HomeMy WebLinkAboutNCG020273_160408 QU Buna Dormant Status DLQ Approval_2019060611
Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
April 85 2016
Unimin Corporation
Attn: Jeff Ferguson
136 Crystal Drive
Spruce Pine, NC 28777
SUBJECT: Exemption from Monitm•ing During Dm•mant States
Certificate of Coverage #NCG020273
Unimin Corporation —Buna Mine
Mitchell County
Dear Mr. Ferguson:
PAT MCCRORYGoiernor
DONALD R. VAN DER VAART
.l'eerelor3
TRACY DAVIS
Duvelor
A Compliance Evaluation hlspection performed at the Buna Quarry on March 4, 2016, by personnel from this office
verified that no industrial activity was taking place at the time of the inspection. Your recent request to keep the
NCG020273 permit, but to discontinue storunvater monitoring is hereby approved based on the following conditions:
There shall be no industrial activities taking place, no stockpiles of raw materials (to include chemical
additives) stored on the site, or wastewater or stormwater industrial discharges while the permittee is not
monitoring.
No wastewater shall be generated and all wastewater treatment units, if any, shall be cleaned and stabilized,
and inactivated as to render them harmless to the environment while the site is dormant.
The Stormwater Pollution Prevention Plan (SPPP) shall be kept updated to reflect the status of the facility.
Updates and conditions of the SPPP of note are:
o The BMP Summary shall be reviewed and updated annually.
o Training programs shall be developed and haining provided at least once a year for facility
personnel with responsibilities for: spill response and cleanup, preventative maintenance
activities, and for any of the facility's operations that have the potential to contaminate
stormwater runoff.
o All aspects of the Stormwater Pollution Prevention Plan shall be reviewed and updated on an
annual basis. The annual update shall include an updated list of significant spills or leaks of
pollutants for the previous three years, or the notation that no spills have occurred. The
annual update shall include written recertification that the stormwater outfalIs have been
evaluated for the presence of nonstormwater discharges. (Should non-stormwater discharges
be discovered the permittee shall contact this office as soon as possible but in no case greater
than 24 hours or the next business day).
o Inspections of the facility and all stormwater systems shall occur as part of the Preventative
Maintenance and Good Housekeeping Program at a minimum on a semi-annual schedule.
Qualitative and analytical monitoring actions as described in Part III, Sections A, B, C, D, and E do not
have to be conducted — as long as the above conditions and all other permit conditions and limitations are met,
including:
State ofNonh Carolina Enodronlnental Quality Energy, h1ineral and Land Resources
2090 US 70 Highway Sw•annanoa, NC 28778-82I 1
828 29G J500 T
Unimin Corporation, Buna Mine
April 8, 2016
Page 2 of 2
o The annual permit fee must be paid. Failure to nay the annual permit fee will be
considered a violation of the subject permit.
• This office mustbe notified in writing and all components of the stormwater permit requiring updates made at
least 30 days prior to commencing any industrial activity on the site, even if they are temporary.
• A copy of this letter must be maintained with the facility permit and associated plans and records for the life
of the permit.
Should you have.an T questions, please contact Shawna Riddle or me at 828-296-4500.
Sincerely,
Stanley E. Aiken,^u�
Regional Engineer
Land Quality Section
Enclosure: Inspection Report
ec: Ken Pickle, Stormwater Permitting
Stale oCNorlh Carolina Environmental Quality Energy, Mineral and Land Resourccs
2090 US 70 Highway ( Swznnmroa, NC 28778-S2I I
82S 296 4500 T
Permit:
NCG020273
SOC:
County:
Mitchell
Region:
Asheville
Compliance Inspection Report
Effective: 10/01/15 Expiration: 09/30/20 Owner: Unimin Corporation
Effective: Expiration: Facility: Buna Mine
Hwy 226 N
Contact Person: Jeffrey S Ferguson
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On•Site Representalive(s):
24 hour contact name
Related Permits:
Title:
Certification:
Jeff Ferguson
Spruce Pine NC 28777
Phone: 828-765-1114 Ext.1602
IJrT7iLA
828-765-4283
Inspection Date: 03/04/2016 Entry Time: 11:45AM Exit Time: 12:30PM
Primary Inspector: Shavma Riddle Phone:
i
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge CGC
Facility Status: Compliant Not Compliant
Question Areas:
® Storm water
(See attachment summary)
Page: 1
permit:
NCG020273
boner- Facility:
Unimin Corporation
Inspection Date:
03/0412016
Inspection Type:
Compliance Evaluation Reason for visit: Routine
Inspection Summary:
I inspected the site with Jeff Ferguson and Daniel Garland, both with Unimin.
The Buna Quarry is not active and had no activity occuring. The site is being monitored and maintained. On a previous
inspection I had suggested that Unimin request an additional inspection of the site and request dormant status to
discontinue stormwater monitoring. Their mining permit is current and they are in compliance with DLR.
We discussed that the annual stormwater permit fees will still need to be paid, and if at any time the mine wants to start
back up a request would need to be submitted to return to active status.
I suggested to Jeff that he submit his request in writing. We received the request on March 21, 2016.
I recommend granting dormant status for the quarry.
Page: 2
Permit: NCG020273 Owner- Facility: Unimin Corporation
Inspection Data: 03/04/2016 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
❑
❑
# Does the Plan include a General Location (USGS) map?
❑
❑
❑
# Does the Plan include a `Narrative Description of Practices"?
❑
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0❑
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
E
❑
❑
❑
# Does the facility provide all necessary secondary containment?
❑
❑
❑
# Does the Plan include a BMP summary?
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
❑
❑
❑
# Does the facility provide and document Employee Training?
N
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
E
❑
❑
❑
# Is the Plan reviewed and updated annually?
0
❑
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
0
❑
❑
❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑
❑
❑
... r'S1iiL�iS�
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? N ❑ ❑ ❑
Comment:
Analytical Monitoring yes No NA NE
Has the facility conducted its Analytical monitoring? M ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 110 ❑
Comment:
Permit and Outfalis
Yes
No NA NE
# Is a copy of the Permit and the Cedificate of Coverage available at the site?
�
❑
❑
❑
# Were all oulfalls o4served during the inspection?
0
❑
❑
❑
# If the facility has representative outfall status, is it property documented by the Division? -
❑
❑
E
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
E
❑
❑
❑
Comment:
Page: 3