Loading...
HomeMy WebLinkAboutNCC190505_ESC Approval Submitted_20190605ROY COOPER Governor MICHAELS,REGAN Secretary S. DANIEL SMITH interim Director NORTH CAROLINA Environmental Quality April 16, 2019 LETTER OF APPROVAL H & H Constructors, Inc. Attn: Brian Walker, Div, Manager & Agent 2919 Breezewood Avenue, Suite 400 Fayetteville, NC 28303 RE: Project Name: Highgrove at Anderson Creek Phase 6B Lots 241, 249 & 250 Acres Approved: 0.93 Project ID: HARNE-2019-077 County: Harnett City: Anderson Creek Township Address: New Castle Lane River Basin: Cape Fear Stream Classification: Other Submitted By: Moorman, Kizer & Reitzel, Inc. Date Received by LQS: March 27, 2019 Plan Type: New —Residential Dear Mr. Walker: This office has reviewed the subject erosion and sedimentation control plan. We fmd the plan to be acceptable and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title I SA NCAC 413 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deu nc ao_ _ v/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette lucas cni ncderingov or Paul Clark at Paul clark2cncdenr.gov. After you submit a complete and correct NOI Form, a COC will be entailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. D E Q�� North Carolina Department of Environmental Quality I Divlstonof Energy, Mineral and Land Resources Fayetteville Regional Office 1225 Green Street, Suite 9141 Fayetteville, North Camllna 28301 =.nwo,�.�dw /"� 910,433,3300 H & H Constructors, Inc. April 16, 2019 Title 15A NCAC 413 .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at the job site: I. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval ofthis plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures, (GS I I3A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, il T' othy L.'LaB ty, P.E. Regional Engineer DEMLR Enclosures: North Carolina SPCA Certificate of Approval cc: Moorman, Kizer & Reitzel, Inc. (via email) Kenneth Slattum, Harnett County (via emai) Fayetteville Regional Office — DEMLR file