HomeMy WebLinkAbout710070_Plan of Action_20180803�L� 2ol�olir�
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 71-70
Facility Name:
Pender 1&2
County:
Pender
Certified Operator Name: Doug Atkins Operator Number:
985738
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways,
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Pender 1 Pender 2
no no
22 18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 8/7/2018
I hereby certify that 1 have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
AJ 'Linton Phone: 910-285-1357
Facility Owner/Manager (print)
Date: 8/3/2018
F,pdlity Owner/Manager (signature)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1" Structure Name/Identifier (ID): Tender 1
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 22.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = -3 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 336235 ft2
e. line c/12 x line d x 7.48 gallons/ft3-628759 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 90 days
g. volume of waste produced according to structural design 417300 ft3
h. current herd # F 3--1-0-01 certified herd #1 3600
actual waste produced = current herd # x line g = 359342 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/19/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
OW
197225 ft3
1387706 gallons
0.86 Ibs/1000 gal.
662.7 Ibs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Pender2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 338100 ft2
e. line c/12 x line d x 7.48 gallons/ft3 210749 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 417300 ft3
h. current herd # 3100 certified herd #1 3600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 7/19/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
359342 ft3
0 ft3
197225 ft3
693853 gallons
0.71 Ibs/1000 gal.
642.3 Ibs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 -
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Pender 1 line m = 652.7 lb PAN
2. Structure ID: Pender 2 line m = 642.3 lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m = lb PAN
line m = lb PAN
line m = lb PAN
n. lines 1 +2+3+4+5+6= 1295.0 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FORAVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIFI D3 TO WHICH PAN (`ANNf)T RF ADPI min nl tlzlnla rum -in r%A ocoinn
o. tract #
p. field #
q. crop
r. acres
s. remalning IRR
2 PAN balance
Qb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x a
u. applicalion window'
Pivot 14
Bermuda
46
179.00
8234.0
March -Sept
Pivot 2
Bermuda
21
86.00
1806.0
March -Sept
Pivot 1
Bermuda
2400
161.00
3864.0
March -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 13904.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 1295.0 - lb. PAN
x. Crop's remalning PAN balance (line v from section IIt) = 13904.0 Ib. PAN
y. Overall PAN balance (w - x) _ -12609 lb. PAN
.ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
caul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
,ased on new information. If new fields are to be included as an option for lowering lagoon level, add these
elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
=ceiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit