O O \\/j\ C C N ;u ;u C / m m o m m 00 zz 0z o z nD N O? ? ? o u m o i/ co m z / r N I,' Co N v? fTl ? J C Z ?'. '\ ?\ OmmS pu m e ° ?o rn to ?/ ?{.?? N I i \/\ f ?? p O m O N" U \//\ ?? I oc °A O r \ i 30 ? S ? p mm \ / ?.f D .? O m 0 (n v) % \/..' ? N N N N 14 -4 4 -4 (A (D CO f.4 00 00 z , , 1 1 1 1 A /AV C N O 1{{ O O /\ \ \\ Il (A W C: C: 0 ;u ;o C N D D \\ ;\ \/ m m n D , m o m z z 0 z DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : E Contact Person: o Phone Number: Level Spreader ID:. 5A151 N 4 5) Level Spreader Length (2 ft. Drainage Area -6-12- ac. Impervious Area 4.0(0 ac. Maximum Filter Strip/Buffer Slope 1441 grass Max. Discharge from a 10 Year Storm 10.(09 cis Max. Discharge to Level Spreader 0.12 cfs Filter Strip/Buffer Vegetation I1 V CEAS ?'1trN?l+ Pre-treatment or Bypass Method '17t?y r j1-104 II. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader)+* (on-site and off-site drainage to the level spreader) *# (6% for forested, leaf littler cover, 8% for thick ground cover)' Tc, BYPAtiS Sys r"1 (thick ground cover or grass, canopied forest with leaf litter roundcover Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Ifa requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. /A Pre-Form Scour Holes are on flat slopes only 2No structures are located in protected buffers' Onl -Y F95 'fl PF RdP AF1204 (F0V_ FSyPASS S g5rem . If bypass method specified in the Draft Level Spreader Design Option Document: 12LA Bypass method is specified (if applicable) and plan details and calculations are provided VL, F+ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. VL 1F No structures are located in protected buffers. (09LI FED s; ZAr W AftUA fog- ?I P? INA Plan details for the bypass and outlets are provided. S`l?e") t " 11 * * y The operation and maintenance agreement includes annual erosion and vegetation repair. iG 4:;I c The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. *+V(tA?n64e, To Leval, sPr ADeIZ IS >-fzar? JDAAo fRaM ?tV4r 1" of IzAWFAL.L. A gYF?s ?iys(1%irvl t5 I P0Vtt?D rrz- L-6<uieF_ S-i-oR.-l'1S. ** * O feAAVIOA 4 F1Air1T-F4itA1cF_ A44, I m "T TO 13;G 1~cwT?b wt-rq -fie CITY 0jr- -?"Et4q. 6/30/2005 EXTENDED DRY DETENTION BASIN #5 CALCULATIONS Drainage Area = DA = 8.12 ac Impervious Area = 4.06 ac % Impervious Cover : I = 50.0 % 1 " Rainfall Event = Rv = 0.05 + 0.0091 = 0.05 + 0.009(50) = 0.5" Volume = Rv(DA) = 0.5" (8.12 ac)(1712")(43,560 sf/1 ac) = 14738 cf (VOI)Ru"ott= 14,738 cf 1" Elev. 265.60 (V01)2-Year= 24,922 Cf 2-Yr Elev. 267.97 (Vol)1o-Year= 41,877 Cf 10-Yr Elev. 269.21 (V00wo-Year= 67,533 Cf 100-Yr Elev. 270.01 (Vo1)To1a1 = 95,035 cf Berm Elev. 271.50 Freeboard 1.49' BASIN VOLUME Water Level (it) Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 261.5 0 0 0.5 495 262 124 124 1.5 2,150 263 1,323 1,446 2.5 4,355 264 3,253 4,699 3.5 6,930 265 5,643 10,341 4.5 9,205 266 8,068 18,409 5.5 10,850 267 10,028 28,436 6.5 12,545 268 11,698 40,134 7.5 14,300 269 13,423 53,556 8.5 16,110 270 15,205 68,761 9.5 17,980 271 17,045 85,806 10 .L--i 18,935 271.5 9,229 95,035 Use 4'x 4' RTCB with (4) 12" openings Weir Elevation = 269.30 Qweir = Qioo- (Q10)max = cwLhtoo 312 Qwefr = 45.2 cfs - 16.69 cis = 28.51 cis Cw = 3.0 L = 16' h100 = 0.71' 100-Year Elevation = 269.3 + 0.71' = 270.01 Pipe size to drain temporary pool in 2 days Q = (14738 cf/48 hr)(1 hr/3600 s) = 0.09 cis Try 1.5" diameter pipe Average head = h = 4.172 - 0.0625'= 1.99' Q = cdA(2gh)05 = 0.6(0.0123)[2(32.2)(1.99)]^0.5 Q = 0.08 cfs - Therefore use 1.5" diameter pipe (Q1o)max = 0.6(0.0123)[2(32.2)(3.85)]^0.5 = 0.12 cis PHC_Detention 5.xis nnr Rasin HS PLD BASIN # 5 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 2 -YR Tc = 2.65 MIN -- USE 5.00 MIN (IM)POST = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) 0, = c(QA = 16.01 CFS OFF-SITE RUNOFF TO POND Q,, = c(QA = 10.79 CFS TOTAL RUNOFF TO POND (POST) Q, = c(I,JA = 26.80 CFS RUNOFF AWAY FROM POND (POST) QAWAY = c(I,JA = 4.65 CFS MAXIMUM RELEASE Qanow = Ove - OQaway = 13.79 CFS COMPUTE DEPTH OF RUNOFF (Q.) P,= 3.60 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.82 Q' _ (P,; 0.2S)Z/(P,+0.8S) Q,; = 1.57 IN PHC_Detention 5.xis 2-YR DESIGN STORM - 613012005 '(PRE) 0, = c(QA = (PRE) Qn = C(I, A = (PRE) QAWAY = c(lJA 2 YR - 24 HR PRECIP la =.2S = 0.56 DAON = 5.24 ACRES DOFF = 2.88 ACRES DAAWAY = 1.39 ACRES DA= 8.12 ACRES H = 26 FEET L = 460 FEET CPOST = 0.53 (45%) CPRE = 0.20 COFF = 0.65 (60%) CAWAY = 0.58 (50%) CN = 78 (45%) 6.04 CFS 16.83 CFS 1.60 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK TP = VOLUME/1.390P = Q'DA/1.39QP TP= 22.4 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + 0 AWAY Q)TP S" = 17,488 CF+25% = 21,860 CF STAGE STORAGE WATER LEVEL SURFACE AREA ____LSFI ELEVATION (FT) INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 8,295 265.6 0 0 0.40 ...9,205. _.:__ , _ _.._ :..... .._..; _ 266.0 _ 3,500 3,500 . 1.40 10,850 267.0 10,028 13,527 11,698 25,225, , - 3.40 14,300 269.0 13,423 38,647 16110 270.0 15,205 53,852 5.40 . 17,980 271.0 17,045 70,897 5.90 18,935 __._._..? .. _. 271:5._. 9,229 80,126._.._._ ... 2 -YR STORM ELEV. = 267.97 51AGtUISUHA HGt UP= 26.80GF5 WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 1.63 (CFS) 0 0 0 0.5r_t 031- rM-_ .. .., ,. ._.._.__ 1.54 1.5 0.92 ' 7.98 2 5 , 1 .54 12.97 3.5 2.15 16.37 4.5 2.77 19.18 5.5 3.38 21.62 6.5 _ .__._ 4.00 23.82 7.5 4.62 25.82 5.23 _? - ..._ 27.69 ?... .. 9.5 5.85 29.43 10.5 6.46 31.08 2 -YR STORM PEAK = 12.34 CFS 19.5 ' ORIFICE K = 4.35 OP = CaA(2gh)os Ca = 0.6 A = 2.07 g = 32.2 IF HW/D<1, Op = K(stage)1-5 PHC_Detention 5.xls PLD 2-YR DESIGN STORM - 613012005 CHAINSAW ROUTING TABLE QP = 26.80 CFS MAX RELEASE = 13.79 CFS Tp = 22.4 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 2.1 0.00 0 0 0 3 8 7.6 0.49 0.49 0.06 0.17 4 12 14.9 1.78 2.27 0.26 0.80 5 16 21.8 3.38 5.66 0.62 2.28 6 20 26.0 4.67 10.33 1.08 5.28 7 24 26.5 4.98 15.31 1.55 8.25 8 28 22.9 4.37 19.69 1.93 10.11 9 32 18.2 3.07 22.76 2.19 11.42 10 36 14.4 1.62 24.37 2.33 12.11 11 40 11.4 0.55 24.92 2.37 12.34 12 44 9.0 -0.22 24.70 2.35 12.25 13 48 7.2 -0.77 23.93 2.29 11.92 14 52 5.7 -1.14 22.79 2.19 11.44 15 56 4.5 -1.38 21.41 2.07 10.85 16 60 3.6 -1.52 19.89 1.94 10.20 17 64 2.8 -1.59 18.30 1.81 9.52 18 68 2.2 -1.60 16.70 1.67 8.84 19 72 1.8 -1.58 15.12 1.54 8.16 20 76 1.4 -1.53 13.58 1.40 7.37 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For 0 < I < 1.25 TP For t > 1.25 TP STORAGE CALCULATED USING THE FOLLOWING FORMULA: Q= O2(1 -cos (7T I)] 2 Tp Q= 4.34 Qp e(-130 (vip)] STORAGE _ [INFLOW(cis) - OUTFLOW(cis)) ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 12.34 CFS (WATER ELEVATION - 267.97) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 13.79 CFS FOR A 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 5.xls PLD 2-YR DESIGN STORM - 613012005 BASIN # 5 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (Qp) Design Storm = 10 -YR T, = 2.65 MIN -- USE 5.00 MIN UPOST = 7.22 IN/HR ON-SITE RUNOFF TO POND (POST) Qn = C(I,JA = 20.06 CFS OFF-SITE RUNOFF TO POND Qn = C(QA = 13.52 CFS TOTAL RUNOFF TO POND (POST) Qn = c(I,JA = 33.58 CFS RUNOFF AWAY FROM POND (POST) QAWAY = c(I,JA = 5.82 CFS MAXIMUM RELEASE Q"W = Opre - AQaway = 17.27 CFS COMPUTE DEPTH OF RUNOFF (Q.) '(PRE) Qn = C(In)A = (PRE) Qn = C(I,JA = (PRE) QAWAY = C(In)A = Pn= 5.38 IN 10 YR - 24 HR PRECIP ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.82 la =.2S = 0.56 Q' _ (P,; 0.2S)2/(Pn+0.8S) On = 3.04 IN PHIC_Detention 5.xis 10-YR DESIGN STORM - 613012005 DAON = 5.24 ACRES DAOFF = 2.88 ACRES DAAWAY = 1.39 ACRES DA= 8.12 ACRES H = 26 FEET L = 460 FEET CPOST = 0.53 (45%) CPRE = 0.20 COFF = 0.65 (60%) CAWAY = 0.58 (50%) CN = 78 (45%) 7.57 CFS 21.09 CFS 2.01 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK Tp = VOLUME/1.390p Tp = = Q'DA/1.390p 34.6 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + A AWAY Q)Tp Sn = 33,846 CF+25% = 42,307 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 8,295 265.60 0 0 0.49 _ ,9,205 266.0 3,500 3,500 1.40 10,850 267.0 10,028 13,527 2.40, ._. . ,.. 12,545 ._:... _. 268.0. 11,698 25,225.... 3.40 14,300 269.0 13,423 38,647 15,205 _._53,852 ._._ 5.40 17,980 271.0 17,045 70,897 5.90 18 935 271.5, 9,229 80,126 10 -YR STORM ELEV. = 269.21 STAGE DISCHARGE Op= 33.58 CFS 19.5 " ORIFICE WATER HW ACCUMULATED LEVEL D FLOW (FT) D = 1.63 (CFS) 0 0 0 0.5 031 _ 154 1.5 0.92 7.98 2.5 12.97 3.5 2.15 16.37 4.5... _...:2_ 17 5.5 3.38 21.62 6.5 - 4.00 23.82 ?_-- 25.82 8.5 5.23 - - 27.69 9.5 5.85 29.43 10.5 6.46 31.08 10 -YR STORM PEAK = 16.69 CFS K = 4.35 Op = CaA(2gh)o.s Ca = 0.6 A = 2.07 g = 32.2 IF HW/D<1, Op = K(stage)15 PHC_Detention 5.xls PLD 10-YR DESIGN STORM - 613012005 CHAINSAW ROUTING TABLE 0, = 33.58 CFS MAX RELEASE = 17.27 CFS Tp = 34.6 MIN dT= 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 1.1 0.00 0 0 0 3 8 4.2 0.26 0.26 0.03 0.09 4 12 9.0 0.99 1.26 0.14 0.44 5 16 14.8 2.06 3.32 0.38 1.16 6 20 20.9 3.28 6.59 0.71 2.88 7 24 26.4 4.32 10.91 1.14 5.65 8 28 30.7 4.98 15.88 1.60 8.49 9 32 33.1 5.32 21.20 2.06 10.76 10 36 33.4 5.37 26.57 2.50 12.97 11 40 31.6 4.91 31.48 2.87 14.22 12 44 27.9 4.17 35.65 3.18 15.27 13 48 24.0 3.03 38.68 3.40 16.04 14 52 20.7 1.91 40.59 3.53 16.45 15 56 17.8 1.01 41.60 3.59 16.64 16 60 15.3 0.27 41.88 3.61 16.69 17 64 13.2 -0.33 41.54 3.59 16.62 18 68 11.3 -0.83 40.71 3.54 16.47 19 72 9.7 -1.24 39.48 3.45 16.22 20 76 8.4 -1.55 37.92 3.35 15.85 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For0<t<1.25To For t > 1.25 Tp STORAGE CALCULATED USING THE FOLLOWING FORMULA: Q = 002 [1 - cos rt t)) 2 Tp Q= 4.34 Qp et-' 30 ( v'v)j STORAGE = [INFLOW(cis) - OUTFLOW(cfs)) ' DTIME(min) '60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 16.69 CFS (WATER ELEVATION - 269.21) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 17.27 CFS FOR A 10-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 5.xls 10-YR DESIGN STORM - 613012005 PLD n 10' BERM - 271.5 3 1: PROPOSED 4'x4' PRE-CAST BOX (REFER TO DETAIL) PROVIDE 1.25' PERFORATED, THREADED PVC OR METAL PIPE W/ CAP do BRACKETED TO CS WALL 2% 3:1 BOTTOM - 261.5 VARIABLE WIDTH BOTTOM 270.01 - MAX. 100-YR WATER SURFACE ELEVATION 269.21 - MAX. 10-YR WATER SURFACE ELEVATION 267.97 - MAX. 2-YR WATER SURFACE ELEVATION 265.60 - 1' RUNOFF WATER SURFACE ELEVATION EXTENDED DRY BASIN #5 CROSS-SECTION (PRE-CAST BOX #??) SCALE: N.T.S. 10' BERM - 271.5 i 3:1 270.01 - MAX. 100-YR WATER SURFACE ELEVATION 269.21 - MAX. 10-YR WATER SURFACE ELEVATION 267.97 - MAX. 2-YR WATER SURFACE ELEVATION 265.60 - i' RUNOFF WATER SURFACE ELEVATION PROPOSED 4'x4' PRE-CAST RTCB (REFER TO DETAIL) 3 1 ?\ 12' RCP OUTLET PIPE ANTI-SEEP COLLAR - 30' RCP OUTLET PIPE ANTI-SEEP COLLAR - EXTENDED DRY BASIN #5 CROSS-SECTION (RAISED-TOP CATCH BASIN #??.) SCALE. N.T.S. 07/27/2005 16:16 9198457703 PIEDMONT LAND DESIGN PAGE 02/02 PLD r Piedmont Land Desiga, LLP 8522-204 Six Forks Road - Raleigh, NC 2715 • (919) 845-7600 • Fax: (919) 845-2703 March 3, 2005 Peyton Hall Still neadow Drive and Wedgewpgd Road Raleigh, North Carolina Impervious Area Calculations Total Site Area .= 42.06 a? res Impervious Areas Lot 1 40,000 sf Lot 2 - 116 (2,500! seach) 287,500 sf Pump Station and Dhlve 3,600 sf Right of Wad _ 211,400 sf Total 542,500 sf 12.45 acres Impervious Area Percentage = (12.45/42.06) 100 = 29.60 % Since the percentage of impervio` s; area is less than 30%, no stortnwater measures are required to meet Division of Water Qualit ; or U.S. Army Corps of Engineers requirements. However storrnwater measures are required to meet the City of Raleigh stormwater quantity control requirements. Dry detention pond$ will be provided to meet this requirement. ClYll Engineers Landscape Archilecis .I Land Planuecs Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Kerr T. Stevens Division of Water Quality Draft Level Spreader Design Options Version 1.0 October 10, 2001 Using Level Spreaders to Provide Diffuse Flow Through Buffers for Compliance with Riparian Area Protection Rules Level spreaders are one means of providing diffuse flow through protected buffers. It is always preferable to not concentrate stormwater initially and provide as many outfalls as possible. This can reduce or even eliminate the need for engineered devices to provide diffuse flow. However, this is not feasible in many cases. Some buffer protection rules such as the Neuse, Catawba, and Tar-Pamlico Riparian Area Protection Rules do not allow direct discharges of stormwater through the protected buffers. However, it is "allowable" with written approval from the DWQ to provide best management practices (BMPs) that remove the nutrients or pollutants in question in order to discharge directly through the buffer. These measures could include the use of the buffer itself as a forested filter strip, for instance, to remove the desired substances. In addition to providing diffuse flow, level spreaders can be used to distribute flow into filter strips. There are certain criteria that apply to every design that utilizes level spreaders to provide diffuse flow: 1) The entire system must safely pass a 10 year storm event without failing or causing erosion, gullies or rills. 2) The design of the level spreader must take into consideration site specific conditions such as topography, vegetative cover, soil and other geologic conditions. If diffused flow is not attainable based on site conditions they should not be used. (i.e. the slope of the natural ground away from or parallel to the level spreader should be relatively smooth in the direction toward the stream so that the flow will not reconcentrate.) 3) Level spreaders should have a minimum length of ten feet and an absolute, maximum length of 300 feet. 4) It is always easier to keep flow distributed than to redistribute it after collection. 5) The type and amount of vegetative ground cover must also be considered. 6) Level spreaders must be level. Level Spreader Design Options: Conventional level spreader design option where entire discharge is passed through the level spreader with no bypass conveyance for larger storms: • For grass or thick ground cover vegetation: i)13 feet of level spreader for every 1 cfs flow (Based on Q10 discharge) ii) maximum length of 300 feet per level spreader iii) Slopes of 8% or less from level spreader to top of stream bank • For forested areas with little or no ground cover vegetation: i) 100 feet of level spreader for every 1 cfs flow (Based on Q10 discharge) ii) maximum length of 300 feet per level spreader iii) slopes of 6% or less from level spreader to top of stream bank Another conventional level spreader design technique that can be used to accommodate steeper slopes where grading is allowed or exempt in zone 2 of protected buffers is to provide level spreaders in series as follows: • Can be used on slopes of up to 15% for forested areas and 25% for grass or thick ground cover • Structural level spreader just outside of zone 2 followed by a grassed berm level spreader just outside of zone 1 North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ Page 2 of 2 • Maximum Q10 discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover In some instances, because of topography, the size and imperviousness of the drainage area, or other site constraints, conventional level spreader designs are not appropriate. However, there are alternative designs, like the ones listed below, that would allow a level spreader to function properly by bypassing the larger discharge events. This is based on the assumption used in designing most water quality BMPs that the "first flush" of stormwater discharge contains the most substances of concern. These other alternatives are "allowable (require written approval from DWQ)" for protected buffers in the Neuse, Tar-Pamlico and Catawba basins, but would not be allowable in protected buffers of the Randleman watershed. Level spreader with bypass for larger drainage areas that require 85% TSS removal or where lateral constraints limit the level spreader length severely: • Dry detention basin designed per NCDENR Stormwater BMP Manual* sized to detain 1" rain and release it over 2-5 days* through a level spreader. • Level spreader length based on the maximum release rate discharge • Discharges from greater than a 1" rain can be bypassed via an appropriate conveyance such as a grassed swale (rip rap lined ditch or pipe may be used if necessary) • Maximum discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover *( in order to meet 85% TSS Removal criteria) Another bypass alternative can be used that would not be considered to remove 85% TSS: • Detention basin such as a type B silt basin preceding the level spreader • Level spreader length based on the 1" per hour intensity storm • A system designed to bypass the greater than 1" in per hour intensity storm through an appropriate conveyance such as a grassed swale (rip rap lined ditch or pipe may be used if necessary) • Maximum discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover Yet another design that can be used in very specific areas with virtually flat slopes is a Preformed Scour Hole with a Level Spreader Apron (typical detail attached): • Discharge area must have virtually flat slopes such as those in flood plains or wetlands • Must be located outside of zone 2 • B = 3 x discharge pipe size for pipes of either 15 or 18 inches B= base width (see detail) • Maximum allowable discharge (Q10) of 6 cfs for a 15 inch pipe and 10 cfs for an 18 inch pipe • Minimum apron width of 4 feet. Any of the above options will be considered acceptable if designed in accordance with the outlined criteria. Please keep in mind that some of the above practices may still require written approval, for instance when a direct bypass discharge is proposed through a protected buffer in the Neuse or Tar-Pamlico River Basin. r` r 1.: ? I U 1 lJ ? . I ; •Y ? • ff` { _ P >j :d 1• • %,•. 0- k: f1 . -....u 1?? - `? ? .. !rte 7. •?1 1 \ -1 •,J •1 1 r 1 iJ 1 C .1 l! r m JUL-28-2005 11:34 FROM:DWQ-WETLANDS 9197336893 TO:98469467 P:2/7 Q?OA W A FF,q Michael F. Aaslcy, Governor William Q Ross Jr., Secretary Vj r North Carolina Department of Environment and Natural Resources a .? Alan ZV. Klimek, P.E. Director Division of Water Quality January 12, 2005 DWQ Project 4 04-1934 Wake County page 1 of 4 Helen T. Lattimore 3122 Eton Road Raleigh, CN 27608 Subject Property: Peyton Sall Subdivision UT.Rocky Creek Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse )[fiver Buffer Protection Mules (15A NCAC 2B .0233) with Additional Conditions Dcar Ms. Lattimore: You have our approval, in, accordance with the attached conditions and those listed below, to place fill within or otherwise impact 198 feet of perennial, streams, 95 feet of intermittent streams, 18,245 square feet (fe) Zone 1 buffers and 12,272 square feet (ft2) Zone 2 of protected riparian buffers for the purpose of constructing a residential subdivision at the subject property, as described within your application dated December2, 2004 and received by the N.C. Division of Water Quality (DWQ) on December 2, 2004. After reviewing. your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USAGE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0233. In. addition, you should obtain or otherwise comply with. any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Nop-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted In, your application shaU expire upon expiration of the 404 Permit. This approval. is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with. alJ conditions. If total fills for this project (now or in the future) exceed one acre of wetland or. 150 linear feet of stream, compensatory mitigation may be required as described in. 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. N'ntu care Carolina 401 Ovsr'fghYExprss; FevtawUnit Ql!liXl?! 1650 Mall SBMca Center, Ralalgh, North Carolina 27699.1650 2,121 Cmbtmo Boulevard, Sulfa 250, Ralelgh, North Carolha 27801 Photo: 919.733.17M I PAX 919-733-6893! lntamet: hitoJir2o.enr.state.no.us/ncwetlands JUL-28-2005 11:35 FROM:DWO-WETLANDS 9197336893 TO:98469467 P:3/7 Helen Lattimore Page 2 of 4 January 12, 2005 The Additional. Conditions of the Certification are: I. Impacts Approved- The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: . Amount Approved (Units) Plan Location or Reference Stream - Perennial 198 (feet) Stream - Intermittent . 95 feet Buffers -Zone 1 , 18,245 (square ft.) Buffers - Zone 2 ` 12,272 (square ft.) 2. Erosion & Sediment Control Practices - Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and. Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be stich that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 3. No Waste, Spoil, Solids, or Fill of Any Kind - No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control. Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, ior rules occur. 4, No Sediment & Erosion Control Measures w/n Wetlands or Waters - Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the.project. 5. Certificate of Completion - Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. JUL-28-2005 11:35 FROM:DWQ-WETLANDS 9197336893 TO:98469467 P:4/7 Helen Lattimore Page 3 of 4 January 12, 2005 6. Written Storniwater Management Plan - An additional condition is that a final., written stormwater management plan (including a signed and notarized Operation and Maintenance Agreement) shall be approved in, writing by this Office before the impacts specified in this Certification occur per Condition No. 4 in GC No. 3402. The stormwater management plan must include plans and specifications for stormwater management. facilities that are appropriate for surface waters classified as Class C and designed to remove 85% TSS according to the most recent version of the NC DENR Storzrmwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. 7. Deed of Notificatioi p - Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in. order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetfands Unit web site at http://h2o.enr.state.tic.us/ncwetlands. S. Compensatory Mitigation Using the Ecosystem Enhancement Program '(EEP) - Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been, determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into a restoration fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: Compensatory Mitigation. Required River and Sub-basin Number Stream 193 (feet) Violations of any condition herein set forth may result in revocation of this Certification and may result in cn.rainal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct .impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 Permit. JUL-28-2005 11:35 FROM:DWQ-WETLANDS 9197336893 TO:98469467 P:5/7 Helen Lattimore Page 4 of 4 January 12, 2005 If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impact§), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you r?ceive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150E of the North. Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are f1.nal and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) 'shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone John Dorney at 919-733-9646 or Bob Zarzec.ki. at 919.733-9726, AWKJbs Enclosures: GC 3402 Certificate of Completion Sincerely, Alan W. Klimek, P.E. cc: Sean Clark, S&EC, Inc., 11010 Raven Ridge Road, Raleigh, NC 27587 USACE Raleigh Regulatory. Field Office DWQ Raleigh Regional Office N.C. Ecosystem Enhancement Program File Copy Central Files Filename: 04-1934 Peyton Hall Subdivision (Wake) 401 NBR JUL-28-2005 11:35 FR0N:DWQ-WETLANDS 9197336893 T0:98469467 P:6/7 WArFRQ? o -c Michael F. Easlcy, Govcmor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek. P.E. UIT=tr)r Division of Water Quality North Carolina Division of Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 2H.0500, Helen T. Lattimore has permission as outlined below to impact 293 linear feet of streams for the purpose(s) of constructing the proposed Peyton Hall Subdivision in Wake County. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS PERMIT IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM DWQ Project No.: 04-1934 DATE: January 12, 2005 LOCATION: Cary COUNTY: Wake BASIN/ SUB BASIN/ STREAM INDEX: 03-04-02 / 27-28 As required by 15A NCAC 2H.0500, and the conditions of this Permit, you are required to compensate for the above im acts through the restoration, creation, enhancement or preservation of wetlands and surface waters as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements roust be rounded up to the nearest foot according to 15 2R.0503(b). Impacts: 293 ft streams (198 ft perennial & 95 ft intermittent) Mitigation: 1.98 ft perennial streams Note. While .DWQ is only requiring a 1:1 mitigation ratio, the USAGE will most likely require a 2:1 ratio. As such, the total mitigation required by the applicant will most likely be 396, ft of perennial stream. In correspondence dated December 22, 2004, the EEP indicated that up.to 396 linear feet of mitigation will be conducted by EEP if necessary. M 401 1Vetland3 Cenltlcatron Unit riA?-?ahCarolina trrrnl/? 1650 Mall Sorvlco Center, Raleigh, North Carorina 27899-,M0 2321 Crel;lma Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919.733.1766 /FAX 918-73363931 Internet http;//h2o.enr.statB.nc.us/ncwotland; An Eoual CaocrtunltWAmimaitJa Aalon Erolover-50'.b FiPr.?cIPd11(r9G PrnirAvwjn-Rr P;imr JUL-28-2005 11:36 FR0N:DWQ-WETLANDS 9197336893 T0:98469467 P:7/7 Helen T. Lattimore Page 2 of 3 January 12, 2005 One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands Restoration Fund per NCAC 28.0503. If you choose this option, please sign this form and mail it to the Ecosystem Enhancement Program at the address below. An invoice for the appropriate amount of payment will be'sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIRCA.TION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1619 Mail Service Ceriter RALEIGH, N.C. 27669.-1619 (919) 733-5208 Filename: 04-1934 Staff Report Project Num: 20041934 Version: 2 Status: Received Name: Peyton Hall Subdivision C/O Helen Lattimore Project Type: Residential Subdivision County: Wake Region: Raleigh Location: Ut Rocky Creek, Peyton Hall, Raleigh Latitude: +35°49'36" Longitude: -78°33'38" SW Plan Location: Owner: Lattimore, Helen Contact Person: Lattimore, Helen Title: Phone: 7820131 Inspection Date: 09/14/2005 EntryTime: 12:51 PM Exit Time: Reason for Inspection: Routine Inspection Type: Staff Report On-Site Representative(s): Primary Inspector: Mike Horan Phone: Secondary Inspector(s): Question Areas: N Site Visit Inspection Summary: I (? V A ' S w Scv ? F? "J li Page: 1 c Project Num: 20041934 Owner: Lattimore, Helen Inspection Date: 09/14/2005 Inspection Type: Staff Report Reason for Visit: Routine Site Visit Do impacts described in the application differ those seen in the field? Yes 11 No NA A O NE C3 If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? 11 13 13 11 If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? 0 00 0 If yes, please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? ? 13 0 ? Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? O M O O Are there additional stromwater conditions that should be required due to the following classifications: 11 M O ? 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? O M O ? If yes, what phase is this? Are there prior impacts from prior phases? 0000 If yes, what are the cumulative imacts for this project? 198 linear feet of perennial, 95 linear feet of intermittent, 20,078sq. ft. of Zone 1 Buffer, & 13,523 sq. ft. of Zone 2 Buffer Possible secondary impacts noted: Comment: Why was mitigation not required for Buffers for Peyton Hall Phase I. 1 believe that mitigation should be required for cumulative buffer impacts. Please put on-hold. Page: 2 Date : 5 d5 e Check List . -?e6t Name. e_ DWQ#.. O ? y T County: ??-- To: ? ARO Kevin Barnett. ? WaRO. Tom Steffens and Kyle Ban ? FRO Ken Averitte ? WiRO Noelle Lutheran ? p Alan Tohnson [] WSRO Daryl Lamb O Mike Horan Telephone : (919) F+?rom: The file attached. Is being forwarded our for your evaluation. Please call if you need\;as Lance. 'Stream length impacted ` Stream determination . - Wetland determination and distance to blue-lids surface'.waters on USFW topo maps ' mization/av ' co issues e:er Rules euse Tar-Pamlico, :Catawba, Ran?eman) ?'Pond fill ? Mitigation Ratios Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? Cumulative impact concern Comments: /a 0 Chris Flowers From: Ron Hendricks [ronh@piedmontlanddesign.com] Sent: Wednesday, October 12, 2005 8:47 AM To: Chris Flowers Subject: FW: Peyton Hall Subdivision - DWQ Project No. 04-1934 Follow Up Flag: Follow up Flag Status: Orange Chris, This is what we have from Cyndi regarding approval of the previous impervious area calculations. Since then they have been reduced quite a bit due to the deletion of some cul-de-sacs. Ron Hendricks Piedmont Land Design, LLP 8522-204 Six Forks Road Raleigh, North Carolina 27615 (919) 845-7600 (919) 845-7703 Fax ronh@piedmontlanddesign.com -----Original Message----- From: Cyndi Karoly [mailto:cyndi.karoly@ncmail.net] Sent: Wednesday, April 20, 2005 2:19 PM To: ronh@piedmontlanddesign.com Subject: Re: Peyton Hall Subdivision - DWQ Project No. 04-1934 Ron - based on the information you've provided, we've determined that you've satisfied Condition #6 of the 401 issued on Jan 12, 2005, and a separate stormwater plan will not be required. I'll put this note in the file as confirmation. Ron Hendricks wrote: >Thanks, >Ron Hendricks >Piedmont Land Design, LLP >8522-204 Six Forks Road >Raleigh, North Carolina 27615 >(919) 845-7600 >(919) 845-7703 Fax >ronh@piedmontlanddesign.com >-----Original Message----- >From: Cyndi Karoly [mailto:cyndi.karoly@ncmail.net] >Sent: Wednesday, April 20, 2005 12:01 PM >To: ronh@piedmontlanddesign.com >Subject: Re: Peyton Hall Subdivision - DWQ Project No. 04-1934 >It hasn't made it to the file. Can you e-mail a copy of your letter? >Ron Hendricks wrote: »Cyndi, 1 >>I wanted to follow up with you regarding a letter we sent to you on >>March 31. This letter states that a stormwater management plan is not >>required >for » DWQ since we are less than 30% impervious area. Of course we still >>have to comply with the City of Raleigh stormwater requirements. >>We are getting ready to submit for girding permit with >>Raleigh and we need to be sure no additional approvals >>DWQ so that we can advise the City. >>Please let me know where this stands. >>Thanks for your help. >>Ron Hendricks >>Piedmont Land Design, LLP »8522-204 Six Forks Road >>Raleigh, North Carolina 27615 >>(919) 845-7600 >>(919) 845-7703 Fax >>ronh@piedmontlanddesign.com the City of are needed from 2 Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.cotn August 1, 2005 S&EC Project # 9772.W l To: NC-Division of Water Quality Attn: Cyndi Karoly 2321 Crabtree Blvd. Suite 250 Raleigh, NC 27604 From: Chris Flowers D ??? ???t Soil 8+ Environmental Consultants, P.A. 11010 Raven Ridge Road - 205 Raleigh, NC 27614 AUG 1 Re: Peyton Hall Phase 2 DENR-WATER QUALITY Wake County, NC Y+'ETLANDSN@STOR!dYIATERIRANCH On behalf of the owner, Centex Homes, Attn: Grey Methven, please find attached a complete application and supplemental information requesting written concurrence from the N.C. Division of Water Quality (DWQ) that the activities proposed below comply with the Neuse River Riparian Buffer Rules. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name Peyton Hall Phase 2 Project Type Residential Development Owner / Applicant Centex Homes, Attn: Grey Methven Count Wake Nearest Town Raleigh Waterbod Name Rock Creek 03-04-02, 27-28 Class C, NSW IMPACT SUMMARY Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact (linear feet): 0 Total Buffer Impact (square feet) 3,134 Attachments: Pre-construction Notification (PCN) Application Form Agent Authorization Form Figure 1, Raleigh East, NC - USGS Map Figure 2, Wake County Soil Survey Map Overall Site Plan Inset Maps (3 Sheets) Stormwater Basin worksheets (3 bundles) Impervious Surface Calculations Level Spreader Guidance Document Previously Approved 401 Permit Charlotte Office: 236 LePhillip Court, Suite C Concord, NC 28025 Phone: (704) 720-9405 Fax: (704) 720-9406 Greensboro Office: 3817-E Lawndale Drive Greensboro, NC 27455 Phone: (336) 540-8234 Fax: (336) 540-8235 Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ? Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NA 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? 11. Applicant Information 1. Owner/Applicant Information Au 6 1 Name: Centex Homes Mailing Address: Attn: Mr. Grey Methven 2301 Sugar Bush Rd Suite 400 Raleigh, NC 27612 Telephone Number: (919) 781-1952 Fax Number: (919) 571-8346 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Chris Flowers Company Affiliation: Soil & Environmental Consultants Mailing Address: 11010 Raven Ride Rd Raleit?h, NC 27714 Telephone Number: (919) 846-5900 Fax Number: (919) 846-9467 E-mail Address: cflowersnsandec.cotn Pabe I of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Peyton Hall, Phase 2 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA, not a DOT project 3. Property Identification Number (Tax PIN): 1735143505 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): Penton Hall Phase 2 Directions to site (include road numbers/names, landmarks, etc.): From Raleigh take US 64 east to New Hope Rd. (SR 2036). Take New Hope Road north to Wedgewood Drive. Turn right on Wedgewood Drive. Take the first left onto Stonewall Drive. Stonewall currently stubs at the property boundary. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35.826675 ON 78.560619 °W 6. Property size (acres): +\-42 acres 7. Name of nearest receiving body of water: Rocky Creek (27-28; C, NSW) 8. River Basin: Neuse (03-04-02) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at littp:/lh2o.enr.state.nc.us/adinin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site is currently undeveloped. The majority of the surroundin,properties are residential subdivisions. Page 2 of 8 10. Describe the overall project in detail, including the type of equipment to be used: The overall project is the development of the second phase of a residential subdivision. The project will involve the construction stormwater devices to comply with the bypass option described in the attached level spreader guidance document dated 10/10/01. 11. Explain the purpose of the proposed work: The purpose of the project is to meet the demand for residential property in Wake County. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Previous hermits have been issued to cover impacts from the existing phase of the subdivision. The 401 was issued on January 12, 2005 (DWQ # 04-1934). Please see the attached copy of the previously approved 401. A road crossing which is depicted on the attached site plan and inset maps was covered under the previous permit. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future permits are anticipated. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Impacts to Neuse River Buffers will result from the constriction of 3 proposed stormwater basins. The bypass outfalls of the basins will extend into Zone 1 and 2 of the Neuse Buffers and a dissipater pad will be Page 3 of 8 implemented to diffuse the energy of the overflow during storm events. The three basins will impact a total of 1,833 square feet of Zone 1 of Neuse Buffers and 1,251 feet of Zone 2 of Neuse Buffers. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Type of Wetland Located within Distance to Area of Site Number Type of Impact (e.g., forested, marsh, 100-year Nearest Impact (indicate on map) herbaceous, bog, etc.) Floodplain Stream (acres) es/no linear feet N/A N/A N/A N/A N/A N/A Total Wetland Impact (acres) 0.0 3. List the total acreage (estimated) of all existing wetlands on the property: +/- 0.5 ac 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multi 1 length X width, then divide b 43,560. Stream Impact Perennial or Average Impact Area of Number Stream Name Type of Impact Stream Width Length Impact indicate on ma Intermittent? Before Impact linear feet acres NA NA NA NA NA NA NA Total Stream Impact (by length and acreage) NA NA 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name Waterbody Type of Waterbody Area of Site Number (if apcablle) applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact indicate on ma ocean, etc. acres NA NA NA NA NA Total Open Water Impact (acres) 0.0 ac 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact acres : 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact linear feet): 0 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Page 4 of 8 Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. There are no isolated wetlands on the property so there are no impacts to isolated wetlands proposed. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NA Current land use in the vicinity of the pond: NA Size of watershed draining to pond: NA Expected pond surface area: NA VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. All of the impacts resulting from the installation of the stonnwater basin outfalls are considered "allowable" according to the Neuse Buffer Rules. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of Page 5 of 8 aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.ne.us/ncwetlands/stnngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. All of the impacts resulting from the installation of the stormwater basin outfalls are considered "allowable" according to the Neuse Buffer Rules, therefore no mitigation is 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wip/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 0 Amount of buffer mitigation requested (square feet): 0 Amount of Riparian wetland mitigation requested (acres): 0 Amount of Non-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? Page 6 of 8 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ? 2.. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet Mitigation 1 1,833 3 (2 for Catawba) 0 2 1,251 1.5 0 Total 3,084 0 * Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 2. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0244, or.0260. NA, the activity is considered "allowable". XI. Stornnvater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The proposed project will result in impervious surface area below 30% therefore no stormwater plan is proposed for approval. Please see the attached impervious surface calculations. The proposed project will comply with the diffuse flow requirements of the Neuse Buffer Rule. The bypass option described within the attached Level Spreader Design Options document is proposed to be used. This option will require disturbance to the buffer to install the bypass conveyances. Page 7 of 8 XIL Scwage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project will tie into the City of Raleigh's existing sanitary sewer network. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwctlands. If no, please provide a short narrative description: We have reviewed the "DRAFT Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetland Programs" document prepared by the NC Division of Water Quality on October 3, 2002, version 1.6. The draft states that most residential subdivisions are unlikely to cause cumulative impacts. Of the three criteria of private projects that can clearly result in cumulative impact Peyton Hall Phase 2 only meets one. The project is not relatively large for a residential development in Wake County, the project will involve no commercial development, however the project will occur in an otherwise relatively undeveloped landscape. Some of the current regulations protecting water quality associated with this project include the 401, 404, C, NSW rules. We anticipate that you will advise us if a qualitative or quantitative impact analysis is required. XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 U7/29/U5 12.46 FAX 9195718846 Centex homes v./ .:oi cvvO tu:41 rAd LA 002 [a 002 3011 dc environmental Consultants, PA 11010 Raven RRISO Road • RaWf) . North Carolina 27616 • Pho= (919) 946-5900 - Pax: (9I9) 846-9467 wwvr SandBC.com ,GENT AUTHORIZATION FORM Project Name/ Attn: Field Office: Re: Wetlands Related Consulting and Permitting To Whom It 1&), Concar= S&EC Project # I, the current ro owner, hereby designate and authorize soil & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit Applications, to furnish upon request supplemental information in support Of applications, etc, from this day forward The 7q day of This notification supersedes any previoul; carresponderlce concerning the agent for this project NOTICE: This authoE=Hon, for liability and professional courtesy re=ons, i9 valid only for government officials to enter the propeztywhen accompariicd by S&EC staff. You should call S&EC to arrange a sits meeting pxior to visking the site. Print Props 1tY Owner's Name Property O S Si e cc: Ms, Cyndi Karohy er: Mr. Chris Flowers NCDENR - DWQ 7321 Crabtree Boulevard Soil & Environmental Consultants, PA Me.igh, NC 2760 236 UrhEEp Court, Suit. C Gr=boro Concord, NC 28025 3317-E ILwn"e Drive Phone: (704) 720-9405 CmetiSGofo, NC 27455 Wiz: (704) 720-9406 Flwne: {336) 5404231 F= (336) 540-kn5 The Drpartment of the Army U.S. Army'Corps of Engineers, WRmington District P.O. Box 1890 Wilmizigton, NC 2&102 201 ( i ? ? C J ? ????/ •?.? ` + . ?: ' (` ?h ?= ?\.?"?? ? \ ? \? ? 1\ ?.`A?? ? ? ate`\ ( l __/ _ ??' 'o.(. ? ? '/'-??._? _?? • r u ? - _ ` 01 r ?i . ? ??. 1 ? r \1e ( 650' 1 7 - r --? ? ? 9P7oject No. Figure 1 - USGS Map PA Soil & Environmental Consultants Peyton Hall Phase 2 , Project Mgr.: CF Centex Homes 11010 Raven Ridge Rd.- Raleigh, NC 27614 (919) 846.5900 - (919) 846-9467 Wake County NC dEC S , .com an Web Page: www. Scale: 1" = 2,000' July 27, 2005 Raleigh EastQuadrangle Lo D p fi/ Ma I P3X + YJkE WkE WY `:a1? 4I11 6 LoC ??f LoC I r o ? LOU Iik _ ? G, . w I o / I J I:. i LoE3 ? Wrm, ? WkE: ?wo'\ \ o LwC wmC2 _ 4oD e LoD .AP32 ?? \ f', O ' LoP " { LoD n ; Wmc' of WrC2. ? . a o ^ lYmC2 APC2 \ WkE ty '\ p ,,E . WmC2 t f °,I rrC t 0 ?? I m WmC2 my W.C2 ?. Aa LoD' `'Ylm n Me LoC G ? LwII2 _`? yy ?E '' CoT3 ?. WmQ2 ;•i ' ?v V 1 ?F ,• AD¢2 ! Lwc d l 4 ewC2 CIQ3 y,? ' 's._ r \ Wm¢Z 1 3 ) I . Vrm¢2 Duu 7CCB2 a Wm62 LwE13 £ k?C ti LYm[3 AP62 LoD.+ 1 LwC2 _ ?' ? \ ? ?' 4SVY - p \` - - 1 ?"R2 mC e? Wy' ApB: f. -Wm Wm62 r l LoC l +• LwC2 •c2t' ? r r I Lob O W u f 3 1?.. ` .-?. , I ?r j 1 v LwC2 Wkc a I ^1 \\ r ; Loy) / ' Llr? *4• zf f= APC2I '? WkE t ( LOT, D ??Yt Lw13 uC ?qA '-`.•' ' e t r'"` QG? _ LoC3y .- O .' SAO I ti 9 _.n rb 4 ? ?? ? Y. WkE 1\ m^ -Wk E kF rAPU1 - _ I - ?. vk - WkC ^ t `'3• - -- -- -'? ' ., r .Wk !"?4 3`?IL LoC o Q- ApQ2 ApC2 Q? WkG WkE 1h4E y. fy?' ~?7Ap ?tv ,?_ `9 - W 77 v? 'Loll WhC - i? 9oP2 L r - hpC2 ApB2. APC2 \ y f i ?°C F7 v ` `?? t J1Pi3 ADQ? LoC ? _ ?' Mc s 'Co0 s Me •w? i• Du¢2 ?, r'- ? ,„ r?? taD /lpC2 r ti s. LOC ;Tt-? c ?WkL r''°6 An ,iC2 APC2 .ic WkC, APB2 x' v > / ?' t \ {__ ; -_~?, L iti IE. \1\t t X e` l ApQ2 ??1PC3 f 4ti }? A t., r \\ t t r s laPQ2 PCZ ApII2 y\ r _ ; ? 'loC? y\t i { oC f r: AP 62 \t Ir -W ?r e - = ,a \ a ,? a F .\ fi?? } > Lo.. WkC yT ?pE3 afi F ! y/? ?Ol;. si z - ! 1'° a"..e .i L. "? _,? t J 1 ?? 4.s_cp L; ? ?• « ? _., ? APC2 t ? iy i t `! '# APC2 i x r F'r ME f \ '? 4 A y\1 y ? y?` "`?i t Z? f t vN to ii?v. \\ , :<}' ° A yLODM?i ?1? a' ! LoC . APB2 s a \\\\ / 3,f t3 a • v 4P[3 f } ri • \" YYtj ?u r y_ \\\ ..-r yp K ~ q? l y Lo ;Y - - S`t'¢2-~? ?r"Y ?i 'ti,t i tt ?1^({cC , ,. `'o,_ \\6 f 2' R APC £ >ew ?} s r s y Ge r APC2 t -132 .t vvi =? ?' !QG P a % t APC2 L 4 si r Api32 v ` ibE3 eta p.F iP PQOti ' f.. DU[3 y ApC2 k ? .?,3 ,4t 3 r' _»^ ?s.A Api3'L ? _?_ WkX. ,Ft -?APQ2 Prr°72 ct No. Figure 2 - Soil Survey Map g Soil & Environmental Consultants PA Project Mgr.: Peyton Hall Phase 2 i.17 11010 Raven Ridge Rd.- Raleigh, NC 27614 CF _ Centex Homes (919) 846-5900 • (919) 846-9467 Wake County, }, r_.•., Web Page: www.SandEC.com Scale: NC_ 1" = 1,320' July 27, 2005 Wake County Soil Survey November, 1970 U VN I'1ONVV H1NON 'HS I -lVN ? ?? ?l`IZlCI GIOOM39CI3M (=NV CO'VN MOOVZINT1119 tow* I I ?SVHci - "I"IVH NOloo•;ld • W " U I Q ? . " o? a aa.oo ?= o SrJj-L1 F^,. A ? 9 w Nc pf •o. ;s wc s w ru a? I? I? II II I I II II I I L T I _ a 3N W Z O F- N_ lL O z I of W 3W W C7 O W 3 W ?Q Z a W aN Z a n:- ?:?o:, c 'v?i?l I '10?'?O H-L-60N `H9 I a IV-ai _ a? ? 3l?lZla aooM?9a3M v+ m b A m C=NV OOV i MOa'v`3Nffil7Its 0 o ?o o I I 5'?Hc? - IIIVH Nolokacd o 6i -Jul ?r o.?00 V1= O Y H OC O z W Z O H N ..,?+- _ ,-, ? ? ?-, inr ? _q??.? - hr.ap??sogabua-?Hd\a?!S?s6uirn?aQ\?Hd\S??a(oad\ _122 m N 'HG ?? 3I?I?Ct QOOM39Q3M ?? ? _ v QNV QOV*al M043vaN"11115 ° III ?. g o I I 5'4?Hc? - -1 WH NOJ.J•?cI o W-1 Q m =6='4 nc °0 0 ?o z 12 Z) V) x°o 0 0 w -- \ \ I \ ? I I I I 1 1 II I1?j/////// l ?lll? 11 I/ I I I I I 1 1 1\\\\\ \? \ \, \ I \\ II I I I I I I ?// // } /?,/ •/ l /IIII j I I ; I i 1 \\ \\ \ \ \ \? \ \ I I II I I III„/I( /// / //?// If 11 I I I I 1 1 1 \ \ \ \ W \ \ \ ?\ I I I I I I I j1111111/ •I / / / / / ; / 1 1 I 1 ? 1 1 1 \ \ \ ? \, \ I III. Il. / //? I I 1 1 \ \ \ \ \ I 111,'• I IiI,?ILIIII // / /? //?; // 1 1 1 1 1 1 1 1 1 1 \ \ \ \ 0 \ \ I I 1,11 I I I / / / / 1 \ \ 1 \ \ ???\ \ i i t i?l i li?ili Bill / /, ,/? ? (? I i 1 1 1\\ 1 1 1 1 1 3\ \, \ I I I I I>/'lll VIII/ /?// / 1 I I 1 1 1 1 1 \ 1 1 1\ \? I / I I I++ Ih!ll III/ I II 1 1 1 1 1 1 1 1 11 \ _ ? \ \\ ? // 1 1 Ipl ?lllll?li j??l III ? ? ? I I I 1 1 y 1 1 \ I?f?-"'1- \ 1 \\ I I // J l 111 I I I Ill/ I I I I 1 1 ? 1 ? ?? ? -1 1 1 1 \ \ IIII 1111 111 ll1 1 I I I 1 1 1 ? _ ?? 1 1 1 1 \ \ 1/il11111111l11I I i I I I I 1_-1 1 1 1 1 1 1 \ \ \ 11I1 IIIU l IJ I I I 1 y 1 1 1 I 1 1 1?\ \ \ \\ 010 O/S' ./ /// i/ l 1111 1111 !1 I i I I I 1 1 1 1 1 1 1 1 0 \ \ \ \ syo 4? / / / /// 1111 1111 !1 i I I I I I ? 1 1 1 y 11 1 y 11 \ ? o ? \\ \ \\ \ \\ dy N /// /!1111/ ?I I I I I 1 1 1 1 1 1 \\ 1 // / 8 ?i?OS ?'' //• / ill l ?111?1 I I I I I I 11 1 11 1 11 1 \\ ? \\ ?\\ \ \ \\ °' \\ 00 viii '?(/ /' / l l l l / / co Icv ? ,.-, I1 \ \ m\ P P 1 1 1 1 I ? P y v 11 1 V ._.- 1 I 1 I , .. m / / ? I ? ? 1 ? v / / v/ I I 11 1 1 1 1 1, P ?\ ! \\ I it 1 Il \\ \ \ ? ? ? / v / 1 v? / \ \ 1 11? 1 1 1 1 ` \ ? j - I 1 v I / /\ r ? ?/ \ \ 1 \ \\?\?\\v \ \ \ \ I\ I ° I I I I I I I ?\ \ 1 / , 7 w.. LLI Z Fes- Fes- -H ^• ?" w Q Q o ? 3w ?3 U) Ld v gG CL EL :3 ED Q N Z U `? O E5 0 cr- r2 !? Z LL N LL. ? WE -j ° Ld (n V) ZNW NU ZM ZUr ?Jm ?o NN N m I-- of n: cO N dam- ° w a ` r to w :_,o? :6 - 70, ' l0 Inf 8f.? - 6,.?p asoq?6ua-?Hd?a?!S?s6u!r?oap??Hd?s??afoad? g 'VN i "10?'?O HIZION 'H91"1'vr? •? o? o g CiNV CIO%VN MOClV?Nll Iis w o w o o ?? I I ?s'??? --1"?'?t? 1?01?•?? o WA- in ??i?? P - \ \\ \ \ ` \ \ \ w... \ \ \ \ \\ \ \ \ \ \ \ \ ,? ---- \?? Ems-. \a \\\\\? '?\ `\ \ \\\? \ \\ `\ `\ \ \ `\ \ \ Q \\ z \\\\\\ \ \ \ \ \ \ \ \ \ \ LLJ \\ ? NLL Li \\?o \\ \ \ \ \ \\ \ \ \ \ I I ?' /- Z CD M \ \ \ \ \ \ \ \\\m \ \ \ \ \ \ \ \< c1 m??? \ ?? \ \?\ \ \ \\ w \\\ \\ \ \ \ \ \\ \ \ \? - - ?.? \ \ \ ?? \\\ \ \ \ 3t9n?\\\ \\ \ \ \ \ \ \ \\ \ \\ \ \\ \? ,„ s \? \\\ \\ \\\\\\?\\ \ \ \\\\? \\ \ \ \\ o \ \ 9 \ \\ \\ \\\ \ \\ \\ \\\ \ \ \ \ \ \ \ 9z \ \??? \ \\\ \\\?\\\\\ X U?,\ ,\ \ / \ \ \ \ \\\ \\ \\ \\\ \ \\\ ZNw \\?`\ \ \1 \/( \\/ \ \\ p?? ?\ ?\ `?\\ \ \ \ \ \\ \\\\ \\\\ \\\\ \\ \ \\\ \ \\\ \\ \ \\ \ \\\\ \\ \ \\\\111'11 l 1 1 1111 ! .i \ \ 9P - _ \\ \zo \ , \\ \\ \ \\ \\?\I ;1 11111 1 ; Il 1 ?`\ \ - ----------- _ ? \\ ?\? `\ \ I 1 1 ` \ \4111 11111 11 11 . \ \ - ? c? \ \ \ / 1 1 1 11 \ \ \?1 11 11 1111 ? \\ \o`? - ------ _? \ \\??\\\ \\ \ ? ? !/ 1 \\\\• 11 1111111 11111 ,\ ?\ ----? \ \ \ \ \ \ \\ \\?\ \ ` \\ \' 111 111,111 ?1 I ? \ \ \ \ ` \ \ \ 1 \ \ \ ?III I 1 - \ \ \ 1 \ \ \ \ \ \ \ I\I \ \ \ I I l / l i l / ? il111 1111 - r m _ \ \ \ \ ? \ \ \ \ \ 1 I r i'? 11 I I 1 I 1 I ,? _ ? \\ \z \\ \\ \ \\ \ \ \ \ \ \ \ \ \ 11.11 III 1 ? w, \ \ \ \ \ \ \ \ \ \ \ \ \ I I I I i l l I \ \ - -?- \ \o `n \ \ \ \\ \ \ \ 1111i 11 f • \ \ \ \ © ? \ ? \ \ \ ,, \ \ \ \ \\ '\ \ \ 1 11111 1'111 Est \ 1 \ -\ \\ \\\ \\ \\\ . \\ \ \ 1 \ \\ \ 1 ?11?11? I1j 11 _ \ \ \ ?,.\? \ \ \\ \ \ \ \ \ \ 1 ? 1 I III I \ \ m \ \ \ \ \ \\ \ \ \ 1 1 \ 1 I ,?II111 III 1 ? \ \ o \ \ \ \ \ ?\ 1 1 1 I I I i '_ -` \ 1 \ \\ \\ \ \\ \ \ \ ? \\ \ \I 1 1 1 1 it II I ? I III I _ \\ \\ \ \ \ \ \\ \ \ \\ \\ \\ ? \\ 11 11 , 11 11 11 111, i I i 11111111 \? \\ \ ? ? \ \ \ \ \ \ \ ? \I 1 1 1 1 1 11111111 1111 \? \ ? \ \ \ \ \ I \ 1 I 1 ? 1 1 1 1\?I111 III. \\ \\ \ \ \ \ \ I I I I I 11 I11I1I. \ \ \ \ \ \ \\ \` ? \\\ 1 ? 1 1 I I 1 \ q l l I ?I 11 I S `s U d v p VN I "10NV,:) i?1?ON 'H9 I '1'v? o? m? 31?1??Q QOOM3?Q?M , ? .? ? ? QN'vr QO'?ZI MOQ??J?I'1'i IlS ? o ? O I- Q n aac-oco_ o z 1 ?\ W 1 ??\\\ LL. w w c? v d m ?- \\ ° ZI `t \\ U N ? ° C4 / 0 CL ?w a ' 3-?? CL 0 LLJ Q: a. Amffi () LL. LJJ \ s? ` // / \1;1 Il\ O O \ ?\ ?i / / CV LL \I\\ ' ?I\\\ N co Ld N \\\\\\ EL •9a - " \\\ Lxj mZ ?O ?_ ?N i z0 oa? vc? nd n. w U 030 'n o a° a?va as cl: _ - . ? •W2?39 \ \ cv \ 05,E / 1? ? - -• ? v LSD. - .? _?? •- ? \ ,* ,` 1 _ ? zsz ? Ft? ?' 1 \ 9V m\ 1 1 \ \ \ \\\ ?s? g 9 \ \\ oo Lg? \ \ I I I I \ \ ??\ S ?? 3? \ \ X56 \? \ \ I I I \ \ ? \ \ \ / 8sZ / \ \\ I I I I I \ \ \ \ _ S? \ \ 1 I I I I I \\ \\ \\ \\ \ \\` \\\ \ ??, of ? Z . ?ON ` \\\\ 1\ I I FED I I I 01 01 \ \\ \\ ? \ \ ? \ ?. ? ? \? r1F.u5 uFtE ? ON ? \ I I ? I \ ? I I \ ? - MFG gP?? ?\ \ \ I I I ? \1 li II ? \ Q \? ?~ ??-,? I I ? I ?F j \\?\\\ \I I j `I ? ? ?? I I I ?/ ??? \ r/ ?` ?\\ 11 11 ? I \\\\\? l i ? l I I I \ \ 1 1 1 I I I I? 1 i \\ JAI, r? \ \ \I 11 1 I \\ \\ i) I i i I i I III II 1 1 ` \\I ` i i III I ?li'? \ ), r \, \ III I I I I rv --, r ?, \\ 1 \ IIII I I 11 I ? 1 \ 1 I I rI ?Q' ??? \\ `? 1 \ n\ \ I I ?I I I I I IIII r ? \ I\ 1 1 1 ?1 I I I I I I I O? , ? \\ ? \ \ I I I II I I I I III II \ `\ \ I III I I II I? \\ \\ I I I I I I I I I it ?? _ \ 1 \\ \\ 11 iii • I I , I \ ` \ \ ?\ \\ \\ I II II I I I I 1111?,? ?/ I, \ ?\ \\ \\\ \\\I I I I I I I I I li'? /?/? ?\ 1 \ \\ IIII I ? ? I ???'r, ?? ,III i ?r? Ir i u,dg? :c, - S0, ?L unr Z'BfJ - btAp,asc)ga6Ua-3Hd\d}!S\s5Ulm DJG\?Hd\s4Z)aroad\ DWQ Project No DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name : I,4 LL - pt+Aec- Contact Person: 124-N41 OWft eL[ Phonc Level Spreader ID:. (15A,5114-413) Level Spreader Length to ft. Drainage Area 2.047 ac. Impervious Area 1. 15 ac. Maximum Filter Strip/Buffer Slope 2 t % grass Max. Discharge from a 10 Year Storm t • cfs Max. Discharge to Level Spreader 0.03 cfs Filter Strip/Buffer Vegetation :E2JT=e T Pre-treatment or Bypass Method 'Prey tTl?+?1>^t0l? II. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader) -#? (on-situ and off-site drainage to the level spreader) *4F (6% for forested, leaf littler cover, 8% for thick ground cover)' To syPA*?; 61rvrr_-M (thick ground cover or grass, canopied forest with leaf litter roundcover Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Applicants Initials U- Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. f A Pre Form Scour Holes are on flat slopes only ?V No structures are located in protected buffers' Onttty FFg rP tit' ap??l \ C FoQ F3y?A5s SySCEM . /) If bypass method specified in the Draft Level Spreader Design Option Document: -VLA Bypass method is specified (if applicable) and plan details and calculations are provided bL F+ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. No structures are located in protected buffers. Ott y FEy *. V r i2A AFru4 fpr_ IN ram "DLIr4 Plan details for the bypass and outlets are provided. S`I e,iTeM? 1 1 * * J( The operation and maintenance agreement includes annual erosion and vegetation repair. iG_k* The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. *+-vmPo4IC ra wweL- SP(-AveF, IS Ffzoo Intr10 FRot ??tur 1" of Fzd4 4FA1,L. A 1 "A-5S 4i eTr-,M ?S 1 ""c7eD Frz- L-6<ZeeF_ ST01; Ms. ** * O ftf4AVIoil F1ArrAr??JA4CF_ ?44?r)"T TD $ F?crcwr?V Wt-rlr.l- TVie GTy Orr- T_At E;iGt.}. 6/30/2005 EXTENDED DRY DETENTION BASIN #3 CALCULATIONS Drainage Area = DA = 2.06 ac Impervious Area = 1.15 ac % Impervious Cover: I = 55.8% 1" Rainfall Event= Rv = 0.05 + 0.0091 = 0.05 + 0.009(55.8) = 0.552" Volume = Rv(DA) = 0.552" (2.06 ac)(1712")(43,560 sf/1 ac) = 4129 cf (Vol)R..,t = 4,129 cf 1 " Elev. 247.30 (V01)2.rear= 9,974 cf 2-Yr Elev. 249.86 (V01)to.Year= 17,949 cf 10-Yr Elev. 251.32 (V01)too-Year= 28,693 cf 100-Yr Elev. 251.77 (V014o1a1 = 34,105 cf Berm Elev. 253.00 Freeboard 1.23' BASIN VOLUME Water Level ft ` Surface ..Area . sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 245.5 0 0 0.5 800 246 200 200 1.5 2,810 247 3,135 3,335 2.5 3,460 248 3,815 7,150 3.5 4,170 249 4,550 11,700 4.5 4,930 250 5,340 17,040 5.5 5,750 251 6,190 23,230 6.5 6,630 252 7,095 30,325 7.5 7,560 253 3,780 34,105 Use 4'x 4' RTCB with (4) 8" openings Weir Elevation = 251.40 Qweir = Q100- (Qt0)max = CWLht00 Qwelr = 12.37 cfs - 1.54 cfs = 10.83 cfs Cw = 3.0 L = 16' htoo = 0.37' 100-Year Elevation 251.4 + 0.37' = 251.77 Pipe size to drain temporary pool in 2 days Q = (4129 cf/48 hr)(1 hr/3600 s) = 0.024 cfs Try 0.75" diameter pipe Average head = h = 1.872 - 0.0313'= 0.87' Q = CdA(2gh)o.s = 0.6(0.0031)[2(32.2)(0.87)]^0.5 Q= 0.014 cfs -Therefore use 0.75" diameter pipe (Qto)max = 0.6(0.0031)[2(32.2)(2.91)]^0.5 = 0.025 cfs PHC_Detention 3.xls n.,, Pnc;n *,4 BASIN # 3 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (Qp) Design Storm = 2 -YR To = 2.65 MIN -- USE 5.00 MIN (WPOST = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) 0, = C(I,)A = 7.26 CFS OFF-SITE RUNOFF TO POND On = C(I„ )A = 0.07 CFS TOTAL RUNOFF TO POND (POST) 0„ = C(I„)A = 7.33 CFS RUNOFF AWAY FROM POND (POST) OAWAY = c(IJA = 1.71 CFS MAXIMUM RELEASE OaCow = Oae . ?Oaway = 1.26 CFS COMPUTE DEPTH OF RUNOFF (Q,) Pn= 3.60 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.20 0' _ (P,; 0.2S)z/(P„+0.8S) On = 1.86 IN PHC_Detention 3.xls 2-YR DESIGN STORM - 613012005 '(PRE) 0„ = C(I„)A = (PRE) On = C(QA = (PRE) OAWAY = C(IJA = 2 YR - 24 HR PRECIP la =.2S = 0.44 DAON = 2.00 ACRES DAoFF = 0.06 ACRES DAAWAY = 0.51 ACRES DA = 2.06 ACRES H = 26 FEET L = 460 FEET CPSST = 0.63 (58%) CPRE = 0.20 COFF = 0.20 CAWAY = 0.58 (50%) CN= 82 (58%) 2.31 CFS 2.37 CFS 0.59 CFS RALEIGH, NC CALCULATE TIME TO PEAK Tp = VOLUME/1.390P TP = = Q'DA/1.390p 22.3 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + 0 AWAY Q)Tp S„= 8,127 CF+25%= 10,159 CF STAGE STORAGE WATER LEVEL SURFACE AREA SF - ELEVATION INCREMENTAL VOLUME C ACCUMULATED VOLUME CF 0 3,005 247.30 0 0 0.70 .. :-_3t460 248.00. 2,263... 1.70 4,170 249.00 3,815 6,078 2 70 4,930 550- ..: -.. , .. : -.. .. 10,628 3.70 5,750 251.00 5,340 15,968 ..22,'158 5.70 7,560 253.00 7,095 29,253 2 -YR STORM ELEV. = 249.86 J I Alit UlbUHA HUL UP = 7.33 U-6 WATER' HW ACCUMULATED LEVEL : D FLOW (FT) D = 0.46 (CFS) . . 0 0 0 1:09 0.41_ 1.5 3.27 0.90 2.5 ., _ .._ .... 5.45 ...__ 20 .. .._ _ a 3.5 7.64 1.44 4 5 , , ._ j _. ... 9M, 5.5 12.00 1.82 µ X1.99 ,,:....., 7.5 16.36 2.14 _.... 85 ...., W_.. 1855 9.5 20.73 2.42 105 22.91 2.55 2 -YR STORM PEAK = 1.21 CFS 5.5 " ORIFICE K = 1.23 Op = CaA(2gh)" Cd = 0.6 A= 0.16 g = 32.2 IF HW/D<1, Op = K(stage)1.5 PHC_Detention 3.xis 2-YR DESIGN STORM - 613012005 CHAINSAW ROUTING TABLE 0, = 7.33 CFS MAX RELEASE = 1.26 CFS Tp = 22.3 MIN dT = 5 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 5 0.9 0.00 0 0 0 3 10 3.1 0.26 0.26 0.08 0.07 4 15 5.6 0.90 1.16 0.36 0.30 5 20 7.1 1.58 2.74 0.83 0.57 6 25 7.1 1.97 4.71 1.34 0.82 7 30 5.5 1.88 6.59 1.81 0.99 8 35 4.1 1.36 7.95 2.11 1.08 9 40 3.1 0.92 8.87 2.31 1.14 10 45 2.3 0.58 9.45 2.44 1.18 11 50 1.7 0.34 9.79 2.52 1.20 12 55 1.3 0.16 9.95 2.55 1.21 13 60 1.0 0.02 9.97 2.56 1.21 14 65 0.7 -0.07 9.90 2.54 1.21 15 70 0.5 -0.15 9.75 2.51 1.20 16 75 0.4 -0.20 9.56 2.46 1.19 17 80 0.3 -0.24 9.32 2.41 1.17 18 85 0.2 -0.26 9.06 2.36 1.15 19 90 0.2 -0.28 8.78 2.29 1.13 20 95 0.1 -0.29 8.49 2.23 1.12 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For 0 < I < 1.25 Tp For t > 1.25 Tp 0= op [I -cos no) 2 Tp 0 = 4.34 Op e(1 30 ( Urp)l STORAGE CALCULATED USING THE FOLLOWING FORMULA: CONCLUSION: STORAGE _ [INFLOW(c(s) - OUTFLOW(cIs)] ' DTIME(min) ' 60 sec 1 (min) MAXIMUM DISCHARGE FROM THE SYSTEM IS 1.21 CFS (WATER ELEVATION - 249.86) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 1.26 CFS FOR A 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 3.xls 2-YR DESIGN STORAI - 613012005 fin BASIN # 3 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 10 -YR Tc = 2.65 MIN -- USE 5.00 MIN NPOST = 7.22 IN/HR ON-SITE RUNOFF TO POND (POST) 0, = c(QA = 9.10 CFS OFF-SITE RUNOFF TO POND 0, = c(I,JA = 0.09 CFS TOTAL RUNOFF TO POND (POST) 0, = c(I,JA = 9.19 CFS RUNOFF AWAY FROM POND (POST) OAWAY = c(I,JA = 2.14 CFS MAXIMUM RELEASE QaAow = QPre - AQaway = 1.58 CFS '(PRE) 0, = c(I,JA = (PRE) On = c(I,JA = (PRE) QAWAY = c(I,JA = COMPUTE DEPTH OF RUNOFF (O,,.) P„= 5.38 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.20 0' _ (P,-0.2S)2/(P,+0.8S) On. = 3.42 IN 10 YR - 24 HR PRECIP la =.2S = 0.44 DAON = 2.00 ACRES DAOFF = 0.06 ACRES DAAWAY = 0.51 ACRES DA= 2.06 ACRES H = 26 FEET L = 460 FEET CPOST = 0.63 (58%) CPRE = 0.20 COFF = 0.20 CAWAY = 0.58 (50%) CN = 82 (58%) 2.89 CFS 2.98 CFS 0.74 CFS RALEIGH, NC PHC_Detention 3.xls 10-YR DESIGN STORM - 613012005 P CALCULATE TIME TO PEAK TP = VOLUME/1.390P TP = = Q'DA/1.39QP 32.7 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + A AWAY O)TP Sn = 14,932 CF+25% = 18,665 CF STAGE STORAGE IEL R SURFACE AREA SF ELEVATION - INCREMENTAL. VOLUME C ACCUMULATED VOLUME CF 0 3,005 247.30 0 0 _ 0.70 .., _ . ` 3,460 _248 00 1.70 4,170 249.00 3,815 6,078 2.76 .. _ . .....: 4 ,930 250 00 4,550 10,628 . -- 3.70 5,750 251.00 5,340 15,968 4.76 _.._ 22,,158 5.70 7,560 253.00 7,095 29,253 10 -YR STORM ELEV. = 251.32 STAGE DISCHARGE QP= 9.19 CFS 5.5' ORIFICE WATER : HW ACCUMULATED . LEVEL. ; D FLOW-. (FT) D =. 0.46 .::. (CFS). 0 0 0 1.5 3.27 0.90 2 5 5.45 1 20 - - 3.5 7.64 1.44 __?, 4 5 ...,. _ _....?_ ..._ _9 82 ...,..... ?. k... x.64$ ?...... ?.. v 5.5 12.00 1.82 14. 7.5 16.36 2.14 18.55 _ :. _ ..... 2 28 a. _ ?. µ 9.5 20.73 2.42 10.5 22.91 10 -YR STORM PEAK = 1.54 CFS K= 1.23 OP = CdA(2gh)" Cd = 0.6 A= 0.16 g = 32.2 IF HW/D<1, Op = K(stage)' S PHC_Detention 3.xls PLD 10-YR DESIGN STORM - 613012005 CHAINSAW ROUTING TABLE QP = 9.19 CFS MAX RELEASE = 1.58 CFS Tp = 32.7 MIN dT = 5 MIN U TIME (MIN) INFLOW (CFS) STORAGE IS (103 CF) AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 5 0.5 0.00 0 0 0 3 10 2.0 0.16 0.16 0.05 0.04 4 15 4.0 0.58 0.73 0.23 0.19 5 20 6.2 1.14 1.88 0.58 0.45 6 25 8.0 1.72 3.59 1.05 0.68 7 30 9.0 2.19 5.78 1.62 0.93 8 35 9.1 2.43 8.21 2.17 1.10 9 40 8.1 2.39 10.61 2.70 1.24 10 45 6.7 2.06 12.67 3.08 1.34 11 50 5.5 1.60 14.26 3.38 1.41 12 55 4.5 1.22 15.48 3.61 1.46 13 60 3.7 0.91 16.39 3.77 1.49 14 65 3.0 0.65 17.04 3.87 1.51 15 70 2.5 0.45 17.49 3.95 1.53 16 75 2.0 0.28 17.77 3.99 1.54 17 80 1.7 0.15 17.91 4.01 1.54 18 85 1.4 0.03 17.95 4.02 1.54 19 90 1.1 -0.06 17.89 4.01 1.54 20 95 0.9 -0.13 17.76 3.99 1.54 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For 0 < t < 1.25 TP For t > 1.25 Tp Q = Op 11 - cos n t)] 2 Tp Q = 4.34 Op e1' 30 urPll STORAGE CALCULATED USING THE FOLLOWING FORMULA: CONCLUSION: STORAGE _ [INFLOW(cfs) - OUTFLOW(cfs)] ' DTIME(min) ' 60 sec 1 (min) MAXIMUM DISCHARGE FROM THE SYSTEM IS 1.54 CFS (WATER ELEVATION - 251.32) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 1.58 CFS FOR A 10-YR STORM. DESIGN IS ACCEPTABLE. PHC Detention 3.xls ? 10-YR DESIGN STORM - 613012005 251.77 - MAX. 100-YR WATER SURFACE ELEVATION 251.32 - MAX. 10-YR WATER SURFACE ELEVATION 249.86 - MAX. 2-YR WATER SURFACE ELEVATION --? 247.30 - 1' RUNOFF WATER SURFACE ELEVATION_-, I I i PROPOSED 4'x4' PRE-CAST BOX (REFER TO DETAIL) PROVIDE 3'i PERFORATED. THREADED PVC OR METAL PIPE W/ CAP & BRACKETED TO CB WALL 2y C VARIABLE WIDTH 10' BERM - 253.0 3:1 BOTTOM - 245.5 EXTENDED DRY BASIN #3 CROSS-SECTION (PRE-CAST BOX #??) SCALE: N.T.S. 12" RCP OUTLET PIPE ANTI-SEEP COLLAR 251.77 - MAX. 100-YR WATER SURFACE ELEVATION 251.32 - MAX. 10-YR WATER SURFACE ELEVATION PROPOSED 4'x4' PRE-CAST BOX 10' BERM - 253.0 249.86 - MAX. 2-YR WATER SURFACE ELEVATION (REFER TO DETAIL) 247.30 - 1' RUNOFF WATER SURFACE ELEVATION 31 31 27 BOTTOM - 245.5 VARIABLE WIDTH BOTTOM EXTENDED DRY BASIN #3 CROSS-SECTION (RAISED-TOP CATCH BASIN #??) SCALE; N.T.S. 3:1 18' RCP OUTLET PIPE ANTI-SEEP COLLAR 3:1----. DWO Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : LL . E Contact Person: ?4Nnly oW Phone Level Spreader ID:. SI?4? Level Spreader Length 10 ft. Drainage Area 12. (a f, ac. Impervious Area 2.43 ac. Maximum Filter Strip/Buffer Slope Imo}: _ % grass Max. Discharge from a 10 Year Storm _ II." cfs Max. Discharge to Level Spreader _ 0. 09 cfs Filter Strip/Buffer Vegetation _Ns:AV gQUSf+ (ME,4T) Pre-treatment or Bypass Method 2e tyTIMT-ID4 It. REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader)+* (on-site and off-site drainage to the level spreader) **, (6% for forested, leaf littler cover, 8% for thick ground cover)' To lay PASS s M (thick ground cover or grass, canopied forest with leaf litter roundcover Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of Khy. At a minimum, a complete stormwaler management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials _ 12W Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. --WA-Pre-Form Scour Holes are on flat slopes only DI/a No structures are located in protected buffers' 04t,1 FFS `-IP [?Af- AF-W04 (r-OV- If bypass method specified in the Draft Level Spreader Design Option Document: 17L41 Bypass method is specified (if applicable) and plan details and calculations are provided bLF4 Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. nL ?} No structures are located in protected buffers. (09LI FES t 7,1 r pAp Af QUA ?X- ?1l rA? 'DLf14 Plan details for the bypass and outlets are provided. Sye Te",> 1 1 " * * The operation and maintenance agreement includes annual erosion and vegetation repair. iG *AC The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. +4: VA?4?rtle To uiwe - SPEA9E:F, le, F?-R4?'1 J?JA Arorl- F1o1 F1reT 1' °F FAWFA?I.L. A IDIFf{?S `yeT--m t5 FV--6vt?D L.6qZ4eF ST0g_t1S. ** * OPe-AATIDA ? F 1Ai AT_r lAtk-F_ A64,5 co l "T TO g`c ? ?cwr,?b w11-4 rl4E CITY 01r- }. 6/30/2005 EXTENDED DRY DETENTION BASIN #4 CALCULATIONS Drainage Area = DA = 12.68 ac Impervious Area = 2.83 ac % Impervious Cover : I = 22.3% 1" Rainfall Event= Rv = 0.05 + 0.0091 = 0.05 + 0.009(22.3) = 0.251 Volume = Rv(DA) = 0.251" (12.68 ac)(1712")(43,560 sf/1 ac) = 11539 cf (VOI)Run.H = 11,539 cf 1 " Elev. 273.30 (V01)2-year= 18,703 cf 2-Yr Elev. 276.90 (V01)to-Year= 33,118 cf 10-Yr Elev. 278.80 (V01)too-year= 54,300 cf 100-Yr Elev. 279.30 (V014,11= 63,858 cf Berm Elev. 280.50 Freeboard 1.2' BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 269.5 0 0 0.5 970 270 243 243 1.5 2,380 271 2,675 2,918 2.5 2,970 272 3,295 6,213 3.5 3,620 273 3,970 10,183 4.5 4,320 274 4,700 14,883 5.5 5,080 275 5,485 20,368 6.5 5,890 276 6,325 26,693 7.5 6,760 277 7,225 33,918 8.5 7,690 278 8,185 42,103 9.5 8,680 279 9,200 51,303 10.5 9,720 280 9,990 61,293 11 10,260 280.5 2,565 63,858 Use 4'x 8' RTCB with (4) 8" openings Weir Elevation = 278.80 Qweir = Qtoo" (Qt0)max = Cwl_htoo 312 Qweir = 45.32 cfs - 19.54 cfs = 25.78 cfs cw = 3.0 L = 24' ht00 = 0.5- 1 00-Year Elevation = 278.8 + 0.5' = 279.30 Pipe size to drain temporary pool in 2 days Q = (11539 cf/48 hr)(1 hr/3600 s) = 0.07 cfs Try 1.25" diameter pipe Average head = h = 3.872 - 0.0521'= 1.85' Q = cdA(2gh)o-s = 0.6(0.0085)[2(32.2)(1.85)]^0.5 Q = 0.06 cfs - Therefore use 1.25" diameter pipe (Qto)max = 0.6(0.0085)[2(32.2)(4.65)]^0.5 = 0.09 cfs PHC_Detention 4.xls f -.. M--:- LL A P BASIN # 4 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 2 -YR T,= 2.65 MIN -- USE 5.00 MIN NPOST = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) Qn = c(IJA = 15.85 CFS OFF-SITE RUNOFF TO POND Qn = C(I,JA = 11.02 CFS TOTAL RUNOFF TO POND (POST) Q, = c(I,JA = 26.87 CFS RUNOFF AWAY FROM POND (POST) QAWAY = c(I,JA = 3.28 CFS MAXIMUM RELEASE O'A'. = Opre - AOaway = 15.62 CFS '(PRE) Qn = C(IrJA = (PRE) Qn = C(IJA = (PRE) QAWAY = C(In)A = COMPUTE DEPTH OF RUNOFF (O,,.) Pn= 3.60 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 3.51 Q' _ (P,-0.2S)2/(P„+0.8S) On = 1.31 IN 2 YR - 24 HR PRECIP 1,=.2S= 0.70 DAON = 5.85 ACRES DAOFF = 6.83 ACRES DAAWAY = 0.98 ACRES DA= 12.68 ACRES H = 26 FEET L = 460 FEET CPOST = 0.47 (36%) CPSE = 0.20 COFF = 0.28 (11%) CAWAY = 0.58 (50%) CN = 74 (36%) 6.74 CFS 17.77 CFS 1.13 CFS RALEIGH, NC PHC_Detention 4.xls MID 2-YR DESIGN STORM - 613012005 CALCULATE TIME TO PEAK Tp = VOLUME/1.39QP TP = = Q'DA/1.39QP 21.0 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + 0 AWAY Q)Tp S„ = 14,176 CF+25% = 17,721 CF STAGESTORAGE WATER LEVEL SURFACE AREA SF _ ELEVATION INCREMENTAL VOLUME C ACCUMULATED VOLUME C 0 3,830 273.3 0 0 274 0 2,852 1.70 5,080 275.0 4,700 7,552 2.70 3.70 6,760 277.0 6,325 19,363 70 __ -„ 769 'Q.. i__ _ __ _. _ _: _278.Q -.. 5.70 8,680 279.0 8,185 34,773 6 70. 280.0 _ 9,200_ . 43,973 7.20 10,260 280.5 4,995 48,968 2 -YR STORM ELEV. = 276.90 STAGE DISCHARGE OP = 26.87 CFS 18.5 ' ORIFICE WATER • ACCUMULATED LEVEL ._ D FLOW _='` ( D..=.1.54 , .. , . ? (CFS) 0 0 0 1.46 .-__ , _ ... 0.97 7.57 ..... 25....__ ..?.?_? 1.`.62...,.._.._._ ?v..._._a,._11 82 ..._..?a ?. 3.5 2.27 14.85 45 5.5 3.57 19.55 51 _ 7.5 4.86 23.32 8.5 ;z_. LL 5 51 ....._ _ -..... _. 24.99 9.5 6.16 26.56 -.10.5 ? -• - -,-_6.81 "" - . - ?-- 28.04. . 2 -YR STORM PEAK = 15.09 CFS K= 4.12 Op = CaA(2gh)o.s Ca = 0.6 A= 1.87 g = 32.2 IF HW/D<1, Op = K(stage)' S PHC_Detention 4.xls 2-YRDESIGN STORh1- 613012005 PLD CHAINSAW ROUTING TABLE 0, = 26.87 CFS MAX RELEASE = 15.62 CFS Tp = 21.0 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 2.3 0.00 0 0 0 3 8 8.5 0.56 0.56 0.14 0.40 4 12 16.4 1.95 2.51 0.62 2.17 5 16 23.3 3.42 5.93 1.36 6.69 6 20 26.7 3.98 9.92 2.13 10.25 7 24 25.5 3.95 13.87 2.83 12.82 8 28 20.6 3.05 16.92 3.31 14.28 9 32 16.1 1.52 18.44 3.55 14.98 10 36 12.6 0.26 18.70 3.60 15.09 11 40 9.8 -0.61 18.10 3.50 14.85 12 44 7.7 -1.21 16.89 3.31 14.27 13 48 6.0 -1.59 15.30 3.06 13.51 14 52 4.7 -1.81 13.49 2.77 12.64 15 56 3.6 -1.91 11.58 2.43 11.54 16 60 2.8 -1.89 9.68 2.09 10.07 17 64 2.2 -1.73 7.95 1.77 8.73 18 68 1.7 -1.56 6.38 1.45 7.28 19 72 1.4 -1.33 5.05 1.17 5.54 20 76 1.1 -1.01 4.05 0.95 4.24 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For 0 < t < 1.25 Tp For t > 1.25 Tp STORAGE CALCULATED USING THE FOLLOWING FORMULA: Q = Op (1 - cos 7i t 1 2 Tp Q = 4.34 Op e1-1 30 i Utpu STORAGE _ (INFLOW(c1s) - OUTFLOW(cfs)1 ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 15.09 CFS (WATER ELEVATION - 276.9) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 15.62 CFS FOR A 2-YR STORM. DESIGN IS ACCEPTABLE. PHC Detention 4.xls PLD 2-YR DESIGN STORAI - 6/30/2005 BASIN # 4 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (Od Design Storm = 10 -YR T,= 2.65 MIN -- USE 5.00 MIN (IJPOST = 7.22 IN/HR ON-SITE RUNOFF TO POND (POST) 0,, = C(I,JA = 19.86 CFS OFF-SITE RUNOFF TO POND 0, = C(I,JA = 13.81 CFS TOTAL RUNOFF TO POND (POST) OA = C(I,JA = 33.67 CFS RUNOFF AWAY FROM POND (POST) QAWAY = C(ln)A = 4.11 CFS MAXIMUM RELEASE Qa6ow = Qpre - AOawal = 19.57 CFS '(PRE) On = C(I,JA = (PRE) On = C(I,JA = (PRE) QAWAY = C(I,JA = COMPUTE DEPTH OF RUNOFF (0,,.) P„= 5.38 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 3.51 0' _ (P,; 0.2S)Z/(Pr,+0.8S) Or,' = 2.67 IN PHC_Detention 4.xls 10-YR DESIGN STORM - 613012005 10 YR - 24 HR PRECIP 1a=.2S= 0.70 DAON = 5.85 ACRES DAOFF = 6.83 ACRES DAAWAY = 0.98 ACRES DA= 12.68 ACRES H = 26 FEET L = 460 FEET CPSST = 0.47 (36%) CPRE = 0.20 COFF = 0.28 (11%) CAWAY = 0.58 (50%) CN = 74 (36%) 8.45 CFS 22.26 CFS 1.42 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK Tp = VOLUME/1.390p Tp = = Q'DA/1.390p 34.2 MIN ESTIMATE REQUIRED STORAGE S = (POST Q . PRE Q + A AWAY O)Tp Sn = 28,927 CF+25% = 36,159 CF STAGESTORAGE WATER LEVEL _. SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME CF 0 3,830 273.30 0 0 0.70. 4,320. .:: " 274 Q _ , . 2,852 2,852 1.70 5,080 275.0 4,700 7,552 236 .:. 5,890 _:. ... ._ . ., . .. 276 0 .. 5,485 _ 13,038.. .. . 3.70 6,760 277.0 6,325 19,363 4.70 -. 7.690 _-__278 7,225.. _ ... _._ . - ,.. 26588 5.70 8,680 279.0 8,185 34,773 9,720.. 280.0 9,200 . ,.. .. 43,973 `. 7.2 10,260 280.5 4,995 48,968 10 -YR STORM ELEV. = 278.80 01AUtUlbLHA HUt Up= 33.67Gh5 WATER.., HW ACCUMULATED . LEVEL - D -:_FLOW (F) D = 1.54 (CFS) _ 0 0 0 _ _.: 0 5 ? . .. 0:32. ....?_ ... .. . _.. _1m..? .......? 1.5 0.97 7.57 1:62 ...11 82 , , ... 3.5 2.27 14.85 ?... 4 `?...... :...... 2 92 . _.. ?.. _ ?.. .,. ? 1736 ....? . . Y 5.5 3.57 19.55 w 7.5 4.86 23.32 -8.5 5.5 24. 9.5 6.16 26.56 10.5 6.81 _ 2804 10 -YR STORM PEAK = 19.54 CFS 18.5 ' ORIFICE K= 4.12 Op = CaA(2gh)os Ca = 0.6 A= 1.87 g = 32.2 IF HW/D<1, Op = K(stage)' S PHC_Detention 4.xls plifl 10-YR DESIGN STORM - 6/30/2005 CHAINSAW ROUTING TABLE 0, = 33.67 CFS MAX RELEASE = 19.57 CFS Tp = 34.2 MIN dT = 4 MIN Vi TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 1.1 0.00 0 0 0 3 8 4.3 0.27 0.27 0.07 0.19 4 12 9.2 1.00 1.27 0.31 0.91 5 16 15.1 2.00 3.26 0.79 3.22 6 20 21.3 2.86 6.13 1.40 6.94 7 24 26.8 3.44 9.56 2.07 9.98 8 28 31.0 4.04 13.60 2.79 12.70 9 32 33.3 4.40 18.00 3.48 14.80 10 36 33.4 4.45 22.44 4.13 16.42 11 40 31.3 4.08 26.53 4.69 17.78 12 44 27.4 3.25 29.78 5.09 18.65 13 48 23.6 2.11 31.89 5.35 19.21 14 52 20.2 1.05 32.94 5.48 19.49 15 56 17.4 0.18 33.12 5.50 19.54 16 60 14.9 -0.52 32.60 5.43 19.40 17 64 12.8 -1.07 31.53 5.30 19.12 18 68 11.0 -1.51 30.02 5.12 18.71 19 72 9.5 -1.85 28.17 4.89 18.22 20 76 8.1 -2.10 26.07 4.63 17.64 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For 0 < t < 1.25 Tp For t > 1.25 Tp STORAGE CALCULATED USING THE FOLLOWING FORMULA: 0 = -0-P-11 -Cos CT -101 2 Tp O = 4.34 Op ei_' 30 vTpu STORAGE _ (INFLOW(cfs) - OUTFLOW(cfs)] ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 19.54 CFS (WATER ELEVATION - 278.8) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 19.57 CFS FOR A 10-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 4.xls M10-YR DESIGN STORM - 613012005 279.30 - MAX. 100-YR WATER SURFACE ELEVATION 10' BERM - 280.5 PROPOSED 4'x4' PRE-CAST BOX 278.80 - MAX. 10-YR WATER SURFACE ELEVATION (REFER TO DETAIL) 276.90 - MAX. 2-YR WATER SURFACE ELEVATION PROVIDE 1.25' PERFORATED, 273.30 - 1' RUNOFF WATER SURFACE ELEVATION THREADED PVC OR METAL PIPE W/ CAP & BRACKETED TO CS WALL 12' RCP OUTLET PIPE r/3 ANTI-SEEP ?ii;! 27. COLLAR BO TTOM - 269.5 35' BOTTOM WIDTH EXTENDED DRY BASIN #4 CROSS-SECTION (PRE -CAST BOX #??.) SCALE: N.T.S. PROPOSED 4'x8' PRE-CAST RTCB (REFER TO DETAIL) 10' BERM - 280.5 30' RCP OUTLET PIPE - ANTI-SEEP COLLAR 279.30 - MAX. 100-YR WATER SURFACE ELEVATION 278.80 - MAX. 10-YR WATER SURFACE ELEVATION 276.90 - MAX. 2-YR WATER SURFACE ELEVATION 273.30 - 1' RUNOFF WATER SURFACE ELEVATION BOTTOM - 269.5 35' BOTTOM WIDTH EXTENDED DRY BASIN #4 CROSS-SECTION (RAISED-TOP CATCH BASIN #??.) SCALE: N.T.S. DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: WAI!f E Contact Person: 'D4Nn1y oW Phone Level Spreader ID:. 5A4IN , 5) Level Spreader Length 12 ft Drainage Area g. IZ ac. Impervious Area 4.O(o ac. Maximum Filter Strip/Buffer Slope 14Z grass Max. Discharge from a 10 Year Storm 1(0.1A cfs Max. Discharge to Level Spreader 0-12- cfs Filter Strip/Buffer Vegetation M V I? CEAS Metir) Pre-treatment or Bypass Method 2KJ t r--T X1^104 IL REQUIRED ITEMS CHECKLIST (perpendicular to flow) (on-site and off-site drainage to the level spreader) +*, (on-site and off-site drainage to the level spreader) *0 (6% for forested, leaf littler cover, 8% for thick ground cover)' To 16YPAe,.5 (thick ground cover or grass, canopied forest with leaf litter roundcover Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheot for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials - mac{{ Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. f a Pre-Form Scour Holes are on flat slopes only DI/ No structures are located in protected buffers' OnJL'y FVS F, pr IzAP A' o C FoQ g ASS '?) If bypass method specified in the Draft Level Spreader Design Option Document: Y? SySrEM . 12Lf Bypass method is specified (if applicable) and plan details and calculations are provided 'bL I+ Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. 12LAF No structures are located in protected buffers. (OtILy FE,- If' Z1 'DLL-4 Plan details for the bypass and outlets are provided. ; ? ? ?1 ,w? foiz- " 1 I p v P * ?K The operation and maintenance agreement includes annual erosion and vegetation repair. 54 4: Ac The operation and maintenance agreement signed and notarized by the responsible party is provided. Level spreaders in sodas can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. +4: VfM464ll; To t,EVE? Srgr-APeR IS Ftzo?l JDAfjo Fit F4T t' rf FKAI AJ L.L . 4 6`???'s ?'YS "?1 k s ?(LOV Lt?p rrr- g? STO t'1S. * * OPe4zAT orl >% F1ArAT-F Anlc? A4?M ?T TZ Y c 6)C E'FC-V.TEt7 Wt-rl,t r E CITY 01F- TAL-EI44- 6/30/2005 EXTENDED DRY DETENTION BASIN #5 CALCULATIONS Drainage Area = DA = 8.12 ac Impervious Area = 4.06 ac % Impervious Cover : I = 50.0% 1 " Rainfall Event = Rv = 0.05 + 0.0091 = 0.05 + 0.009(50) = 0.5" Volume = Rv(DA) = 0.5" (8.12 ac)(1712")(43,560 sf/1 ac) = 14738 cf (VOI)R,,?f1= 14,738 cf 1" Elev. 265.60 (VOI)2•Yeaf = 24,922 Cf 2-Yr Elev. 267.97 (Vol)10-Year= 41,877 Cf 10-Yr Elev. 269.21 (V0I)100-Year= 67,533 Cf 100-Yr Elev. 270.01 (VOI)Total = 95,035 cf Berm Elev. 271.50 Freeboard 1.49' BASIN VOLUME Water Level ft Surface Area sf Elevation ft Incremental Volume cf Accumulated Volume cf 0 0 261.5 0 0 0.5 495 262 124 124 1.5 2,150 263 1,323 1,446 2.5 4,355 264 3,253 4,699 3.5 6,930 265 5,643 10,341 4.5 9,205 266 8,068 18,409 5.5 10,850 267 10,028 28,436 6.5 12,545 268 11,698 40,134 7.5 14,300 269 13,423 53,556 8.5 16,110 270 15,205 68,761 9.5 17,980 271 17,045 85,806 10 L-1 18,935 271.5 9,229 95,035 Use 4'x 4' RTCB with (4) 12" openings Weir Elevation = 269.30 Qweir = Q100- (Q10)max = Cwl-h,00= Qweir = 45.2 cis - 16.69 cis = 28.51 cfs Cw = 3.0 L = 16' h1DG = 0.71' 100-Year Elevation = 269.3 + 0.71' = 270.01 Pipe size to drain temporary pool in 2 days Q = (14738 cf/48 hr)(1 hr/3600 s) = 0.09 cfs Try 1.5" diameter pipe Average head = h = 4.172 - 0.0625'= 1.99' Q = c,A(2gh)1.5 = 0.6(0.0123)[2(32.2)(1.99)]^0.5 Q = 0.08 cfs - Therefore use 1.5" diameter pipe (Qto)max = 0.6(0.0123)[2(32.2)(3.85)]^0.5 = 0.12 cis PHC_Detention 5.xls BASIN # 5 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (Od Design Storm = 2 -YR T, = 2.65 MIN -- USE (In)POST = 5.76 IN/HR ON-SITE RUNOFF TO POND (POST) On = C(IJA = 16.01 CFS OFF-SITE RUNOFF TO POND On = C(IJA = 10.79 CFS TOTAL RUNOFF TO POND (POST) Qn = C(IJA = 26.80 CFS RUNOFF AWAY FROM POND (POST) OAWAY = c(IJA = 4.65 CFS MAXIMUM RELEASE OaEow = Oae - AQaway = 13.79 CFS COMPUTE DEPTH OF RUNOFF (0,,.) Pn= 3.60 IN ESTIMATE SOIL STORAGE S =1000/CN -10 = 2.82 5.00 MIN '(PRE) On = C(IJA = (PRE) On = c(QA = (PRE) OAWAY = c(IJA = 2 YR - 24 HR PRECIP la =.2S = 0.56 Q' _ (Pn-0.2S)z/(Pn+0.8S) On. = 1.57 IN DAON = 5.24 ACRES DAOFF = 2.88 ACRES DAAWAY = 1.39 ACRES DA= 8.12 ACRES H = 26 FEET L = 460 FEET CPOST = 0.53 (45%) CPRE = 0.20 COFF = 0.65 (60%) CAWAY = 0.58 (50%) CN = 78 (45%) 6.04 CFS 16.83 CFS 1.60 CFS RALEIGH, NC PNC_Detention 5.xls j2-YR DESIGN STORM - 6/30/2005 CALCULATE TIME TO PEAK Tp = VOLUME/1.390p TP = = Q'DA/1.39QP 22.4 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + A AWAY Q)Tp S„ = 17,488 CF+25% = 21,860 CF STAGE STORAGE WATER 'LEVEL SURFACE AREA SF ELEVATION INCREMENTAL VOLUME CF ACCUMULATED VOLUME _ C . 0 8,295 265.6 0 0 0.4-011.1-1- ..?._:.. 9,205 _ ._.._...__ 266 0 - ..? .. _..... _ ... 3.500 _. _ _. w_._... _ .... 1.40 10,850 267.0 10,028 13,527 r 2.40,._ ?, _- X2,545 ,, ,:• . _. . ; _ 2680 : ..... .. ..... ... ..11,698. 2 3. 14,300 269.0 - 13,423 38,647 4.40 , -- 161 1.0.:.? - 270.0 205 15-- 3 852 5.40 17,980 271.0 17,045 70,897 .5-.90 18,935 271.5 .9,229... __...?.. 80126 2 -YR STORM ELEV. = 267.97 SIAUtUIbL;HA HGt UP= 26.80 CFS WATER HW - ACCUMULATED LEVEL :. _ D ' FLOW._ ' (FT) D =.1.63. ' (CFS) , 0 0 0 ^ 154 : 1.5 0.92 7.98 12.97 ' ?._.. _ 3.5 2.15 16.37 F 2.77 5.5 3.38 21.62 ~ ~ 82 - 7.5 4.62 25.82 a 23 __ ?.. 2769 .._..: .. 9.5 5.85 29.43 2 -YR STORM PEAK = 12.34 CFS 19.5 " ORIFICE K = 4.35 OP = CaA(2gh)" Cd = 0.6 A = 2.07 g = 32.2 IF HWID<1, Op = K(stage)1s PHC_Detention 5.xls 2-YR DESIGN STORM - 613012005 CHAINSAW ROUTING TABLE Q, = 26.80 CFS MAX RELEASE = 13.79 CFS Tp = 22.4 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) i 0 0 0 0 0 0 2 4 2.1 0.00 0 0 0 3 8 7.6 0.49 0.49 0.06 0.17 4 12 14.9 1.78 2.27 0.26 0.80 5 16 21.8 3.38 5.66 0.62 2.28 6 20 26.0 4.67 10.33 1.08 5.28 7 24 26.5 4.98 15.31 1.55 8.25 8 28 22.9 4.37 19.69 1.93 10.11 9 32 18.2 3.07 22.76 2.19 11.42 10 36 14.4 1.62 24.37 2.33 12.11 11 40 11.4 0.55 24.92 2.37 12.34 12 44 9.0 -0.22 24.70 2.35 12.25 13 48 7.2 -0.77 23.93 2.29 11.92 14 52 5.7 -1.14 22.79 2.19 11.44 15 56 4.5 -1.38 21.41 2.07 10.85 16 60 3.6 -1.52 19.89 1.94 10.20 17 64 2.8 -1.59 18.30 1.81 9.52 18 68 2.2 -1.60 16.70 1.67 8.84 19 72 1.8 -1.58 15.12 1.54 8.16 20 76 1.4 -1.53 13.58 1.40 7.37 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For0<t<1.25Tc For t > 1.25 Tp STORAGE CALCULATED USING THE FOLLOWING FORMULA: Q = Op (1 - cos (n t)) 2 Tp O= 4.34 Qp el-i JO( urv)i STORAGE _ (INFLOW(cfs) - OUTFLOW(cfs)) ' DTIME(min) ' 60 sec 1 (min) CONCLUSION: MAXIMUM DISCHARGE FROM THE SYSTEM IS 12.34 CFS (WATER ELEVATION - 267.97) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 13.79 CFS FOR A 2-YR STORM. DESIGN IS ACCEPTABLE. PHC_Detention 5.xls 2-YR DESIGN STORh1 - 613012005 BASIN # 5 DETENTION CALCULATIONS ON-SITE DRAINAGE AREA TO SYSTEM = OFF-SITE DRAINAGE AREA = DRAINAGE AREA AWAY FROM SYSTEM = TOTAL DRAINAGE AREA TO SYSTEM = HEIGHT OF REMOTE POINT IN WATERSHED ABOVE OUTLET = HYDRAULIC LENGTH OF WATERSHED = COMPOSITE RUNOFF COEFFICIENT AFTER DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT BEFORE DEVELOPMENT = COMPOSITE RUNOFF COEFFICIENT OFF-SITE _ COMPOSITE RUNOFF COEFFICIENT (AWAY) = SCS CURVE NUMBER AFTER DEVELOPMENT = ESTIMATE PEAK RUNOFF (OP) Design Storm = 10 -YR T, = 2.65 MIN -- USE 5.00 MIN (1n)POST = 7.22 IN/HR ON-SITE RUNOFF TO POND (POST) Qn = c(I,JA = 20.06 CFS OFF-SITE RUNOFF TO POND Qn = C(I,JA = 13.52 CFS TOTAL RUNOFF TO POND (POST) Qn = c(I,JA = 33.58 CFS RUNOFF AWAY FROM POND (POST) QAWAY = c(I,JA = 5.82 CFS MAXIMUM RELEASE Oj6 w = Qpre - Away = 17.27 CFS COMPUTE DEPTH OF RUNOFF (0,.) '(PRE) Qn = c(I,JA = (PRE) Qn = C(I,JA = (PRE) QAWAY = c(1n)A = Pn= 5.38 IN 10 YR - 24 HR PRECIP ESTIMATE SOIL STORAGE S = 1000/CN - 10 = 2.82 1,=.2S= Q' _ (P,; 0.2S)?/(P,+0.8S) On. = 3.04 IN PHC_Detention 5.xls 10-YR DESIGN STORM - 613012005 0.56 DAON = 5.24 ACRES DAOFF = 2.88 ACRES DAAWAY = 1.39 ACRES DA= 8.12 ACRES H = 26 FEET L = 460 FEET CPOST = 0.53 (45%) CPRE = 0.20 COFF = 0.65 (60%) CAWAY = 0.58 (50%) CN = 78 (45%) 7.57 CFS 21.09 CFS 2.01 CFS RALEIGH, NC PLD CALCULATE TIME TO PEAK TP = VOLUME/1.390P TP = = Q'DA/1.390P 34.6 MIN ESTIMATE REQUIRED STORAGE S = (POST Q - PRE Q + A AWAY Q)TP Sn = 33,846 CF+25% = 42,307 CF STAGE STORAGE WATER SURFACE ELEVATION INCREMENTAL ACCUMULATED LEVEL AREA VOLUME VOLUME SF (FT) (CF) (CF). 0 8,295 265.60 0 0 3,500 .. -31 -00- 1.40 10,850 267.0 10,028 13,527 268 0 t 698 ... .. _ 25225 -J_..... -:.....: 3.40 14,300 269.0 13,423 38,647 4 40 __._:16 1-10- 270.0 _ 15 205 . 5.40 17,980 271.0 17,045 70,897 590. ; 181935..._..._. 2715._.._.... 9.?29,. .:.:. . ... ,. 804126 .;; . 10 -YR STORM ELEV. = 269.21 S i Atit URA MA HLit UP = 33.58 CFS WATER HW ACCUMULATED - LEVEL D FLOW (Fn,.. 63 (CFS) 0 0 0 05 _ 0.31 ._._... _.._...?.._ . ? . 1.5 0.92 7.98 1297_.._-._ 3.5 2.15 16.37 5.5 3.38 21.62 -w 65_ ? _._. 4.00 , - -23.82 7.5 4.62 25.82 8 5 523 27.69 . . 9.5 5.85 29.43 10.5 6.46 f 31:08. `• 10 -YR STORM PEAK = 16.69 CFS 19.5 ' ORIFICE K = 4.35 OP = CaA(2gh)o.s Ca = 0.6 A = 2.07 g = 32.2 IF HW/D<1, Op = K(stage)1-5 PHC_Detention 5.xls 10-YR DESIGN STORM - 613012005 CHAINSAW ROUTING TABLE Op = 33.58 CFS MAX RELEASE = 17.27 CFS Tp = 34.6 MIN dT = 4 MIN U TIME (MIN) INFLOW (CFS) STORAGE (103 CF) IS AS STAGE (FT) OUTFLOW (CFS) 1 0 0 0 0 0 0 2 4 1.1 0.00 0 0 0 3 8 4.2 0.26 0.26 0.03 0.09 4 12 9.0 0.99 1.26 0.14 0.44 5 16 14.8 2.06 3.32 0.38 1.16 6 20 20.9 3.28 6.59 0.71 2.88 7 24 26.4 4.32 10.91 1.14 5.65 8 28 30.7 4.98 15.88 1.60 8.49 9 32 33.1 5.32 21.20 2.06 10.76 10 36 33.4 5.37 26.57 2.50 12.97 11 40 31.6 4.91 31.48 2.87 14.22 12 44 27.9 4.17 35.65 3.18 15.27 13 48 24.0 3.03 38.68 3.40 16.04 14 52 20.7 1.91 40.59 3.53 16.45 15 56 17.8 1.01 41.60 3.59 16.64 16 60 15.3 0.27 41.88 3.61 16.69 17 64 13.2 -0.33 41.54 3.59 16.62 18 68 11.3 -0.83 40.71 3.54 16.47 19 72 9.7 -1.24 39.48 3.45 16.22 20 76 8.4 -1.55 37.92 3.35 15.85 INFLOW CALCULATED USING THE FOLLOWING FORMULAS: For0<I<1.25Tp For t > 1.25 Tp O = QP 11 - cos n 1)] 2 Tp Q = 4.34 Op e1130 ( UTp)l STORAGE CALCULATED USING THE FOLLOWING FORMULA: CONCLUSION: STORAGE _ (INFLOW(cfs) - OUTFLOW(cfs)] ' DTIME(min) ' 60 sec 1 (min) MAXIMUM DISCHARGE FROM THE SYSTEM IS 16.69 CFS (WATER ELEVATION - 269.21) WHICH IS LESS THAN THE ALLOWABLE DISCHARGE OF 17.27 CFS FOR A 10-YR STORM. DESIGN IS ACCEPTABLE. PHC Detention 5.xls 10-YR DESIGN STORM - 613012005 270.01 - MAX. 100-YR WATER SURFACE ELEVATION 10' BERM - 271.5 PROPOSED 4'x4' PRE-CAST BOX 269.21 - MAX. 10-YR WATER SURFACE ELEVATION (REFER TO DETAIL) 267,97 - MAX. 2-YR WATER SURFACE ELEVATION PROVIDE 1.25' PERFORATED, F265.60 - 1' RUNOFF WATER SURFACE ELEVATION F TTHR PIPE O CB WALCAP L & BRACKETED EXTENDED DRY BASIN #5 CROSS-SECTION (PRE-CAST BOX #??) SCALE N.T.S. 270.01 - MAX. 100-YR WATER SURFACE ELEVATION 10' BERM - 271.5 269.21 - MAX. 10-YR WATER SURFACE ELEVATION PROPOSED 4'x4' PRE-CAST RTCB 267.97 - MAX. 2-YR WATER SURFACE ELEVATION (REFER TO DETAIL) 265.60 - 1' RUNOFF WATER SURFACE ELEVATION 21 3:1 2% 4 \'30 . 1 30' RCP OUTLET PIPE -? / BOTTOM - 261.5 ANTI-SEEP COLLAR --- J/ L VARIABLE WIDTH BOTTOM EXTENDED DRY BASIN #5 CROSS-SECTION (RAISED-TOP CATCH BASIN #??) SCALE: N.T.S. 07/27/2005 16:16 9198457709 PIEUIONT LAND DESIGN PAGE 02/02 Piedmont Land Desna, LLP i 8522-204 Six Forks Road - Raleigh, NC 2W March 3, 2005 • (919) 845-7600 - Fax: (919) 845-7703 Peyton Hall Stillmeadow Drive and Wedgewpgd Road Raleigh, North Carolina Impervious Area Calculations Total Site Area.;-- 42.06 arcs Impervious Areas Lot 1 40,000 sf Lot 2 - 116 (2,500 s each) 287,500 sf Pump Station and D 've 3,600 sf Right of Way _ 211,400 sf Total 542,500 sf 12.45 acres Impervious Area Percentage = (12.45/42.06) 100 = 29.60 % Since the percentage of impervio` s; area is less than 30%, no stortuwater measures are required to meet Division of Water Qualit 'or U.S. Army Corps of Engineers requirements. However stomwater measures are required to meet the City of Raleigh stormwater quantity control requirements. Dry detention pond$ will be provided to meet this requirement. Ciyil Engineers - Landscape Archilecls - Land Planners I Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Kerr T. Stevens Division of Water Quality Draft Level Spreader Design Options Version 1.0 October 10, 2001 Using Level Spreaders to Provide Diffuse Flow Through Buffers for Compliance with Riparian Area Protection Rules Level spreaders are one means of providing diffuse flow through protected buffers. It is always preferable to not concentrate stormwater initially and provide as many outfalls as possible. This can reduce or even eliminate the need for engineered devices to provide diffuse flow. However, this is not feasible in many cases. Some buffer protection rules such as the Neuse, Catawba, and Tar-Pamlico Riparian Area Protection Rules do not allow direct discharges of stormwater through the protected buffers. However, it is "allowable" with written approval from the DWQ to provide best management practices (BMPs) that remove the nutrients or pollutants in question in order to discharge directly through the buffer. These measures could include the use of the buffer itself as a forested filter strip, for instance, to remove the desired substances. In addition to providing diffuse flow, level spreaders can be used to distribute flow into filter strips. There are certain criteria that apply to every design that utilizes level spreaders to provide diffuse flow: 1) The entire system must safely pass a 10 year storm event without failing or causing erosion, gullies or rills. 2) The design of the level spreader must take into consideration site specific conditions such as topography, vegetative cover, soil and other geologic conditions. If diffused flow is not attainable based on site conditions they should not be used. (i.e. the slope of the natural ground away from or parallel to the level spreader should be relatively smooth in the direction toward the stream so that the flow will not reconcentrate.) 3) Level spreaders should have a minimum length of ten feet and an absolute, maximum length of 300 feet. 4) It is always easier to keep flow distributed than to redistribute it after collection. 5) The type and amount of vegetative ground cover must also be considered. 6) Level spreaders must be level. Level Spreader Design Options: Conventional level spreader design option where entire discharge is passed through the level spreader with no bypass conveyance for larger storms: • For grass or thick ground cover vegetation: i)13 feet of level spreader for every 1 cfs flow (Based on Q10 discharge) ii) maximum length of 300 feet per level spreader iii) Slopes of 8% or less from level spreader to top of stream bank • For forested areas with little or no ground cover vegetation: i) 100 feet of level spreader for every 1 cfs flow (Based on Q10 discharge) ii) maximum length of 300 feet per level spreader iii) slopes of 6% or less from level spreader to top of stream bank Another conventional level spreader design technique that can be used to accommodate steeper slopes where grading is allowed or exempt in zone 2 of protected buffers is to provide level spreaders in series as follows: • Can be used on slopes of up to 15% for forested areas and 25% for grass or thick ground cover • Structural level spreader just outside of zone 2 followed by a grassed berm level spreader just outside of zone 1 North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetiands/ Page 2 of 2 • Maximum Q10 discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover In some instances, because of topography, the size and imperviousness of the drainage area, or other site constraints, conventional level spreader designs are not appropriate. However, there are alternative designs, like the ones listed below, that would allow a level spreader to function properly by bypassing the larger discharge events. This is based on the assumption used in designing most water quality BMPs that the "first flush" of stormwater discharge contains the most substances of concern. These other alternatives are "allowable (require written approval from DWQ)" for protected buffers in the Neuse, Tar-Pamlico and Catawba basins, but would not be allowable in protected buffers of the Randleman watershed. Level spreader with bypass for larger drainage areas that require 85% TSS removal or where lateral constraints limit the level spreader length severely: • Dry detention basin designed per NCDENR Stormwater BMP Manual* sized to detain 1" rain and release it over 2-5 days* through a level spreader. • Level spreader length based on the maximum release rate discharge • Discharges from greater than a 1" rain can be bypassed via an appropriate conveyance such as a grassed swale (rip rap lined ditch or pipe may be used if necessary) • Maximum discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover *( in order to meet 85% TSS Removal criteria) Another bypass alternative can be used that would not be considered to remove 85% TSS: • Detention basin such as a type B silt basin preceding the level spreader • Level spreader length based on the 1" per hour intensity storm • A system designed to bypass the greater than 1" in per hour intensity storm through an appropriate conveyance such as a grassed swale (rip rap lined ditch or pipe may be used if necessary) • Maximum discharge of 1 cfs per 100 feet of level spreader for forested areas and 1 cfs per 13 feet of level spreader for grass or thick ground cover Yet another design that can be used in very specific areas with virtually flat slopes is a Preformed Scour Hole with a Level Spreader Apron (typical detail attached): • Discharge area must have virtually flat slopes such as those in flood plains or wetlands • Must be located outside of zone 2 • B = 3 x discharge pipe size for pipes of either 15 or 18 inches B= base width (see detail) • Maximum allowable discharge (Q10) of 6 cfs for a 15 inch pipe and 10 cfs for an 18 inch pipe • Minimum apron width of 4 feet. Any of the above options will be considered acceptable if designed in accordance with the outlined criteria. Please keep in mind that some of the above practices may still require written approval, for instance when a direct bypass discharge is proposed through a protected buffer in the Neuse or Tar-Pamlico River Basin. FLn`,J IE Vi r- us f) I,• or ::t- :?• ,_ IeI 'r t. r For) I+:11 :I+I - u. C 10/13/01 JLIL-28-2005 11:34 FROM:DWQ-WETLANDS 9197336893 TO:98469467 P:2/7 FF?Q? qi(3'M, Michael F. J3asicy, Governor William G. Ross Jr., Secretary North Carolina Depamncnt of Environment and Natural Resources P `C January 12, 2005 Helen T. Lattimore 3122 Eton Road Raleigh, CN 27608 Subject Property: Peyton Hall Subdivision UT;Rocky Creek Alan W. Klimek, P.$. DircCtor Division of Water Quality DWQ Project 4t 04-1934 Wake County Page 1 of 4 Approval of 401 Water Quality Certifleationt and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions Dear Mr. Lattimore: You have our approval., in, accordance with the attached conditions and those listed below, to place fill within or otherwise impact 198 feet of perennial. streams, 95 feet of intermittent streams, 18,245 square feet (fe) Zone 1 buffers and 12,272 square feet (ft) Zone 2 of protected riparian buffers for the purpose of constructing a residential subdivision at the subject property, as described within your application dated December2, 2004 and received by the N.C. Division of Water Quality (DWQ) on December 2, 2004. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USACE). This letter shall also act as your approved. Authorisation Certificate for impacts to the protected riparian buffers per 15A NCAC 213 .0233. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Nojl-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct Impacts to waters as depicted In your application shall expire upon expiration of the 404 Permit. This approval. is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with. all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or. 150 linear feet of stream, compensatory mitigation may be required as described i1i 15A NCAC 2H.0506 (h). This approval .requires you to follow the conditions listed in the attached certification and any additional co-dit'i.ons listed below. IV it hCarotina 401 Ov©rslghVFxprass RGAaw Unit d?QllldXlllj/ 1 G50 Mall S©r*a Cantor, R3lslgh, North Carolina 27699-1650 2321 Crablmo Ooulevard, Sulte 250, Ralalah, North Carolina 27601 Phom: 919.733.1765 / FAX 919-733-63931 Intomat hitpl/h2o.nnr.*tzte.no.m/ncwetlands JUL-28-2005 11:35 FRON:DWO-WETLANDS 9197336893 TO:98469467 P:3/7 Helcn L.'Ittimoze Page 2 of 4 January 12, 2005 The Additional, Conditions of the Certification are: Impacts Approved - The following impacts are hereby approved as Ion- as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: . Amount Approved (Units Plan Location or Reference Stream - Perennial 198 (feet) Stream - Intermittent . 95 feet Buffers - Zone 1 . 18,7115 (square ft.) Buffers - Zone 2 ` 12,272 (square ft.) 2. Erosion & Sediment Control Practices - Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed,. installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and. Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 3. No Waste, Spoil, Solids, or Fill of Any Kind - No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control. Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, ior rules occur. 4. No Sediment & Erosion. Control Measures w/n Wetlands or Waters -Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion - Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. JUL-28-2005 11:35 FROM:DWO-WETLANDS 9197336993 TO:98469467 P:4/7 Helen Lattimore Page 3 of 4 January 12, 2005 6. Written Storrmwater Management Plan - An additional condition is that a final, written stormwater management plan (including a signed and notarized Operation and Maintenance Agreement) shall be approved in. writing by this Office before the impacts specified in this Certification occur per Condition No. 4 in GC No. 3402. The stormwater management plan must include plans and specifications for stormwater management: facilities that are appropriate for surface waters classified as Class C and designed to remove 85% TSS according to the most recent version of the NC DENR Storiawater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. 7. Deed of Notificatiolp - Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in. order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetfands Unit web site at ,http://h2o.enr.state.tic.us/ncwet.lands. S. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) - Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been. detexnu_ned by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into a restoration fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: Compensatory Mitigation Required River and Sub-basin Number Stream 198 (feet) Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 Permit. JUL-28-2005 11:35 FRON:DWO-WETLANDS 9197336893 TO:98469467 P:5/7 Helcn Latti uzom Page 4 of 4 January 12, 2005 If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impactt), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150E of the North. Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) 'shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neese riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone John Dorney at 919-733-9646 or Bob 7arzecki. at 919-733-9726. AWKJbs Enclosures: GC 3402 Certificate of Completion Sincerely, J ,Alan W. Klimek, P.E. cc: Sean Clark, S&EC, Inc., 11010 Raven Ridge Road, Raleigh, NC 27587 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office N.C. Ecosystem Enhancement Program File Copy Central Files Filename: 04-1934 Peyton Hall Subdivision (Wake) 401 NBR JUL-28-2005 11:35 FR0N:DWQ-WETLANDS 9197336893 T0:98469467 P:6/7 w a r?RQ? o -c Michael F. Easley, Govemor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Rc;vurccs Alin W. Mimck. P.L_ Director Division of Water Quality North) Carolina Division of. Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with ISA NCAC 2H.0500, Helen T. Lattimore has permission as outlined below to impact 293 linear feet of streams for the purpose(s) of constructing the proposed Peyton Hall Subdivision in Wake County. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS PERMIT IS NOT VALID WITHOUT THE ATTACHMENTS . COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM DWQ Project No.: 04-1934 DA'R'E: January 12, 2005 LOCATION: Cary COUNTY: Wake BASIN! SUB BASIN/ STREAM INDEX: 03-04-02 /27-28 As required by 15A NCAC 2H.0500, and the conditions of this Permit, you are required to compensate for the above impacts through the restoration, creation, enhancement or preservation of wetlands and surface waters as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Impacts: 293 ft streams (198 ft perennial & 95 ft intermittent) Mitigation: 198 ft perennial streams Note; While ,DWQ is only requiring a 1:1 mitigation ratio, the USA.CE will most likely require a 2:1 ratio. As such, the total mitigation required by the applicant will most likely be 396 ft of perennial strewn. In correspondence dated December 22, 2004, the EEP indicated that up to 396 linear feet of mitigation will be conducted by EEP if necessary. 401 Wellands 00r11r1c0on Unlt 1 G50 Mall SonVICO Center, Rslei n. North Carolina 27699•YGSo 2321 Cnsbtrua Soul ard, Sulto 2S0, Rabi h, North Caroruta 27604 Phone: 919-733-IM3 / FAX 910-733-6393/ Internet htto://h2o.enr.stata.nc.us/ncvvotlands 'Ore hCarolinn Allrlutrrllif An EauaI OacortunUAMmiaOia Aabn E nclover - 501,e RP.rvcL1Wl (M Prat ('.rxmxni it Panur JUL-28-2005 11:36 FROM:DWQ-WETLANDS 9197336893 TO:98469467 P:7/7 Helen T. Latt more page 2 of 3 January 12, 2005 One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands Restoration Fund per NCAC 28.0503. If you choose this option, please sign this form and mad it to the Ecosystem Enhancement Program at the address below. An invozce for the appropriate amount of payment will be-sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL, YOU RECENE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1619 Mail Service Ceriter RALEIGH, N.C. 276694619 (919) 733-5208 Filename: 04-1934