HomeMy WebLinkAbout710070_Plan of Action_20180129PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name 71-70 Pender 1802 County: Pender Certified Operator Name: Doug Atkins Operator Number: 985738 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Pender 1 Pender 2 no no 18 23 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action_ are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid. level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop - information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/2/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my -knowledge and ability, the information is accurate and correct. AJ Linton Phone:_ 910-285-1357 Facility Owner/Manager (print) - -4Q ,/ ateI Date: 1/29/2018 Facilo Owner/Manager (signature) � J! PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): JPenderi 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 336235 ftZ e. line c/12 x line d x 7.48 gallons/ft3 209586 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design F 4173001 ft3 h. current herd # 3100 certified herd # 3600 actual waste produced = current herd # x line g = 359342 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 11/17/2017 m. ((lines e + k)/1000) x line I REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) ft3 197225 ft3 1387706 gallons 1.47 1 Ibs/1000 gal. 2348.0 Ibs. PAN PoA (30 Day) 2/21/00 M PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1.'Structure Name/Identifier (ID): Pender2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 23.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) _ -4 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 3381'00 ftZ e. line c/12 x line d x 7.48 gallons/ft3-842996,gallons 3. Projected volume of waste liquid produced during draw down period _ f. temporary storage •period,according to structural design 180 days -g. volume of waste produced according to structural design. 417300 ft3 h. current herd # 3100 certified herd # 3600 actual waste produced = current herd # x• line g = _ 359342 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 197225 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 693853 gallons 4. Total PAN to be, land applied during draw down period I. current waste analysis dated 11/17/2017 1.27 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = -189 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Pender 1 line m = 2348.0 lb PAN 2. Structure ID: Pender2 line m = -189 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 2168.6lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF APPI mn ntIRINr. THIS nn nAv PFRInn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance Qb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' Pivot 14 small grain 46 68.00 3128.0 Sep -March Pivot 2 small grain 21 53.00 1113.0 Se -March Pivot 1 small grain 24.00 63.00 1512.0 Sep -March 1,3,5,7 1a small grain 9.98 Sep -March 2,4,6,8 1b small grain 14.79 Sep -March 15 2 small grain 1.54 50.00 77.0 Sep -March 21-23 3 small grain 13.30 3.00 39.9 Sep -March 25-28 4 small grain 12.10 25.00 302.5 Sep -March 29 5 small grain 3.80 14.00 53.2 Se -March 30-31 6 small grain 8.26 8.00 66.1 Sep -March 32-33 7 small grain 9.80 3.00 29.4 Sep -March Aerway 1 small grain 1 20.00 1 Se -March 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 6321.1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 2158.6 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 6321.1 Ib. PAN y. Overall PAN balance (w - x) = -4162 Ib. PAN ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fields are to be included as an option for lowering lagoon level, add these elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the :ceiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21/00