Loading...
HomeMy WebLinkAbout20090821 Ver 1_Approval Letter_20090819NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 19, 2009 DWQ# 09-0821 Mecklenburg County Dr. Greg Thorpe, Ph.D., Manager Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina, 27699-1548 APPROVAL of 401 Water Quality Certification with Additional Conditions, Replacement of Bridge No. 177 Over Reedy Creek on State Road 2804 (Reedy Creek Road), Mecklenburg County, Federal Aid Project No. BRZ-2804(2), WBS Element 33782.1.1, TIP No. 8-4580 Dear Dr. Thorpe: You have our approval, in accordance with the attached conditions and those listed below, to permanently impact 68 linear feet (If), to temporarily impact 60 If of streams and to permanently impact 0.01 acres of wetlands as described in the table below: ''4 FL f ',., ? . t A?. : 1 "' 3 'A' T? '. s4 }y - ( r ".* R' y?? 5. `'z°.* .Y ?e f !"?f T- 2 4 'b tion No 14 ti St A ^t :u fZ?Stream Name/ i+ r i1 Type of? r y ?k„ Amount of ? G £ t{ tWetlarid Type/ a * ? 8? ? ,rat ??`?' Stream T ems' Impact ? Y S , r Stream Im act ? t "? Amount of Wetland !s a ; ' L a „F-0 rv * lihear Met ; rlm act' acres) ; ' . f .r" v .. s < , , 32+80-L-LT Reedy Creek/ Permanent 8 If N/A Perennial Riprap 32+96/33+13-L-RT N/A Permanent N/A Riverine/0.01 Riprap 33+14/33+41-L- Reedy Creek/ Permanent 601f N/A Perennial Riprap 32+95/33+23-L- Reedy Creek/ Temporary 60 If N/A Perennial Causeway Stream and wetland impacts are associated with the replacement of Bridge No. 177, as described in your application received by the Division of Water Quality (DWQ) on July 30, 2009. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Numbers 3688, 3689 and 3701. Mooresville Regional Office Location: 610 East Center Ave., Suite301 Mooresville, NC 28115 Phone: (704) 663-16991 Fax: (704) 66M040 i Customer service: 1-877-523-6748 Internetw .ncwaterqualily.crg An Equal Opoortunity 1 Affirmative Action Employer - 50% Recyc!ed110% Post Consumer paper NorthCarolina Naturally Dr. Gregory J. Thorpe Page Two Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval will expire with the associated 404 permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design that you described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and you may be required to submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification and those listed below: 1. The use of riprap above the normal high water mark shall be minimized. Any riprap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 2. The post construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. 3. Strict adherence to the most recent version of NCDOT's Best Management Practices for Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification. 4. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre- treated through site appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. 5. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval from NCDWQ first. 6. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters. This water shall be captured, treated and disposed of properly. 7. All pile driving or drilling activities shall be enclosed in turbidity curtains unless otherwise approved by NCDWQ in this certification. 8. All bridge construction shall be performed from the existing bridge, temporary work bridges, temporary causeways, or floating or sunken barges. If work conditions require barges, they shall be floated into position and then sunk. The barges shall not be sunk and then dragged into position. Under no circumstances should barges be dragged along the bottom of the surface water. 9. Heavy equipment shall be operated from the banks rather than in the stream channel in order minimize sedimentation and reduce the introduction of other pollutants into the stream. 10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 11. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic conditions can be provided. 12. If concrete is used during construction, a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 13. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of the NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Dr. Gregory J. Thorpe Page Three 14. The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 15. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 16. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification 17. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 18. A copy of this Water Quality Certification shall be posted on the construction site at all times. In addition, the Water Quality Certification and 21I subsequent modifications, if any, shall be maintained with the Division Engineer and the on- site project manager. 19. Native riparian vegetation must be re-established within the construction limits of the project by the end of the growing season following completion of construction. 20. Sediment and erosion controi measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within 30 days after the Division of Land Resources has released the project. 21. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 22. The Permittee shall ensure that the final design drawings adhere to the certification and to the drawings submitted for approval. 23. The outside buffer, wetland or water boundary located within the construction corridor approved by this certification shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 24. The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery. 25. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this project within waters and/or wetlands, except as authorized by this Certification, or any modification to this Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this Certification without appropriate modification. If this occurs, compensatory mitigation may be required since it is a direct impact from road construction activities. Dr. Gregory J. Thorpe Page Four 26. Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certificate of Completion" form to notify DWQ when all work included in the 401 Certification has been completed. Please include photographs upstream and downstream of the structure to document correct installation. 27. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any state water quality standard [including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d)- Before codifying the certification, DWQ shall notify NCDOT and the USACE, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this Certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This Certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review by the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Pally Lespinasse in the Mooresville Regional Office at 704-663-1699. Sincerely, forColeen H. Sullins Attachments cc: Steve Lund, USACE Asheville Field Office Sonia Gregory, DWQ Wetlands Unit File Copy