Loading...
HomeMy WebLinkAbout20090725 Ver 1_More Info Received_20090820 Strickland, Bev From: Sent: To: Subject: Attachments: Steenhuis, Joanne Thursday, August 20, 2009 3:23 PM Strickland, Bev FW: # 20090725 New River Officer 401 Cert. PCN_Revised 4 and 5.pdf; NR01-stream crossing-EX-1 O.pdf Bev, Some changes they needed to make in the application and a drawing. From: Tom Davis [mailto:tdavis@leainc.com] Sent: Tuesday, August 18, 20094:23 PM To: Steenhuis, Joanne Subject: New River Officer 401 Cert. Good Afternoon, Joanne: Attached are a couple of files that address your comments from earlier this afternoon. Let me know if you need anything else, Thanks for your help, Tom Thomas J. Davis, PE Project Manager LITfLEJOHN ENGINEERING ASSOCIATES 1935 2lstAvenue South, Nashville, TN 37212 T: 615-385-4144/ M: 615-476-7235/ F: 615-385-4020 Celebrating our 20th Year! r;/; Consider the environment, Please do not print this e-mail unless necessary, 1 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the V.S, then individually list all open water imoacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary (T) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? DYes ONo If yes, permit fD no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below, If yes, then individually list all buffer impacts below. If any impacts require mitiqation, then YOU MUST fill out Section D of this form. 6a. Project is in which protected basin? o Neuse o Tar-Pamlico 0 Catawba o Randleman I&J Other: White Oak 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number - mitigation impact impact Permanent (P) or required? (square (square Temporary (T) feeO feet) 81 T Pipe Removal Unknown Tributary No 45 B2 T Pipe Removal Unknown Tributary No 88 B3 T Pipe Removal Unknown Tributary No 113 B4 T Pipe Removal Unknown Tributary No 28 B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 274 6i. Comments: A total of 109 linear feet of existing pipe is being removed from the stream. Page 5 of 10 c. Proposed Impacts Inventory 1. Impacts Summary 1a, Which sections were completed below for your project (check all that apply): o Wetlands 1&1 Streams - tributaries o Buffers o Open Waters o Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted, 2a. 2b. 2c. 2d. 2e, 21. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404.10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary (T) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one YesINo - W4 , Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 31. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Culvert Unknown PER OWQ 2 75 S2 P Culvert Unknown PER OWQ 2 52 S3 - - - S4 , Choose one - - S5 - Choose one . . S6 - Choose one - - 3h. Total stream and tributary impacts 127 3L Comments: Page 4 of 10 peN Form - Version 1.4 January 2009 I I I I - 1 I , , I I I I I I I I I I I I I \ I , , - ...... ...... ...... 1 11 1 o 20 40 60 80 100 200 I iIi ::s I ill J!! t:l lJ) 0 is''''''' z _ N ~N;; ::c: 2: l1J z 0"'" U)('f'\~ 0 Z g;~;6 <: < Zoo'" "-l ~ ~[3~ I ~ "-l U 0 ,..,z_ "'z... I 0 ~ ~~~ ~ ~<>i::;; ~ t:l lJ) ~ z......J~ w ......:i ~ " ~;;'" ~ :r:~ z ~~~ ~ ~Zp., INCIDENT & INJURY SIN 0 ACCIDENTE iIi .. III Cl - No: 2601 Drawn: Checked: *Scale: if varies from 22 x 34 300 SHEET 1 OF 2 .