Loading...
HomeMy WebLinkAbout20052000 Ver 1_Complete File_20050111?Q.W- AMichael F. Easley, Governor William G. Ross Jr., Secretary j [ North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of WatcrQuality December 22, 2005 DWQ Project # 05-2000 Ver. 2 Rutherford County Tom Hartzog and James Dunn Buffalo Cove, LLC 311 Buffalo Creek Road Lake Lure, NC 28746 Subject Property: Buffalo Cove Subdivision Modification Buffalo Creek Road, Rutherford County Approval of 401 Water Quality Certification with Additiona Dear Mr. Hartzog and Dunn: D DEC 3'0 2005 V1ETLA S/WD 7UT4 AT RIERI? Gi 1 Conditions You have our approval, in accordance with the attached conditions and. those listed below, to place fill within or otherwise impact 298 linear feet of streams for the purpose of property development at the subject property, as described within your application received by the N.C. Division of Water Quality (DWQ) on November 4, 2005. The modification is for the corrected mitigation requirement. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, stormwater, and buffer regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the culverting and impounding activities described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: http://h2o.enr state.nc.us/ncwetlands One North Carolina ,1Valurally An Equal Opportunity/Affirmative Action Employer- 50°. Recycled/10°o Post Consumer Paper Buffalo Cove, LLC Yage2 of 8 December 22, 2005 1,. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are rnet. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference UT to Buffalo Creek 40 (feet) Road Crossing UT to Buffalo Creek 10 (feet) Dam Fill UT to Buffalo Creek 248 (feet) Impounded Waters 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. I Buffalo Cove, LLC Pa-3 of 8 December 22, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the-'NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into a restoration fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Ecosystem Enhancement Program to meet the following compensatory mitigation requirement: Compensatory Mitigation Required River and Sub-basin Number Stream 110 (feet) BRD05 - 9-53-(5) 7. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. Buffalo Cove, LLC Pa;e4 of8 December 22, 2005 8. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities. 9. Turbidity Standard The turbidity standard of 50 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 213. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. Continuous monitoring by onsite, calibrated, continuous recording, equipment must be performed both upstream and downstream of any instream work. The results of this monitoring must be submitted along with the below required stability monitoring. Additionally, should the results indicate a violation of the turbidity standard, all work shall cease until such a point the measures are implemented to protect surface waters form further violations. 10. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. 11. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCG010000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http.-Ah2o.enr.state.nc.us/su/Forms Documents.htm. J, Buffalo Cove, LLC Page5 of 8 December 22. 2005 12. Deed Restrictions Deed restrictions or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. 13. Temporary Fills All temporary fill and culverts shall be removed and the impacted area returned to the original grade, including each stream's original cross sectional dimensions, planform pattern, and longitudinal bed and bed profile after construction is complete or within 6 months of the establishment of the crossing, which ever is sooner, and the various sites shall be stabilized with natural woody vegetation (except for the maintenance areas of permanent utility crossings) and restored to prevent erosion. If the crossings are not completely removed and restored as described above within the specified time above, additional written approval from this Office must be obtained to modify this condition. 14. Culvert Installation Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Therefore, you must provide plans with adequate details that indicate that the current stability of the stream will be maintained or enhanced. You must receive written approval from this Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according to approved plans. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Buffalo Cove, LLC Pa;e6 of 8 December 22, 2005 15. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration hnmediatelyfolloivina construction. (Please see attached.) 16. Culverts that are less than 48 inches in diameter should be installed with 20% of the diameter of the culvert placed below the level of the stream bottom to allow the accumulation of stream bed materials and to facilitate aquatic life passage during periods of low stream flow. Larger diameter culverts should be placed 1 foot below the stream bottom. Culverts should be placed in the main flow channel (i.e. thalweg). Partial burial of culverts in this manner also may require increasing their size to accommodate flow requirements. 17. If concrete is used during construction (e.g., headwalls), a dry work area must be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts live concrete should not be discharged to surface waters due to the potential for water chemistry change and a fish kill. 18. Rock, sand, or other materials should not be dredged from the stream channels except in the immediate vicinity of the crossings. Instream dredging has severe effects on aquatic life and disturbance of the natural form of the channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the channels adjacent to the crossings should not be modified by widening or changing their depths. 19. Sandbags, flexible pipe, or other diversion structures should be used to avoid excavation in flowing water. Materials used for flow diversions should be removed from the stream bed after completing the construction work. Any diversion channels must be lined with fabric and/or rock. 20. Storm water from roads should be directed to vegetated buffer areas (e.g. level spreaders) or retention basins and not routed directly to streams. Drop inlets on streams must not be constructed. 21.Any riprap placed for inlet or outlet stabilization should be clean and limited to the stream bank below the high water mark and vegetation should be used above. Rip rap must not be placed in stream channels in a manner that obstructs fish passage. 22.AII crossings should be constructed as close to perpendicular to the stream channels as possible to minimize stream and buffer disturbance. Road and utility alignments should be set-back as far as possible from stream channels to minimize sedimentation and buffer disturbance. 23. Riparian vegetation, especially trees and shrubs, should be preserved as much as possible. Native woody vegetation (e.g., rhododendron, dog hobble, silky dogwood, sycamore, river birch, red maple) should be reestablished upstream and downstream of the stream crossings if it is removed during construction to provide bank stability and shading. We encourage the use of native plants that must be removed from permanently disturbed areas. Buffalo Cove, LLC Pagel of8 December 22, 2005 24.All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. 25. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 26.The remaining lengths of streams and riparian areas on the tract should be protected in either their existing or improved state (i.e. with native vegetation reestablished where absent) in perpetuity from fill, vegetation removal, and other forms of disturbance with deed restrictions or similar instrument. A riparian buffer width of 25 feet is minimally consistent with the "trout buffer rule", but wider buffers are recommended to provide more water quality and habitat functions. 27.All jurisdictional waters on the site shall be inspected weekly for stability (longitudinal profile, cross sectional dimension, and pattern) and a monthly report submitted to the Asheville Regional Office within 15 days of the end of each month. 28.Any Bottomless Culverts installed must span from high bank to high bank. The digging of footers which change the flow of the stream, or otherwise impact the natural course on the stream are prohibited. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Buffalo Cove, LLC Page 8 of 8 December 22, 2005 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Kevin Barnett in the DWQ Asheville Regional Office at either Kevin. BarnettCcDncmail. net or at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AW Klkhb Enclosures: GC 3402 Certificate of Completion cc: Ecosystem Enhancement Program USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office David McHenry, NC Wildlife Resources Commission File Copy Central Files Filename: 05-2000Ver2.BuffaloCove, LLC. approval OF WATER (DUG, Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality November 15, 2005 DWQ Project # 05-2000 Rutherford County Tom Hartzog and James Dunn Buffalo Cove, LLC 311 Buffalo Creek Road Lake Lure, NC 28746 Subject Property: Buffalo Cove Subdivision Buffalo Creek Road, Rutherford County Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Hartzog and Dunn: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 298 linear feet of streams for the purpose of property development at the subject property, as described within your application received by the N.C. Division of Water Quality (DWQ) on November 4, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, stormwater, and buffer regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the culverting and impounding activities described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733.1786 /FAX 919-733-6893 / Intemet:httr)7/ih2o.enr.state.nc.us/nc,,vetlands N?oyr`tt,Carolina ,Xaturailll An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10°10 Post Consumer Paper Buffalo Cove, LLC Page 2 of 8 November 15, 2005 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference UT to Buffalo Creek 40 feet Road Crossing UT to Buffalo Creek 10 feet Dam Fill UT to Buffalo Creek 248 feet Impounded Waters 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Buffalo Cove, LLC Page 3 of 8 November 15, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into a restoration fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Ecosystem Enhancement Program to meet the following compensatory mitigation requirement: Compensatory Mitigation Required River and Sub-basin Number Stream 298 feet BRD05 - 9-53-(5) 7. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. Buffalo Cove, LLC Page 4 of 8 November 15, 2005 8. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities. 9. Turbidity Standard The turbidity standard of 50 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. Continuous monitoring by onsite, calibrated, continuous recording, equipment must be performed both. upstream and downstream of any instream work. The results of this monitoring must be submitted along with the below required stability monitoring. Additionally, should the results indicate a violation of the turbidity standard, all work shall cease until such a point the measures are implemented to protect surface waters form further violations. 10. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. 11. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCG010000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http.-Ah2o.enr.state.nc.us/su/Forms Documents htm. Buffalo Cove, LLC Page 5 of 8 November 15, 2005 12. Deed Restrictions Deed restrictions or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. 13.Temporary Fills All temporary fill and culverts shall be removed and the impacted area returned to the original grade, including each stream's original cross sectional dimensions, planform pattern, and longitudinal bed and bed profile after construction is complete or within 6 months of the establishment of the crossing, which ever is sooner, and the various sites shall be stabilized with natural woody vegetation (except for the maintenance areas of permanent utility crossings) and restored to prevent erosion. If the crossings are not completely removed and restored as described above within the specified time above, additional written approval from this Office must be obtained to modify this condition. 14. Culvert Installation Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Therefore, you must provide plans with adequate details that indicate that the current stability of the stream will be maintained or enhanced. You must receive written approval from this Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according to approved plans. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Buffalo Cove, LLC Page 6 of 8 November 15, 2005 15. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 25 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 16. Culverts that are less than 48 inches in diameter should be installed with 20% of the diameter of the culvert placed below the level of the stream bottom to allow the accumulation of stream bed materials and to facilitate aquatic life passage during periods of low stream flow. Larger diameter culverts should be placed 1 foot below the stream bottom. Culverts should be placed in the main flow channel (i.e. thalweg). Partial burial of culverts in this manner also may require increasing their size to accommodate flow requirements. 17.If concrete is used during construction (e.g., headwalls), a dry work area must be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts live concrete should not be discharged to surface waters due to the potential for water chemistry change and a fish kill. 18. Rock, sand, or other materials should not be dredged from the stream channels except in the immediate vicinity of the crossings. Instream dredging has severe effects on aquatic life and disturbance of the natural form of the channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the channels adjacent to the crossings should not be modified by widening or changing their depths. 19. Sandbags, flexible pipe, or other diversion structures should be used to avoid excavation in flowing water. Materials used for flow diversions should be removed from the stream bed after completing the construction work. Any diversion channels must be lined with fabric and/or rock. 20. Storm water from roads should be directed to vegetated buffer areas (e.g. level spreaders) or retention basins and not routed directly to streams. Drop inlets on streams must not be constructed. 21.Any riprap placed for inlet or outlet stabilization should be clean and limited to the stream bank below the high water mark and vegetation should be used above. Rip rap must not be placed in stream channels in a manner that obstructs fish passage. 22.All crossings should be constructed as close to perpendicular to the stream channels as possible to minimize stream and buffer disturbance. Road and utility alignments should be set-back as far as possible from stream channels to minimize sedimentation and buffer disturbance. 23. Riparian vegetation, especially trees and shrubs, should be preserved as much as possible. Native woody vegetation (e.g., rhododendron, dog hobble, silky dogwood, sycamore, river birch, red maple) should be reestablished upstream and downstream of the stream crossings if it is removed during construction to provide bank stability and shading. We encourage the use of native plants that must be removed from permanently disturbed areas. t Buffalo Cove, LLC Page 7 of 8 November 15, 2005 24-All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. 25. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 26.The remaining lengths of streams and riparian areas on the tract should be protected in either their existing or improved state (i.e. with native vegetation reestablished where absent) in perpetuity from fill, vegetation removal, and other forms of disturbance with deed restrictions or similar instrument. A riparian buffer width of 25 feet is minimally consistent with the "trout buffer rule", but wider buffers are recommended to provide more water quality and habitat functions. 27.All jurisdictional waters on the site shall be inspected weekly for stability (longitudinal profile, cross sectional dimension, and pattern) and a monthly report submitted to the Asheville Regional Office within 15 days of the end of each month. 28.Any Bottomless Culverts installed must span from high bank to high bank. The digging of footers which change the flow of the stream, or otherwise impact the natural course on the stream are prohibited. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Buffalo Cove, LLC Page 8 of 8 November 15, 2005 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Kevin Barnett in the DWQ Asheville Regional Office at either Kevin.Barnett(@ncmail.net or at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AW Klkhb Enclosures: GC 3402 . Certificate of Completion cc: USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office David McHenry, NC Wildlife Resources Commission File Copy Central Files Filename: 05-2000.BuffaloCove,LLC.approval NOV g 2005 DENR - WATER QU''E'R t., . LITY i.'ETVj,'DSf,,DSTC_n.,;,?r,i?,.,._1 c. CH RA,N; Triage Check Dist Date: 11/02/05 To: Kevin Barnett, Asheville Regional Office Project Name: Buffalo Cove, LLC DWQ #:05-2000 County: Rutherford 60-day Processing Time: 11/01/05 to 12/30/05 From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! F@[ROWIRD NOV 1 - 2005 Office Use Only: DENR -','AMA'QLiA1ilTRebuary 2004 1%ETLANDS NO STOi INIATER BRAt1CH USACE Action ID No. DWQ No. (If any particular item is not applicablc to this project, please enter "Not .applicable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: X Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ -;01 ? 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nw39 If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts (verify availability with NCEEP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information I. Owner/Applicant Information Name: BUffALD Cori.: LLC. om 14,0g Ao Mailing Address: 311 LA 2 Telephone Number: ?2,?- (n7-5-2508 Fax Number: 2-2'- G 25' 4400 E-mail Address: P P_1„ Ct?iv% 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 5of12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property bodridaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than I I by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: QuFfAeP, CD< i 2. T.I.P. Project Number, NCIvIA or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: &%OU1?4 Nearest Town: ?Aie LINLC Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): t3?us UE04 2J -? OL46WO (A-Wv- /Lono s2 1314) dN cry 5. Site coordinates (Lat/Long; D/IvUS format): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody..) 6. Property size (acres): 97. O.) 4 5 7. Nearest body of water (streain/river/sound/ocean/lake): ?T 1-0 04FAt0 GIrEK 3. River Basin: &AO La (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: WOOthh 1U V.CSiDrNAAI,, Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: 13ur-FA-Lo Caul / If-I.F`f /4"=S wr - 7 U Q /4 ox ?.?f .f-r 6 ?- Y 2 H I., i s o? 2DA4 S aJ ITJJ /? ?Q t5cS4IJr/J /410e--I r40.j '7-4 4-I L Si04 Iwl6 -c-t54 C.C e 4SK A4= D PO.?/Q 2 i .r • I ?/ C T.4 L L n Q d I T L/ Y-Q .CG /G -h,[ v$ L04d S't t4 /?JL?.A o Zg2 IV. V. VI. I I . Explain the purpose of the proposed work: Amaj ay Awo ?--%t Corirm i rfy LNNoynA; Nf A??p lLo.4? !/lcsS,?C ram- Siff: q?ctsS ,-- Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. NoNt6- Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Pan 7 of 12 1. Provide a written description of the proposed impacts: ffl) 'I /APO" OtA12NN ANfl ? 1? Ro4o tAassla6 ' 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of ' Impact (acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, rill, excavation, flooding, ditch ing/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FI INI), or FEMA-approved local tloodplain maps. Maps arc available through the FEMA Map Service Center at 1-800-358-9616, or online at http://w,?vw.fema.,ov. **" List a wetland type that best describes wetland to be impacted (e.g., freshwatedsaltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area-of wetland impact proposed: 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please secif ) wwcAf !At TD NffAW 2' ?c KN1Al. Ceti "tit N 6uffAw cy. 2 &Cci IPi , * List each impact separately and identify temporary impacts. Impacts include. but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at I-300-358-9616, or online at www.uses. ov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tonozone.com, www.mnpquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: Page 8 of 12 4. Individually list all open water impacts (including lakes, pond-, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of ImPact* Area cot f ImPa (acres) Name ofWaterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) * r: u: LSL caCu uupaCL separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? rsul Lt? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): b IA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.):- 11\65'r A-M t_ Size of watershed draining to pond: AExpected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. f?NO tS INiti6ci?/tc? 4,41Musfix Z fit. vi :'N,,"l t7Y dr' (,J?!itlL ?g! C.or?71'f7uNr?y . VIII. Mitt ration DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and i\/fodification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://l12o.enr.state.nc.us/ncwetlands/strmgide.htm1. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. A 2. Mitigation .may also be made by payment into the North Carolina Ecosystem Enhancement Program (NC. EEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net . If use of the NCEEP is proposed, please check the appropriate box on page three and provide the following information: i Amount of stream mitigation requested (linear feet): ! D O Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): N C?? -- Cr, al?-a?" ?'?c???. - W;1? ?otzw??. dd r??.m c.n?'S v??1? Page 10 of 12 ' IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land" Yes ? No [ If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? Y. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer RequK ents), or other (please identify )? Yes ? No If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact . (square feet /acres) Multiplier Required Mitigation 1 3 - Total Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration. / Enhancement. Presentation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. 4 NU STd/lirt rho 04d4tcr-y /,J/.SGl42(, e-0 i'b S c.2fil c? XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. 0rJ• 511r- ?Pi?c XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes V1 No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). /./o../1c LuLitc- /4 r- At:Z. d is /e=.a1- 4csod-r e--.r r 04 DLL At00 Z Y PQEJrovs ?D 41 C j? scvaS/O?? °/erg/--- Applicant/Agent's Signature (Agent's signature is valid only if an authorization Date the pplicant is provided.) Page 12 of 12 Attachment A: Proposed Mitigation Plan. Site Location: Site is off Buffalo Creek Road between the Apple Valley and Bald Mountain Golf Courses at the Lake Lure Golf and Beach Resort at Lake Lure. Property resides outside town limits. See attached site plan with affected UT highlighted. Affected Area: UT to UT to Bill's Creek. Preservation Mechanism. Protection of old mountain trail, 15+ green belt acres, 1700 feet of UT by deed restriction or conservation area with Foothills Conservancy. Current Site Condition. Forested. Mitigation: 100 linear feet of stream mitigation to North Carolina Ecosystem Enhancement Program. o CSTd-?A W V /^)/ < A / 1 I r F/y1 oAn DIRECTIONS' Published by Multi-Media Marketing (910) 616-4052 ( 70 ?,, - -, Z?\,, ? ??, r,? ? - -, u MUJD\\ r?,- n / ? \, . LA- ©Cafi1c,:Vlile,TP) -AT TA IRIII 1) M0U'RIAIN$ I-40 East Exit Sugar H'ill Y 31 t _ Asi?eville Morganton Black Mountain D Sugar I;III Rd. o? t7nl O lJ Bald'.lountaln Asheville tip Gait Course d Cedar Bills CrPPkfalo m Creel: Rd. Creel: SlefiT?tel°s®filVill° ., I ROdd Road E;tit 13/1 ve a. t I ?? rS _ .nppey Dalton'! i, GolfCoCOurUrse r Genera 1G 1 y Stcre •R _ Hlci:erY I x `e ChimneY?7??! Nut Gorge Rouc2 ROClc ?_ SIN _ - 1803 a o ,0 Bills Creek ;ri \_ l ?? as III Y); a ?ir Road ? ono LP,e Lure ? !c, II I a Tryon Coie,:nll us +`°° ` ?7Q?l? G4 7?A' E:it33 ??QB Lalce R Adge 9 Green River uv??`t??v wvti, 3 Statesville 0 c) Rutherlordton Spindale Forest City V-0. (In Henrietta) 74 IF o„ b-t) cznl at" CC Gre2nvilie, SC I-i15 P or 1 ?e charlotte Internaticnel --- -'-`. Airport [ tease I-o-Le: ni ?, is .roe -L-,3 !: E-:le. ' 1q; .1GG 101 ?, LI ,'r"`t'• X1'1:-?? , ..? 10101 103" ..o 109 IC a 23 102,E 21 101'._ ZI I9 g2 100 G5. GG S3 13 67 :.3' 93 ff . . 17 u? 77, .. 03, UZ is cc ' 10 1 C3.n - - 12 64 rp v; al .. '? 1. 9G CO 1 21 p 21 t 13- " GSD 371r`y 10 - " ?79 p.' 1G _ E3 12 Z7 ^3191 6'G2 Iz'.. .. `? T ID cr: 15 11 zi GI 0 29 S3 72 14 22 ?.. EO 13 la 7 0' TG 13 25 131.1 9 11 5 8..,4. z? p C , _I 3 yi I? 6 7 256; 43 54 :.Ol r 4 52 r 2 2 4 3iC 4 3 1 47Z `13 7 , _ 1 6 17. '.43 la - 5 7 19 9 ?? _ET , ' - 5 G 6 l`LJ .2 11 " 1Z '1 3 `7 1 c.. ??try, - ` 5 1 zc a lp 3 4 ?G 7 a -g 1D _ 13 14 1 _1 y 3 s " I' - 1 is 17 `? 53 II% z 50 Cl_ Ca la Z5 Z' 5 is. L6 C r<. C 1 lq 5 4 ..:.5 o v2 Sp iv3 T "7 2 43 v 7 01 _G c 1G9 13 3-. e;:: ..3 41 _ 71 ^ 33, D _, _.C iOOP 7 SI ?f3 n I2 u 3 _3 vl 3Z r° I.. C3 41 Sa.- L.11G2' f', 3 .3 it la 35 ° 3I [5 Zi 80 SO 103 03 IC4 d 'YOUf:GS I-iT - / SOUTH 12,. ?e. G F, 9 cR ? APPLE V a x FOR 16 5 4'41v__ b z? \' . 1TERSIDEi ```a - - ' % PROPMU) •, Ica ' 107, DEVELOPMENT 104 ;. CR\ Ica. 109 - G° J " WE S r6 , rte' I?13 ??_ I G 11 \_ 6 ¢ i -? a 12 13 a 4 14 .. f1 15, 3, - J ' 16 1 17 _ ?III._, G7' \ 68? _ •' 70 - _ I3 59 - 74 ..`' 53 75 57? 76 SG - ' 77-_._ i 7,3 ss .. , '? 29 ... 54 a 3 - 81 / .. 43 92 ' q 44 83 i a0 41 & 4 40 0 ? 84 4 48 49 3 °u 47 S8•?67 S3 0 7 67 J 36 91 ! 3s •. a 13. ..` . 34 :a 9I 94 J!' APPLE VALLEY Ii 33 ° 96 93 32 I L11.LJ 1.; 14 4. t:1 rw ??u7 r c-1 'w \ 4 72' c . - - .- ? 110.67 t: S.C r _-1 :IL 4I'c' ;.n w 27 Gai ' '-J t anti 1 5 S4u,4 L4'k? &q? o (ovc UNIKf, 44Lec., NO ?2,9- C 25- 2500 7< 4. :z. 400 A l17( e%F / z c2 -4 Cl 7 7 P c3?72 1 REA ?Zf5c6?-??.c? Yahoo! Mail - jamespdunnra'?,yahoo.com Page 1 of 2 i•r ? z-??f. ? ?.:-t d ? ?- v p o o •t- / 4- / J Co..< : Z 2 L r 4---! C- Y Yahoo! My Yahoo! Mail Search , ~ . = Welcome, jamespdunn Mail Home - Hail Tutorials - Help [Sign Out, My Account] -" ?[[i19 Addresses Calendar notepad %f7hat's New - Upgrades - Options :. Checic Mail Compose Search Mail I Search the Web Check Other Mail [Edit] Previous I Next I Back to Messages Printable View - Full Hea foretek.com Delete Reply Forward Spam Move.. Folders [Add - Edit] This message is not flagged. [ Flag i,tessage - Flark as Unread From: info@foothillsconservancy.org evd Contact Details Add Mobile Alert lnbo:: (1) ?V Draft To: "James Dunn" <jamespdunn@yahoo.com> Sent CC: tkenney@foothillsconservancy.org Bulk (90) [Empty] Subject: Re: Question Trash [Empty] Date: Tue, 30 Aug 2005 07:32:20 -0400 My Folders [Hide] American Expresss Jim' It depends on the quality of the property and the context, but we typically accept Aviation easements on qualified tracts that are at least 50 acres since our easement responsibilities & associated stewardship costs are forever. If the trail and creek lin' Buffalo Cove other conserved property or rare plant species exist, the acreage could perhaps be Carver less. We would have to evaluate. Smaller areas can be protected with deed Family restrictions by landowners. Send us more details if you would like to discuss this wi us, and we can set up a time for a phone conversation. I'm glad that property owne Finance like you are looking for ways to protect areas like this. We are working in partnershi LewisTree now with N. G. tae Par KS, The Nature Conservancy, and Carolina Mountain Land Conservancy to secure lands for the new Hickory Nut Gorge State Park and want ti Misc work with private landowners in the area who are interested in conservation Real Estate easements. Foothills Conservancy serves all of Rutherford, along with McDowell, Resort Burke, Caldwell, Alexander, Catawba, Lincoln, and Cleveland counties. We have protected almost 40,000 acres in the last 10 years working with state and federal Roundhouse natural resource agencies and private landowners interested in conservation Travel easements and land donations. Thank you for contacting us. Susie Hamrick Jones Executive Director Foothills Conservancy 828437-9930/9912fax PO Box 3023 Morganton, NC 28680 -Original Message - From: James Dunn To: info@foothilisconservancy.org Sent: Monday, August 29, 2005 10:28 PM Subject: Question Hello 1 am developing some land in Lake Lure. There is a wonderful mountain trail ani spring fed creek on the property that I want to preserve.. I will do this with either greenbelt area or with the donation to a land trust. http://us.f526.mail.yahoo.com/ymIShowLetter?Msgld=4642_0 731_1826 2581 0_8599... 10/28/2005 p?@Rowm 0 NOV 1 - 2005 DENR - WATER QUALITY MMUS At@ STCPYWATER BRANCH Office Use Only: Form Version February 2004 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: X Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ -:P' ? 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nw39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? II. 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts (verify availability with NCEEP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? Applicant Information 1. Owner/Applicant Information Name: BuFfgw CoV,= U.C Oh Mailing Address: MW K -f Telephone Number: Y22-- 15'2508 Fax Number: 28'- 2 00 E-mail Address:_ G? q (?) kA01_LA ln.AR- '. C-0WN, ?art?.sP4??v.icL' YaaF.eo,eo.... 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: Page 5 of 12 III. Project Information Attach a vicinity map clearly slowing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property bodridaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: &fFALZ, r 2. T.I.P. Project Number, NCMA or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: _ kUk% ef-64 Nearest Town: Wz- " Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): rJ4 6N C_r-Fr - - 5. Site coordinates (Lat/Long; D/M/S format): (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 47. Ye aue s 7. Nearest body of water (stream/river/sound/ocean/lake): (AT' Th 64FFlw C CEK 3. River Basin: &AO &a (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http:Hh2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Woo0cp j0 0.;610rri11AL;, Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: ISuFFA-Lo Coat tir Cl7.F`f /- "=S 4-J1-t4 ?4?Qosc?-Nor-rsc. r' 2 Ni,,cS o¢ A!0,44 S .,.) t-rJ4 .4 /D.Q ?sC: fl y oe4fe..-d, 40-4 C.CC??( .rt-.?4 C'o.•r.?so?? f?t=Q ?o,.ro f?s..?• ??cT.4L??O v?rt/ v-¢.4-a?crrfo? Lo4d Est s?, /?JLLA o z?2. 1 I . Explain the purpose of the proposed work: AmefmfY IoNA rbo- Qgmmtw Ry -L:-:t4 \0 ,4 M ',41- .qr?p 12-0.40 C-1 .sS w t rue- 5/M -J c""r-s IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. NoN5' VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Provide a written description of the proposed impacts: 1 WOVtaOtA<NJ AN>D ? I? ?4? C?sSW6 ' 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Locatcd within 100-year Floodplain** (yes/r Distance to Nearest Stream (linear feet) Type of Wetland*** I * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEaIMA) Flood Insurance Rate Maps (FIRM), or FENIA-approved local tloodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http:NwNvw.tema.,,ov. *"* List a wetland type that best describes wetland to be impacted (e.g., freshwatcdsaltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area'of wetland impact proposed: 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Strcam Before Impact Perennial or Intermittent? (please secif ) 1 ww6mf IAf TO 6tMt4 If ?Jl?n'NIA(. 1Rf.'+''t0 osa >,- Z 1?+?Pcwr aL?r „? . uT ro WMLO CK. Z ??RCc.NIAI. * List each impact separately and identify temporary impacts. Impacts include.' but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain). stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If strc:un relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at wwtv.us?_,s.eov. Several intemet sites also allow direct download and printing of USGS maps (e.g., WWW.tOV07one.com, www.mnpquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: Page 8 of 12 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of I Im act p (acres) Name Waterbody tt applicable) ( pp Type of Waterbody I (lake, pond, estuary, sound, bav, ocean, etc.) I LtsL ca?u impact separately and tdennry temporary impacts. impacts include, but arc not limited to: rill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands L.A r;J1 stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): b &A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.):- AC, 51>AS'n t_ Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. b 'ra p2o410 C AM C-% iD EM-AN'4 516t 09 P/L03E CT , ?+D is r?yiti6??2tt, ??fMr?3an? ?'r?Z ?..?""?•?s:?„? ??r ar' VIII. Mitibation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and iVloditication of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered it, determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://l12o.enr.state.nc.us/ncwetIands/stn-n.izide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate"sheet if more space is needed. 2. Mitigation .may also be made by payment into the North Carolina Ecosystem Enhancement Program (NEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net . If use of the NCEEP is proposed, please check the appropriate box on page three and provide the following information: i Amount of stream mitigation requested (linear feet): !DD Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure. of public (federaUstate) funds or the use of public (federaUstate) land" Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5033 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? Y. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requir ments), or other (please identify )? Yes ? No If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* fm pact (square feet /acres) Multiplier Required Nfititzation 1 3 _ 2 - 1.5 Total Zone l extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the cdge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement. Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15 A NCAC 2B .0242 or .0200. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Nd 3;T3/441 rho D??.?iGTrtGGy /JisGn26?? Ib Swt1-?? XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N, s mR 5?, P;7c XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes [AJ No ? Is this an after-the-fact permit application? kri No ? Yes p XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). OL0 AiPF IsY PQEJ1ovs ??,?/ •C I ?Scv?s.o.•! cJlSze. .LL'S co_rx-_et?4_7-ra_e d -ecse. -C e Applicant/Agent's Signature Date (Agent's signature is valid only if an authorizati0 ett from the applicant is provided.) Page 12 of 12 Attachment A: Proposed Mitigation Plan. Site Location: Site is off Buffalo Creek Road between the Apple Valley and Bald Mountain Golf Courses at the Lake Lure Golf and Beach Resort at Lake Lure. Property resides outside town limits. See attached site plan with affected UT highlighted. Affected Area: UT to UT to Bill's Creek. Preservation Mechanism. Protection of old mountain trail, 15+ green belt acres, 1700 feet of UT by deed restriction or conservation area with Foothills Conservancy. Current Site Condition. Forested. Mitigation: 100 linear feet of stream mitigation to North Carolina Ecosystem Enhancement Program. A-7-7-4-C 9. 4( 0 1 et-i L.v jr- ?fJrraL'o Co L, )S- DIRECTIONS° Published by Multi-Media Marketing (910) 616-4052 ?1?v?ti`ttty wvti. LASE LUKE AREA / Marion To Knoxville, TN AT VA IRVICLU MU UN IAINS 1-40 East Exit Sugar Hill ?V 81 Asheville ?i Mot Black Mountain a c Sugar Hill Rd. 9 s 74 a, > Bald Mouuntam v Asheville 'L/o4 ! i _ f .ou e f Airport w Cedar Bills r Bk?a?o [reek Rd. t;; a m Creek Hendersonville z oad Road Exit 18A ?11 (a t, Tryon ?t eedr?9E? Greenville, SC ? 25-2500 m g Bat Cave Z, -CS e Valley - course Dalton's 9 a ? General Store 64 Hickory Ir Nut Gore Route Chimneyvq1008 Rock' Roy Ow Bills 9Psay a Road Lake ,, o 0 Lure 0(64J Columbus 74 Rutherfordton v Spindale Forest City Exit 36 108 lake Adger 9 - Green River 4 (in Henrietta) 74 By-bass ::., 108 74 By-Pass OSpartanburg? 1-85 North Chariotte International Airport Please note: map is not =oscaile. M .1 106 104' loei0x 104` L as as !J V ?? .? LO (. t? V ?? lOBb' 102 ES -21 27 IS q-L?'Fz L4J/? 83 I8 Ez too as : BY .., toe - 23 ? 99 ST 85; ? 92 17 98 z' .. a8' 1 _ Z8 88, 14'$6 97 89C 4 2Q g 81 4 s li gI 96 '. gg., ' ' - RI E y zl W.. - 18 as ' 9 9390 83 7A?•` 28 ?? IE 27 94 91'2 62 Za?'•. - IB I5 - 11. as 92 Sl of ? 41: , 98. 59 1T`• 14 22 ` • S 35 36 55 - ZO 15 10 ksr T 30 ° 34.... 78 ?y - 6 . 31 13 31 . 75 1314:y 9 ll. 38 9?3 5 $Jfi 50 201A 22 w 4 7`41 - e o 21 7 3 IE- i 8. 54 201 8 . 20 .81Z x.19 5Brl a ( 43 - 1.•3 BE s.ah`P. ,?9T$•. SDI. 8 - £18 T 41 a 1 8 r 17,. 49 3 18 4 s l\? ? 5 y 19 ;.4n i N 1 4 70 i • $ s ` 4 it 3 10 - g- 2. 11 ° 12 43 gg' -T4 aid d 5 6 ?p 23 1 ZG 4TA • ,,, 8. 5 V \ ZB _ - 1 YC .ptr Cq l 4 58 :..2 - L 57 78 i8 3. 4 Yg ? T A 9 T10 1.13; 14 t 2 88_.ST' _ ,? 5 zr 0?.., as YY Be t9 to 20 5a? 55 Be -`, _ l - --?• at "'+++iii::: 19 ZO 1 2 S3 BS 6160 59 9T A8 \ - 53 ? \ ? 16 25 24 F • 51 52 62 alj 3 11Q; 54 +, /" 80 6 4 15 26 h 83 84 gg 86 as ` 81 50 64 14! go 53 $y r 7 6 oe 28. 2T 42. 93 ?• 49 n? 7,f 72?h .866 ° Sla 98 95 94 51 1.08 43 ` fE •$ eiN 25 41 - 71 a .9 1 51 : ( a - 8 26 31 3Y 99 40 44 48 is, bZO eT 9T 92 «i I'/ x30 __ . 34 - 41 76 2. 76 89 96 101 108 OR s'"0" u r M - /'- °ll. o ?` 106 41 --"48 i.. P - 36 _ 38 ... 45 }gs. 84 t;.jg 34 35 ST 46 TT 80 99`100 103 104 40 - fA;1 d YO GS 38 47 ` )Se S-QVTH_ e5'; 87 7 go 91 9 33 93 10 91 <...- a APPLE VALLEY 5 : \ , 34 84?p A _ VALL a so 95 1 IS Nl• 32 32 30 13 _ w. .. ?s 3 18 u 20 t _ a ?. ie zb 1TERSID @` i 1i r PROPOSW 10 a 107'.. • 18 24 -23 OevaaPr?aMr 104 0`R 108; ;..log , ` - \KL Fz $- C 25-- 2500 I J4. Clr ? •? v "Y 400 A ?l.t 1. f 1 ? \ r VI .-\{ G11 17:) -]7? `' ?• -1,: C 1 \112 C,? l ?/ / ,• '. t.: t4,?LJ 1 j, i `'.'.1 7;11. \,..1./5'.5 .11.. 'f. 1•????.<???? /? f ??`{L`?` 1 F4l? 1'.'.uL E7_ 774 t. I / I..'S16'3TW ?!Q CI f1'1 J KEA ?t4 C. •' 1:1 1: .:7 7 V \N j <' \110 i c. ? 4 s ?' L J .. 114.79 rIC]`.'_. _•7,._tT :, .. •I:' •t' '" ]7 / 44, c. 127 12 A L" :3 r;j FT l ??~I?A GS xt, ?24 4y 1.?? \ 3 F r :? 4, w cl? h ? 7?ar 14: !,3' t;c LI.A ?' \ S1;i ti G4'E/ , .r' f n L4i ? ,}• Ll 1L1?, •?'\ Yahoo! Mail - jamespdunn(ayahoo.com Page 1 of 2 Yahoo! Mir Yahool Mail Search :'7 Welcome, jamespdunn Mail Home - Mail Tutorials - Help My Account] [Sign Out , - ' d it PIt9s ` . Addresses ` Calendar P:ot pad What's P?evr -Upgrades - Options Check Mail Compose Search Mail Search the Web Check Other Mail [Edit] Previous I Next I Back to Messages Printable View - Full Hea foretek.com Delete Reply Forward Spam Move... This message is not flagged. [ Flag Flessage - Mark as Unread Folders [Add - Edit] From: info@foothillsconservancy.org C 'ew Contact Details ; Add Mobile Alert 7 lnbox (1) Draft To: "James Dunn" <jamespdunn@yahoo.com> Sent CC: tkenney@foothillsconservancy.org Bulls (90) [Empty] Subject: : ?' Re: Question Trash [Empty] Date: Tue, 30 Aug 2005 07:32:20 -0400 My Folders [Hide] Jim, American Expresss It depends on the quality of the property and the context, but we typically accept Aviation easements on qualified tracts that are at least 50 acres since our easement responsibilities & associated stewardship costs are forever. If the trail and creek lin! Buffalo Cove other conserved property or rare plant species exist, the acreage could perhaps be Carver less. We would have to evaluate. Smaller areas can be protected with deed Family restrictions by landowners. Send us more details if you would like to discuss this wi us, and we can set up a time for a phone conversation. I'm glad that property owne Finance like you are looking for ways to protect areas like this. We are working in partnershi LewisTree now with N. G. tae a s, e Nature Conservancy, and Carolina Mountain Land Conservancy to secure lands for the new Hickory Nut Gorge State Park and want b Misc work with private landowners in the area who are interested in conservation Real Estate easements. Foothills Conservancy serves all of Rutherford, along with McDowell, Resort Burke, Caldwell, Alexander, Catawba, Lincoln, and Cleveland counties. We have protected almost 40,000 acres in the last 10 years working with state and federal Roundhouse natural resource agencies and private landowners interested in conservation Travel easements and land donations. Thank you for contacting us. Susie Hamrick Jones Executive Director Foothills Conservancy 828-437-9930/9912fax PO Box 3023 Morganton, NC 28680 - Original Message -- From: James Dunn To: info@foothillsconservancy.org Sent: Monday, August 29, 2005 10:28 PM Subject: Question Hello I am developing some land in Lake Lure. There is a wonderful mountain trail any spring fed creek on the property that I want to preserve. I will do this with either greenbelt area or with the donation to a land trust. http://us.f526.mail.yahoo.com/ym/ShowLetter?MsgId=4642 0 731_1826 2581 0_8599... 10/28/2005 a: F "I*-- u,.o; Z . 1k-5-oS :TEcos stem PROGRAM RECEIPT Tom Hartzog Buffalo Cove, LLC 311 Buffalo Creek Road Lake Lure, NC 28746 Project: Buffalo Cove County: Rutherford G S ---000 ?r?@P=Owp= B JAN 3 0 2006 DENR - YVATER QUALITY i riL AtiDS AND STO(ilCvVATER EMiCli January 23, 2006 DWQ #: 05-2000 COE #: 200630112 The North Carolina Ecosystem Enhancement Program (NC EEP) has received a check in the amount of $24,090.00, check number 1104, as payment for the compensatory mitigation requirements of the 401 Water Quality Certification and/or US Army Corps of Engineers 404 and/or Division of Coastal Management CAMA permit(s) issued for the above referenced project. This receipt serves as notification that the compensatory mitigation requirements accepted by NC EEP for this project have been satisfied. Please note that you must also comply with all other conditions of the certification/permit(s) including any additional mitigation conditions not accepted by NC EEP and any other state, federal or local government permits or authorization associated with this activity. The NC EEP, by acceptance of this payment, acknowledges that the NC EEP is responsible and agrees to provide the compensatory mitigation requirements as indicated in the table below. The mitigation will be performed in accordance with the Memorandum of Understanding between the NC Department of Environment and Natural Resources and the US Army Corps of Engineers dated November 4, 1998. Wetlands (credits) Stream (credits) River Basin Cataloging Unit Riparian Non- Coastal Cold Cool Warm Buffer (sq. ft.) Riparian Marsh Broad 03050105 0 0 0 110 0 0 0 Please note that a payment made to the Ecosystem Enhancement Program is not reimbursable unless a request for reimbursement is received within 12 months of the date of the receipt. Any such request must also be accompanied by letters from the permitting agencies stating that the permit and/or authorization have been rescinded. If you have any questions or need additional information, please contact Carol Shaw at (919) 733-5205. Sincerely, , illiam D. Gilmore, PE Director cc: Cyndi Karoly, Wetlands/401 Unit Steve Chapin, USACE - Asheville Kevin Barnett, DWQ Regional Office - Asheville File kutori,1?5... E aka"... Protect 0" State ern NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net