HomeMy WebLinkAbout20090725 Ver 1_More Info Received_20090820
Strickland, Bev
From:
Sent:
To:
Subject:
Attachments:
Steenhuis, Joanne
Thursday, August 20, 2009 3:23 PM
Strickland, Bev
FW: # 20090725 New River Officer 401 Cert.
PCN_Revised 4 and 5.pdf; NR01-stream crossing-EX-1 O.pdf
Bev,
Some changes they needed to make in the application and a drawing.
From: Tom Davis [mailto:tdavis@leainc.com]
Sent: Tuesday, August 18, 20094:23 PM
To: Steenhuis, Joanne
Subject: New River Officer 401 Cert.
Good Afternoon, Joanne:
Attached are a couple of files that address your comments from earlier this afternoon. Let me know if you need anything
else, Thanks for your help,
Tom
Thomas J. Davis, PE
Project Manager
LITfLEJOHN ENGINEERING ASSOCIATES
1935 2lstAvenue South, Nashville, TN 37212
T: 615-385-4144/ M: 615-476-7235/ F: 615-385-4020
Celebrating our 20th Year!
r;/; Consider the environment, Please do not print this e-mail unless necessary,
1
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the V.S, then individually list all open water imoacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number (if applicable) Type of impact Waterbody Area of impact (acres)
Permanent (P) or type
Temporary (T)
01 - Choose one Choose
02 - Choose one Choose
03 - Choose one Choose
04 - Choose one Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland
purpose of pond (acres)
Flooded Filled Excavated Flooded Filled Excavated
P1 Choose one
P2 Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required? DYes ONo If yes, permit fD no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below, If yes, then individually list all buffer impacts
below. If any impacts require mitiqation, then YOU MUST fill out Section D of this form.
6a. Project is in which protected basin? o Neuse o Tar-Pamlico 0 Catawba o Randleman I&J Other: White Oak
6b. 6c. 6d. 6e. 6f. 6g.
Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2
number - mitigation impact impact
Permanent (P) or required? (square (square
Temporary (T) feeO feet)
81 T Pipe Removal Unknown Tributary No 45
B2 T Pipe Removal Unknown Tributary No 88
B3 T Pipe Removal Unknown Tributary No 113
B4 T Pipe Removal Unknown Tributary No 28
B5 - Yes/No
B6 - Yes/No
6h. Total Buffer Impacts: 274
6i. Comments: A total of 109 linear feet of existing pipe is being removed from the stream.
Page 5 of 10
c. Proposed Impacts Inventory
1. Impacts Summary
1a, Which sections were completed below for your project (check all that apply):
o Wetlands 1&1 Streams - tributaries o Buffers o Open Waters o Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted,
2a. 2b. 2c. 2d. 2e, 21.
Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of
number Corps (404.10) or impact
Permanent (P) or DWQ (401, other) (acres)
Temporary (T)
W1 - Choose one Choose one Yes/No -
W2 - Choose one Choose one Yes/No -
W3 - Choose one Choose one YesINo -
W4 , Choose one Choose one Yes/No
W5 - Choose one Choose one Yes/No -
W6 - Choose one Choose one Yes/No -
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 31. 3g.
Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact
number intermittent (INT)? jurisdiction stream length
Permanent (P) or width (linear
Temporary (T) (feet) feet)
S1 P Culvert Unknown PER OWQ 2 75
S2 P Culvert Unknown PER OWQ 2 52
S3 - - -
S4 , Choose one - -
S5 - Choose one . .
S6 - Choose one - -
3h. Total stream and tributary impacts 127
3L Comments:
Page 4 of 10
peN Form - Version 1.4 January 2009
I
I
I
I
-
1
I
,
,
I
I
I
I
I
I
I
I
I
I
I
I
I
\
I
,
,
-
......
......
......
1
11
1
o 20 40 60 80 100
200
I iIi
::s
I ill
J!!
t:l lJ) 0 is'''''''
z _ N
~N;;
::c: 2: l1J z 0"'"
U)('f'\~
0 Z g;~;6
<: <
Zoo'"
"-l ~ ~[3~
I ~ "-l U 0 ,..,z_
"'z...
I 0 ~ ~~~
~ ~<>i::;;
~
t:l lJ) ~ z......J~
w ......:i ~
" ~;;'"
~ :r:~
z ~~~
~ ~Zp.,
INCIDENT & INJURY
SIN 0 ACCIDENTE
iIi
..
III
Cl
-
No: 2601
Drawn:
Checked:
*Scale:
if
varies from 22 x 34
300
SHEET
1
OF
2
.