Loading...
HomeMy WebLinkAbout710084_Plan of Action_20180217PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 00 Facility Number: 71-84 Facility Name: Stoneybrook Nursery Certified Operator Name: County i Pender Kenneth Brown Operator Number: 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways;.and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 7 12 2. Check all applicable items XXX Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *ifanimals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Kenneth Brown Phone: Facility Owner/Manager (print) Date: 2/17/2018 Facility Owner/Manager (signature) II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 71-84 line 1= 15469 gallons 2. structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1 + 2 + 3 + 4 + 5 + 6 = 15469 gallons o. line n / 27154 = 0.57 acre -inches 1 III. TOTAL ACRES AVAILABLE.TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD',2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) W. maximu m applicat ion amount (inches 906 AW#1 Small Grain Overs 0.58 15 0.5 1 906 AW#2 Small Grain Oversd 2.90 15 0.5 1 906 AW#3 Small Grain Oversd 2.62 15 0.5 1 906 AW#4 Small Grain Overs4 3.10 15 0.5 1 906 AW#5 Small Grain Overs4 4.47 15 0.5 1 906 P#1 Small Grain OverSE 4.70 15 0.5 1 906 P#2 Small Grain OverSE 3.14 15 0.5 1 9061 P#3 Small Grain OverSE 2.73 15 0.5 1 x. total acres available during,5 day draw down (sum of column t) = 24.24 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE Y. line o = 0.02 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to lancl apply nyciraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficabilit " across soils; will soils absofb application without runc Fields are very wet. 2. Date and amount of last rainfall event? DATE: 1 02/16/18 AMOUNT: 0.50 inches ff, etc.) 4. Given optimum soil and weather conditions. is irrieation equipment capable of arwivine the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Yes it is capable 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposea cnanges in application rates ana amounts; ana any otner information Tor consiaer Shorter pumping times and lower applications will be used. Mr. Brown called 2/16/2018 to self report his lagoon was in structure of 12 inches. This POA was created on 2/17/2018 by Sam Edwards Environmental Specalist/Division of Soil and Water Conservation. Mr. Brown also has more small grain PAN available. ition. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD 1. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 71-84 2. Current liquid volume in structural freeboard a. current liquid level according to marker 12.0 inches b. designed structural freeboard zone 12.0 inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = inches d. top of dike surface area according to -design (area at below structural freeboard elevation) 44676 ft2 e. line c/12 x line d x 7.48 gallons/ft3 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1 1801 days g. volume of waste produced according to structural design 46888i ft3 h. current herd # 6400 certified herd #1 6400 r actual waste produced = current herd # x line g = 46888 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line It = 0 ft3 27563 ft3 15469 gallons 15469 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)