HomeMy WebLinkAboutNCC190505_ESC Approval Submitted_20190605ROY COOPER
Governor
MICHAELS,REGAN
Secretary
S. DANIEL SMITH
interim Director
NORTH CAROLINA
Environmental Quality
April 16, 2019
LETTER OF APPROVAL
H & H Constructors, Inc.
Attn: Brian Walker, Div, Manager & Agent
2919 Breezewood Avenue, Suite 400
Fayetteville, NC 28303
RE: Project Name: Highgrove at Anderson Creek Phase 6B Lots 241, 249 & 250
Acres Approved: 0.93
Project ID: HARNE-2019-077
County: Harnett City: Anderson Creek Township
Address: New Castle Lane
River Basin: Cape Fear
Stream Classification: Other
Submitted By: Moorman, Kizer & Reitzel, Inc.
Date Received by LQS: March 27, 2019
Plan Type: New —Residential
Dear Mr. Walker:
This office has reviewed the subject erosion and sedimentation control plan. We fmd the plan to be acceptable
and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site.
This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title I SA NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction
Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of
any land disturbing activity on the above -named project. The NOI form may be accessed at deu nc ao_ _ v/NCG01.
Please direct questions about the NOI form to Annette Lucas at Annette lucas cni ncderingov or Paul Clark at
Paul clark2cncdenr.gov. After you submit a complete and correct NOI Form, a COC will be entailed to you
within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit.
However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
D E Q�� North Carolina Department of Environmental Quality I Divlstonof Energy, Mineral and Land Resources
Fayetteville Regional Office 1225 Green Street, Suite 9141 Fayetteville, North Camllna 28301
=.nwo,�.�dw /"� 910,433,3300
H & H Constructors, Inc.
April 16, 2019
Title 15A
NCAC 413
.0118(a) and the NCGO 1 permit require that
the following documentation be kept on file
at the job
site:
I. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval ofthis plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land -disturbance, as called for on the application
plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would
require a revised plan and additional application fee. Any addition in impervious surface, over that already
noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion
control measures and the stormwater retention measures, (GS I I3A-54.1(b)). In addition, it would be helpful
if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference. Your cooperation is appreciated.
Sincerely,
il
T' othy L.'LaB ty, P.E.
Regional Engineer
DEMLR
Enclosures: North Carolina SPCA Certificate of Approval
cc: Moorman, Kizer & Reitzel, Inc. (via email)
Kenneth Slattum, Harnett County (via emai)
Fayetteville Regional Office — DEMLR file