Loading...
HomeMy WebLinkAbout20051881 Ver 1_Complete File_20051010LPIWA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor November 22, 2005 Mr. Ken Lindholm Faith Properties 10410-50OG Park Road Charlotte, NC. 28210 . Subject Property: Piedmont Crossing APPROVAL OF STORM WATER MANAGEMENT PLAN Dear Mr. Lindholm: William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director DWQ Project # 05-1881 Guilford County On November 22, 2005, the Division of Water Quality (DWQ) received the revised storm water management plan prepared by your engineer, Mr. Ravindra Bissram, P.E. of Jamestown Engineering Group Inc. This Plan has been reviewed and satisfies the storm water management conditions and the special conditions of the 401 Water Quality Certification issued on October 19, 2005. The structural storm water practices as approved by DWQ as well as drainage patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. Storm water easements shall be recorded for a distance of at least 10 feet on each side of all storm water conveyances on all lots containing these structures including future access for maintenance. The storm water easements shall allow for the ability to maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Samuel A. Aghimien. at 919-733-3574. Sincerely, Alan W. Klimek, P.E. CBKlsaa cc: DWQ Winston-Salem Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Ravindra Bissram, Jamestown Engineering Group, 117 East Main Street, Jamestown, NC.27282 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 One 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 NorthCarolina Phone: 919-733-1786/FAX 919.733.6893/Internet:http!//h2o.enr.state.nc.us/ncwetiands ;Vatimally An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper 11/22/2005 12:32 3368365478 JAIIESTOWHENG PAGE 01 //4Er JAMESTOWN ENGINEERING GROUP, INC FAX TRANSMITTAL LEADSHEE'T 17 NUMBER OF PACES INCLUDING, LF.ADSlfEET_ DA TE: TO FAX NUMBER: -gI?73`?&I3 T0= LOCA7TON: PIZOJ',F.CT. PROJECT NIiMBF-I?: COMMENTS: 7 117 FAST AlA1N STREET L' L,`' B P.O. BOX 3G5 1 <: ? D inc JAM?STO?N, NORTH CAROLINA 17282 NOV 2 A, 2 005 T.E',L,EP,EI(7NJr - (3361 13[16-5523 FAX - (33G) 886-547.9 n6A;z _ W;?TER QU ALITY E-MAIL ADDRESS - JFGINC(?AOL.COJ?f:7! •:wSJ,; pSTG::',",?,TER6,'I,CN qlnl 110,11-22-2 005 TUE 00:33 TEL: 9197336893 NAME: DWQ-WETLANDS P. 1 I1 11"'22!2)005 12:32 3368865478 JAMESTOWNENG PAGE 02 0 (to be provided by D1FQ} Project No. DV?'Q DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DW StOrmwateI M a n a emccnt P1,an Rcvicc w'- for cach * complete stormwater management plan includes submittal outlet stnacture1 deta?lssandta fully ex e uasi tcd design calculations, plans and specifications showing all basin and operation and maintenance agreement. An incomplete review and approval of the a wiiltresult in a request for additional proj. information and will substantially delay final 1. PROJECT INFOILMATION (please complete the following information): Project Name : Phone Number: j]0) 7LP- 9'IO C - Contact Person: 1?eand _ rtd_?t?Li?tiswm For projects with multiple basins, specify which basin this worksheet applies to:_?tslt t ) Basin Bottom Elevation ti l 9Sris ft. 8k g_ ft. (average elevation of the floor of the basin) (elevation of the orifice invert out) on eva permanent Pool E Temporary Pool Elevation b ft. (elevation of the outlet structure invert in) Permanent Pool Surfacc Area sq. ft. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) Drainage Area 143 _ ac. 5 •yt ac. (on-site and off-site drainage to the basin) Impervious Area Permanent Pool Volume l .24 25.r f cu. ft. 2'76 cu, ft. `a5 (combined volume of main basin and foxebay) (volume detained on top of the permanent pool) ume Temporary Pool Vo , ft. cu Forebay Volume . SA/DA used J-1• oti °?.?? (surface area to drainage area ratio) Diameter of Orifice 2r in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 214 .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met. attach an explanation of why. A licants I . ials 1---' The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. _i_7-The basin side slopes are no steeper than 3:1. N A submerged and vegetated perimeter shelf at less than 6:1 is provided. 1 Vegetation to the permanent pool elevation is specified. G An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The foxebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the 0&M plan. FORM SWG100 09197 Page 1 of 1 1100-22-2005 TUE 00:33 TEL:9197336893 NAME:DWO-WETLANDS P. 2 11/22/2005 12:32 3368865478 JAPIESTOWNENG PAGE 03 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET QWO Stotmwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : Rted,nont P? .Z"11 Contact Person: Andell f)jtprb Phone Number: ( 70¢) 7,D:9Y0S- For projects with multiple basins, specify which basin this worksheet applies to: j41Q} 6111 -0 2 t t?71?s ubh?,i Basin Bottom Elevation A ft. (average elevation of the floor of the basin) Permanent Pool Elevation 460.94 ft. (elevation of the orifice invertl out) Temporary Pool Elevation ^g52.3 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area I - sq, fl. (water surface area at permanent pool elevation) Drainage Area (on-site and off-site drainage to the basin) Impervious Area $,_8R ac. (on-site and off-site drainage to the basin) Permanent Pool Volume h'7tg2J cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 1.,2JA_ cu. ft. (volume detained on top of the permanent pool) Forebay Volume ,....-QA000 _ cu. ft- SA/DA used (surface area to drainage area ratio) Diameter of Orifice in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST Thu following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1003. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Ifa requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the I inch storm event. 14?w" The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. -An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 209/o of the total basin volume. Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. r A vegetation management/mowing schedule is provided in the 0&M plan. Semi-annual inspections are specified in the 0&M plan. A debris check is specified in the OScM plats to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in 0&M plan. A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page I of 1 t101J-22-2005 TUE 00:34 TEL:9197336893 NAr1E:DWQ-WETLAPIDS P. 3 1.1-'22/2005 12:33 3368865478 JAMESTOWHEtJG PAGE 04 Project No. DWQ (to be provided byD11'Q) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review_ A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : I?reGl•no?ir l7. Contact Person: 1AJtr&dl 0 ftcVl Phone Number. ( 71YJ 1 72y'9`ktS er fiend 0 ?1_iI `elyl Nrc.?7 For projects with multiple basins, specify which basin this worksheet applies to: w Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Arca Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DA used Diameter of Orifice $43.5-. ft. (average elevation of the floor of the basin) 0H.51L ft. (elevation of the orifice invert out) 65p . 5 R (elevation of the outlet structure invert in) ¢onvt;D la?9cq. ft lLl g?_ ac. ac- qpr4Q cu. 8. S 00 * cu. ft. 1,1,90/" .. in. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained on top of the permanent pool) (surface area to drainage area ratio) (draw down orifice diameter) 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .100S. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Ifa requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. 4 A submerged and vegetated perimeter shelf at less than 6:1 is provided. G Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the pcrmanent pool. Access is provided for maintenance- A minimum 30-foot vegetative filter is provided at the outlet- A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the 0&M plan. _Semi-annual inspections are specified in the O&M plan. A debris check is specified in the 0&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in 0&M plan. - A. responsible party is designated in the 0&M plan. FORM SWOI00 09197 Page 1 of I 110IJ-22-2005 TUE 00:34 TEL:919733G893 NAME: DWQ-WETLANDS P. 4 11J22/2005 12:32 3368865478 JNIESTOWHENG PAGE 05 Project No. DW (to be provided by D16'Q) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET pWQ Stormwatcr Management Plan Reyicw: A complete stormwatcr management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreemcnt. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name :iP Contact Person: WColl Otmrlu?? Phone Number: (7441 770 -glcti For projects with multiple basins, specify which basin this worksheet applies to; + ?T ?oNp ?4 Basin Bottom Elevation g71- Z ft. (average elevation of the floor of the basin) Permanent Pool Elevation Temporary Pool Elevation x ft. '17•? 678.5 -ft, (elevation of the orifice invert out) (elevation of the outlet structure invert in) Permanent Pool Surface Area /9 00 sq. ft. (water surface area at permanent pool elevation) Drainage Area .o ac. q-q( ac (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) impervious Area . Permanent Pool Volume Z9.9003_ cu, ft. (combined volume of main basin and forebay) Temporary Pool Volume 2?.? - . cu. eft. (volume detained on top of the permanent pool) Forebay Volume {7 000 -cu. ft. SA/DA used 1. - °w- (surface area to drainage area ratio) Diameter of Orifice .fl )_,- _ -in. (draw down orifice diameter) lI. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. r- The basin length to width ratio is greater than 3:1. ? The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. v The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. ?- Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. r A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth)•in O&M plan. A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of 1 HOU-22-2005 TUE 00:35 TEL:9197336893 NAME:DWO-WETLANDS P. 5 I , 11.2212005 12:32 3368865478 JAPIESTOWNENG PAGE 06 DWO Project DIVISION OF WATER QUALITY - BIORETEKTION AREA WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Protect Name : o Contact Person: Phone Number: 0 - For projects with multiple basins, specify which basin this wort<sheel applies to: - So Q ohm AtErt " t` errtli G x.51 ! ?? ,, Permanent Pool Elevation Temporary Pool Elevation $4J.S ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) Biorelention Surface Area Drainage Area impervious Area Rational c Coefficient Size "10 Inlet Velocity Inlet flow depth Depth to Ground Water -' Planting soil lnfiltraion Rate ImSltu Sol Infiltration Rate W3 _- sq. ft. 2.7 ac. ?. ac. n.r.S n? O.b? fps In fL t, 0 inJhr. 0. 2 7 in.mr. It. REQUIRED ITEMS CHECKLIST (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in wlsand under drain or 7% in w/o) (the soil layer down to 4 feet) (the soil layer below 4 feet or below the sand bed) initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management p,an submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully ex=ted operation arld maintenance agreement. An incomplete submittal package will result in a request for additional Information and will substantially delay final review and approval of the project No vertical sand bed is proposed The bioretention area is at least 40 feet by 15 feet. Sheet flow is provided at inlet. Water table depth is greater than 6 feet. 41. Minimum of 6' ponding is provided. ,The ponded area will draw down in less then 4 days. Planting soil infiltration rate is greater than 0.52 in/hr. The in-situ soil infiltration rate is greater than 0.2 in/hr, A planting plan with species and densities is provided. _Mulch layer is specified in plans. Planting soil meets minimum soil specificafons (NCDENR Stormwater Best Management Practices Manual, April 1999) Plan details for the bioretention area provided. -Plan details for the inlet and outlet are provided. -An operation and maintenance agreement sign?d and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains * ?Rrrx S WF_X6 1700E "T VAR1043 UXATIoOS ACeP:$5 S % rC 70 1)EPTNS OP' 151 4-0 2W ?- CT¢oKn1D W+1f6Q--Mltilo NaT r4pPEP?- rN $oWt1? c?cfs. 1100-22-2005 TUE 00:35 TEL:9197336893 NAME:DWO-WETLANDS P. 6 11/220'2005 12:22 3368855478 JAMESTO4,JNEHG PAGE 07 DWt7 Project No. DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET 1. PROJECT INFORMATION (please complete the following informaticn): Project Name Contact Person: uu++dd\ oy-r- 01 Phone Number (1d'PI 720 - +105 For projects will multiple basins, specify which basin this worksheet applies to: i t ? 10I.A d ' Permanent Pool Elevation Temporary Pool Elevation 651,5 -ft. - _. 652..0 ft. (elevation of the orifice invert out) (elevation of the outlet structure invert in) Bioretention Surface Area Drainage Area Impervious Area Rational C Coefficient Size % 14x163 sq. R. , ac. x.31 ac. 7 % Inlet Velocity -1 _I s Inlet flow depth in Depth to Ground Water fd ft.-Mr Planting Scil Infiltration Rate f. ° _ InJhr In-Situ Soil Infiltration Rate Q X7 inJhr REQUIRED ITEMS CHECKLIST (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5`.rO in whand under drain or 7 %0 in w/o) (the soil layer down to 4 feet) (the soil layer below 4 feet or below the sand bed) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a mquimrnent has not peen met, altach an explanation of why. At a minimum, a complete stormwaler management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will subslantialy delay final review and approval of the project W No vertical sand bed is proposed The bioretention area is at least 40 feet by 15 feet Sheet lbw is provided at in!eL Water table depth is greater than 6 feet- t Minimum of B" pending is provided. The ponded area will draw down in I= than 4 days. Planting soil infiltration rate is greater than 0.52 Wrr. The in-situ sod infiltration rate is greater than 0.2 ink. A planting plan with species and densities is provided. Mulch layer is specified in plans. Planting soil meets minimum soil specifications (NCOENR Storrrmater Best Management Practices Manual, April 1999) l Plan details for the bioretention area provided. Plan details for the inlet and outlet are provided. 1l_? An operation and maintenance agreement signed and notarized by the responsible party is provided. Please nol° that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains ?o(L?N4r+ W6gL Voma RT VRIGIous LaCAT1oNS RC0_QSS THC SITE Tb D15VPf OP° IV 4-0 7-Q?. geou+y WAMIZ TagL Dra POT APPEAR rQ 1ROP-W4 cer,S. NOIJ-22-2005 TUE 017:35 TEL:9197336893 HAME:DWQ-WETLANDS P. 7 Project Name: Piedmont Cr Project No. DW Q 05-1881 Pond No. SUBAMITED DESIGN: 1 REQUIRED DESIGN: 11/22/2005 elevations 2.7, average depth status Bottom of Basin (ft) 837.5 Permanent Pool (ft) 843.5 6 ft. depth ok Temporary Pool (ft) 845.6 2.1 ft. depth ok areas Permanent Pool SA (sq ft) 9860 6654 sq. ft. ok Drainage Area (ac) 19.3 5019 based on avg depth ok Impervious Area (ac) 5.48 28.4 % - volumes Permanent Pool (cu ft) 26287 Temporary Pool (cu ft) 25276 21406 cu. ft. ok Forebay (cu ft) 5500 20.9 % ok other parameters SA/DA 1.06 0.79 - Orifice Diameter (in) 2 0.11 cfs drawdown - Design Rainfall (in) 1 2.7 day drawdown ok Linearlnterpolation of Correct SAIDA*** 6 ft. Permanent Pool Depth % Impervious SAMA fron (Avg. Depth) Next Lowest 20 0.59 0.426351927 1.08 Project Impervious 28.4 0.79 0.60 1.37 Next Highest 30 0.83 0.629614604 1.43 3 ft 4 Project Name: Peidmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 2 REQUIRED DESIGN: 11/22/2005 elevations 2.9 average depth status Bottom of Basin (ft) 844.4 Permanent Pool (ft) 850.4 6 ft. depth ok Temporary Pool (ft) 852.3 1.9 ft. depth ok areas Permanent Pool SA (sq ft) 16763 10074 sq. ft. ok Drainage Area (ac) 16.5 9199 based on avg depth ok Impervious Area (ac) 8.88 53.8 % - volumes Permanent Pool (cu ft) 47921 Temporary Pool (cu ft) 36269 32006 cu. ft. ok Forebay (cu ft) 9000 18.8 % ok other parameters SA/DA 1.06 1.40 - Orifice Diameter (in) 2.5 0.16 cfs drawdown - Design Rainfall (in) 1 2.6 day drawdown ok Linear Interpolation of Correct SA/DA * * * 6 ft. Permanent Pool Depth % Impervious (Avg. Depth) Next Lowest 20 0.59 0.520780886 1.08 Project Impervious 53.8 1.40 1.28 2.26 Next Highest 30 0.83 0.745241902 1.43 3 ft 4 Project Name: Peidmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 3 REQUIRED DESIGN: 11/22/2005 elevations 3.1 average depth status Bottom of Basin (ft) 843.5 Permanent Pool (ft) 849.5 6 ft. depth ok Temporary Pool (ft) 850.5 1 ft. depth ok areas Permanent Pool SA (sq ft) 28000 6720 sq. ft. ok Drainage Area (ac) 14.8 7272 based on avg depth ok Impervious Area (ac) 5.75 38.9 % - volumes Permanent Pool (cu ft) 87434 Temporary Pool (cu ft) 30540 21471 cu. ft. ok Forebay (cu ft) 17500 20.0 % ok other parameters SA/DA 1.69 1.04 - Orifice Diameter (in) 2.5 0.12 cfs drawdown - Design Rainfall (in) 1 3.0 day drawdown ok Linear Interpolation of Correct SA/DA * * * 6 ft. Permanent Pool Depth % Impervious (Avg. Depth) Next Lowest 20 0.59 0.650095 1.08 Project Impervious 38.9 1.04 1.13 1.74 Next Highest 30 0.83 0.903585714 1.43 3 ft 4 Project Name: Peidmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 4 REQUIRED DESIGN: 11/22/2005 elevations 3.0 average depth status Bottom of Basin (ft) 871.2 Permanent Pool (ft) 877.2 6 ft. depth ok Temporary Pool (ft) 878.8 1.6 ft. depth ok areas Permanent Pool SA (sq ft) 10000 5808 sq. ft. ok Drainage Area (ac) 13 5770 based on avg depth ok Impervious Area (ac) 4.96 38.2 % - volumes Permanent Pool (cu ft) 29903 Temporary Pool (cu ft) 22033 18564 cu. ft. ok Forebay (cu ft) 6000 20.1 % ok other parameters SA/DA 1.6 1.03 - Orifice Diameter (in) 2 0.09 cfs drawdown - Design Rainfall (in) 1 2.7 day drawdown ok Linear Interpolation of Correct SAIDA*** 6 ft. Permanent Pool Depth % Impervious (Avg. Depth) Next Lowest 20 0.59 0.585247 1.08 Project Impervious 38.2 1.03 1.02 1.72 Next Highest 30 0.83 0.82418 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 2 REQUIRED DESIGN: 11/22/2005 elevations 2.9 average depth status Bottom of Basin (ft) 844.4 Permanent Pool (ft) 850.4 6 ft. depth ok Temporary Pool (ft) 852.3 1.9 ft. depth ok areas Permanent Pool SA (sq ft) 16763 10074 sq. ft. ok Drainage Area (ac) 16.5 9199 based on avg depth ok Impervious Area (ac) 8.88 53.8 % - vohnnes Permanent Pool (cu ft) 47921 Temporary Pool (cu ft) 36269 32006 cu. ft. ok Forebay (cu ft) 9000 18.8 % ok other parameters SA/DA 2.03 1.40 _ Orifice Diameter (in) 2 0.10 cfs drawdown - Design Rainfall (in) 1 4.1 day drawdown ok Linear Interpolation of Corr ect SA/DA*** 6 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 20 0.59 0.520780886 1.08 Project Impervious 53.8 1.40 1.28 2 26 Next Highest 30 0.83 0.745241902 . 1.43 3 ft 4 Project No. DWQ Piemont Cr Project Name: 05-1881 SUBMITTED DESIGN: B-1 11/22/2005 elevations Permanent Pool (ft) 841.5 Temporary Pool (ft) 842 areas Permanent Pool SA (sq ft) 4613 Drainage Area (ac) 2.7 Impervious Area (ac) 1.32 Rational C 0.65 Precipitation (in) 0.07 volumes REQUIRED DESIGN: 0.5 ft. depth 375 sq. ft. ac 48.9 % impervious no sand underdrain Inlet Velocity 0.67 0 fps Inlet Flow Depth 3.7 in Depth to Ground Mater 6 6 ft Planting Soil Infiltration 1 0.52 in/hr In-Situ Soil Infiltration 0.27 0.00 in/hr ok ok ok ok ok Project No. DWQ Piemont Cr Project Name: 05-1881 SUBh1IITED DESIGN: B-2 11/22/2005 elevations Permanent Pool (ft) 851.5 Temporary Pool (ft) 852 areas Permanent Pool SA (sq ft) 4783 Drainage Area (ac) 2.8 Impervious Area (ac) 1.31 Rational C 0.65 Precipitation (in) 0.07 volumes REQUIRED DESIGN: 0.5 ft. depth 388 sq. ft. ac 46.8 % impervious no sand underdrain Inlet Velocity 0.67 0 fps Inlet Flow Depth 4.8 in Depth to Ground Mater 6 6 ft Planting Soil Infiltration 1 0.52 in/hr In-Situ Soil Infiltration 0.27 0.00 in/hr ok ok ok ok ok AT ?q0 ?O G r O ? 'C Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 19, 2005 DWQ# 05-1881 Guilford County CERTIFIED MAIL: 7003 3110 0003 6489 8186 Return Receipt Requested Mr. Ken Lindholm Faith Properties 10410-50OG Park Road Charlotte, NC 28210 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Lindholm: Faith Properties has our approval, in accordance with the attached conditions, to place permanent fill in 149 linear feet of perennial stream and to place temporary fill in 30 linear feet of perennial stream and 0.09 acre of wetlands in order to construct a road crossing and install a sanitary sewer line for the Piedmont Crossing (also known as Lilliefield Subdivision) single-family and multi-family residential subdivision located on Barrow Road, in High Point, Guilford County, as described in your application received by the Division of Water Quality (DWQ) on October 10, 2005. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Numbers 3374 and 3402, which can be viewed on our web site at littp://h2o.enr.state.nc.us/ncwetlands. These Certifications allow you to use Nationwide Permit Numbers 12 and 39 respectively when they are issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certifications. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of these Certifications and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached Certifications, as well as the additional conditions listed below: 1. The following impacts are hereby approved as long as all other specific and general conditions of these Certifications are met. No other impacts, including incidental impacts, are approved: NorthCarolina .11alnrnlly North Carolina Division of Water Quality Wetlands Certification Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Phone (919) 733-1786 FAX (919) 733-2496 2321 Crabtree Blvd. Raleigh, NC 27603-2260 Internet http//:h2o.enr.state.nc.us/ncwetlands Customer Service Number: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer-50°6 Recycled/10%Post Consumer Paper Mr. Ken Lindholm Page 2, DWQ# 05-1881 October 19, 2005 I 'IN Amount Approved Plan Location or Reference Streams 179 linear feet Unnamed tributaries to Oak Hollow Lake located near Barrow Road in High Point, Guilford County. Reference: "Overall Watershed Delineation Map for Lilliefield Subdivision". Headwater wetlands located near Barrow Road in High Point, Wetlands 0.09 acre Guilford County. Reference: "Overall Watershed Delineation Ma for Lilliefield Subdivision". 2. A final, written stormwater management plan must be approved in writing by this Office before the impacts specified in this authorization occur, per condition No. 4 in General Certification 3402. The stormwater management plan must include plans and specifications for stormwater management facilities that are appropriate for surface waters classified as Class WS-IV and designed to remove, at a minimum, 85% Total Suspended Solids according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any new permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office, as well as drainage patterns, must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. This stormwater management plan must be submitted to the Central Office of the Wetlands/401 Certification Unit in Raleigh within 60 days of receiving this letter. 3. The proposed project must comply with the local water supply ordinance approved by the N.C. Environmental Management Commission (EMC) as required under the Randleman Lake Water Supply Watershed Rule (Randleman Buffer Rule): 15A NCAC 02B .0250, Protection and Maintenance of Riparian Areas, and 15A NCAC 02B .0251, Stonnwater Requirements. (Local Governments include Archdale, Greensboro, High Point, Randleman, Jamestown, Randolph County and Guilford County.) 4. Appropriate sediment and erosion control measures which equal or exceed those outlined in the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual (available from the Division of Land Resources at NCDENR regional offices or the central office), whichever is more appropriate, shall be designed, installed and maintained properly to assure compliance at all times with the North Carolina water quality standards that are applicable to Class WS-IV waters as described in 15A NCAC 02B .0216 Fresh Surface Water Quality Standards For Class WS-IV Waters. Such measures must equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. These measures must be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor owned and leased borrow pits, which are associated with this project. 5. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control measures in wetlands or waters is unavoidable, orlr. K,:n Lindholm Page 3, DWQ# 05-1881 October 19, 2005 they shall be removed and the natural grade restored within six months of the date that the project is completed or, if applicable, within six months of the date that the project is released by the North Carolina Division of Land Resources. 6. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control "Best Management Practices" shall be performed so that no violations of state water quality standards, statutes, or rules occur. 7. The culvert required for this project shall be installed in such a manner that the original stream profile is not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions (including the pattern and profile) are to be maintained above and below the location of the culvert. The culvert shall be designed and installed to prevent head cutting of the stream. If the culvert becomes perched, the appropriate stream grade shall be re-established or, if the culvert is installed in a perched manner, the culvert shall be removed and re-installed correctly. The Applicant must submit a plan and receive written approval from this Office to address any head cutting that will occur as a result of this project (e.g., use of cross vanes downstream of the culvert). 8. Where riprap is required for energy dissipation and scour protection, it shall be limited to the minimum dimensions specified by appropriate engineering calculations. Riprap may only be used below the normal high water level. The original grade and elevation of the stream's cross-section must be maintained. Riprap placed in the stream bottom must be inserted into the bottom matrix to a depth sufficient to provide the thickness of riprap required for scour protection. The elevation of the stream bottom must not be increased by the placement of riprap. Placement of riprap must not result in destabilization of the streambed or banks upstream or downstream. 9. All construction activities associated with this project shall minimize built-upon surface area, direct stormwater runoff away from surface waters, and incorporate best management practices to minimize water quality impacts. If concrete is used with any fill material, it shall not be allowed to come in contact with surface waters until it has cured. If any stormwater must be collected for discharge into a stream channel, it shall not enter the stream as a point source, but shall be slowed and discharged as sheet flow prior to entering the riparian buffer on either side of the stream. 10. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been finished. This certificate should be sent to the 401 /Wetlands Unit of the NC Division of Water Quality at the address listed on the form. Along with the Certificate of Completion form, please send photographs upstream and downstream of the culvert site and utility line crossing to document correct installation. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Mr. Ken Lindholm Page 4, DWQ# 05-1881 October 19, 2005 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Daryl Lamb in the DWQ Winston-Salem Regional Office at 336-771- 4600, extension 293, or Ian McMillan in the Wetlands/401 Central Office in Raleigh at 919-715-4631. Sincerely, Alan W. Klimek, P.E. AWK/cdl Attachments cc: Mr. Todd Tugwell, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office Winston-Salem DWQ Regional Office Central Files Wetlands/401 File Copy Mr. Wendell Overby, Soil &Environmental Consultants, PA, 236 LePhillip Court, Suite C, Concord, NC 28025 Triage Check List Date: 10/11/05 Project Name: Piedmont Crossing DWQ#: 05-1881 County: Guilford Daryl Lamb, Winston-Salem Regional Office To: 60-day processing time: 10110105 - 12/08/05 From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! JA,MESTOWN ENGINEERING GROUP, INC. CIVIL • SANITARY • SURVEYING pp = 0? ? D C 117 East Main Street • P.O. Box 365 • Jamestom n, N.C. 27 F ? (;z' r inc. Telephone (336) 886-5523 Fax (336) 886-5 Email: .I1:c1NCC?AOL.con[ NOV 1 5 2005 Charles J. Junes, PE & PLS Daniel W. Pritehctt, PE & PLS DrivR '4A7E.I2 ?;:AUTY !'iETL,V+J-S 1.0 STMMWATER 6FW.'CH November 14, 2005 Re: Piedmont Crossing 401 Permit Supplemental Information JEG Number 2004-068 Mr. Samuel Aghimien NC Division of Water Quality 2321 Crabtree Blvd. Raleigh, N.C. 27604 Dear Mr. Aghimien: Per our conversation on Tuesday, November 8, 2005, I have enclosed the following information you requested: • Maintenance/operation agreements for (4) wet detention ponds, (2) bio- retention areas, and (2) level spreaders. • 401 Wet Detention Basin Worksheets for the four ponds, Bio-Retention Area Worksheets for the two bio-retention areas, and Level Spreader Worksheets for the two level spreaders. • Landscape/plant design plan for the two bio-retention areas. If any additional information is needed or if you have any questions, please feel free to contact me at (336) 886-5523. Yours very truly, JAMESTOWN ENGINEERING GROUP, INC. ?a4?J &'Vt- Ravindra Bissram, P.E. Janus 13. Ste%en,. PLS • Rich Glover, EIT • James D. Terrell, PIS IT WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. ?GDimcnjr When the permanent-pool. depth reads[-t- •"?i.c?feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] SC' D i,n t;N T When the permanent-pool depth reads L S'( c.efeet•in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation ?cH3,s Sediment Lvation . 240, 75% --------- - Sediment Removal Elevation '37,? _ Bottom E e.1,C orfi4.5. --- -------?---------------------------------- --?-'?-g'-? of FOREBAY MAIN POND `k i 11" V?,z,, c,_ ,Acs cL `S '. (:' `nom.. Srcc.tiGc tEt-v= (1 LkS4- LZ C.le(Ln u.k ??lt;cL t-' ZtDlc'kt1 q GL , V6%(a Cti '5, k,' ?,% t? e_ Ptn .? (?l,ic j'C In Oie k,1cun ?Git.I? ?2 i??Q,S ,11 t? ?cu.(li?Y ??{ ?? ? ?fC?•1 ?G?i:i?:?Y iaC'{'j'C??7), Page 1 of 2 4 1- 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. ct)t? I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. 41' Print name: 1z ? L - -/, ?/Z 4 Title: Address ySCJ J Phone: 23 ( - 8?- `7/- 3 -?- S?21 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Pearlie R. Hall, Jr. , a Notary Public for the State of North Carolina County of Gni lford , do hereby certify that Ken Lindholm personally appeared before me this 1n day of nTmu mhor , mom , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, pEARLiE R. t3()'TARY Pt3L? IC etllL'FORD COUhi5 I , ec ^?`? ? rzs 14, :?so SEAL C?J My commission expires January 14, 2010 Page 2 of 2 Project No. D (to be provided by DTYQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DW Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : ?t e-drAon} rossina Contact Person: Wendel duarbu Phone Number: (10t ) 77?- q}o! ' For projects with multiple basins, specify which basin this worksheet applies to: P00e 4.1 CL111kA'irht S'AW;Vi'>;n) Basin Bottom Elevation 63q ft. Pennanent Pool Elevation 813. S ft. Temporary Pool Elevation 81f5- b ft. (average elevation of the floor of the basin) (elevation of the orifice invert out) (elevation of the outlet structure invert in) Permanent Pool Surface Area sq. ft. (water surface area at permanent pool elevation) Drainage Area Iq.3 ac. (on-site and off-site drainage to the basin) Impervious Area 6. y8 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume _&2W cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume Q5. 27b cu. ft. (volume detained on top of the pennanent pool) Forebay Volume cu. ft. SA/DA used 1• o? 040 (surface area to drainage area ratio) Diameter of Orifice 3/ " in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Enviromnent, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of wiry. A licants 16ials art The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. PLANJIFTOJA submerged and vegetated perimeter shelf at less than 6:1 is provided. 1l? Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. 1G _ The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. h A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. !- - - A debris check is specified in the O&M plan to be performed after every storm event. --??' A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of I .'& c Form SWG100 Attachment 1 For Pond #1, a submerged and vegetated perimeter shelf is not provided. Instead of having side slopes of 3:1, slopes were flattened to 4:1. From flattening the side slopes to 4:1 and removing the shelf, the surface area at the normal pool elevation increased, thus enhancing water treatment. t WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the pSe?erent-pool depth reads LL??irl,c feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] ?Dim??3r When the per-manent-pool depth reads feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation t 5o,. Sediment moval EdaS7! -------Sedime nt Removal ElevationBottom E vation -------------------------- V it - 7- c'rT4 Bottom F1 vation o `c,?3:o ,c??Mi uc FOREBAY MAIN POND •k 7uN?) ?r Z W,S hk?? ???t5tu "l Lk;A4 N '". `i t `t_,i:CMV)L;w STCe4kc-JC Zcr? The SWctacic -j'Lcn ti?nuSr ?JC CL01"Z-V To 1 C,?C??IMCy L-:L, '61iri. C vZ 4' t Cu.vl 0' tpci'jo '")j IlE'1'CU?IM,)TCLy 3.`? ! 1(1 •}hi! (?c?.:ll I?C?C,.17, Page 1 of 2 5. ", Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. Coo .u 2 1 acknow-ied-ge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible part/y. Print name: e- l .-?.n N h r, //n Title: 1/1 - -- -? --ter Address: `15'O 5<?fa cam;<? r ?? ?, /)[e z"? Phone: 3 -3 3 2, f? Signature: Date: //- U Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Ponr1 i o rz u-,1 I , jr- , a Notary Public for the State of Nnrt-h Carol i na , County of Guilford , do hereby certify that Ken Lindholm personally appeared before me this 10 day of November , 2005 , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, i-ZOTAV C-3liLMVID COURT.(: , V- 1A 1= SEAL ?-FA E R. MALL, R. I'SDTARY PUDUC CUILMD COUMr, , no rVros A-a 14, Z`0410 My commission expires January, 2010 Page 2 of 2 Project No. DWQ (to be provided by DIFQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : R lmo t ,,ro5si49 Contact Person: Andell Dvprb„ Phone Number: ( 700 ) 720-940.5 For projects with multiple basins, specify which basin this worksheet applies to: E06 FonA AI 2 L ilikk1'cld Smt dlyklw_) Basin Bottom Elevation 94S.D ft. (average elevation of the floor of the basin) Permanent Pool Elevation 0.L4 ft. (elevation of the orifice invert out) Temporary Pool Elevation $52.3 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area I 7iv3 sq. ft. (water surface area at permanent pool elevation) Drainage Area (J?- ac. (on-site and off-site drainage to the basin) Impervious Area f?, CS ac. (on-site and off-site drainage to the basin) Permanent Pool Volume Temporary Pool Volume Forebay Volume 1411q 21 cu. ft. 3 („?_ 4 cu. ft. -7tp cu. ft. (combined volume of main basin and forebay) (volume detained on top of the permanent pool) SA/DA used Diameter of Orifice 2.03'/. LZ) I Vy in. (surface area to drainage area ratio) (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. I fa requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. )l Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. -? Sediment storage is provided in the permanent pool. Access is provided for maintenance. -%A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of 1 WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. 7??1m?Nr When the permanent-pool depth reads Ci, rtll,,C; feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] v 10% u0'( When the peFmanent-pool. depth reads feeHn the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation S'I11:1 tir 4`i•s Sediment moval El. 4e,.s 75 a ----------------- ------ Sediment Removal Elevation- _'6H --5 7r% ------------------------------------- ------ ?c?'?:c= Bottom E vation i i_? -o /o Bottom Elevation bttc FOREBAY ` MAIN POND T:ti ?? u3 X10.5 4?.C?, k_k-'icph l,%?thia 5? DIM?fJ? 71 C.??C1 ZL'tl%, ..t?? S1G??c=,Z ML1 r tae G_GNNcd Page 1 of 2 f S. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. vc'-eJV n-i I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. / Print name: ??- Z- ` Title: Address: Phone: Signature i?I e- e-- c-- 3G3 e-r fc r/'? Date: 11-10-0-5- Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Pearlie R. Hall, Jr. , a Notary Public for the State of North Carolina , County of Guilford , do hereby certify that uQn T i ndLQ m personally appeared before me this 10 day of November , 2005 , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, P£ARLIE R. HALL, JR. NOTARY PUMIC OUILFORD CQUMYY, ice` Za 14, M SEAL My commission expires January 14, 2010 Page 2 of 2 Project No. DWQ (to be provided by Dil'Q) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stonnwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : lei dmonk CroSSina Contact Person: wtndtl1 tlo'erb, Phone Number: (10q ) 72p-q*6 For projects with multiple basins, specify which basin this worksheet applies to: we-T pond-0a Basin Bottom Elevation 943 ft. (average elevation of the floor of the basin) Permanent Pool Elevation Sgq.S ft. (elevation of the orifice invert out) Temporary Pool Elevation 850 , S ft. (elevation of the outlet structure invert in) QDYID?1 A'!? Permanent Pool Surface Area 07 to y4-sq. ft. (water surface area at permanent pool elevation) Drainage Area 14. ,8o ac. (on-site and off-site drainage to the basin) Impervious Area 5.-15 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume (Teo a. ft. (combined volume of main basin and forebay) Temporary Pool Volume 3n rzi o cu. ft. (volume detained on top of the permanent pool) Forebay Volume 1'1, 5 no t cu. ft. SAIDA used 1. b9 % (surface area to drainage area ratio) Diameter of Orifice (2) 1 We " in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. Ifa requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. l The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A submerged and vegetated perimeter shelf at less than 6:1 is provided. ' Vegetation to the permanent pool elevation is specified. i An emergency drain is provided to drain the basin. J The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). V- ' The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. li Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. Y A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of 1 It WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] - F)GPO?LN T Cf LSD>I? ?? The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. "jGD101CU C It When the permanent poo depth reads GL_ i `'H.o feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] SLViM cNC When the permanent- =Ldepth reads CL 16x1`.0 feet-in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation ?,j <2 Sediment moval El. Bottom E vation CTfL-a ; FOREBAY 76% Sediment Removal Elevation '&'7qx Rnttnm Flpvntinn `BrI L0 MAIN POND ____-- G-- To CH 0 S ? l:C.ai:; c tc?l?) t?y llas c; ?N Di.?-.ic;n;V-o WITH 11 3.0' `- t>1 zr-)C ?" iceAc?U , ?, LFaLiIIfY L c;,J? ?ltL}?l fit: jcetiNyG Z ? mLAS5 6C Yrlt1.U LLr?? lrc? Z? t h Page 1 of 2 '?.;emove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. 0PQ-LiA I ac now a ge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: A4 .-, r ?-•c / Address: y Phone: Signah Date: /- / O --C3 j //-/0-0-3- /- /- _ /I/c 2-7 yNote: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Pearlie /R. Hall, Jr. , a Notary Public for the State of North Carolina County of Guilford , do hereby certify that Ken Lindholm personally appeared before me this 10 day of November 2005, and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, PIARLIE R. HALL, JR. NOTARY PUUIC CIPLPQRD COUNTY, rX C==3 CO= im 142M SEAL My commission expires jan i 903n Page 2 of 2 Project No. DWQ (to be provided by DiVQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : Zedmont C m" Contact Person: Wendell 0s rbu Phone Number: ( X04 ) '77o -9 S For projects with multiple basins, specify which basin this worksheet applies to: w FT Pozp -ti-14 Basin Bottom Elevation em.0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 8'17.2 ft. (elevation of the orifice invert out) Temporary Pool Elevation 678.8 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area / 0, 817 sq. ft. (water surface area at permanent pool elevation) Drainage Area 13 •o ac. (on-site and off-site drainage to the basin) Impervious Area 4•9t, ac. (on-site and off-site drainage to the basin) Permanent Pool Volume Zcl,, Q 03 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 22.033 cu. ft. (volume detained on top of the permanent pool) Forebay Volume //, (030 cu. ft. SA/DA used W % (surface area to drainage area ratio) Diameter of Orifice (2 1 3/ " in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. 1! The basin side slopes are no steeper than 3:1. I? f A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. Y A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of 1 BIO-RETENTION AREA 91 OPERATION AND MAINTENANCE AGREEMENT PIEDMONT CROSSING Upon complction of site construction and home construction, bio-retention area sliall be constructed and maintained. Prior to complction of construction activities, Erosion Control measures following NCDENR BMP's shall be installed and maintained. During the lime which Bio-Retention Area #I is not installed, the developer shall maintain a bond for the construction of the device. When installed, maintenance of the Bio- Retention Area is as follows: Description Method rre uenc Time of Year Soil Inspect and Repair Erosion Visual Monthly Montlily Or anic Layer Re-nmlch Any Void Areas By Hand Whenever Needed Wlicncvcr Needed Remove Previous Mulch Layer By Hand Once Every Two or Spring Before Applying New Layer Three Years (Optional) Any Additional Mulch added By Hand Once a Year Spring Plants Removal and Replacement of all See Planting 3115 to 4/30 and Dead and Diseased Vegetation Specifications 10/1 to 11/30 Considered Beyond Treatment Treat all Diseased Trees and Mechanical N/A Varies, but will Depend on Shrubs or by Hand Insect or Disease Infestation Watering of Plant Material Shall By Hand Immediately After N/A Take Place at the End of Each Day Completion of for 14 Consecutive Days and After Project Planting has been Completed Replacenent of Support Stakes By Hand Once a Year Only Remove Stakes in the Spring Replace any Deficient Stakes or By Hand Wlenever Needed Whenever Needed Wires I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name: le---, e ,'- Z- .n cl& Title: _ Address. Phone: Date: Fy- Note: The legally responsible party should not be a liomeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1 Pearl.ie R. Rail, Jr. , a Notary Public for the State of North Xgrolina County of Guilford do liereby certify that Ken Lindholm personally appeared before me this 10 day of NevPmhPr 2.n(15__ and acknowledge the due execution of the foregoing bio-retention area maintenance requirements. Witness my hand and official seal, My commission expires Jarniary 14, 2010 WTARY PUBtlC EI. LFORD COUNTY. Wes' 14, =0 DWQ Project No. cqtJ: I g g, DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name : & oK!' Gross?ti. Contact Person: wo-i-dtA tly""' Phone Number: ( -04) 120 - !3,40S For projects with multiple basins, specify which basin this worksheet applies to: Bib- 2vlewh.? Ael; (e.?flr'e4r??.4 Subd?+r3; Permanent Pool Elevation $36.0 ft. (elevation of the orifice invert out) Temporary Pool Elevation 6141 Is ft. (elevation of the outlet structure invert in) Bioretention Surface Area 4 6l4 sq. ft. Drainage Area 2.7 ac. (on-site and off-site drainage to the basin) Impervious Area 1.32 ac. (on-site and off-site drainage to the basin) Rational C Coefficient Size % -1 % (either 5% in wlsand under drain or 7% in w/o) Inlet Velocity I.H fps Inlet flow depth 3. h in Depth to Ground Water =? 7 (, ft. Planting Soil Infiltration Rate 1.0 inJhr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate 0.17 inJhr. (the soil layer below 4 feet or below the sand bed) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. No vertical sand bed is proposed The bioretention area is at least 40 feet by 15 feet. Sheet flow is provided at inlet. Water table depth is greater than 6 feet" Minimum of 6' ponding is provided. The ponded area will draw down in less than 4 days. Planting soil infiltration rate is greater than 0.52 inrnr. The in-situ soil infiltration rate is greater than 0.2 in/hr. A planting plan with species and densities is provided. Mulch layer is specified in plans. ,Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) Plan details for the bioretention area provided. Plan details for the inlet and outlet are provided. An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains ZoRt wERg DANE ft r VA2rou3 t-OCATIOaS ACWSS 51Tt To -DEPT NS of 15? f'0 ?O GP_04n1D WAt6R--tELDlb NOT Appr'-A(- 10 ?OWNC? 1pEgS. BIO-RETENTION AREA #2 OPERATION AND MAINTENANCE AGREEMENT PIEDMONT CROSSING Upon completion of site construction and home construction, bio-retention area shall be constructed and maintained. Prior to completion of construction activities, Erosion Control measures following NCDENR BMP's shall be installed and maintained. During the tine which Blo-Rctcntlon Area #2 is not installed, the developer shall maintain a bond for the construction of the device. When installed, maintenance of the Bio- Retention Area is as follows: Description Method Frequency Time of Year Soil Inspect and Repair Erosion Visual Monthly Monthly Or anic Layer Re-mulch Any Void Areas By Hand Whenever Needed Whenever Needed Remove Previous Mulch Layer By Hand Once Every Two or Spring Before Applying New Layer Three Years (Optional) Any Additional Mulch added By Hand Once a Year Spring Plants Removal and Replacement of all See Planting 311 to 4/30 and Dead and Diseased Vegetation Specifications 10/1 to 11/30 Considered Beyond Treatment Treat all Diseased Trees and Mechanical N/A Varics, but will Dcpcnd on Shrubs or by Hand Insect or Disease Infestation Watering of Plant Material Shall By Hand Immediately After N/A Take Place at the End of Each Day Completion of for 14 Consecutive Days and After Project Planting has been Completed Replacement of Support Stakes By Hand Once a Year Only Remove Stakes in the Spring Replace any Deficient Stakes or By Hand Whenever Needed Whenever Needed Wires I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the s}-stem or prior to any changes to the system or responsible party.. Print Name: 1-- Z, L 1, `' CI ??--? Title: AA X-' e- :":i -a-,- Address- Phone: Date: Q 7 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1 Pearl.ie R. Nall, Jr. , a Notary Public for the State of North Carolina County of Guilford do hereby certify that Ken Lindholm personally appeared before me this 10 day of November , 200 and acknowledge the due execution of the foregoing bio-retention area maintenance requirements. Witness my hand and official seal, My commission expires -January ill, 2010 . _ PLAR E R. gal-.., .?+ } ?-a ( NOTARY PUaIC (y}MRD COUNTY, Fx C=g*ft c;ka tin A 2=0 DWQ Project DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name : eAm."t Crosse -- Contact Person: wehdt,\\ 0 u-er1?v Phone Number: (701h -12,0-1305 For projects with multiple basins, specify which basin this worksheet applies to: gio • V e e4 on Re" -h2, CL.11.1-ffelot Permanent Pool Elevation M.o ft. (elevation of the orifice invert out) Temporary Pool Elevation 851.5 ft. (elevation of the outlet structure invert in) Bioretention Surface Area 11 163 sq. ft. Drainage Area . 9 ac. (on-site and off-site drainage to the basin) Impervious Area 1.31 ac. (on-site and off-site drainage to the basin) Rational C Coefficient 0"'5 Size % 7 % (either 5% in w/sand under drain or 7% in w/o) Inlet Velocity 1.53 fps Inlet flow depth ?• Q in Depth to Ground Water 7 w ft. Planting Soil Infiltration Rate 1.0 inlhr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate 0.27 inJhr. (the soil layer below 4 feet or below the sand bed) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project No vertical sand bed is proposed The bioretention area is at least 40 feet by 15 feet. Sheet now is provided at inlet. Water table depth is greater than 6 feet.-t Minimum of 6' ponding is provided. The ponded area will draw down in less than 4 days. / Planting soil infiltration rate is greater than 0.52 in1hr. The in situ soil infiltration rate is greater than 0.2 in/hr. A Eplanting plan with species and densities is provided. Mulch layer is specified in plans. Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) Plan details for the bioretention area provided. Plan details for the inlet and outlet are provided. An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains aoa,Nks wEK.E'D°NZ OT ?pe,ous c.ocar,oNS ac,eoss T" C SiTE fb DEPTHS or- IS' do ?A GQ?uav W,tteQ Ta8LT_ D,D r10T A PP EA a ra '60-1f7 L,o c?S . ) ? LEVEL SPREADER OPERATION AND MAINTENANCE AGREEMENT 1.-V" 55'?CF?9i Q Z*l'? Cr L1l.LILF lll?7 L,iwLL QII?Gnu'? Ce,-,--,3q The level spreader is defined as an elongated, level threshold, designed to diffuse stormwater runoff. Maintenance activities shall be performed as follows: 1. After construction and until vegetation has been established, level spreader(s) shall be inspected after every rainfall. Thereafter, level spreader(s) shall be inspected at least every month and more frequently during the fall season and after heavy rainfall events: a. Accumulated sediment, leaves, and trash shall be removed, and repairs made if required. b. Inspect level spreader(s) for evidence of scour, undercutting, settlement of the structure, and concentrated flows downhill from the level spreader(s). c. A level elevation shall be maintained across the entire flow-spreading structure at all times. Repair or replace the level spreader if it is damaged. d. Mow vegetative cover to a height of six (6) inches and prune plants if they cover over half of the level spreader surface. e. Repair eroded areas and replace/replant dead or damaged vegetation. 2. The contractor should avoid the placement of any material on and prevent construction traffic across the structure. If the measure is damaged by construction traffic, it shall be repaired immediately. 3. Inspect and repair the collection system (e.g., catch basins, pipes, swales, riprap) four (4) times a year to maintain proper functioning. acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: A-) < -- Address: Phone: ?- Signature: t? Date: l/' / o - 0,;7- Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Pearlie R. Hall Jr. , a Notary Public for the State of North Carolina , County of Guilford , do hereby certify that Ken Lindholm personally appeared before me this 10 day of Novemher 2005 , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, _ FLEARLIE =TARY PULJI C FEARLIE R. HALL, .f:3. tY.ttt flMRD COUNTY, ?X UWARY PUIXIC .,,.. brk t4, =0 aFORD COUNTY, sec 'D: COO 1!= 14, V20 SEAL e? My commission expires Januar; 14, 201 Page 1 of 1 DWQ Project DIVISION OF WATER QUALITY • LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: piedmarii Crosson - Contact Person: W „daft 0,iuba Phone Number. (7off) 9Zo -`1 `fflS Level Spreader ID:. opf or= LA u.I C -F 1E#-D OltA Level Spreader Length 170 ft. (perpendicular to flow) Drainage Area a2q ac. (on-site and off-site drainage to the level spreader) Impervious Area 0.12 ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope 5. % (6% for forested, leaf littler cover, 8% for thick ground cover)* grass Max. Discharge from a 10 Year Storm I ,r( cfs Max. Discharge to Level Spreader 0 cfs Filter Strip/Buffer Vegetation ?;l1 ?rA -hK (thick ground cover or grass, canopied forest with leaf litter I..,? t?lt,.e cbro-J Good groundcover) Pre-treatment or Bypass Method ?M. LCOAMCN1c II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Ini1jaig Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. 4/ Pre-Form Scour Holes are on flat slopes only z No structures are located in protected buffers* If bypass method specified in the Draft Level Spreader Design Option Document: L01A) Bypass method is specified (if applicable) and plan details and calculations are provided (ulA) Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass dischargetNh) No structures are located in protected buffers. (.NIA) - Plan details for the bypass and outlets are provide4O I a? The operation and maintenance agreement includes annual erosion and vegetation repair. N) a The operation and maintenance agreement signed and notarized by the responsible party is provided. * Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. LEVEL SPREADER OPERATION AND MAINTENANCE AGREEMENT L,2?e1 Sprtaaer op'- of vkcDmonT C9-415S1Nc, pe-IVL The level spreader is defined as an elongated, level threshold, designed to diffuse stormwater runoff. Maintenance activities shall be performed as follows: 1. After construction and until vegetation has been established, level spreader(s) shall be inspected after every rainfall. Thereafter, level spreader(s) shall be inspected at least every month and more frequently during the fall season and after heavy rainfall events: a. Accumulated sediment, leaves, and trash shall be removed, and repairs made if required. b. Inspect level spreader(s) for evidence of scour, undercutting, settlement of the structure, and concentrated flows downhill from the level spreader(s). c. A level elevation shall be maintained across the entire flow-spreading structure at all times. Repair or replace the level spreader if it is damaged. d. Mow vegetative cover to a height of six (6) inches and prune plants if they cover over half of the level spreader surface. e. Repair eroded areas and replace/replant dead or damaged vegetation. 2. The contractor should avoid the placement of any material on and prevent construction traffic across the structure. If the measure is damaged by construction traffic, it shall be repaired immediately, 3. Inspect and repair the collection system (e.g., catch basins, pipes, swales, riprap) four (4) times a year to maintain proper functioning. I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: tA, -, ?'- z_ Address: PhnnP• Signatu Date: //- /o- C') Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, Pee ,lie R. Hall Jr a Notary Public for the State of North rgr-ol}na , County of Gui 1 fnrd , do hereby certify thatKen-L,indhalM personally appeared before me this 10 day of Nov?m?Pr 005 , and acknowledge the due e,Cecution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, FEAKLIE R. KALs, M. ,40TARY PUD SD GUILMRD COi NV- , KC C!r' an,M Sjjft, s;m 14, X10 SEAL My commission expires January I , 2010 Page 1 of 1 DWQ Project No DIVISION OF WATER QUALITY • LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name : PW mnn+ 0_f'os" Contact Person: We„d_il 0y rb., Phone Number: (70q) 7ZO -alfgs' Level Spreader ID:. OFF OF p i FDr,oar C, Rossrny Da.tvv Level Spreader Length a 00 ft. (perpendicular to flow) Drainage Area 0. r13 ac. (on-site and off-site drainage to the level spreader) Impervious Area 0-36 ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope 3. K % (6% for forested, leaf littler cover, 8% for thick ground cover)* grass Max. Discharge from a 10 Year Storm a $ cfs Max. Discharge to Level Spreader a.g cfs Filter Strip/Buffer Vegetation CAnrp;j C-oret# w1 (thick ground cover or grass, canopied forest with leaf litter I rii-er,3rot_4 groundcover) Go uee Pre-treatment or Bypass Method _ ?Qe-cQ?zmet?t II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants niti Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. Pre-Form Scour Holes are on flat slopes only No structures are located in protected buffers* If bypass method specified in the Draft Level Spreader Design Option Document: N(FF Bypass method is specified (if applicable) and plan details and calculations are provided 01A Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. Min, -- No structures are located in protected buffers. NlR Plan details for the bypass and outlets are provided. 4A The operation and maintenance agreement includes annual erosion and vegetation repair. NJA The operation and maintenance agreement signed and notarized by the responsible party is provided. * Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBh11TTED DESIGN: I REQUIRED DESIGN- 11/21/2005 elevations 2.7 average depth status Bottom of Basin (ft) 834 ---? Permanent Pool (ft) 843.5 9.5 ft. de check de // Temporary Pool (ft) 845.6 ft. depth ok areas Permanent Pool SA (sq ft) 9860 4969 sq. ft. ok Drainage Area (ac) 19.3 2772 based on avg depth ok Impervious Area (ac) 5.48 28.4 % - volumes Permanent Pool (cu ft) 26287 Temporary Pool (cu ft) 25276 21406 cu. ft. ok Forebay (cu ft) 6690 25.4 % check forebc other parameters SA/DA 1.06 0.59 - Orifice Diameter (in) 1.375 0.05 efs drawdown - Design Rainfall (in) 1 5.8 day drawdown check draws. Linear Interpolation of Correct SAIDA ** * 9.5 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 20 0.44 0.226255578 1.08 Project Impervious 28.4 0.59 0.33 1.37 Next Highest 30 0.62 0.349479716 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 1 REQUIRED DESIGN: 11/21/2005 elevations 2.7 average depth status Bottom of Basin (ft) 834 Permanent Pool (ft) 840 6 ft. depth ok Temporary Pool (ft) 845.6 5.6 ft. depth ok areas Permanent Pool SA (sq ft) 9860 6654 sq. ft. ok Drainage Area (ac) 19.3 5019 based on avg depth ok Impervious Area (ac) 5.48 28.4 % - volumes Permanent Pool (cu ft) 26287 Temporary Pool (cu ft) 25276 21406 cu. ft. ok Forebay (cu ft) 5500 20.9 % ok other parameters SA/DA 1.06 0.79 - Orifice Diameter (in) 1.375 0.08 cfs drawdown - Design Rainfall (in) 1 3.5 day drawdown ok Linear Interpolation of Correct SAIDA * * * 6 ft. Permanent Pool Depth % Impervious SAMA fron (Avg. Depth) Next Lowest 20 0.59 0.426351927 1.08 Project Impervious 28.4 0.79 0.60 1.37 Next Highest 30 0.83 0.629614604 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 2 REQUIRED DESIGN: 11/21/2005 elevations 2.9 average depth status Bottom of Basin (ft) 843 Permanent Pool (ft) 850.4 7.4 ft. depth check depth Temporary Pool (ft) 852.3 1.9 ft. depth ok areas Permanent Pool SA (sq ft) 16763 8383 sq. ft. ok Drainage Area (ac) 16.5 8335 based on avg depth ok Impervious Area (ac) 8.88 53.8 % - volumes Permanent Pool (cu ft) 47921 Temporary Pool (cu ft) 36269 32006 cu. ft. ok Forebay (cu ft) 7620 15.9 % check forebe other parameters SA/DA 2.03 1.17 - Orifice Diameter (in) 1.75 0.08 cfs drawdown - Design Rainfall (in) 1 5.4 day drawdown check dratim Linear Interpolation of Correct SA/DA * * * 7.4 ft. Permanent Pool Depth % Impervious SAIDA fron (Avg. Depth) Next Lowest 50 1.09 1.091412635 1.08 Project Impervious 53.8 1.17 1.16 1.21 Next Highest 60 1.29 1.27022311 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN. 2 REQUIRED DESIGN- 11/21/2005 elevations 2.9 average depth status Bottom of Basin (ft) 843 Permanent Pool (ft) 849 6 ft. depth ok Temporary Pool (ft) 852.3 3.3 ft. depth ok areas Permanent Pool SA (sq ft) 16763 9920 sq. ft. ok Drainage Area (ac) 16.5 10089 based on avg depth ok Impervious Area (ac) 8.88 53.8 % - volumes Permanent Pool (cu ft) 47921 Temporary Pool (cu ft) 36269 32006 cu. ft. ok Forebay (cu ft) 9000 18.8 % ok other parameters SA/DA 2.03 1.38 - Orifice Diameter (in) 2 0.13 cfs drawdown - Design Rainfall (in) 1 3.1 day drawdown ok Linear Interpolation of Correct SA/DA * * * 6 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 50 1.3 1.331077969 1.08 Project Impervious 53.8 1.38 1.40 1.21 Next Highest 60 1.51 1.52130108 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 3 REQUIRED DESIGN. 11/21/2005 elevations 1.6 average depth status Bottom of Basin (ft) 843 Permanent Pool (ft) 849.5 6.5 ft. depth check depth Temporary Pool (ft) 850.5 1 ft. depth ok areas Permanent Pool SA (sq ft) 56242 5654 sq. ft. ok Drainage Area (ac) 14.8 876 based on avg depth ok Impervious Area (ac) 5.75 38.9 % - volumes Permanent Pool (cu ft) 87434 Temporary Pool (cu ft) 30540 21471 cu. ft. ok Forebay (cu ft) 17500 20.0% ok other parameters SA/DA 1.69 0.88 - Orifice Diameter (in) 1.875 0.07 cfs drawdown - Design Rainfall (in) I 5.4 day drawdown check draws Linear Interpolation of Correct SAIDA*** 6.5 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 30 0.7 0.150749262 1.08 Project Impervious 38.9 0.88 0.14 1.39 Next Highest 40 0.9 0.13393976 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 3 REQUIRED DESIGN: 11/21/2005 elevations 1.6 average depth status Bottom of Basin (ft) 843 Permanent Pool (ft) 849 6 ft. depth ok Temporary Pool (ft) 850.5 1.5 ft. depth ok areas Permanent Pool SA (sq ft) 56242 5654 sq. ft. ok Drainage Area (ac) 14.8 876 based on avg depth ok Impervious Area (ac) 5.75 38.9 % - volunnes Permanent Pool (cu ft) 87434 Temporary Pool (cu ft) 30540 21471 cu. ft. ok Forebay (cu ft) 17500 20.0 % ok other paranneters SA/DA 1.69 0.88 - Orifice Diameter (in) 2.5 0.14 cfs drawdown - Design Rainfall (in) 1 2.5 day drawdown ok Linear Interpolation of Correct SAIDA * * * 6 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 30 0.7 0.150749262 1.08 Project Impervious 38.9 0.88 0.14 1.39 Next Highest 40 0.9 0.13393976 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 3 REQUIRED DESIGN: 11/21/2005 elevations 1.6 average depth status Bottom of Basin (ft) 843 Permanent Pool (ft) 849 6 ft. depth ok Temporary Pool (ft) 850.5 1.5 ft. depth ok areas Permanent Pool SA (sq ft) 56242 6606 sq. ft. ok Drainage Area (ac) 14.8 3205 based on avg depth ok Impervious Area (ac) 5.75 38.9 % - volumes Permanent Pool (cu ft) 87434 Temporary Pool (cu ft) 30540 21471 cu. ft. ok Forebay (cu ft) 17500 20.0 % ok other parameters SA/DA 1.69 1.02 - Orifice Diameter (in) 2.5 0.14 cfs drawdown - Design Rainfall (in) 1 2.5 day drawdown ok Linear Interpolation of Correct SA/DA*** 6 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 30 0.83 0.46865083 1.08 Project Impervious 38.9 1.02 0.50 1.39 Next Highest 40 1.05 0.500749262 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN: 3 REQUIRED DESIGN: 11/21/2005 elevations 3.4 average depth status Bottom of Basin (ft) 843 Permanent Pool (ft) 849 6 ft. depth ok Temporary Pool (ft) 850.5 1.5 ft. depth ok areas Permanent Pool SA (sq ft) 26000 6606 sq. ft. ok Drainage Area (ac) 14.8 7460; based on avg depth ok Impervious Area (ac) 5.75 38.9 % - volumes Permanent Pool (cu ft) 87434 Temporary Pool (cu ft) 30540 21471 cu. ft. ok Forebay (cu ft) 17500 20.0 % ok other parameters SA/DA 1.69 1.02 - Orifice Diameter (in) 2.5 0.14 efs drawdown - Design Rainfall (in) 1 2.5 day drawdown ok Linear Interpolation of Correct SAIDA * * * 6 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 30 0.83 0.920711538 1.08 Project Impervious 38.9 1.02 1.16 1.39 Next Highest 40 1.05 1.187881538 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBh1ITTED DESIGN: 4 REQUIRED DESIGN: 11/21/2005 elevations 2.8 average depth status Bottom of Basin (ft) 871 Permanent Pool (ft) 877.2 6.2 ft. depth check depth Temporary Pool (ft) 878.8 1.6 ft. depth ok areas Permanent Pool SA (sq ft) 10817 5716 sq. ft. ok Drainage Area (ac) 13 5241 based on avg depth ok Impervious Area (ac) 4.96 38.2 % - volumes Permanent Pool (cu ft) 29903 Temporary Pool (cu ft) 22033 18564 cu. ft. ok Forebay (cu ft) 4630 15.5 % check forebe other parameters SA/DA 1.6 1.01 - Orifice Diameter (in) 1.375 0.04 efs drawdown - Design Rainfall (in) 1 5.7 day drawdown check drawc. Linear Interpolation of Correct SA/DA * * * 6.2 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 30 0.83 0.771111214 1.08 Project Impervious 38.2 1.01 0.93 1.37 Next Highest 40 1.05 0.960489045 1.43 3 ft 4 Project Name: Piedmont Cr Project No. DWQ 05-1881 Pond No. SUBMITTED DESIGN. 4 REQUIRED DESIGN.- 11/21/2005 elevations 2.8 average depth status Bottom of Basin (ft) 371 Permanent Pool (ft) 877 6 ft. depth ok Temporary Pool (ft) 878.8 1.8 ft. depth ok areas Permanent Pool SA (sq ft) 10817 5716 sq. ft. ok Drainage Area (ac) 13 5241 based on avg depth ok Impervious Area (ac) 4.96 38.2 % - volumes Permanent Pool (cu ft) 29903 Temporary Pool (cu ft) 22033 18564 cu. ft. ok Forebay (cu ft) 6000 20.1 % ok other parameters SA/DA 1.6 1.01 - Orifice Diameter (in) 2 0.10 cfs drawdown - Design Rainfall (in) 1 2.6 day drawdown ok Linear Interpolation of Correct SAIDA *** 6 ft. Permanent Pool Depth % Impervious SA/DA fron (Avg. Depth) Next Lowest 30 0.83 0.771111214 1.08 Project Impervious 38.2 1.01 0.93 1.37 Next Highest 40 1.05 0.960489045 1.43 3 ft 4 Project No. DWQ Piedmont Cr Project Name: 05-1881 11/21/2005 SUBMITTED DESIGN. 1 REQUIRED DESIGN: elevations Permanent Pool (ft) 835 6.5 ft. depth Temporary Pool (ft) 841.5 areas Permanent Pool SA (sq ft) 4613 3746 sq. ft. Drainage Area (ac) 2.7 ac Impervious Area (ac) 1.32 48.9 % impervious Rational C 0.65 Precipitation (in) 0.7 no sand underdrain volumes Inlet Velocity 1.4 0 fps Inlet Flow Depth 3.7 in Depth to Ground Water 6 6 ft Planting Soil Infiltration 1 0.52 in/hr In-Situ Soil Infiltration 0.27 0.00 in/hr check depth ok check veloci ok ok Project No. DWQ Piedmont Cr Project Name: 05-1881 11/21/2005 SUBMITTED DESIGN: 2 REQUIRED DESIGN: elevations Permanent Pool (ft) 845 6.5 ft. depth Temporary Pool (ft) 851.5 areas Permanent Pool SA (sq ft) 4783 3885 sq. ft. Drainage Area (ac) 2.8 ac Impervious Area (ac) 1.31 46.8 % impervious Rational C 0.65 Precipitation (in) 0.7 no sand underdrain volumes Inlet Velocity 1.8 0 fps Inlet Flow Depth 4.8 in Depth to Ground lVater 6 6 ft Planting Soil Infiltration 1 0.52 in/hr In-Situ Soil Infiltration 0.27 0.00 in/hr check depth ok check veloci ok ok OCT 1 0 2005 't,?TW4D3R410Voiiy;J?TERC'V1?1 October 6, 2005 S&EC #5-1325w1 Environmental Consultants, PA , Suite C • Concord, North Carolina.,; (704) 720-9405 • Fax: (704) 720-9406 US Army Corps of Engineers Raleigh Regulatory Field Office Attn: Todd Tugwell 6508 Falls of Neuse Road, Suite 120 Raleigh, NC 27615 Dear Mr. Tugwell and Ms. Karoly: NC Division of Water Quality 401 Oversight/Express Permits Unit Attn: Cyndi Karoly 2321 Crabtree Blvd Raleigh, NC 27604 Our client, Faith Properties of the Carolinas, requests the use of Nationwide Permits 12 and 39 for the proposed "Piedmont Crossing" project in High Point, NC. Specifically, this notification requests impacts associated with development for Tracts B-E of the proposed project. Tracts F-I have no final designs at this time and wetland/stream impacts are not anticipated for those parcels. The subject property (including all tracts) is approximately 197-acres in size and located west of Barrow Road. A signed agent authorization accompanies the enclosed preconstruction notification. As proposed, Piedmont Crossing will result in the construction of single and multifamily units as well as a section of Piedmont Parkway to be funded and constructed by the developer. No other segment of the proposed Piedmont Parkway to be constructed for this project. The approximate property boundaries are shown on the attached USGS Topo Quad vicinity map. Surface waters on the property are unnamed tributaries that flow to Oak Hollow Lake in the Randleman Lake watershed/Cape Fear river basin (WSIV;CA/ WCA.Tier 4). S&EC has met with regulatory personnel from the USACE and NC DWQ regarding approval of our wetland delineation and Randleman buffer origin points, respectively. As proposed construction of Piedmont Crossing will result in impacts to perennial streams, wetlands, and isolated wetlands. Permanent impacts to perennial streams involve 149 linear feet for 2 road crossings. A road crossing over the largest perennial stream will involve an arch span to avoid impacts. Two temporary stream impacts totaling 301f are proposed for sanitary sewer construction. Proposed wetland impacts associated with lot fill and road crossings total .09 acres. Impact WI on the attached sheet involving approximately 0.016 acres of wetlands (included in the .09ac total) has occurred. That impact total fell below USACE and NC DWQ notification thresholds. Proposed impacts to isolated wetlands total 0.082 acres. The isolated wetland impacts are below notification thresholds for the NC DWQ. Proposed impacts to Randleman Lake riparian buffers (50') total 24,510sf for Zoned and 18,170sf for Zone 2, respectively. Buffer impacts are associated with proposed road and sewer crossings. The crossings occur at perpendicular angles and are exempt under the Randleman Lake watershed buffer rules. Enclosed with the completed PCN are impervious calculations and stormwater management plans from the project engineer. Proposed stormwater management facilities include construction of (4) wet ponds followed by level spreaders and (2) bio-retention cells. Stormwater management facilities have been approved by the watershed review committee and follow City of High Point guidelines as well as NC DWQ general certification #3402. Greensboro Office: Ralei;h Office: 3817-E Lawndale Drive 11010 Raven Ridge Road Greensboro, NC 27455 Raleigh, NC 27614 Phone: (336) 540-8234 Phone: (919) 846-5900 Fax: (336) 540-8235 Fax: (919) 846-9467 . 7 Attached please find: 1) A completed Pre-construction Notification 2) signed Agent Authorization Form, 3) USGS topo quad vicinity map, 4) Guilford County Soil Survey map, 5) Construction plans, 6) Cross-sectional view of arch span, 7) 3 copies of impervious calculations/stormwater plans, 8) Wetland data forms, and 9) 401 processing fee of $475. Please call if more copies of the stormwater plans/calculations are needed. Sincerely, Wendell Overby NC Licensed Soil Scientist Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 12,39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Faith Properties (Ken Lindholm) Mailing Address: 10410-50OG Park Road Charlotte, NC 28210 Telephone Number: (704) 564-2672 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Wendell Overby Company Affiliation: Soil & Environmental Consultants, PA Mailing Address: 236 LePhillip Court Suite C Concord, NC 28025 Telephone Number: (704) 720-9405 Fax Number: (704) 720-9406 E-mail Address: woverby(a)sandec.com Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Piedmont Crossing 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 180005500000100004, 180005500000100001, 18000550000010000501 4. Location County: Guilford Nearest Town: High Point Subdivision name (include phase/lot number): Piedmont Crossing Directions to site (include road numbers/names, landmarks, etc.):I-40 exit 210 (Hwy 68). Go South 2.5 miles to Willard Dairy Road Turn right go 1.3 miles to Barrow Road. Property is across Barrow Road. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 350525°N 79.9912°W 6. Property size (acres): 197 7. Name of nearest receiving body of water: UT Oak Hollow Lake (WSIV CA) 8. River Basin: Cape Fear (03030003) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at littp://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Formerly farming operation with open pastures and woodland. Two homes occurred on the property. General land use in vicinity is predominantly residential. A high school and fire station located in very close proximity. Page 6 of 13 10. Describe the overall project in detail, including the type of equipment to be used: Tract B-64 single family homes C 1 Phase 1 &2 181 single & multi family units, C Ph 2,3 24 multi family units D Ph 1 & 2 106 single family units E 304 multi family units. Use of heavyyquipment including _pans, backhoes and trenches required for site preparation. 11. Explain the purpose of the proposed work: Construction of Piedmont Crossing project and a portion of Piedmont Parkway Thoroughfare IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules.No prior determinations or permits known. S&EC's delineation approved by Andrea Wade (USACE). Site meetings between S&EC USACE and NC DWO have been held to review wetlands/streams and Randleman buffers. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. Future phases predicted but no impacts estimated at this time. Design of future phases have not been finalized to date (Tracts F-I). No future impacts anticipated for those tracts. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts:Two perennial stream impacts totaling 149 if proposed for road crossings. Wetland impacts totaling .09 acres requested. Impacts to isolated wetlands total .083 acres. Temporary stream impacts of 301f proposed for sewer xings. Page 7 of 13 Buffer impacts zone 1 (20,21 0sfl zone 2 (14,65 8)Impacts exempt for proposed road xings. Impacts for temporaryxings- zone 1 (4 300sfl zone 2 (3 512sf). Exempt for sewer xings. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Located within Distance to Area of Wetland Impact Type of Wetland 100-year Nearest Impact Site Number Type of Impact (e.g., forested, marsh, Floodplain Stream (acres) (indicate on map) herbaceous, bog, etc.) ( es/no) (linear feet) W1 Fill Linear headwater No 0 .016 W2 Fill Linear headwater No 0 .006 W3 Fill/Pipe Linear headwater No 0 .008 W4 Fill Headwater No 0 .05 W5 Fill Headwater No 0 .01 Total Wetland Impact (acres) .09 3. List the total acreage (estimated) of all existing wetlands on the property: 3.45 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Perennial Average Stream Impact Stream Impact Area of Number Stream Name Type of Impact ittent Intermittent Width Length Impact (indicate on map) Before (linear feet) (acres) Impact S I UT Oak Hollow L Pipe Perennial 4' 74 .007 S2 UT Oak Hollow L Pipe Perennial 3' 75 .005 T1 UT Oak Hollow L Temp Perennial 4' 15 .005 T2 UT Oak Hollow L Temp Perennial 4' 15 .005 Total Stream Impact (by length and acreage) 149 .012 179(+temp) ,022+temp 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name of Waterbody Type of Waterbody Area of Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma) ocean, etc.) (acres) N/A N/A N/A N/A N/A Total Open Water Impact (acres) N/A Page 8 of 13 6. List the cumulative impact to all Waters of the U.S. resulting from the project. Stream Impact (acres): 0.012 Wetland Impact (acres): .09 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) .102 Total Stream Impact (linear feet): 149 7. Isolated Waters Do any isolated waters exist on the property? ® Yes ? No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. Three isolated wetlands approved by USACE on property totaling 0.2 acres. Proposed impacts of 083 acres to isolated wetlands for the development. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ® uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): excavation with installation of riser Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): stormwater Current land use in the vicinity of the pond: Agriculture or forested. Size of watershed draining to pond(s): 1-19.3ac, 2-16ac, 3-14.8ac, 4-13ac Expected pond(s) surface area: 1-.23ac 2-.38ac 3-1.3ac, 4-.25ac VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts.Since our involvement with nroiect chances in road lavout made to avoid additional stream/wetland impacts. Proposed arch span proposed to avoid impacts to perennial stream Proiect designed to avoid buffer impacts except for exempt road/sewer crossings at perpendicular angles. Small % of wetland and stream impact amounts compared to total wetland/stream acreages on site and size of project. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 9 of 13 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http:/ih2o.enr.state.ne.us/ncwetlands/strmuide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Planning of subdivision to avoid and minimize impacts will serve as mitigation. Development will utilize stormwater ponds combined with level spreaders as well as bioretention areas for water quality. Impacts to perennial (mitigable) streams at the minimum necessary and less than 1501f Impacts to large perennial stream avoided at cost of bottomless span Road alignments have chanced to reduce proposed impacts Proposed wetland impacts less than .1 acres. Proposed isolated wetlands impact less than .1 acres. Project subject to Randleman and water supply buffers. Proposed buffer impacts exempt 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 0 Amount of buffer mitigation requested (square feet): 0 Page 10 of 13 Amount of Riparian wetland mitigation requested (acres): 0 Amount of Non-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify)? Yes ® No ? 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet) Mitigation 1 24,510 3 (2 for Catawba) 0 2 18,170 1.5 0 Total 42,680 0 * Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. *Buffer impacts for proposed road and sewer crossings are exempt. Page 11 of 13 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. Buffer impacts for exempt activities requiring no mitigation XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Calculations for four water quality ponds attached Delineation maps of watersheds and construction plans of four wet ponds and 2 bioretention areas attached Estimated impervious percents to be treated by pond 1 (28.4%), pond 2 (53.8%), pond 3 (38.9%), pond 4 (38.2% bioretention 1 (50%) bioretention 2 (48%). Stormwater facilities approved by watershed review committee. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Construction of sanitary sewer lines are proposed for the development. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://12o.enr.state.nc.us/ncwetiands. If no, please provide a short narrative description:In our opinion project is residential subdivision/amenities that will not result in violation of downstream water quality standards. Project mandated to conform to water supply rules and Randleman buffers. On site stormwater controls to be constructed that meet state and local rules. Page 12 of 13 XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for- lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). J-1v ic•(-7 105 Applicant/Agent' (Agent's signature is valid ignature Date if an authorization letter from the applicant is provided.) Page 13 of 13 oil & Environmental Consultants; P.A ?s Ptwoc: (704) 720 9405 Fu (104) 720-9405 f 236 LcMip Court Suite C Cook Noah CuoGna 28025 www.SandEC.eotn AGENT AUTHORIZATION FORM All Blanks To Be Filled In B The Current Landowner Name: . Address: d Cl/ d ?O tI C- f r ri ?i 4 G/?a MZ -1'6 -7ay_V- 2-(,1,72 - , Phone: Project Name/Description _PlEC7Monl T CRbSG)NCC Date: The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 / Attu Field Office: •Ralei?h Re: Wetlands Related Consulting and Permitting To Whom It May Concern: I, the current propg!y owner, hereby designate. and authorize Soil & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit. applications, to furnish upon request' supplemental information in support of applications, etc. from this day forward. The P 3 f- day of 1Z, - This notification supersedes any previous correspondence concerning the agent for this project:. . . NOTICE: This authorization, for liability. arid prgfessional courtesy reasons, is valid onlyfor government officials to enter the propety r when accompanied by S&EC staff. You sho nl&&H S&EC to arrange a site meeting prior to visiting the site. Print Property Owner's Name Property Owner's Signature _ ca Mr. John Dorney cc Mr. Wendell Overby NCDENR - DWQ Soil & Environmental Consultants; PA 2321 Crabtree Boulevard Raleigh, NC 27604 blank agent auth fomLdoc Greensboro Office: Hickory Arta Office:. Ralci h Office: 3817-E Uwndalc Drive 710 Boston Road 11016 Ravea Ridge Road Gitensboro, NC 27455 Taylorsville, NC 28681 Raleigh, NC 27614 Phone: (336) 540-8234 Phone: (828) 635-5820 Phone (919) 846-5900 Cop5TVt (C) 1997, Nbptech, Inc. Guilford County Soil Survey 0 too N C z S 86'-5.'-51' E TRACT "T" 1 500' 250' 0 500' 1000' - m!'?.('Z_ SINGLE/MULTI-FAI41LY RESIDENTIAL' (RM-FJ STANDARDS FOR TRACTS C-1,2,3) AREA C-1 = 36.4 Ac. AREA C-2.3- 3.0 Ac,t ISA ALLOTMENT - 15.4 Ac. (457) MASTER SKETCH PLAN PIEDMONT CROSSING DEVELOPED BY FAITH PROPERTIES OF THE CAROLINAS, LLC i;;T'; C" HIGH P011JT -0GH "=CHIT i-C, JSHIP - GUILFORD U"ITI' II 10 CTI .,: RCLI I I SITE DATA - ZONING: CU-PD-MIXED - REFERENCES: MAP 550, BLOCK 1, LOT 5; MAP 550, BLOCK 1, LOT 4; MAP 550, BLOCK 1, LOT 1 - TOTAL AREA = 196.6 Ac.± - No. OF TRACTS = 8 it - TOTAL MAXIMUM NUMBER OF RESIDENTIAL UNITS = 773 - AMOUNT OF COMMON AREA REQUIRED = 19.3 Ac. (2.5/100 UNITS) - TOTAL AREA OF NON-RESIDENTIAL DEVELOPMENT = 52.4 Ac. - AMOUNT OF COMMON AREA REQUIRED = 5.2 Ac. (10%) - TOTAL COMMON AREA REQUIRED = 30.1 Ac. WATERSHED DATA - WATERSHED: OAK HOLLOW WCA TIERS 4 AND CITY LAKE GWA - TOTAL ALLOWABLE ISA = 49.1% - MAXIMUM PROPOSED ISA = 48.5% - EXISTING ISA TO BE REMOVED = 0.78 Ac.t TOTAL EXISTING STRUCTURES = 0.49 Ac,t EXISTING DRIVES = 0.27 Ac.± ALLOTMENT TO TRACT 'A' = 0.18 Ac. REMAINING ALLOTMENTS = 0.60 Ac. -SOIL TYPE: EnB, EnC, MhB2, MhC2, Co, Ch -AVERAGE SLOPE: 7% -DISTANCE TO FLOODWAY: 0 L.F.t ^F',FI n.c FAITH PPCPERTIES OF THE CARCL!NAS, LLC. e%o KEN LINDHOL 1 10410-50 DG PARK RD. CHARLOTTE, N" 28210 PH VIE: `/G4)-?Yl-._v..l -rn-? 9, TRACT RESIDENTIAL UNITS B-PH-1 64 SINGLE FAMILY B-PH ®® ®p 6e® ?' \ C1-PH-1,2 181(C-1-PH-1 SINGLE FAMILY) ?,: ?, ?? g ®p 6 g w N, (C-1 PH-2 MULTI-FAMILY) --? ???-- ® p F 8 L C-2,3 24 MULTI-FAMILY) "SINGII-FAMILY RtSil) 'r,0J " p p 6 e N (RS-7 S*ANi)A'DI © © a p ®®® a v D-PH-1 59 SINGLE FAMILY) t3S\? ©p p 0 g D-PH-2 47 SINGLE FAMILY) TOTAL AREA-24.0 A p ISA ALLOTMENT-IC.E Ac. ( 74 -S?? p p p ® E 305 (MULTI-FAMILY) 46, CA F 0 G 0 • c r - H 0 THE PURPOSE CF THIS OVER;,LL MASTER PLAN S TO DEMOv cIRAiE THE ? I 0 NON-RESIDENTIAL AREA (ACRES) 0 0 0 0 0 1.0 10.0 19.5 14.2 8.7 o ?Lyl- - 5 TRACT- - 11088_3 W 'SINGLE/MULTI-FAMILY RESIDEN11AL (RM-8 STMDARDS) ,J0?AL AF;EA 31,3 Ac. - AJIOTMENT 14.1 Ac. (*b7) _'ussw I r r . I J I 0 } ?I FUTL''f P :'f 0 PL.1 1 JI .1 i? O / Ga" f N 1728$!!) CAI. W f'S W n I I TIE TO 89'- '-1 /E' 0.49' SUBDIVIS ON I N E5'-57'-55' > 676,00' TOT \ Mee 8 S/.r- N 0 N O Q •i 0 B I N - vcl! J 1 1 ? !'?.s i W I Y Out POW: ON _ "wIft-vallm Ix INSERT "A" H E-47 rip '5 "A", Cl p r ?l IJ o"o l'V1 S T R I r--"P T, : t 8 --•--- -------`-'•° ----------- ' 1 ?._-.1 L --------- --- _'r i I`i'- ; LLB - i i 1 1 ? l' 1 i?1'1 w r-7 NN S 8 / V / St7.70' ®b® I l ? 447,1µZ1 51251' 1 .0?, YII A9 I ' l .......,.. -TT"CC ?10 PLANS AVAILABLE / :'r THI TI AIE D 20-264 ' _ / r 12 _ _ "?'__ I- ------ ~- 68 DUKE POWER OVER - I ? AN - - - _ jl I T-n ? F N O SHEET r, _? jf Jr / ??4?i / H E ? ? 7m wl u t S 57`-59'-SS/ 1.55' (TOTAL 1183. A'- < S 6T 33 w I'UTUP' .1`1?? ti /! I /I' / ; 'I ,!O P' 1 M E. L?, T I El AT I =o /s"86iws0 w N FUTUME P..,kzi" ?L2; '10 PUNS AVAILABLE Al' TIES TI?.IE 0 r WyL i,i ---- II' 1 it f I , it .. S/19??gE• M/z" 5?17? rT-,1 r_ Wetland & Stream Impact Map RiED1w1C??1T CRO'SSINC- ?t BARROW ROAD 1 ------ CITY OF HIGH POINT " GUILFORD COUNTY, NORTH CAROLINA r i?1tiEt 0 J OVERALL SITE 8 " - 64° .?, =R zi O ? o /tY ~ % (D 111 © ® J / 6 I lV Line Bearing Distance Lt N 86'-45'-27" W 162.38' L2 S 89'-57'-46" E 133.69' L3 N 59'-50'-48" W 49.92' L4 S 29-30'-56" W 50.62' L5 S 59'-47'-11" E 77.39' L6 S 1'-43'-19" W 225.61' L7 S 38'-40'-05" W 61.88' L8 N 89'-58'-Ot" E 45.39' L30 N 00'-05'-28" E 14.67' L31 N 51'-16'-45" W 4.15' L32 N 14'-58'-36" W 135.74' L33 S 75•-42'-25" E 90.02' L34 N 00'-51'-56" W ' " 54,67' ' L35 N 00'-51 -56 W 2,52 L36 N 88'-51'-13 W " ' 165.98, L37 N 85-12 W -48 92,14 L38 S 32•-28'-43" W 20.09' L39 N 87'-37'-15" W 91.06' L40 S 02'-16'-40 W ' ' 43.49; L41 -40 S 02'-16 W 16.52 L42 S 87'-59-33 W 148,59' L43 N 87'-19'-24" W 14.23' L44 S 19' _31'-23" W 104,17' ' L45 S 89'-56'-32" E 169.03 L46 S 87'-07'-03" E 219.86' L47 N 83'-27'-57" W 239.41' L48 N 86'-28'-44" W 75.78' L49 S 19'-31'-17" W 85.01' 300' 0 300' 600' SCALE: 1 3 OQ' 44%? A, L i A AIl,Ir -!T !-E,/ EL T, 8 1-?v 1 u . J ? -- ZONE 1? C5 SF Z0 NE 2 823 V JF z'j v \.r V CD N a -+ o? i• T REA ;i TO?? . ' P ' / ? 74 L / „„ 1 so s zoN N ' t C?? C i= N \ j go T A Z W ? W n m? _Jry y n o \ b N 1 ll I.? Wetland & Stream Impact Map BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 so' 100' SCALE: 1" = 50' sheet, 2 of 62 2 /r i / X06 06 f zo? r 4807 ,1' ?J , o? ,9LI \ 2 S 1 - 144, 4' 82 Wetland & Stream Impact Map BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' too' SCALE: 1 50' 0L -70 / 'ux r CL / CL XL i CL / r i 7CL Vf r ., / yya r r S'I?I ?J J err :41P R: R,' B U 'j / ZON I. Zo,, f 1 r? 6 IEAP. CREEh< a c U a U r / es lJr J r V d AW4' s. I ?d AW4' 1d AW4' I f / Wetland & Stream Impact Map BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' Emoll SCALE: 1" = 50' Sheet 4- of 5 STRE2`:i'vl '1"0" BE ,R iL:il PAC i )GO ?i a ti a ti r 'vt / J L '? ?i11 ,t r' ? 0' J" i EN BOTTOM CROSSING / HEADWALLS i ?v Wetland & Stream Impact Map L L' BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' SCALE: 1" = 50' r 1,V {+.. i-,hi ? til E:. PO EE iZr:. C,IT D: J ?V(--+ t.,' L ! , E O1J ED - 511 'ff L 49202B O l 203B ? -T- ? I? u i 1 iL' B-Q i .L V IrI'T I1I BUFFER iMP4CTS IONIE 1: 5,577 SP 7 NIE 1,805 SF A-PI ?t? 1uC?? sUI,I?,EP:: ? r ?REA ri T/L; S-E ` - DISTURBED. 7r-/ L17 C:3 Nn J-- 42 ' 8~ S.S. PIEDMONT CROSSING DRIVE MAIN CREEK CROSSING 8" W.L. *' .•; •;-.. ...:. .... 40' 30' 20' 10' 0 40' Be 71, 77144:•: i SCALE: 1"=40' 26+95 27+00 27+05 27+10 27+15 27+20 27+25 27+30 27+35 27+40 27+45 27+50 852.50 PROPO SED R AD 850.00 PROP SED 4 'x10' CON/ PAN RIDGE 847.50 SYSTE 845.00 D15 RBA CE HIN 0IT 10' 0 842.50 NO DISTUR 3ANCE - WI IN 10' OF it [ 840.00 TOP OF 8 NK K 837.50 FOO ING 7 EXI TING GRADE 835.00 EX D TO ROCK 832.50 g' 3' 0 g' 12' 1 B' SCALE: 1 " = 6' Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21103 Applicant/Owner. Faith Properties County: Guilford Investigator: W. Overby, A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Mix-Pine-Hardwood Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: Upland (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Pinus viriginana Tree FACU 9. Pinus echinata Tree FACU 2. Liriodendron tulipifera Tree FAC+ 10. 3. Liquidambar styraciflua Tree FAC 11. 4. Juniperus virginiana Tree FACU- 12. 5. Rubus argutus Herb FACU 13. 6. Acer rubrum Tree FAC 14. 7. Lonicera japonica Herb FAC- 15. 8. Quercus alba Tree FACU 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 40 Remarks: Much of upland in pasture (fescue) or cultivated field. HYDROLOGY _ Recorded Data (Describe in Remarks): Stream, Lake or Tide Gauge Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: Inundated Saturated in Upper 12 Inches Sediment Deposits Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: N/A (in.) Water-Stained Leaves _ Local Soil Survey Data Depth to Free Water in Pit: N/A (in.) FAC-Neutral Test _ Other (Explain in Remarks) Depth to Saturated Soil: N/A (in.) Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: Upla.-d cnn c Map Unit Name Drainage Class: Well (Series and Phase): Enon Field Observations Taxonomy (Subgroup): Ultic Hapludalf Confirm Mapped Type? x Yes _ No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-4 Ap 10YR 4/2 Sand Loam 4-12 Bt1 2.5Y 5/4 Sand clay loam 12+ Bt2 10YR 5/8 Clay Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: L-- I WFTI ANDS nFTFRMINATION X Hydrophytic Vegetation Present? Yes _ No Is this sampling point within a wetland? Wetland Hydrology Present? Yes x No Yes x No Hydric Soils Present? Yes x No Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21103 Applicant/Owner. Faith Properties County: Guilford Investigator: W. Overby A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Headwater Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: Wetland (If needed, explain on reverse.) VP[,-PTe'nnN Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Juncus effusus Herb FACW 9. 2. Sambucus Canadensis Herb FACW 10. 3. Salix nigra Tree OBL 11. 4. Carex sp. Shrub FACW 12. 5. Rubus argutus Herb FACU 13. 6. Cyperus strigosis Herb FACW 14. 7. Ludwigia sp. Herb OBL 15. 8. 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 85 Remarks: HYDROLOGY _ Recorded Data (Describe in Remarks): Stream, Lake or Tide Gauge _ Aerial Photographs Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: x Inundated x Saturated in Upper 12 Inches Sediment Deposits Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): x Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: 0-2 (in.) Water-Stained Leaves Local Soil Survey Data Depth to Free Water in Pit: 0-12+ (in.) x FAC-Neutral Test _ Other (Explain in Remarks) Depth to Saturated Soil: 0-12+ (in.) Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: wetland JV ILJ Map Unit Name Drainage Class: Poorly (Series and Phase): Wehadkee Field Observations Taxonomy (Subgroup): Fluvaquentic endoaquept Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-4 Ap 10YR 5/2 Loam 4-12 Bg 10 YR 6/2 7.5YR 5/8 Few/Distinct Sand clay loam Hydric Soil Indicators: Histosol Concretions _ Histic Epipedon High Organic Content in Surface Layer in Sandy Soils _ Sulfidic Odor Organic Streaking in Sandy Soils _ x Aquic Moisture Regime x Listed on Local Hydric Soils List x Reducing Conditions x Listed on National Hydric Soils List x Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: IAICTI AKIr10 r1CTCDAA1MAT1nkf x Hydrophytic Vegetation Present? - Yes No Is this sampling point within a wetland? Wetland Hydrology Present? x Yes No x Yes No Hydric Soils Present? x Yes No Remarks: L- J 1 r i 1 Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21/03 Applicant/Owner. Faith Properties County: Guilford Investigator. W. Overby, A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Riparian wetlands Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: wetland (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Ligustrum sinense Tree FAC 9. 2. Liriodendron tulipifera Tree FAC+ 10. 3. Liquidambar styraciflua Tree FAC 11. 4. Microstegium vimenium Herb FAC 12. 5. Smilax rotundifolia Vine FAC 13. 6. Acer rubrum Tree FAC 14. 7. Woodwardia areolata Herb OBL 15. 8. Salix nigra Tree OBL 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 100 HYDROLOGY _ Recorded Data (Describe in Remarks): _ Stream, Lake or Tide Gauge _ Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: Inundated x Saturated in Upper 12 Inches _ Sediment Deposits x Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): x Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: 0 (in.) x Water-Stained Leaves x Local Soil Survey Data Depth to Free Water in Pit: 0-12 (in.) FAC-Neutral Test Other (Explain in Remarks) Depth to Saturated Soil: 0-12+ (in.) Remarks: . r I , Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: wetland SOILS Map Unit Name Drainage Class: Poorly (Series and Phase): Worsham Field Observations Taxonomy (Subgroup): Typic Endoaquult Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-5 A 10YR 5/1 Sand Loam 4-15 Bg 10YR 6/1 10YR 5/2 Common/Distinct Clay loam Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils _ x Aquic Moisture Regime x Listed on Local Hydric Soils List x Reducing Conditions x Listed on National Hydric Soils List x Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: L- I WETLANDS DETERMINATION X Hydrophytic Vegetation Present? - Yes No Is this sampling point within a wetland? Wetland Hydrology Present? x Yes No x Yes No Hydric Soils Present? x Yes No Remarks: EROSION CONTROL AND STORM WATER HYDRAULIC CALCULATIONS FOR PIEDMONT CROSSING TRACT •C• MULTI-FAMILY SECTION DEVELOPED BY.• FAITH PROPERTIES OF THE CAROLINAS, LLC AUGUST, 2005 SAR S AL . a , 1 5 ? ._ Ni s R, @EnW D O C T 1 0 2005 O. RIR - WATER QUlkLITY VOU-''os 1 0 S T (rJ? 1FYATER ER lxj l JAMESTOWN ENGINEERING GROUP, INC. 117 EAST MAIN STREET P. 0. BOX 365 JAMESTOWN, NC 27282 (336) 886-5523 EROSION CONTROL AND STORM WATER HYDRAULIC CALCULATIONS FOR PIEDMONT CROSSING TRACT °C° MULTI-FAMILY SECTION DEVELOPED BY.• FAITH PROPERTIES OF THE CAROLINAS, LLC AUGUST, 2005 o??N SQR l S AL = 1 65 JAMESTOWN ENCINEERINC GROUP, INC. 117 EAST MAIN STREET P. 0. BOX 365 JAMESTOWN, NC 27282 (336) 886-5523 JAMESTOWN ENGINEERING GROUP, INC. 117 E. MAIN STREET JAMESTOWN, NC 27282 DESIGN OF WATER QUALITY POND NO. 4 e I. GENERAL A. DESIGN CRITERIA - \ .y DESIGN IS BASED UPON CITY OF HIGH POINT STORMVATER GUIDELINES FOR VATER QUALITY AND FLOOD CONTROL. IN CONJUNCTION WITH ENVIRONMENTAL REGULATIONS, ARTICLE A, SECTION 9-7-5 FOR WATERSHED CRITICAL AREAS. D. SITE INFORMATION THE PROPOSED SITE IS LOCATED VITNIN THE OAK HOLLOW GENERAL VATERSHED GENERAL SITE DATA IS LISTED BELOW: POND 14 SITE AREA 13.0 OFF-SITE AREA 0.00 TOTAL SITE AREA 13.00 OFF-SITE DRAINAGE AREA 0.00 SITE DRAINAGE AREA 13 DISTURBED AREA 12 S UNITS PROPOSED (MULTI-FAMILY) 51.5 BARROW ROAD WIDENING (FUTURE) 0.69 AC IMPERVIOUS AREA SFzUHIT (MULTI-FAMILY) 2200 ' IMPERVIOUS AREA (BARROW RD) 0.69 IMPERVIOUS AREA (MULTI- FAHI 2.60 STREETS, SIDEVALKS. POOL 1.67 0 AD.IACENT LOT 9 .00 AC 0.00 TOTAL 4.96 1 i BUILT UPON (FOR SITE DRAINAGE AREA) 38.15i % BUILT UPON (FOR TOTAL SITE AREA) 38.1S% DU/ACRE (SITE) 4.0 ' IN ACCORDANCE WITH TABLE 7-S-1 A VET DETENTION POND IS REQUIRED C. VET POND INFORMATION/REQUIREMENTS VOLUME REQUIREMENTS OF POND 1 ' 38.2: IMPERVIOUS e 3.2 ft 1.60/ OF DRAINAGE AREA POOL SURFACE AREA REQUIRED .016 x 13.00 x 43560 9057 SF 1/8 PERM SED STORAGE .125 x 13.00 x 3630 - 5899 CF • 112 TEMP SED STORAGE S00 r. 12.00 x 3630 21780 CF TOTALSEDIMENT STORAGE VOLUME REQUIRED 27679 CF RUNOFF VOLUME - 1.Oin x Rv x DA vhere Rv - 0.05 + 0.009 (I) TEMPORARY VOLUME - 1.0 in x 0.39 x 13.00 • 10563 CF t D OF ANALYSIS INFLOW HYDROGRAPHS: SHALL WATERSHED METHOD PEAK INFLOWS: RATIONAL METHOD ' POND ROUTING: REGRESSION ANALYSIS FOR STAGE STORAGE RELATIONSHIP DESI 1FL0?. ROGRAPHS 1. PRE-DEVELOPEHEHT ' OFF-SITE AREA 0.00 ACRES ((1/4 AC LOTS) C. 0.35 ON-SITE AREA 13.00 ACRES (UNIMPROVED) C. 0.35 13.0 ACRES C. 0.35 TIME OF CONCENTRATION HYDRAULIC PATH VELOCITY LENGTH TIME SHEEP FLOW S fps 300 ft 600 sec CHANNEL FLOW 8.0 fps ft sec 600 sec Tc - 10.0 win e PEAK FLOW 0 - CIA I(2) - 4.3 in/hr I(10) - 5.8 in/hr I(100) - 9.0 in/hr Q(2) - 19.6 CPS Q(10) - 26.4 CFS Q(100) - 36.4 CFS t 2. POST-DEVELOPEHEifT OFF-SITE AREA ((1/4 AC LOTS) 0 ACRES C. 0.35 ON-SITE AREA 38.15: IMPERVIOUS IMPERVIOUS 4.96 ACRES C. 0.95 LAWN 8.04 ACRES 0.35 SITE DRAINAGE AREA AVERAGE 0.58 ' COMPOSITE 13.0 ACRES C. 0.58 TIME OF CONCENTRATION HYDRAULIC PATH VELOCITY LENGTH TIME SHEET FLOW S fps 250 ft 500 sec CHANNEL FLOW 8.0 fps 800 ft 100 sec ' 600 sec Tc - 10.0 win ' PEAK FLOW I(2) 0 - CIA - 4.3 in/hr 100) - 5.3 in/hr I(100)- 8 0 in/hr Q(2) = 32.4 CFS 0(10) 43.6 CFS 0(100) - 60.2 CPS ' DEPTH OF RUNOFF 2-YEAR 6-HOUR PRECIPATION (P) - 2.52 in 10-YEAR 6-11OUR PRECIPATION (P) - 3.71 in 100-YEAR 6-HOUR PRECIPATION (P) - 4.93 in CH 83 S - (1000/CN)-30 - 2.05 in RUNOFF DEPTH(Q¦) - (P-0.2 x S)"2/(P+0.8 x S) - 1.07 in 2-YEAR 6-HOUR RUNOFF DEPTH RUNOFF DEPTH(Q-) - (P-0.2 x S)"2/(P+0.8 x S) - 2.04 in 10-YEAR 6-110UR RUNOFF DEPTH RUNOFF DEPTH(Q-) - (P-0.2 x S)"2/(P+0.8 x S) - 3.11 in 100-YEAR 6-HOUR RUNOFF DEPTH TIME OT PEAK - RUNOFF VOLUME/(I.39 x Op;2-YEAR 18.73 ¦in TIME OT PEAK - RUNOFF VOLUHE/(1.39 x OP; 10-YEAR 26.40 ¦in TIME OT PEAK - RUNOFF VOLUME/(l. 39 x Op. 100-YEAR 29.24 win 1 I ID t i A. 1 ',J J J J t t t t D. ESTIMATE STORAGE 1. S - (Q(Post)-Q(Pr )) - Tp S - 7678 CF 2. POND ELEVATIONS/AREA/VOLUME CUMULATIVE TEMP\PERM SED STORAGE REQ'D 27679 CF 27679 CF PERMAHENT STORAGE REQ'D 5899 CF 33578 CF ESTIMATED STAGE STORAGE 7678 CF 412SS CF ASSUME POND INVERT (DOTTOH OF POND) 871.0 SEDIMENT STORAGE REQUIRED 5899 CF WATER QUALITY SURFACE AREA REQUIRED 9057 SF ACCUMALATED Z ELEV AREA VOLUME VOLUME STAGE In S In Z 871.00 3629 0 0 0.0 872.00 4480 4047 4047 1.0 8.306 0.000 873.00 5398 4932 8979 2.0 9.103 0.693 874.00 6383 5884 14863 3.0 9.607 1.099 875.00 7434 6902 21764 4.0 9.988 1.386 876.00 8552 7986 29751 5.0 10.301 1.609 877.00 9736 9138 38888 6.0 10.568 1.792 878.00 15143 12340 51229 7.0 10.844 1.946 879.00 16662 15896 67125 8.0 11.114 2.079 800.00 18247 17448 84574 9.0 11.345 2.197 881.00 19899 19067 103641 10.0 11.549 2.303 882.00 21618 20753 124393 11.0 11.731 2.398 883.00 23403 22505 146898 12.0 11.897 2.485 884.00 25000 24197 171095 13.0 12.050 2.565 885.00 28000 26486 197581 14.0 12.194 2.639 886.00 31500 56375 227470 15.0 12.335 2.708 AVERAGE - 10.930 1.964 ASSURE SEDIMENT STORAGE ELEVATION - 874.0 SEDIMENT STORAGE VOLUME PERMANENT - 13911 CF ASSUME ORIFICE ELEVATION - 877.20 SURFACE AREA PROVIDED - 10817 SF PERMANENT WATER QUALITY VOLUME 29903 CF ASSUME RISOR ELEVATION = 878.80 TEMPORARY WATER QUALITY VOLUME - 22033 CF ASSUME EMERGENCY SPILLWAY ELEVATION - 880.10 ASSUME BARREL INVERT ELEVATION 874.0 3. REGRESSION ANALYSIS SUMMARY OUTPUT PERFORMED ON LAST 8 ENTRIES vher b-(sua(ln(Z)-ln(Z))-1/n-sua(ln(Z))-sua(ln(S)))/(su a(ln(Z)"2)-1/n-(sua(ln(S )))"2) b- 1.77 a-1/n-sua(ln(S))-b/n-sua(ln(Z)) a- 7.45 R"2-(sum(In(Z)-ln(S))-n- In(Z)_ln(S)_)"2/((sun (ln(z )"2)-n-In(Z)_"2)-(sua(In (S)"2)-n- ln(S)_"2) R"2- 1.00 Ks-3"a Ks- 1720 SEDIMENT Z STORAGE est ELEV 0.00 1.62 874.00 2.54 3.37 4.18 4.98 5.80 6.77 7.88 8.98 10.07 11.16 12.26 13.36 14.49 15.69 874.00 5899 CF REQUIRED 9057 SF REQUIRED 18563 CF REQUIRED I C. OUTLET STRUCTURES 1. PRINCIPLE SPILLWAY INVERT ELEVATION z 874.0 ' ASSUME RISOR ELEVATION 878.8 SOLVE FOR ROUGH RISOR SIZE @ 26.4 CFS DIAMETER(in)-Q-12/(Cv-(H"312) •3.14159) '.... ROUGH DIAMETER - SOLVE FOR ROUGH BARREL SIZE 31 in DIAMETER(in)- (Q-4/(3.14159-Cd-(2-g-h)". S)".S ROUGH DIAMETER - 21 in ASSUME RISOR DIA - 36 in 36 ASSUME BARREL DIA 24 in 24 ASSUME ORIFICE PLATE DIA 21 in 24 2. EMERGENCY SPILLWAY SOLVE FOR WEIR LENGTH USE h- 1.0 ft ASSUME SPILLWAY ELEV - 880.1 L-Q/(Cv-h"3/2) vhere Q(100) - 60.2 cfs RISOR Q Q ELEV 878.80 22.6 cfs ' EMERGENCY SPILLWAY Q 37.6 cfs WEIR LGTR (ft) 13 ft 100-YEAR H.W.L. 880.76 TOP OF DAM WEIR ORIFICE ORIFICE - PRINCIPAL 882.1 EMERGENCY TOTAL ELEV RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 678.0 0.0 22.6 0.0 0.0 0.0 0.0 879.0 2.8 23.2 15.2 2.8 0.0 2.8 879.2 7.9 23.7 21.5 7.9 0.0 7.9 879.4 14.5 24.3 26.4 14.5 0.0 14.5 879.6 22.3 24.8 30.4 22 3 0 0 22 3 ' 879.8 31.1 25.4 34.0 . 25.4 . 0.0 . 25.4 880.0 40.9 25.9 37.3 25.9 0.0 25.9 880.2 51.5 26.4 40.3 26.4 0.9 27.4 880.4 62.9 26.9 43.1 26.9 4.9 31.8 880.6 75.1 27.4 45.7 27.4 10.6 38.0 ' 880.8 08.0 27.9 48.1 27.9 17.6 45.5 881.0 101.5 28.4 50.5 20.4 25.6 54.0 881.2 115.6 28.8 52.7 28.8 34.6 63.4 881.4 130.4 29.3 ALLOWABLE OUTFLOW 54.9 29.3 • 44.5 26.4 73.8 CFS t t D. ROUTING 2, 10 6 111 YEAR POST-DEVELOPEMENT STORM TDRU POND ' 1. INPUT DATA FOR 2-YEAR STORM Q(2) 32.4 Tp 18.73 TIME INCREMENT 2.00 min ' Ks 1720 b 1.77 INVERT ELEVATION 871.00 ORIFICE ELEVATION 877.20 RISOR ELEVATION 878.80 PERMANENT STORAGE 65847 EM SPILLWAY ELEV 880.10 TIME INFLOW STORAGE STAGE ' 0.00 0.0 43814 877.20 2.00 0.9 43868 877.20 4.00 3.5 44133 877.23 6.00 7.S 44795 877.28 8.00 12.5 45997 077.37 10.00 17.9 47823 877.51 12.00 23.1 50283 877.70 14.00 27.5 53322 877.93 16.00 30.7 56816 870.18 ' 18.00 32.2 60593 878.44 20.00 32.0 64447 878.71 22.00 30.0 68060 878.95 24.00 26.5 70981 879.14 26.00 23.1 72999 879.27 28.00 20.1 74244 879.35 30.00 17.5 74907 879.39 32.00 15.2 75155 879.40 34.00 13.3 75120 879.40 1 36.00 11.5 74898 879.39 38.00 10.0 74559 879.37 40.00 8.7 74151 879.34 42.00 7.6 73708 879.31 44.00 6.6 73252 879.28 ' 46.00 S.8 72799 879.25 48.00 5.0 72357 879.23 50.00 4.4 71932 879.20 52.00 3.8 71529 879.17 1 54.00 3.3 71140 879.15 56.00 2.9 70791 879.12 58.00 2.5 70457 879.10 60.00 2.2 70145 879.08 62.00 1.9 69856 879.06 ' 64.00 1.7 69587 879.05 66.00 1.4 69337 879.03 68.00 1.3 69106 879.02 70.00 1.1 68891 879.00 ' 72.00 0.9 68693 878.99 74.00 0.8 68509 878.98 76.00 0.7 68330 878.96 78.00 0.6 68180 878.95 80.00 0.5 68034 878.94 82.00 0.5 67833 878.94 84.00 0.4 67773 878.93 PEAK INFLOW 32.4 CFS PEAK OUTFLOW n 14.6 CFS PEAK ALLOWABLE OUTFLOW 19.6 CFS PEAK ELEV - 879.40 PEAK STORAGE - 75155 CF 11 WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR DARREL RISOR SPILLWAY SPILLWAY OUTFLOW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.7 23.0 13.0 1.7 0.0 1.7 6.1 23.6 19.8 6.1 0.0 6.1 9.9 23.9 23.3 9.9 0.0 9.9 12.5 24.1 25.1 12.5 0.0 12.5 14.0 24.3 26.1 14.0 0.0 14.0 14.6 24.3 26.4 14.6 0.0 14.6 14.5 24.3 26.4 14.5 0.0 14.5 14.0 24.3 26.1 14.0 0.0 14.0 13.2 24.2 25.6 13.2 0.0 13.2 12.3 24.1 25.0 12.3 0.0 12.3 11.4 24.0 24.3 11.4 0.0 11.4 10.4 24.0 23.6 10.4 0.0 10.4 9.5 23.9 22.9 9.5 0.0 9.5 8.6 23.8 22.2 8.6 0.0 8.6 7.8 23.7 21.5 7.8 0.0 7.8 7.1 23.7 20.8 7.1 0.0 7.1 6.4 23.6 20.1 6.4 0.0 6.4 5.8 23.5 19.4 5.8 0.0 5.8 5.2 23.5 18.7 5.2 0.0 S.2 4.7 23.4 18.1 4.7 0.0 4.7 4.2 23.3 17.5 4.2 0.0 4.2 3.8 23.3 16.9 3.8 0.0 3.8 3.4 23.3 16.3 3.4 0.0 3.4 3.1 23.2 15.8 3.1 0.0 3.1 2.8 23.2 15.3 2.8 0.0 2.8 2.5 23.1 14.8 2.5 0.0 2.5 2.3 23.1 14.3 2.3 0.0 2.3 2.1 23.1 13.8 2.1 0.0 2.1 1.9 23.0 13.4 1.9 0.0 1.9 1.7 23.0 13.0 1.7 0.0 1.7 1.6 23.0 12.6 1.6 0.0 1.6 1.4 23.0 12.2 1.4 0.0 1.4 ,l I -,") 1 2. INPUT DATA FOR 10-YEAR STORM 0(10) 44 Tp 26.40 min TIME INCREMENT 2 00 min Ks 1720 b 1.77 INVERT ELEVATION B71.00 ORIFICE ELEVATION 877.20 RIGOR ELEVATION 878.60 PERMANENT STORAGE 43814 EM SPILLWAY ELEV 880.10 TIME INFLOW STORAGE STAGE 0.00 0.0 43814 877.20 2.00 0.6 438S1 077.20 4.00 2.4 44033 877.22 6.00 S.3 44499 877.25 8.00 9.2 45368 877.32 10.00 13.7 46741 877.43 12.00 18.7 48687 877.58 14.00 23.9 51245 877.77 16.00 29.0 S4416 878.01 10.00 33.6 58172 878.27 20.00 37.6 62447 878.S7 22.00 40.7 67103 878.88 24.00 42.8 71632 879.18 26.00 43.6 75463 879.42 28.00 43.3 78407 879.61 30.00 41.7 80638 879.74 32.00 39.0 82433 879.85 34.00 35.5 83828 879.94 36.00 32.2 64792 879.99 38.00 29.2 85361 880.03 40.00 26.4 SS578 880.04 42.00 23.9 85480 880.04 44.00 21.7 85104 880.01 46.00 19.7 84480 879.98 48.00 17.8 83637 879.93 50.00 16.1 82601 879.86 52.00 14.6 81395 879.79 54.00 13.3 80040 879.71 56.00 12.0 78659 879.62 58.00 10.9 77439 879.55 60.00 9.9 76428 879.48 62.00 8.9 7SS70 879.43 64.00 8.1 74831 879.38 66.00 7.3 74183 879.34 68.00 6.7 73608 879.31 70.00 6.0 73092 879.27 72.00 5.5 72626 879.24 74.00 S.0 72201 879.22 76.00 4.5 71812 879.19 78.00 4.1 71454 879.17 80.00 3.7 71123 879.15 82.00 3.3 70816 879.13 84.00 3.0 70531 879.11 86.00 2.7 70266 879.09 88.00 2.S 70018 679.07 PEAK INFLOW - 43.65 CFS PEAK OUTFLOW - 26.00 CFS PEAK ALLOWABLE OUTFLOW, 26.39 CFS PEAK ELEV 880.04 PEAK STORAGE 85S78 CF WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RIGOR BARREL RIGOR SPILLWAY SPILLWAY OUTFLOW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 22.8 9.0 0.8 0.0 0.8 7.3 23.7 21.0 7.3 0.0 7.3 1S.3 24.4 26.9 15.3 0.0 1S.3 22.S 24.9 30.6 22.S 0.0 22.S 28.5 2S.2 33.1 2S.2 0.0 2S.2 33.6 2S.S 34.9 25.5 0.0 25.S 37.7 25.7 36.3 25.7 0.0 25.7 40.6 25.9 37.2 2S.9 0.0 2S.9 42.4 26.0 37.7 26.0 0.0 26.0 43.0 26.0 37.9 26.0 0.0 26.0 42.7 26.0 37.8 26.0 0.0 26.0 41.6 25.9 37.S 25.9 0.0 25.9 39.7 2S.8 36.9 2S.8 0.0 2S.8 37.1 2S.7 36.1 2S.7 0.0 25.7 34.1 2S.S 35.1 2S.5 0.0 25.5 30.6 25.3 33.9 25.3 0.0 2S.3 26.9 2S.1 32.4 25.1 0.0 25.1 23.2 24.9 30.9 23.2 0.0 23.2 20.1 24.7 29.4 20.1 0.0 20.1 17.6 24.5 28.1 17.6 0.0 17.6 15.5 24.4 27.0 15.5 0.0 15.5 13.8 24.2 26.0 13.8 0.0 13.8 12.4 24.1 25.1 12.4 0.0 12.4 11.2 24.0 24.2 11.2 0.0 11.2 10.1 23.9 23.4 10.1 0.0 10.1 9.2 23.9 22.6 9.2 0.0 9.2 8.3 23.8 21.9 8.3 0.0 0.3 7.6 23.7 21.3 7.6 0.0 7.6 6.9 23.6 20.6 6.9 0.0 6.9 6.3 23.6 20.0 6.3 0.0 6.3 5.8 23.5 19.4 5.8 0.0 S.8 S.3 23.5 18.9 5.3 0.0 5.3 4.9 23.4 18.4 4.9 0.0 4.9 4.S 23.4 17.8 4.5 0.0 4.5 3. INPUT DATA FOR 100-YEAR STORM O(100) Tp TIME INCREMENT Ks b INVERT ELEVATION ORIFICE ELEVATION RISOR ELEVATION PERMANENT STORAGE EM SPILLWAY ELEV TIRE INFLOW STORA 0.00 0.0 4381 ' 2.00 0.7 4385 4.00 2.7 4406 6.00 6.0 44S8 ' 8.00 10.00 10.5 15.8 1557 1715 12.00 21.7 4940 14.00 28.1 5239 16.00 34.6 5615 18.00 40.8 6067 20.00 46.6 6591 22.00 S1.6 7139 24.00 5S.6 7636 26.00 28.00 58.4 59.9 8061 8160 30.00 60.1 8866 32.00 S8.9 9218 34.00 S6.3 9489 36.00 S2.6 9671 ' 38.00 48.2 9770 40.00 44.1 9802 42.00 40.4 9784 41.00 46.00 36.9 33.8 9733 9658 48.00 30.9 9567 50.00 28.3 9466 S2.00 2S.9 9359 54.00 23.7 9247 } 56.00 21.7 9133 58.00 19.8 9016 60.00 18.1 8898 ' 62.00 64.00 16.6 15.2 8776 8648 66.00 13.9 8510 68.00 12.7 8360 70.00 11.6 8199 72.00 10.6 8029 1 74.00 9.7 7862 76.00 8.9 7718 78.00 8.1 7604 80.00 82.00 7.5 6.8 7511 7433 84.00 6.2 7367 86.00 5.7 7310 88.00 5.2 7260 90.00 4.8 7216 ' 92.00 4.4 7176 94.00 4.0 7140 96.00 3.7 7107 98.00 PEAK INFLOW 3.3 7076 PEAK OUTFLOW PEAK ELEV - ' PEAK STORAGE 60 29.24 min 2 00 min 1720 1.77 871.00 877.20 878.80 43814 880.10 GE STAGE 4 877.20 S 877.20 1 877.22 8 877.26 8 877.34 1 877.46 2 877.63 4 877.86 3 878.13 5 878.45 6 878.80 3 079.16 6 079.48 6 879.74 1 879.99 5 880.22 1 880.43 1 880.58 4 880.69 5 880.74 1 880.76 6 880.75 0 880.72 0 000.68 4 000.63 6 080.57 2 880.51 7 880.45 3 680.38 8 880.31 1 880.24 2 880.17 6 880.10 S 880.01 3 079.92 4 879.03 3 879.72 0 879.62 8 079.53 6 079.46 3 879.40 6 879.3S 6 879.31 5 879.27 5 879.24 2 079.21 5 879.19 6 079.16 9 879.14 0 879.12 60.21 CFS 43.89 CFS WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 22.6 2.3 0.0 0.0 0.0 6.8 23.6 20.5 6.8 0.0 6.8 17.4 24.5 28.1 17.4 0.0 17.4 20.S 25.2 33.1 25.2 0.0 25.2 40.3 2S.9 37.1 25.9 0.0 25.9 52.8 26.S 40.6 26.5 1.3 27.8 64.6 27.0 43.4 27.0 5.6 32.6 74.1 27.4 45.5 27.4 10.1 37.4 80.6 27.6 46.8 27.6 13.5 41.1 84.2 27.8 47.4 27.8 15.5 43.2 BS.4 27.8 47.7 27.8 16.1 43.9 84.7 27.8 47.5 27.8 15.7 43.S 82.8 27.7 47.2 27.7 14.7 42.4 80.1 27.6 46.7 27.6 13.2 40.8 76.9 27.S 46.0 27.S 11.5 39.0 73.3 27.3 45.3 27.3 9.7 37.0 69.5 27.2 44.5 27.2 7.9 35.0 65.6 27.0 43.7 27.0 6.1 33.1 61.7 26.9 42.8 26.9 4.4 31.3 57.8 26.7 41.8 26.7 2.9 29.6 53.9 26.5 40.9 26.5 1.6 28.1 49.9 26.3 39.8 26.3 0.6 26.9 4S.9 26.1 38.7 26.1 0.0 26.1 41.6 2S.9 37.5 25.9 0.0 25.9 37.0 2S.7 36.1 25.7 0.0 25.7 32.3 2S.4 34.5 25.4 0.0 25.4 27.6 25.2 32.7 2S.2 0.0 2S.2 23.1 24.9 30.8 23.1 0.0 23.1 19.4 24.7 29.1 19.4 0.0 19.4 16.7 24.5 27.6 16.7 0.0 16.7 14.S 24.3 26.4 14.5 0.0 14.5 12.7 24.2 25.3 12.7 0.0 12.7 11.3 24.0 24.3 11.3 0.0 11.3 10.1 23.9 23.4 10.1 0.0 10.1 9.1 23.9 22.6 9.1 0.0 9.1 8.3 23.8 21.9 8.3 0.0 8.3 7.5 23.7 21.2 7.S 0.0 7.5 6.8 23.6 20.5 6.8 0.0 6.8 6.3 23.6 19.9 6.3 0.0 6.3 5.7 23.S 19.4 S.7 0.0 5.7 880.76 EMERGENCY SPILLWAY ACTIVATED 98021 CF t t t E. ORIFICE BOLE 4 -DAY RELEASE NUMBER OF BOLES 2 AVERAGE SURFACE AREA 13771 SF DETENTION DEPTH 1.60 FT a - 0.415/t-A-(h)".S a - 3.01 SO IN d - 1.38 IN 1 6/16 in 0 -DAY RELEASE NUMBER OF HOLES 2 AVERAGE SURFACE AREA 13771 SF DETENTION DEPTH 1.60 FT a - 0.41S/t-A-(h)".S a - 1.51 SO IN d - 0.98 IN 0 16/16 in AVE d - 1.18 IN 1 3/16 in F. FLOTATION OF RIGOR VOLUME OF RIGOR ASSUME INVERT ELEV 874.0 ASSUME RIGOR ELEV 878.8 RIGOR DIAMETER - 36 in V - 3.14159-r'2-h V 33.9 CF VOLUME OF BARREL ASSUME LENGTH - 15.00 ft BARREL DIAMETER - 24 in V - 3.14159-r"2-L V - 47.1 CF TOTAL VOLUME - 81.1 CF CONCRETE REQ'D DISPLACED WATER - 5058 LB WEIGHT OF CONCRETE (DOUYAHT) - 87.60 LB/CF CONCRETE REQ'D - 57.7 CF RIGOR AREA • 7.1 SF CONCRETE REQ'D - 8.2 LF ADD IS% SAFETY FACTOR - 9.4 LF 66.4 CF ' SUMMARY TOP OF DAM 100-YEAR HIGH WATER 10-YEAR HIGH WATER EMERGENCY SPILLWAY ELEV RISOR ELEV ORIFICE ELEV INVERT ELEV SEDIMENT STORAGE REQUIRED SEDIMENT STORAGE PROVIDED TEMPORARY WATER QUALITY VOLUME REQUIRED ' TEMPORARY WATER QUALITY VOLUME PROVIDED SURFACE AREA REQUIRED SURFACE AREA PROVIDED RISOR DIAMETER BARREL DIAMETER ORIFICE PLATE DIAMETER ORIFICE HOLE t/DIAMETER WEIR LENGTH t [I 1 1 2 @ 882.1 880.8 880.0 880.1 878.80 877.20 874.0 5899 CF 13911 CF 18563 CF 22033 CF 9057 SF 10817 SF 36 in 24 in 21 in 1.38 in 13 ft STORM WATER MAP PIEDMONT CROSSING BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' SCALE: 1" = 50' Sheet 1 of 2 / --- ?- X147 j 129 131 128 130 114 I ! LE 113 3? : ' CI?C?? ' N 112 110 108109 106`107 4 103 10 105 102 '? 101 b bSOil nb b0"? v ?- \ DSO %J/ \3/ \ b! 1ao2 I a N y 0? ?V ?401 v I -'5' P it r r ?6?? y l Y r D I I? ,ea 31 T o o'a N, ° N VEL SPREA ER ^ I I I _ FOR PONDS 4 DISCHARGE Q10 =26 CFS I LENGTH=30 ET I STORM WATER MAP PIEDMONT CROSSING BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' SCALE: 1" = 50' Sheet 1 of 2 N I L 4'AV IV 1 J? 4 LL 840 -1?1 EL SPREA7ARLA FOR FORESTED SIGN -=---1-0 0 LF/ 1--CS OF FLOW LENGTH=170 FEET 84? n J OCT 1 0 2005 October 6, 2005 DENR - WATER QUALITY S&EC #5-1325w1 V,7r .ANDS AND STORMWATER 5RA1.1W Environmental Consultants, PA . Suite C • Concord, North Carolina 28025 • Phone: (704) 720-9405 • Fax: (704) 720-9406 US Army Corps of Engineers Raleigh Regulatory Field Office Attn: Todd Tugwell 6508 Falls of Neuse Road, Suite 120 Raleigh, NC 27615 Dear Mr. Tugwell and Ms. Karoly: NC Division of Water Quality 401 Oversight/Express Permits Unit Attn: Cyndi Karoly 2321 Crabtree Blvd Raleigh, NC 27604 Our client, Faith Properties of the Carolinas, requests the use of Nationwide Permits 12 and 39 for the proposed "Piedmont Crossing" project in High Point, NC. Specifically, this notification requests impacts associated with development for Tracts B-E of the proposed project. Tracts F-I have no final designs at this time and wetland/stream impacts are not anticipated for those parcels. The subject property (including all tracts) is approximately 197-acres in size and located west of Barrow Road. A signed agent authorization accompanies the enclosed preconstruction notification. As proposed, Piedmont Crossing will result in the construction of single and multifamily units as well as a section of Piedmont Parkway to be funded and constructed by the developer. No other segment of the proposed Piedmont Parkway to be constructed for this project. The approximate property boundaries are shown on the attached USGS Topo Quad vicinity map. Surface waters on the property are unnamed tributaries that flow to Oak Hollow Lake in the Randleman Lake watershed/Cape Fear river basin (WSIV;CA/ WCA.Tier 4). S&EC has met with regulatory personnel from the USACE and NC DWQ regarding approval of our wetland delineation and Randleman buffer origin points, respectively. As proposed construction of Piedmont Crossing will result in impacts to perennial streams, wetlands, and isolated wetlands. Permanent impacts to perennial streams involve 149 linear feet for 2 road crossings. A road crossing over the largest perennial stream will involve an arch span to avoid impacts. Two temporary stream impacts totaling 301f are proposed for sanitary sewer construction. Proposed wetland impacts associated with lot fill and road crossings total .09 acres. Impact W 1 on the attached sheet involving approximately 0.016 acres of wetlands (included in the .09ac total) has occurred. That impact total fell below USACE and NC DWQ notification thresholds. Proposed impacts to isolated wetlands total 0.082 acres. The isolated wetland impacts are below notification thresholds for the NC DWQ. Proposed impacts to Randleman Lake riparian buffers (50') total 24,510sf for Zone d and 18,170sf for Zone 2, respectively. Buffer impacts are associated with proposed road and sewer crossings. The crossings occur at perpendicular angles and are exempt under the Randleman Lake watershed buffer rules. Enclosed with the completed PCN are impervious calculations and stormwater management plans from the project engineer. Proposed stormwatcr management facilities include construction of (4) wet ponds followed by level spreaders and (2) bio-retention cells. Stormwater management facilities have been approved by the watershed review committee and follow City of High Point guidelines as well as NC DWQ general certification #3402. Greensboro Office: Ralei;h Office: 3817-E Lawndale Drive 11010 Raven Ridge Road Greensboro, NC 27455 Raleigh, NC 27614 Phone: (336) 540-8234 Phone: (919) 846-5900 Fax: (336) 540-8235 Fax: (919) 846-9467 Attached please fmd: 1) A completed Pre-construction Notification 2) signed Agent Authorization Form, 3) USGS topo quad vicinity map, 4) Guilford County Soil Survey map, 5) Construction plans, 6) Cross-sectional view of arch span, 7) 3 copies of impervious calculations/stormwater plans, 8) Wetland data forms, and 9) 401 processing fee of $475. Please call if more copies of the stormwater plans/calculations are needed. Sincerely, Wendell Overby NC Licensed Soil Scientist Office Use Only' Form Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 12,39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Faith Properties (Ken Lindholm) Mailing Address: 10410-50OG Park Road Charlotte, NC 28210 Telephone Number: (704) 564-2672 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Wendell Overby Company Affiliation: Soil & Environmental Consultants, PA Mailing Address: 236 LePhillip Court Suite C Concord, NC 28025 Telephone Number: (704) 720-9405 Fax Number: (704) 720-9406 E-mail Address: woverby(@sandec.com Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Piedmont Crossing 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 180005500000100004, 180005500000100001, 18000550000010000501 4. Location County: Guilford Nearest Town: High Point Subdivision name (include phase/lot number): Piedmont Crossing Directions to site (include road numbers/names, landmarks, etc.): 1-40 exit 210 (Hwy 68). Go South 2.5 miles to Willard Dairy Road. Turn right go 1.3 miles to Barrow Road. Property is across Barrow Road. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 350525°N 79.9912°W 6. Property size (acres): 7. Name of nearest receiving body of water: UT Oak Hollow Lake (WSIV CA) 8. River Basin: Cape Fear (03030003) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Formerly frming operation with open pastures and woodland. Two homes occurred on the property. General land use in vicinity is predominantly residential. A high school and fire station located in very close proximity. Page 6 of 13 10. Describe the overall project in detail, including the type of equipment to be used: Tract B-64 single family homes C I Phase 1&2 181 single & multifamily units, C Ph 23 24 multi family units D Ph 1 & 2 106 single family units, E 304 multi family units. Use of heavy equipment including pans backhoes and trenches required for site preparation. 11. Explain the purpose of the proposed work: Construction of Piedmont Crossing project and a portion of Piedmont Parkway Thoroughfare IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules.No prior determinations or permits known. S&EC's delineation approved by Andrea Wade (USACE). Site meetings between S&EC, USACE and NC DWO have been held to review wetlands/streams and Randleman buffers. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. Future phases predicted but no impacts estimated at this time. Design of future phases have not been finalized to date (Tracts F-I). No future impacts anticipated for those tracts. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts:Two perennial stream impacts totaling 149 If proposed for road crossings. Wetland impacts totaling .09 acres requested. Impacts to isolated wetlands total .083 acres. Temporary stream impacts of 301f proposed for sewer xings. Page 7 of 13 Buffer impacts zone 1 (20,21 0sfl zone 2 (14,65 8). Impacts exempt for proposed road xings. Impacts for temporary xings- zone 1 (4 300sf) zone 2 (3 512sf). Exempt for sewer xings. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) W1 Fill Linear headwater No 0 .016 W2 Fill Linear headwater No 0 .006 W3 Fill/Pipe Linear headwater No 0 .008 W4 Fill Headwater No 0 .05 W5 Fill Headwater No 0 .01 Total Wetland Impact (acres) .09 3. List the total acreage (estimated) of all existing wetlands on the property: 3.45 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multi 1 length X width, then divide b 43,560. Perennial Average Stream Impact Stream Impact Area of Number Stream Name Type of Impact or Intermittent Width Length Impact (indicate on map) Before (linear feet) (acres) Impact S l UT Oak Hollow L Pipe Perennial 4' 74 .007 S2 UT Oak Hollow L Pipe Perennial 3' 75 .005 T1 UT Oak Hollow L Temp Perennial 4' 15 .005 T2 UT Oak Hollow L Temp Perennial 4' 15 .005 Total Stream Impact (by length and acreage) 149 .012 179(+temp) ,022+temp 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name of Waterbody Type of Waterbody Area of Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma) ocean, etc.) (acres) N/A N/A N/A N/A N/A Total Open Water Impact (acres) N/A Page 8 of 13 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.012 Wetland Impact (acres): .09 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) .102 Total Stream Impact (linear feet): 149 7. Isolated Waters Do any isolated waters exist on the property? ® Yes ? No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. Three isolated wetlands approved by USACE on property totaling 0.2 acres. Proposed impacts of 083 acres to isolated wetlands for the development. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ® uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): excavation with installation of riser Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): stormwater Current land use in the vicinity of the pond: Agriculture or forested. Size of watershed draining to pond(s): 1-19.3ac, 2-16ac, 3-14.8ac, 4-13ac Expected pond(s) surface area: 1-.23ac 2-.38ac 3-1.3ac, 4-.25ac VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts.Since our involvement with nroiect chances in road lavout made to avoid additional stream/wetland impacts. Proposed arch swan proposed to avoid impacts to perennial stream Project designed to avoid buffer impacts except for exempt road/sewer crossings at perpendicular angles Small % of wetland and stream impact amounts compared to total wetland/stream acreages on site and size of project. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 9 of 13 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http:/ih2o.enr.state.nc.us/ncwetlands/strm,gide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Planning of subdivision to avoid and minimize impacts will serve as mitigation. Development will utilize stormwater ponds combined with level spreaders as well as bioretention areas for water quality. Impacts to perennial (mitigable) streams at the minimum necessary and less than 1501f. Impacts to large perennial stream avoided at cost of bottomless span Road alignments have changed to reduce proposed impacts. Proposed wetland impacts less than 1 acres. Proposed isolated wetlands impact less than .1 acres. Project subject to Randleman and water supply buffers. Proposed buffer impacts exempt 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): 0 Amount of buffer mitigation requested (square feet): 0 Page 10 of 13 Amount of Riparian wetland mitigation requested (acres): 0 Amount of Non-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify)? Yes ® No ? 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multi Required plien r,r:,. , f. .. 1 24,510 3 (2 for Catawba) 0 2 18,170 1.5 0 Total 42,680 0 * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. *Buffer impacts for proposed road and sewer crossings are exempt. Page 11 of 13 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. Buffer impacts for exempt activities requirin.g no mitigation XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Calculations for four water quality ponds attached. Delineation maps of watersheds and construction plans of four wet ponds and 2 bioretention areas attached. Estimated impervious percents to be treated by pond 1 (28.4%), pond 2 (53.8%), pond 3 (38.9%), pond 4 (38.2%) bioretention 1 (50%) bioretention 2 (48%). Stormwater facilities approved by watershed review committee. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Construction of sanitary sewer lines are proposed for the development XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes El No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:In our opinion project is residential subdivision/amenities that will not result in violation of downstream water quality standards. Project mandated to conform to water supply rules and Randleman buffers. On site stormwater controls to be constructed that meet state and local rules. Page 12 of 13 XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 04_,VChjt (OA - 1 -7 105 Applicant/Agent' Signature Date (Agent's signature is valid my if an authorization letter from the applicant is provided.) Page 13 of 13 r 4V -Soil & Environmental Consitha-it§ PA f 236 L4UUp Court. Suite C Concord, Nash Carolina 28025 Mow: (704) 720.9405 Fax: (704) 720.9406 ti wwwSandEC.com AGENT AUTHORIZATION FORM All Blanks To Be Filled In B The Current Landowner Name: Address: / O W 4 ' --5 OtJ C- /?? r ?G ?/ G .?/?o ?f r? , / < Z z- . Phone: o y ?? L lv ?Z ,: Project Name/ Description: _PIEDMoN7 CRbSS JnlG Date: 1-1-3 O V The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 g I Attu Field Office: •Raleigh Re: Wetlands Related Consulting and Permitting To Whom It May Concern: I, the current propgE!y owner, hereby designate, and authorize Sod & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit applications; to furnish upon request' supplemental information in support of applications, etc. from this day forward. The f 3 .- day of -7? This notification supersedes any previous correspondence concerning the agent for this project. : . . NOTICE This authorization, for liability and professional courtesy seasons, is valid only for ta.. government officials to enter the property when accompanied by S&EC staff. You shonld'call S&EC to arrange a site meeting prior to visiting the site. Print Property Owner's Name Property Owner's Signature `.` cc: Mr. John Dorney cc Mr. Wendell Overby t NCDENR - DWQ Soil & Environmental Con'suJtarits PA 2321 Crabtree Boulevard Raleigh, NC 27604 bLU& ac-d oath fnxmdoe Greensboro Office: Hickory Area Office: Ralci Off a: 3817-E Lawndale Drive 710 Boston Road 11016 Raavca,Ridge Road Greensboro, NC 27455 Taylorsville. NC 28681 Raleigh. NC 27614 Phone: (336) 540-8234 Phone: (828) 635-5820 Phone (919) 846-5900 Guilford County Soil Survey w o? N? li M z o ??--?" 1088.3p 'SINGLE%MULTI-FAMILY RESIDENTAL (RM-FS STANOARDS) dOTRL AREA - 31.3 Ac. LA ALLOTMENT - 14.1 Ac. (467) ilssw =.===_%/ -FAMILY RFSDENTAL 0 15-7 STANtARDS) ,TAL AREA- 24.0 A- ?S , ? LL0TVENT-10.8 Ac. 744 `„/ 6. o`, 0 a To i I? N C z \'", \ S 86'-51'-51" E ?`V? 750.7' ?l\ TRACT 'i"--- ____-SINGLE/MULTI-FAl4lLY RESIDENTIAL- o (RM-Fi STANDARDS FOR TRACTS C-1,2,3) j o AREA C-1 = 36.4 Ac. T AREA C-2,3 - 3.0 Ac.t ?,o ISA ALLOTMENT - 15.4 Ac. (457) MASTER SKETCH PLAN !-- UF' PIEDMONT CROSSING DEVELOPED BY FAITH PROPERTIES OF THE CAROLINAS, LLC 500' 250' 0 500' 1000' ;ALE: 5- 00' ?ITi CF HIGh PrdhIT i iC','IiJSHIP - GUILFuRD CCUN7i' NGRTH CAROLIIIA. I „a u?. ?oo4-osa _EPTEI.ICEP, 200. SITE DATA 1 - ZONING: CU-PD-MIXED - REFERENCES: MAP 550, BLOCK 1, LOT 5; } MAP 550, BLOCK 1, LOT 4; MAP 550, BLOCK 1, LOT 1 I - TOTAL AREA = 196.6 Ac.t 1 - No. OF TRACTS = 8 I % - TOTAL MAXIMUM NUMBER OF RESIDENTIAL UNITS = 773 - AMOUNT OF COMMON AREA REQUIRED = 19.3 Ac. (2.5/100 UNITS) 1 - TOTAL AREA OF NON-RESIDENTIAL DEVELOPMENT = 52.4 Ac. - AMOUNT OF COMMON AREA REQUIRED = 5.2 Ac. (10%) - TOTAL COMMON AREA REQUIRED = 30.1 Ac. WATERSHED DATA - WATERSHED: OAK HOLLOW WCA TIERS 4 AND CITY LAKE GWA - TOTAL ALLOWABLE ISA = 49.1% - MAXIMUM PROPOSED ISA = 48.5% - EXISTING ISA TO BE REMOVED = 0.78 Ac.t TOTAL EXISTING STRUCTURES = 0.49 Ac.t EXISTING DRIVES = 0.27 Ac.t ALLOTMENT TO TRACT 'A' = 0.18 Ac. REMAINING ALLOTMENTS = 0.60 Ac. -SOIL TYPE: EnB, EnC, MhB2, MhC2, Co, Ch - AVERAGE SLOPE: 7% -DISTANCE TO FLOODWAY: 0 LF.f nr',/EI_(;Prr FAITH PROPERTIES OF THE CAROLINAS, LLC° c/o KENT LINDHCLM 10410-5000 PARK RD. CHARLOTTE, PIC 25210 PHONE: (704)-541-8 _31 TRACT NUMBER OF RESIDENTIAL UNITS B-PH-1 64 (SINGLE FAMILY) Ct-PH-1,2 181(C-1-PH-1 SINGLE FAMILY) (C-1 PH-2 MULTI-FAMILY) C-2,3 24 (MULTI-FAMILY) D-PH-1 59 (SINGLE FAMILY) D-PH-2 47 (SINGLE FAMILY) E 305 (MULTI-FAMILY) F 0 G 0 H 0 1 0 NON-RESIDENTIAL AREA (ACRES) 0 0 0 0 0 1.0 10.0 19.5 14.2 8.7 • .,r _ _ r. 7 Co UTI 1 1 T 'r?, 1 , 1 I?1 •? /r Q 91'.p5' r ,. ZAL r/ <N 7?d1 28W r +° r r I 1 I -- ----° S 89'- -17 E ?----- !'IL T? 0.49' SU;;DiVIS 0 1 / v I N 85-57'-55' > 675.00' TOTA 8 O Y. , O O u O Q i 0 ?p 0 A ??' SH11, 1 T 1T r nu ."" INHEERT . E E "IF OPEN, BOTT'O M ^I fTI ;?, ITI ?f ,TT- ------- - ---------- - ----- ----------- ------ i?/a r 4tit 1aM w I_,>r CTS 0 0 0 `WNIS" I I I I w i I ,I/ I /L - I Lf > I ju I I I 1•. ? ?., pl 0 0nlr I V oujj iu ?\ < S 87'_59'-33/ T?31_86'_TOTAL?_ t • --. ..-.. /? }__.y? 1163. - 6 V `7 HIF (I T ;iL•;ntti` I?VnII?.,CL', ?i_r7f I (I ?I T I'.' f / 1 !ol ?? L1 0 1 I `' I b?_ ?lly THIS "TAE 20-264 - - - - - 68' DUKE POWER IG -?-? I-- 1- -----------`_ OVER .F-AN Ih i / 3t .70' f J/ O / , JJ/?'%? 0 0 0 a" 04 on 1-j /- / r O 27 lA?? = ?I9 I r r j? r/ , J 1 _ r I /h( ° h .. ( _ z / of /-'r JJ /S 68'-54'-18 W / / 145.50 N • • UTURE Pr1a' NO PL',NS ,1VAIL ,EL' A7 TI-IS T11-1E 55- > . 'ooo / Wetland & Stream Impact Map ) BARROW ROAD - ` 1 ------ CITY OF HIGH POINT + ` GUILFORD COUNTY, NORTH CAROLINA \ \\? , ? Sheet, ! 0 E a \ ? / OVERALL SITE - 10 O 0 ® ^?r Y O O • nl r ;/ l / ' I 300' 0 300' SCA,LE: X00' {I ? I r --- I I Cv C I. l li Line Lt 1, L2 L3 I L4 L5 L6 L7 L8 I L30 I L31 P L32 I L33 L36 III L37 L33 L39 L43 L46 L49 Bearing Distance 86'-45-21" W 162.38' 89'-57'-46" E 133.69' 59'-50'-48" W 49.92' 29'-30'-56" W 50.62' 59'-47'-11" E 77.39' 1'-43'-19" W 225.61' 38'-40'-05" W 61.88' 89'-58'-Ot" E 45.39' 00'-05'-28" E 14.67' 51'-16'-45" W 4.15' 14'-58'-36" W 135.74' 75'-42'-25" E 90.02' 00'-51'-56 ; W 54.67 00'-51;-56; W 2.52; 88'-51,-13" W 165.98 85'-12 -48 W 92.14 32'-28'-43" W 20.09' 87'-37'-15" W 91.06' 02'-16;-40 W " 43.49; 02'-16 -40 W 16.52 87'-59'-33" W 148.59' 8T-19'-24" W 14.23 19'-31'-23" W ' " 104.17' ' 89'-56 -32 E 169.03 87'-07'-03" E 219.86' 83'-27'-57" W 239.41' 86'-28'-44" W 75.78' 19'-31'-17" W 85.01' 600' 4111, * W * r rmS' 840 ;%t- -- ZONE 1 05 SF! ZONE ?: 4,w2 .?1 / r 4 L 1'? 1 r1 1 Wetland & Stream Impact Map BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' SCALE: 1" = 50' a N o N \ N ''CIppM W \ F a ?. o c ? n r ? 0 .y i1103A ' ? ETT AND ':?? ,EA i A ? n ,{(0`d?L T i, "PO E 1W?'til -1 1170 v ti +L 668 8j? 8j4 8?6 \ qo? T 70e' 866 2 ' 8 88 j 8a?? 74 126) ? 127 J / e>s 128 129 130 r r13 3 so? •, a2q' _ i 62 /r 209 Iasi ? r 9807 ,1 I 's .2 'q6 \ ?i .2 '$ fe - I 74, 4' -0. i 82 i / X06 ?Od Os Wetland & Stream Impact Map BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' SCALE: 1" = 50' Oi 5 70 Ll. 1 it iLi ICTS / r' a lI ?' CL i / CL XL CL / 0 ?o SILT FLiJCF / 1CL A A v ? A v os N n I `1? y N C V ti ~ ?J V a N ? IE?1F CREEh;? "• T-? n?0 'po ?i ?N'?QR DRILY .?1 1. DISTURBID, 15 Ll' it%RY'?RBUFIi ER ILiPA? 1 6 ik5 %b ??0 6 LILT F;EHCE {I I c a u .? r r _J l / l ?c/96 9 A V, ct AW4' A' 1c1 AW4' icl AW4' Wetland & Stream Impact Map i+'1` _BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' SCALE: 1" = 50' / S RL1a?;i T'0 BE Tl } nP. _'TT 17 DISTURBED: 15 L`? TEiVIPORARY PUFFER IAPAC,T' Z(`'1E - ='.,09C) i zo/ m ? P r , ? Z o ? /-, n y ? q D q2. D 7-1 LA m J vx / /////r Ll 221 'J L o" 1 W F 0 -1 P?TD Ix, 22 '3, 610 S EN BOTTOM CROSSING HEADWALLS B-J BUFFER -11,11FACTS ZONE 1: 5,577 S1± ZONE ',805 SF Wetland & Stream Impact Map PIEDvl(D1 J l CFOS.` ,' BARROW ROAD CITY OF HIGH POINT GUILFORD COUNTY, NORTH CAROLINA 50' 25' 0 50' 100' SCALE: 1" = 50' sheet 5 or 5 T ?'1ETI?AI? AREA TO BE RE JOVED: `?,2 1n N- oo? IVET??11 D ?=A TO BE X OVED- / 511F L 412028 o 2038/ ^ T L n i / ,IV LPER`JIOUS APT` `?II'EIN 1-0(,!?-/BUFFER: f i tREA I TXl S-E DISTURBED: LF n c"' I I N ? 42 ' ' '• : :`:: :., z .:: , : .. 8" S.S. PIEDMONT CROSSING DRIVE MAIN CREEK CROSSING 8" W.L. 7` n N N ,... 40' 30' 20' 10' 0 40' 80' : r 77144-.' SCALE: J"=40' 26+95 27+00 27+05 27+10 27+15 27+20 27+25 27+30 27+35 27+40 27+45 27+50 852.50 '--,] PROPO GHAU SED R OAD J 850.00 PROP SED 4 'x10' CON/ PAN RIDGE 847.50 SYSTE M 845.00 .00 0 DIS RBA CE THIN 10' 0 842.50 WI IN 10' OF .0 it 840.00 TOP OF 8 NK 837.50 \ F00 ING TO AO EXI TING RADE 835.00 EXTE ND TO ROCK 832.50 6' a 12' 18' SCALE: 1" = 6' Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21/03 Applicant/Owner. Faith Properties County: Guilford Investigator: W. Overby, A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Mix-Pine-Hardwood Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: Upland (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Pinus viriginana Tree FACU 9. Pinus echinata Tree FACU 2. Liriodendron tulipifera Tree FAC+ 10. 3. Liquidambar styraciflua Tree FAC 11. 4. Juniperus virginiana Tree FACU- 12. 5. Rubus argutus Herb FACU 13. 6. Acer rubrum Tree FAC 14. 7. Lonicera japonica Herb FAC- 15. 8. Quercus alba Tree FACU 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 40 Remarks: Much of upland in pasture (fescue) or cultivated field. HYDROLOGY _ Recorded Data (Describe in Remarks): _ Stream, Lake or Tide Gauge Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: Inundated Saturated in Upper 12 Inches Sediment Deposits Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: WA (in.) _ Water-Stained Leaves _ Local Soil Survey Data Depth to Free Water in Pit: WA (in.) FAC-Neutral Test Other (Explain in Remarks) Depth to Saturated Soil: WA (in.) Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: Uplai+d crvi c Map Unit Name Drainage Class: Well (Series and Phase): Enon Field Observations Taxonomy (Subgroup): Ultic Hapludalf Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-4 Ap 10YR 4/2 Sand Loam 4-12 Bt1 2.5Y 5/4 Sand clay loam 12+ Bt2 10YR 5/8 Clay Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: L- I WFTI ANnS nFTFRMINATION X Hydrophytic Vegetation Present? - Yes No Is this sampling point within a wetland? Wetland Hydrology Present? Yes x No Yes x No Hydric Soils Present? - Yes x No Remarks: .1 11 Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21/03 Applicant/Owner. Faith Properties County: Guilford Investigator: W Overby A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Headwater Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: Wetland (if needed, explain on reverse.) f nrTA. ^Ll Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Juncus effusus Herb FACW 9. 2. Sambucus Canadensis Herb FACW 10. 3. Salix nigra Tree OBL 11. 4. Carex sp. Shrub FACW 12. 5. Rubus argutus Herb FACU 13. 6. Cyperus strigosis Herb FACW 14. 7. Ludwigia sp. Herb OBL 15. 8. 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 85 Remarks: _ Recorded Data (Describe in Remarks): _ Stream, Lake or Tide Gauge _ Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: x Inundated x Saturated in Upper 12 Inches _ Sediment Deposits Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): x Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: 0-2 (in.) Water-Stained Leaves Local Soil Survey Data Depth to Free Water in Pit: 0-12+ (in.) x FAC-Neutral Test _ Other (Explain in Remarks) Depth to Saturated Soil: 0-12+ (in.) Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: wetland J%JI"J Map Unit Name Drainage Class: Poorly (Series and Phase): Wehadkee Field Observations Taxonomy (Subgroup): Fluvaquentic endoaquept Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-4 Ap 10YR 5/2 Loam 4-12 Bg 10 YR 6/2 7.5YR 5/8 Few/Distinct Sand clay loam Hydric Soil Indicators: Histosol Concretions _ Histic Epipedon High Organic Content in Surface Layer in Sandy Soils _ Sulfidic Odor Organic Streaking in Sandy Soils x Aquic Moisture Regime x Listed on Local Hydric Soils List X Reducing Conditions x Listed on National Hydric Soils List x Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: L- 11 urcrt A WIC nCTCDRA1UATI(lN X Hydrophytic Vegetation Present? _ Yes No Is this sampling point within a wetland? Wetland Hydrology Present? x Yes No x Yes No Hydric Soils Present? x Yes _ No Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21103 Applicant/Owner. Faith Properties County: Guilford Investigator. W. Overby, A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Riparian wetlands Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: wetland (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Ligustrum sinense Tree FAC 9. 2. Liriodendron tulipifera Tree FAC+ 10. 3. Liquidambar styraciflua Tree FAC 11. 4. Microstegium vimenium Herb FAC 12. 5. Smilax rotundifolia Vine FAC 13. 6. Acer rubrum Tree FAC 14. 7. Woodwardia areolata Herb OBL 15. 8. Salix nigra Tree OBL 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 100 HYDROLOGY _ Recorded Data (Describe in Remarks): _ Stream, Lake or Tide Gauge _ Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: Inundated x Saturated in Upper 12 Inches _ Sediment Deposits x Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): x Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: 0 (in.) x Water-Stained Leaves x Local Soil Survey Data Depth to Free Water in Pit: 0-12 (in.) FAC-Neutral Test _ Other (Explain in Remarks) Depth to Saturated Soil: 0-12+ (in.) Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: wetland SOILS Map Unit Name Drainage Class: Poorl y (Series and Phase): Worsham Field Observations Taxonomy (Subgroup): Typic Endoaquult Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-5 A 10YR 5/1 Sand Loam 4-15 Bg 10YR 6/1 10YR 5/2 Common/Distinct Clay loam Hydric Soil Indicators: Histosol Concretions _ _ Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils _ x Aquic Moisture Regime x Listed on Local Hydric Soils List x Reducing Conditions x Listed on National Hydric Soils List x Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: L- 11 WETLANDS DETERMINATION X Hydrophytic Vegetation Present? - Yes No Is this sampling point within a wetland? Wetland Hydrology Present? x Yes No x Yes No Hydric Soils Present? x Yes No Remarks: L- I Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21/03 Applicant/Owner. Faith Properties County: Guilford Investigator: W. Overby, A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Mix-Pine-Hardwood Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: Upland (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Pinus viriginana Tree FACU 9. Pinus echinata Tree FACU 2. Liriodendron tulipifera Tree FAC+ 10. 3. Liquidambar styraciflua Tree FAC 11. 4. Juniperus virginiana Tree FACU- 12. 5. Rubus argutus Herb FACU 13. 6. Acer rubrum Tree FAC 14. 7. Lonicera japonica Herb FAC- 15. 8. Quercus alba Tree FACU 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 40 Remarks: Much of upland in pasture (fescue) or cultivated field. HYDROLOGY _ Recorded Data (Describe in Remarks): _ Stream, Lake or Tide Gauge _ Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: Inundated Saturated in Upper 12 Inches Sediment Deposits Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: WA (in.) Water-Stained Leaves Local Soil Survey Data Depth to Free Water in Pit: N/A (in.) FAC-Neutral Test Other (Explain in Remarks) Depth to Saturated Soil: N/A (in.) Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: Upla*d Czn!! C Map Unit Name Drainage Class: Well (Series and Phase): Enon Field Observations Taxonomy (Subgroup): Ultic Hapludalf Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-4 Ap 10YR 4/2 Sand Loam 4-12 Bt1 2.5Y 5/4 Sand clay loam 12+ Bt2 10YR 5/8 Clay Hydric Soil Indicators: Histosol Concretions Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils Aquic Moisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: WETI ANDR DETERMINATInN X Hydrophytic Vegetation Present? - Yes _ No Is this sampling point within a wetland? Wetland Hydrology Present? Yes x No Yes x No Hydric Soils Present? - Yes x No Remarks: -1 11 Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21/03 Applicant/Owner. Faith Properties County: Guilford Investigator: W Overby A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Headwater Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: Wetland (If needed, explain on reverse.) \I?A TYI\I VL.VL-I r%I IV 1\ Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Juncus effusus Herb FACW 9. 2. Sambucus Canadensis Herb FACW 10. 3. Salix nigra Tree OBL 11. 4. Car-ex sp. Shrub FACW 12. 5. Rubus argutus Herb FACU 13. 6. Cyperus stri_gosis Herb FACW 14. 7. Ludwigia sp. Herb OBL 15. 8. 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 85 Remarks: J vr%nr%l !1!_v 111 ulwwv 1 _ Recorded Data (Describe in Remarks): _ Stream, Lake or Tide Gauge _ Aerial Photographs Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: x Inundated x Saturated in Upper 12 Inches Sediment Deposits Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): x Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: 0-2 (in.) Water-Stained Leaves _ Local Soil Survey Data Depth to Free Water in Pit: 0-12+ (in.) x FAC-Neutral Test _ Other (Explain in Remarks) Depth to Saturated Soil: 0-12+ (in.) Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 Project/Site: Barrow Road Plot ID: wetland SOILS Map Unit Name Drainage Class: Poorl y (Series and Phase): Wehadkee Field Observations Taxonomy (Subgroup): Fluvaquentic endoaquept Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-4 Ap 10YR 5/2 Loam 4-12 Bg 10 YR 6/2 7.5YR 5/8 Few/Distinct Sand clay loam Hydric Soil Indicators: Histosol Concretions _ Histic Epipedon High Organic Content in Surface Layer in Sandy Soils _ Sulfidic Odor Organic Streaking in Sandy Soils _ x Aquic Moisture Regime x Listed on Local Hydric Soils List x Reducing Conditions x Listed on National Hydric Soils List x Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: L- I wGTI none n=TG0MINeTI(1N X Hydrophytic Vegetation Present? - Yes No Is this sampling point within a wetland? Wetland Hydrology Present? x Yes No x Yes No Hydric Soils Present? x Yes No Remarks: Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704) 720-9405 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Barrow Road Date: 10/21/03 Applicant/Owner. Faith Properties County: Guilford Investigator. W. Overby, A. Rollans State: NC Do Normal Circumstances exist on the site? X Yes No Community ID: Riparian wetlands Is the site significantly disturbed (Atypical Situation)? Yes X No Transect ID: Is the area a potential Problem Area? Yes X No Plot ID: wetland (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. Ligustrum sinense Tree FAC 9. 2. Liriodendron tulipifera Tree FAC+ 10. 3. Liquidambar styraciflua Tree FAC it. 4. Microstegium vimenium Herb FAC 12. 5. Smilax rotundifolia Vine FAC 13. 6. Acer rubrum Tree FAC 14. 7. Woodwardia areolata Herb OBL 15. 8. Salrx nigra Tree OBL 16. Percent of Dominant Species that are OBL, FACW, or FAC (excluding FAC-): 100 HYDROLOGY _ Recorded Data (Describe in Remarks): _ Stream, Lake or Tide Gauge _ Aerial Photographs _ Other X No Recorded Data Available Wetland Hydrology Indicators: Primary Indicators: Inundated x Saturated in Upper 12 Inches Sediment Deposits x Drainage Patterns in Wetlands Field Observations: Secondary Indicators (2 or more required): x Oxidized Root Channels in Upper 12 Inches Depth of Surface Water: 0 (in.) x Water-Stained Leaves x Local Soil Survey Data Depth to Free Water in Pit: 0-12 (in.) _ FAC-Neutral Test _ Other (Explain in Remarks) Depth to Saturated Soil: 0-12+ (in.) Remarks: ,' r Wetland Delineation Performed By: Soil & Environmental Consultants, PA 236 LePhillip Ct., Suite C Concord, North Carolina 28025 (704)720-9405 Project/Site: Barrow Road Plot ID: wetfand SOILS Map Unit Name Drainage Class: Poorly (Series and Phase): Worsham Field Observations Taxonomy (Subgroup): Typic Endoaquult Confirm Mapped Type? x Yes No Profile Description: Depth Matrix Color Mottle Color Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. 0-5 A 10YR 5/1 Sand Loam 4-15 Bg 10YR 6/1 10YR 5/2 Common/Distinct Clay loam Hydric Soil Indicators: Histosol Concretions _ _ Histic Epipedon High Organic Content in Surface Layer in Sandy Soils Sulfidic Odor Organic Streaking in Sandy Soils _ x Aquic Moisture Regime x Listed on Local Hydric Soils List x Reducing Conditions x Listed on National Hydric Soils List x Gleyed or Low-Chroma Colors Other (Explain in Remarks) Remarks: 11 1 WETLANDS DETERMINATION X Hydrophytic Vegetation Present? Yes No Is this sampling point within a wetland? Wetland Hydrology Present? x Yes No x Yes No Hydric Soils Present? x Yes No Remarks: EROSION CONTROL AND STORM WATER HYDRAULIC CALCULATIONS FOR LILLIEFIELD SUBDIVISION DEVELOPED BY.• FAITH PROPERTIES OF THE CAROLINAS, LLC APRIL, 2005 O`??N,ESS ROB - io - C1tJ?; • .2. , JAMESTOWN ENGINEERING CROUP, INC. 117 EAST MAIN STREET P. 0. BOX 365 J"ESTOWN, NC 27282 (336) 886-5523 P@113ZINWE" D OCT 1 0 Zoos DENR - WMER QUALITY , ETL`? DS A.ND STG Z'.",',,kTER E,j;;; Cfi EROSION CONTROL AND STORM WATER HYDRAULIC CALCULATIONS FOR LILLIEFIELD SUBDIVISION DEVELOPED BY.- FAITH PROPERTIES OF THE CAROLINAS, LLC APRIL, 2005 I _) I`,1 I1,,,,'' N CAR - L = 6 JAMESTOWN ENGINEERING CROUP, INC. 117 EAST HAIN STREET P. 0. BOX 365 JAMESTOWN, NC 27282 (336) 886-5523 ' JAHESTOUN ENGINEERING GROUP. INC. 117 E. HAIN STREET JAHESTOWN, NC 27262 DESIGN OF VATER QUALITY POND NO. 1 ' GENERAL t. DESIGN CRITERIA DESIGN IS BASED UPON CITY OF HIGH POINT STORMYATER GUIDELINES ' FOR WATER QUALITY AND FLOOD CONTROL. IN CONJUNCTION WITH ENVIRONMENTAL REGULATIONS. ARTICLE A. SECTION 9-7-S FOR WATERSHED CRITICAL AREAS. B. SITE INFORMATION THE PROPOSED SITE IS LOCATED WITHIN THE OAK HOLLOW GENERAL WATERSHED ' GENERAL SITE DATA IS LISTED BELOW: POND $1 ' SITE AREA 12.7 OFF-SITE AREA 6.60 TOTAL SITE AREA 19.30 OFF-SITE DRAINAGE AREA 6.60 SITE DRAINAGE AREA 12.7 DISTURBED AREA 12.7 S UNITS PROPOSED 52 IMPERVIOUS AREA SF/UNIT 3000 UNITS 3.S8 STREETS, SIDEWALKS, POOL 1.90 0% ADJACENT LOT @ 6.60 AC 0.00 TOTAL 5.48 % BUILT UPON (FOR SITE DRAINAGE AREA) 28.40% % BUILT UPON (FOR TOTAL SITE AREA) 43.16% ' DU/ACRE (SITE) 4.1 IN ACCORDANCE WITH TABLE 7-5-1 A WET DETENTION POND IS REQUIRED ' C. WET POND INFORMATION/REQUIREMENTS VOLUME REQUIREMENTS OF POND 1 28.4% IMPERVIOUS @ 3.9 ft 1.06% OF DRAINAGE AREA POOL SURFACE AREA REQUIRED .011 x 19.30 x 43560 1/8 PERM SID STORAGE .125 x 19.30 x 3630 + lit TEMP SED STORAGE .500 x 12.70 x 3630 TOTALSEDIMENT STORAGE VOLUME REQUIRED RUNOFF VOLUME - 1.Oin x Rv x DA vhere Rv - 0.05 + 0.009 (I) it TEMPORARY VOLUME - 1.0 in x 0.31 x 19.30 li D. METHOD OF ANALYSIS INFLOW HYDROGRAPHS: PEAK INFLOWS: POND ROUTING: III SMALL WATERSHED METHOD RATIONAL METHOD REGRESSION ANALYSIS FOR STAGE STORAGE RELATIONSHIP 8897 SF 8757 CF 23051 CF 31808 CF 21410 CF POND 91 DESIGN HYDRDGRAPHS A. INFLOV 1. PRE-DEVELOPEMENT OFF-SITE AREA 6 60 ACRES (<1/4 AC LOTS) C• 0.3S ON-SITE AREA 12.70 ACRES (UNIMPROVED) C. 0.35 19.3 ACRES C. 0.3S / TIME OF CONCENTRATION HYDRAULIC PATH VELOCITY LENGTH TIME SHEET FLOV 15 fps 300 it 600 sec CHANNEL FLOV 8.0 fps it sec 600 sec Tc 10.0 min PEAK FLOW Q CIA I( in/hr ' 1(10) 5 5 6 8 in/hr I(100) - 8.0 in/hr Q(2) - 29.0 CFS 0(10) - 39.2 CPS Q(100) - S4.0 CPS 2. POST-DEVELOPEMENT OFF-SITE AREA ((1/4 AC LOTS) 6.6 ACRES C. 0.65 ON-SITE AREA 28.40: IMPERVIOUS IMPERVIOUS 5.48 ACRES C. 0.95 LAVN 7.22 ACRES 0.35 SITE DRAINAGE AREA AVERAGE 0.61 COMPOSITE 19.3 ACRES C. 0.62 TIME OF CONCENTRATION HYDRAULIC PATH VELOCITY LENGTH TIME SHEET FLOW 5 fps 250 it S00 sec CHANNEL FLOW 8 0 fps 800 it 100 sec 600 sec Tc 10.0 min PEAK FLOW Q - CIA I(2) 4.3 in/hr I(10) 5.0 in/hr ' I(100)• 8 0 in/hr Q(2) 51.7 CFS 0(10) = 69.7 CFS 1 Q(100) - 96.2 CFS DEPTH OF RUNOFF 2-YEAR 6-HOUR PRECIPATION (P) • 2.S2 in 10-YEAR 6-HOUR PRECIPATION (P) 3.71 in 100-YEAR 6-HOUR PRECIPATION (P) = 4.93 in CH • 83 S = (1000/CN)-10 • 2.05 in RUNOFF DEPTH(Q•) _ (P-0.2 x S)"2/(P+0.8 x S) • 1.07 in 2-YEAR 6-HOUR RUNOFF DEPTH RUNOFF DEPTH(Q•) • (P-0.2 x S)"2/(P+0.8 x S) • 2.04 in 10-YEAR 6-HOUR RUNOFF DEPTH RUNOFF DEPTII(Q•) _ (P-0.2 x S)'2/(P+0.8 K S) • 3.11 in 100-YEAR 6-HOUR RUNOFF DEPTH TIME OT PEAK = RUNOFF VOLUHF/(1.39 x Qp,2-YEAR 17.40 min TIME OT PEAK • RUNOFF VOLUMF/(1.39 x Qp.10-YEAR 24.53 min TIME OT PEAK = RUNOFF VOLUME/(1.39 x Qp'100-YEAR 27.17 ¦in ESTIMATE STORAGE 1. S - (Q(Post)-Q(Pre)) - Tp S . 13593 CF POND ELEVATIONS/AREA/VOLUME 2 . CUMULATIVE TEHP\PERH SED STORAGE REQ'D 31808 CF 31008 CF PERMANENT STORAGE REQ'D 8757 CF 40565 CF ESTIMATED STAGE STORAGE 13593 CF 54159 CF ASSUME POND INVERT (DOTTOH OF POND) . 834 0 SEDIMENT STORAGE REQUIRED 8757 CF WATER QUALITY SURFACE AREA REQUIRED 8897 SF ACCUHALATEC Z ELEV AREA VOLUME VOLUME STAGE In S In Z 834.00 128 0 0 0.0 835.00 429 264 264 1.0 S.S75 0.000 836.00 905 652 916 2.0 6.820 0.693 837.00 1556 1216 2132 3.0 7.665 1.099 838.00 2372 1950 4082 4.0 8.314 1.386 839.00 3352 2848 6930 5.0 8.844 1.609 840.00 4469 3897 10827 6.0 9.290 1.792 841.00 5771 5106 15933 7.0 9.676 1.946 842.00 7258 6500 22433 8.0 10.018 2.079 843.00 8931 8080 30513 9.0 10.326 2.197 844.00 10789 9845 40359 10.0 10.606 2.303 845.00 12833 11796 S21SS 11.0 10.862 2.398 846.00 15049 13926 66081 12.0 11.099 2.485 847.00 17432 16226 82307 13.0 11.318 2.565 848.00 19982 18692 101000 14.0 11.523 2.639 849.00 22700 21327 122326 15.0 11.714 2.708 850.00 2SS49 64085 146392 16.0 11.894 2.773 AVERAGE - 11.040 1.964 ASSUME SEDIMENT STORAGE ELEVATION - 839.6 SEDIMENT STORAGE VOLUME PERMANENT - 9260 CF ASSUME ORIFICE ELEVATION - 843.50 SURFACE AREA PROVIDED - 9860 SF PERMANENT WATER QUALITY VOLUME - 26287 CF ASSUME RISOR ELEVATION . 845.60 TEMPORARY WATER QUALITY VOLUME . 25276 CF ASSUME EMERGENCY SPILLWAY ELEVATION . 848.30 ASSUME BARREL INVERT ELEVATION . 839.6 3. REGRESSION ANALYSIS SUMMARY OUTPUT PERFORMED ON LAST 8 ENTRIES vhere b-(sum(ln(Z)-ln(Z))-1/n-sum(ln(Z))-sum(ln(S)))/(sum(In(Z)^2)-1/n-(sum(ln(S)))^2) b- 2.69 a-1/n¦sum(ln(S))-b/n-sum(ln(Z)) a. 4.43 R^2-(sum(In(Z)-ln(S))-n-ln(Z)_ln(S)_)^2/((sum(ln(z)^2)-n-ln(Z) _^2)-(sum( ln(S)^2)-n-ln(S)_^2) R^2- 1.00 Ks-e^a Ks. 84 SEDIMENT Z STORAGE est ELEV 0.00 1.53 2.44 3.34 4.25 5.17 839.60 6.10 7.OS 8.00 8.97 9.96 10.95 11.96 12.98 14.01 15.04 16.08 839.60 8757 CF REQUIRED 8897 SF REQUIRED 21410 CF REQUIRED C. OUTLET STRUCTURES 1. PRINCIPLE SPILLWAY INVERT ELEVATION = 839.6 ' ASSUME RISOR ELEVATION 845.6 SOLVE FOR ROUGH RISOR SIZE 9 39.2 CFS DIAMETER(in)-0•12/(Cv-(H'3/2)- 3.14159) ROUGH DIAMETER - 22 in SOLVE FOR ROUGH BARREL SIZE DIAMETER(io)- (Q-4/(3.14159-Cd -(2-9-h)'. 5)'.S ROUGH DIAMETER - 25 in ASSUME RISOR DIA 36 in 48 ASSUME BARREL DIA 24 in 30 ASSUME ORIFICE PLATE DIA 21.0 in 30 2. EMERGENCY SPILLWAY SOLVE FOR WEIR LENGTH USE h- 1.0 ft ASSUME SPILLWAY ELEV - 848.3 L-Q/(Cv-h'3/2) Q( where 96.2 cfs E RISOR RISOR Q 0 ELEV 865.60 = 25.9 cfs ' EMERGENCY SPILLWAY Q 70.3 cfs WEIR LGTH (ft) 23 ft 100-YEAR H.W.L. 849.05 TOP OF DAM - 850.3 e WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL ELEV RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 845.6 0.0 25.9 0.0 0.0 0.0 0.0 ' 845.8 2.8 26.4 15.2 2.8 0.0 2.8 846.0 7.9 26.9 21.5 7.9 0.0 7.9 846.2 14.5 27.4 26.4 14.5 0.0 14.5 846.4 22.3 27.9 30.4 22.3 0.0 22.3 ' 846.6 31.1 28.4 34.0 28.4 0.0 28.4 846.8 40.9 28.8 37.3 28.8 0.0 28.8 847.0 51.5 29.3 40.3 29.3 0.0 29.3 847.2 62.9 29.8 43.1 29.8 0.0 29.8 847.4 75.1 30.2 45.7 30.2 0.0 30.2 ' 847.6 88.0 30.6 48.1 30.6 0.0 30.6 847.8 101.5 31.1 50.5 31.1 0.0 31.1 848.0 115.6 31.5 52.7 31.5 0.0 31.5 848.2 130.4 31.9 54.9 31.9 0.0 31.9 ' ALLOWABLE OUTFLOW 39.2 CFS i i 1 1 1 1 D. ROUTING 2. 10 S 100 YEAR POST-DEVELOPEHENT STORM THRU POND ' 1. INPUT DATA FOR 2-YEAR STORM Q(2) 51.7 T 17 40 TIME INCREMENT 2 00 ¦in ' Ks 84 b 2.69 INVERT ELEVATION 834.00 ORIFICE ELEVATION 843.50 RIGOR ELEVATION 845.60 PERMANENT STORAGE 60831 EH SPILLWAY ELEV 848.30 WEIR ORIFICE ORIFICE PRINCIPAL EHERGENCY TOTAL TIME 00 0 INFLOW STORAGE 0 35SS5 0 STAGE 843.50 RIGOR 0.0 BARREL 0.0 RIGOR 0.0 SPILLWAY 0.0 SPILLWAY 0.0 OUTFLOW 0.0 . 2.00 . 1.7 35655 843.51 0.0 0.0 0.0 0.0 0.0 0.0 4.00 6.5 36142 843.56 0.0 0.0 0.0 0.0 0.0 0.0 6.00 13.7 37354 843.68 0.0 0.0 0.0 0.0 0.0 0.0 8.00 22.6 39534 843.88 0.0 0.0 0.0 0.0 0.0 0.0 10.00 31.9 42801 844.18 0.0 0.0 0.0 0.0 0.0 0.0 12.00 40.4 47134 844.55 0.0 0.0 0.0 0.0 0.0 0.0 14.00 47.0 S2375 844.97 0.0 0.0 0.0 0.0 0.0 0.0 16.00 00 18 50.9 51 6 58246 64179 845.41 845.83 0.0 3.5 0.0 26.S 0.0 16.4 0.0 3.5 0.0 0.0 0.0 3.5 . 20.00 . 48.9 69177 846.17 13.3 27.3 25.7 13.3 0.0 13.3 22.00 43.4 72564 846.39 21.7 27.9 30.2 21.7 0.0 21.7 24.00 37.3 74425 846.50 26.7 28.1 32.4 26.7 0.0 26.7 26.00 32.2 75293 846.56 29.1 28.3 33.3 28.3 0.0 28.3 28.00 27.7 75488 846.57 29.7 28.3 33.5 28.3 0.0 28.3 30.00 23.9 75184 846.55 28.8 28.3 33.2 28.3 0.0 28.3 32.00 20.5 74458 846.51 26.8 28.1 32.4 26.8 0.0 26.8 34.00 36 00 17.7 2 15 73555 72618 846.45 846.39 24.3 21.8 28.0 27.9 31.4 30.2 24.3 21.8 0.0 0.0 24.3 21.8 . 38.00 . 13.1 71687 846.33 19.4 27.7 29.1 19.4 0.0 19.4 40.00 11.3 70789 846 27 17.2 27.6 27.9 17.2 0.0 17.2 42.00 9.7 69939 846.22 15.1 27.4 26.8 15.1 0.0 15.1 44.00 8.4 69143 846.17 13.2 27.3 25.6 13.2 0.0 13.2 46.00 7.2 68406 846.12 11.6 27.2 24.5 11.6 0.0 11.6 48.00 6.2 67727 846.07 10.1 27.1 23.4 10.1 0.0 10.1 50.00 5.4 67105 846.03 8.8 27.0 22.4 8.8 0.0 8.8 52.00 54 00 4.6 4 0 66536 66018 845.99 96 845 7.7 6.7 26.9 26.8 21.3 20.4 7.7 6.7 0.0 0.0 7.7 6.7 . S6.00 . 3.4 65547 . 845.93 5.8 26.7 19.5 5.8 0.0 5.8 58.00 2.9 65119 845.90 5.0 26.7 18.6 5.0 0.0 5.0 60.00 2.5 64729 845.87 4.4 26.6 17.7 4.4 0.0 4.4 62.00 2.2 64376 845.85 3.0 26.5 16.9 3.8 0.0 3.8 64.00 1.9 64055 845.82 3.3 26.S 16.1 3.3 0.0 3.3 66.00 1.6 63764 845.80 2.9 26.4 15.4 2.9 0.0 2.9 68.00 1.4 63499 845.79 2.5 26.4 14.7 2.5 0.0 2.5 70.00 1.2 63258 845.77 2.2 26.3 14.0 2.2 0.0 2.2 72.00 1.0 63040 845.75 1.9 26.3 13.4 1.9 0.0 1.9 74.00 0.9 62840 845.74 1.6 26.3 12.8 1.6 0.0 1.6 76.00 0.8 62659 845.73 1.4 26.2 12.2 1.4 0.0 1.4 78.00 0.7 62494 845.72 1.2 26.2 11.6 1.2 0.0 1.2 ' 80.00 0.6 62344 845.71 1.1 26.2 11.1 1.1 0.0 1.1 82.00 0.5 62207 845.70 0.9 26.1 10.6 0.9 0.0 0.9 84.00 0.4 62081 845.69 0.8 26.1 10.1 0.0 0.0 0.8 PEAK INFLO W i 51.7 CF S PEAK OUTFLOW 28.3 CFS PEAK ALLOWABLE OUTFLOW 29.0 CFS PEAK ELEV - 846.57 PEAK STORAGE - 75488 CF ' 2. INPUT DATA FOR 10-YEAR STORM Q(10) 70 Tp 24.53 in TIME INCREMENT 2.00 Rxn Ks 84 ' y 2.69 INVERT ELEVATION 834.00 ORIFICE ELEVATION 843.50 RISOR ELEVATION 845.60 PERMANENT STORAGE 35555 EM SPILLVAY ELEV 848.30 TIME INFLOW STORAGE STAGE ' 0.00 0.0 35555 w 843.50 2.00 1.1 35623 843.51 4.00 4.5 35960 843.54 6.00 9.8 36817 843.62 8.00 16.8 38410 843.78 10.00 24.9 40909 844.01 12.00 33.7 44423 844.32 14.00 42.6 48997 844.70 16.00 50.9 54605 845.14 18.00 58.2 61148 y 845.62 20.00 64.0 67845 846.08 22.00 67.9 73632 846.45 24.00 69.7 78688 846.77 26.00 69.1 83523 847.05 28.00 66.4 88084 847.31 30.00 61.5 92126 847.54 32.00 55.5 95464 847.72 34.00 49.9 98065 847.85 ' 36.00 44.9 99999 847.96 38.00 40.4 101338 848.02 40.00 36.3 102149 B48.07 42.00 32.7 102489 848.08 ' 44.00 29.4 102411 848.08 46.00 26.4 101962 848.06 48.00 23.8 101184 848.02 50.00 21.4 100115 847.96 52.00 19.2 98789 847.89 ' J 54.00 17.3 97238 847.81 56.00 15.6 95488 847.72 58.00 14.0 93566 847.61 60.00 12.6 91494 847.50 ' 62.00 11.3 89292 847.38 64.00 10.2 86979 847.25 66.00 9.2 84573 847.11 68.00 8.2 82088 846.97 70.00 7.4 79539 846.82 72.00 6.7 76939 846.66 74.00 6.0 74336 846.50 76.00 5.4 72121 846.36 78.00 4.9 70434 846.25 80.00 4.4 69114 846.16 82.00 3.9 68056 646.09 84.00 3.5 67192 846.04 86.00 3.2 66473 845.99 ' 88.00 2.9 65866 845.95 PEAK INFLOW - 69. 74 CFS PEAK OUTFLOW - 31. 68 CFS PEAK ALLOVABLE OUTFLOJ- 39. 18 CFS ' PEAK ELEV 848 .08 PEAK STORAGE - 102489 CF VEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RISOR SPILLVAY SPILLVAY OUTFLOW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 26.0 S.1 0.1 0.0 0.1 10.4 27.1 23.6 10.4 0.0 10.4 24.5 28.0 31.4 24.5 0.0 24.5 39.1 28.8 36.7 28.8 0.0 28.8 54.4 29.4 41.0 29.4 0.0 29.4 69.7 30.0 44.5 30.0 0.0 30.0 83.8 30.5 47.4 30.5 0.0 30.5 95.8 30.9 49.5 30.9 0.0 30.9 105.3 31.2 51.1 31.2 0.0 31.2 112.4 31.4 52.2 31.4 0.0 31.4 117.4 31.6 53.0 31.6 0.0 31.6 120.4 31.6 53.4 31.6 0.0 31.6 121.7 31.7 53.6 31.7 0.0 31.7 121.4 31.7 53.6 31.7 0.0 31.7 119.7 31.6 53.3 31.6 0.0 31.6 116.8 31.5 52.9 31.5 0.0 31.5 112.9 31.4 52.3 31.4 0.0 31.4 107.9 31.3 51.5 31.3 0.0 31.3 102.2 31.1 50.6 31.1 0.0 31.1 95.9 30.9 49.5 30.9 0.0 30.9 88.9 30.7 48.3 30.7 0.0 30.7 81.5 30.4 46.9 30.4 0.0 30.4 73.8 30.2 45.4 30.2 0.0 30.2 65.9 29.9 43.7 29.9 0.0 29.9 57.8 29.6 41.9 29.6 0.0 29.6 49.7 29.2 39.8 29.2 0.0 29.2 41.7 28.9 37.5 28.9 0.0 28.9 33.9 28.5 35.0 28.5 0.0 28.5 26.5 28.1 32.3 26.5 0.0 26.5 20.5 27.8 29.6 20.5 0.0 20.5 16.3 27.5 27.4 16.3 0.0 16.3 13.2 27.3 25.6 13.2 0.0 13.2 10.8 27.1 23.9 10.8 0.0 10.8 9.0 27.0 22.5 9.0 0.0 9.0 7.5 26.9 21.2 7.5 0.0 7.5 6.4 26.8 20.1 6.4 0.0 6.4 3. INPUT DATA FOR 100-YEAR STORM 1 0(100) 96 Tp 27.17 t in TIME INCREMENT 2 00 ¦in Ks 84 b 2.69 INVERT ELEVATION 834.00 ORIFICE ELEVATION 843.50 j RIGOR ELEVATION 845.60 PERMANENT STORAGE 35555 EM SPILLWAY ELEV 848.30 TIME INFLOW STORAGE STAGE WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RIGOR SPILLWAY SPILLWAY OUTFLOW 0.00 0.0 35555 35632 843.50 51 843 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.00 00 4 1.3 5.1 36012 . 843.55 0.0 0.0 0.0 0.0 0.0 0.0 . 00 6 11.1 36982 843.64 0.0 0.0 0.0 0.0 0.0 0.0 . 8 00 19.2 38799 843.81 0.0 0.0 0.0 0.0 0.0 0.0 ' . 00 10 28.7 41672 844.08 0.0 0.0 0.0 0.0 0.0 0.0 . 12 00 39.3 45756 844.43 0.0 0.0 0.0 0.0 0.0 0.0 . 14 00 50.4 51141 844.88 0.0 0.0 0.0 0.0 0.0 0.0 . 16 00 61.4 57847 845.39 0.0 0.0 0.0 0.0 0.0 0.0 ' . 18.00 71.6 65479 72892 845.92 41 846 5.7 22.6 26.7 27.9 19.3 30.6 5.7 22.6 0.0 0.0 5.7 22.6 20.00 00 22 80.6 87.9 79909 . 846.84 42.9 28.9 37.9 28.9 0.0 28.9 . 24.00 93.0 87230 847.26 66.8 29.9 43.9 29.9 0.0 29.9 00 26 95.8 94910 847.69 93.8 30.8 49.2 30.8 0.0 30.8 ' . 00 28 96.0 102661 848.09 122.4 31.7 53.7 31.7 0.0 31.7 . 30 00 93.6 109935 848.46 150.1 32.5 57.5 32.5 3.7 36.1 . 32 00 86.9 115624 848.73 172.2 33.0 60.2 33.0 16.9 49.9 . 34 00 82.0 119061 848.89 185.7 33.3 61.7 33.3 27.2 60.6 . 36.00 74.6 8 67 120593 120830 848.96 97 848 191.7 192.6 33.5 33.5 62.4 62.5 33.5 33.5 32.3 33.1 65.8 66.6 38.00 40 00 . 61.6 120297 . 848.95 190.5 33.5 62.3 33.5 31.3 64.8 . 42 00 55.9 119334 848.90 186.7 33.4 61.9 33.4 28.1 61.5 . 44.00 50.8 118151 848.85 182.1 33.3 61.3 33.3 24.4 57.6 ' 46.00 46.2 116867 848.79 177.0 33.1 60.8 33.1 20.5 53.6 00 48 42.0 115551 048.73 171.9 33.0 60.2 33.0 16.7 49.7 . 00 50 38.2 114237 848.66 166.8 32.9 59.6 32.9 13.1 46.0 . 00 52 34.7 112942 848.60 161.7 32.8 59.0 32.8 9.9 42.7 1 . 54.00 6 0 31.5 28 6 111669 110414 848.54 848.48 156.8 151.9 32.6 32.5 58.4 57.7 32.6 32.5 7.1 4.5 39.7 37.1 .0 5 58 00 . 26.0 109168 848.42 147.1 32.4 57.1 32.4 2.4 34.8 . 00 60 23.6 107914 848.36 142.3 32.3 56.5 32.3 0.8 33.1 . 62.00 21.5 106623 848.29 137.4 32.1 55.8 32.1 0.0 32.1 ' 64.00 19.5 105227 848.22 132.1 32.0 55.1 32.0 0.0 32.0 00 66 17.7 103626 848.14 126.0 31.8 54.3 31.8 0.0 31.8 . 00 68 16.1 101842 848.05 119.3 31.6 53.3 31.6 0.0 31.6 . 70.00 14.7 99898 847.95 112.0 31.4 52.2 31.4 0.0 31.4 72.00 00 13.3 12 1 97811 95600 847.84 847.72 104.3 96.3 31.2 30.9 50.9 49.6 31.2 30.9 0.0 0.0 31.2 30.9 74. 00 76 . 11.0 93281 847.60 87.9 30.6 48.1 30.6 0.0 30.6 . 78.00 10.0 90870 847.47 79.4 30.3 46.5 30.3 0.0 30.3 80.00 9.1 88379 847.33 70.7 30.0 44.7 30.0 0.0 30.0 ' 82.00 8.3 85821 847.18 62.0 29.7 42.8 29.7 0.0 29.7 84 00 7.5 83208 847.03 53.4 29.4 40.7 29.4 0.0 29.4 . 86.00 6.8 80550 846.88 44.9 29.0 38.5 29.0 0.0 29.0 88 00 6.2 77858 846.71 36.6 28.6 35.9 28.6 0.0 28.6 ' . 90.00 5.6 5 1 75140 72527 046.55 38 846 2B.7 21.6 28.2 27.9 33.1 30.1 28.2 21.6 0.0 0.0 28.2 21.6 92.00 94.00 . 4.6 70595 . 846.26 16.7 27.6 27.7 16.7 0.0 16.7 96.00 4.2 69148 846.17 13.2 27.3 25.6 13.2 0.0 13.2 98.00 3.8 68037 846.09 10.8 27.1 23.9 10.8 0.0 10.8 ' PEAK INFLOW • 96.19 CFS PEAK OUTFLOW - 66.61 CFS PEAK ELEV 848.97 EMERGENCY SPILLWAY ACTIVATED ' PEAK STORAGE - 120830 CF 1 I E. ORIFICE HOLE 4 -DAY RELEASE NUMBER OF HOLES 2 AVERAGE SURFACE AREA 12036 SF DETENTIOH DEPTH 2.10 FT a - 0.415/t•A•(h)".5 a - 3.02 SQ IN d - 1.39 IN 1 6/16 in 8 -DAY RELEASE NUMBER OF HOLES 2 AVERAGE SURFACE AREA 12036 SF DETENTION DEPTH 2.10 FT a - 0.415/t-A-(h)".5 a - 1.51 SQ IN d - 0.98 IN 0 16/16 in AVE d - 1.18 IN 1 3/16 in FLOTATION OF RISOR VOLUME OF RISOR ASSUME INVERT ELEV - 839.6 ASSUME RISOR ELEV • 845.6 RISOR DIAMETER 36 in V - 3.14159-r'2•h V 42.4 CF VOLUME OF BARREL ASSUME LFI;= - 1S.06 ft BARREL DIAMETER - 24 in V - 3.14159•r'2-L V - 47.1 CF TOTAL VOLUME - 89.5 CF CONCRETE REQ'D DISPLACED VATER SS87 LB VEIGHT OF CONCRETE (DOUYANT) - 87.60 LB/CF CONCRETE REQ'D - 63.8 CF RISOR AREA • 7.1 SF CONCRETE REQ'D = 9.0 LF ADD 15% SAFETY FACTOR 10.4 LF 73.3 CF SUMMARY 1 TOP OF DAM 100-YEAR HIGH VATER j 10-YEAR HIGH VATER EMERGENCY SPILLVAY ELEV RISOR ELEV ' ORIFICE ELEV INVERT ELEV SEDIMENT STORAGE REQUIRED SEDIMENT STORAGE PROVIDED ' SURFACE AREA REQUIRED SURFACE AREA PROVIDED RISOR DIAMETER BARREL DIAMETER ORIFICE PLATE DIAMETER ORIFICE HOLE $/DIAMETER VEIR LENGTH 2 2 850.3 849.0 848.1 848.3 845.60 843.50 839.6 8757 CF 9268 CF 8897 SF 9860 SF 36 in 24 in 21 in 1.39 in 23 It ' JAMESTOWN ENGINEERING GROUP, INC. 117 E. MAIN STREET JAMESTOWN, NC 27282 DESIGN OF WATER QUALITY POND NO. 3 I•'. 1 /ORAL ._, A. DESIGN CRITERIA DESIGN IS BASED UPON CITY OF HIGH POINT STORMWATER GUIDELINES FOR WATER QUALITY AND FLOOD CONTROL, IN CONJUNCTION WITH ENVIRONMENTAL REGULATIONS, ARTICLE A, SECTION 9-7-5 FOR WATERSHED CRITICAL AREAS. 9. SITE INFORMATION THE PROPOSED SITE IS LOCATED WITHIN THE OAK HOLLOW GENERAL WATERSHED GENERAL SITE DATA IS LISTED BELOW: ' POND •3 SITE AREA 13.3 OFF-SITE AREA 1.50 TOTAL SITE AREA 14.60 OFF-SITE DRAINAGE AREA 1.50 SITE DRAINAGE AREA 13.3 DISTURBED AREA 13.3 • UNITS PROPOSED 53 IMPERVIOUS AREA SF/UNIT 3000 UNITS 3.65 STREETS, SIDEWALKS, POOL 2.10 07. ADJACENT LOT a 1.50 AC 0.00 TOTAL 5.75 1 BUILT UPON (FOR SITE DRAINAGE AREAI 36.657. ' % BUILT UPON <FOR TOTAL SITE AREA) 43.23% DU/ACRE (SITE) 4.0 ' IN ACCORDANCE WITH TABLE 7-5-1 A WET DETENTION POND IS REQUIRED 7 C WET POND INFORMATION/REQUIREMENTS . VOLUME REQUIREMENTS OF POND 1 ' 36.9% IMPERVIOUS a 3.0 ft 1.691 OF DRAINAGE AREA - POOL SURFACE AREA REQUIRED •017 x 14.60 x 43560 10865 SF 1/6 PERM SED STORAGE .125 x 14.80 x 3630 6716 CF 112 TEMP SED STORAGE -500 x 13.30 x 3630 24140 CF TOTALSEDIMENT STORAGE VOLUME REQUIRED 30855 CF RUNOFF VOLUME = 1.0in x Rv x DA where Rv = 0.05 + 0.009 (I) TEMPORARY VOLUME = 1.0 in x 0.40 x 14.80 = 21472 CF ' D. METHOD OF ANALYSIS INFLOW HYDROGRAPHS: SMALL WATERSHED METHOD PEAK INFLOWS: POND ROUTING: RATIONAL METHOD REGRESSION ANALYSIS FOR STAGE STORAGE RELATI ONSHIP II, 01 DESIGN f _ A. INFLOW HYDROGRAPHS ' 1• PRE-DEVELOPEMENT OFF-SITE AREA 1.50 ACRES (<1/4 AC LOTS) C= 0.35 ON-SITE AREA 13.30 ACRES (UNIMPROVED) C. 0.35 14.6 ACRES C= 0.35 TIME OF CONCENTRATION ' HYDRAULIC PATH VELOCITY LENGTH TIME SHEET FLOW •5 fps 300 ft 600 sec CHANNEL FLOW 6.0 fps ft sec 600 sec ' Tc = 10.0 min PEAK FLO W Q = CIA ' I(2) 4.3 in/hr I(10) = 5-8 in/hr I(100) = 6.0 in/hr j2(2) = 22.3 CFS 9(l0) = 30.0 CFS Q(100) = 41.4 CFS 2• POST-DEVELOPEMENT OFF-SITE AREA (<1/4 AC ON-SITE LOTS) 1-S ACRES AREA 38.85% IMPERVIOUS C. 0.35 i IMPERVIOUS 5.75 ACRES C. 0.95 LAWN 7.55 ACRES 0.35 SITE DRAINAGE AREA AVERAGE 0.61 ' COMPOSITE 14.6 ACRES C. 0.56 TIME OF CONCENTRATION HYDRAULIC PATH VELOCITY LENGTH TIME ' SHEET FLOW 5 fps 250 ft 500 sec CHANNEL FLOW 6.0 fps 600 ft 100 sec 600 sec ' Tc = 10.0 min PEAK FLO W Q CIA I(2) 4.3 in/hr ' I(10) = 5.8 in/hr I(100)= 8.0 in/hr Q(2) 37.1 CFS Q(10) _ 50.1 CFS Q(100) = 69.0 CFS ' DEPTH OF RUNOFF 2-YEAR 6-HOUR PRECIPATION (P) = 2.52 in 10-YEAR 6-HOUR PRECIPATION (P) = 3.71 in 100-YEAR 6-HOUR PRECIPATION (P) = 4.93 in ' CN - 83 S = (1000/CN)-10 = 2.05 in RUNOFF DEPTH(Q=) _ (P-0.2 x S)A2/(P-0.6 x S) = 1.07 in 2-YEAR 6-HOUR RUNOFF DEPTH RUNOFF DEPTH(Qs) _ (P-0.2 x S)•2/(P.0.6 x S) - 2.04 in 10-YEAR 6-HOUR RUNOFF DEPTH ' RUNOFF DEPTH (Q=) _ (P-0.2 x S)?21 P+0.8 x S) = 3.11 in 100-YEAR 6-HOUR RUNOFF DEPTH TIME OT PEAK RUNOFF VOLUME/(1.39 x Qp 2-YEAR 16.59 min TIME OT PEAK = RUNOFF VOLUME/(1.39 x Qp 30-YEAR 26.21 min ' TIME OT PEAK = RUNOFF VOLUME/(1.39 x Qp 100-YEAR 21.03 min ESTIMATE STORAGE 1. S = (Q(Post)-Q(Pre)) * Tp S = 8901 CF 2. POND ELEVATIONS/AREA/VOLUME CUMULATIVE TEMP\PERM SED STORAGE REQI D 30655 CF 30655 CF PERMANENT STORAGE REQ'D 6716 CF 37571 CF ESTIMATED STAGE STORAGE 8901 CF 46472 CF ASSUME POND INVERT (BOTTOM OF POND) = 643.0 SEDIMENT STORAGE REQUIRED 6716 CF WATER QUALITY SURFACE AREA REQUIRED 10665 SF ACCUMALATED Z ELEV AREA VOLUME VOLUME STAGE In S In Z 843.00 6092 0 0 0.0 844.00 13577 9588 9586 1.0 9.168 0.000 845.00 16436 14984 24572 2.0 10.109 0.693 646.00 16363 17391 41962 3.0 10.645 1.099 647.00 20360 19353 61315 4.0 11.024 1.386 646.00 22426 21365 82700 5.0 11.323 1.609 649.00 24561 23485 106165 6.0 11.573 1.792 650.00 26765 25655 131640 7.0 11.769 1.946 851.00 36266 31396 163237 6.0 12.003 2.079 852.00 36816 37535 200772 9.0 12.210 2.197 653.00 41434 40116 240869 10.0 12.392 2.303 654:00 44120 42-770 283659 11.0 12.556 2.396 655.00 46674 45490 329149 12.0 12.704 2.465 656.00 49696 46279 377429 13.0 12.841 2.565 857.00 52591 51136 426566 14.0 12.966 2.639 658.00 55552 105196 482624 15.0 13.067 2.708 AVERAGE = 12.069 1.964 ASSUME SEDIMENT STORAGE EL EVATION = 846.5 SEDIMENT STORAGE VOLUME PERMANENT = 33557 CF ASSUME ORIFICE ELEVATION = 649.50 SURFACE AREA PROVIDED = 56242 SF PERMANENT WATER QUALITY VOLUME = 67434 CF ASSUME RISOR ELEVATION = 650.50 TEMPORARY WATER QUALITY VOLUME = 30540 CF ASSUME EMERGENCY SPILLWAY ELEVATION = 651.50 ASSUME BARREL INVERT ELEVATION 846.5 3. REGRESSION ANALYSIS SUMMARY OUTPUT PERFORMED ON LAST 7 ENTRIES Where b=(sum(ln(Z)*ln(Z) 1-1/n*sum(ln(Z))*su m(ln(S)))/(s um(ln(Z)A2)-1/ns(sum(l n(S)))•2) b= 1.57 a=1/n*sum(ln(S))-b/n*sum(ln(Z)) as 6.76 RA2=(sum (In(Z)*In(S))-nsIn(Z)_ln(S)_) A2/((sum(ln( Z) .2)-n*ln(Z)_ •2)*(sum (In(S)•2)-n*ln(S)_•2) RA2- 1.00 Ks=era Ks= 6371 SEDIMENT Z STORAGE est ELEV 0.00 646.50 1.30 2.36 3.32 4.22 5.10 5.46 6.66 7.66 8.97 10.07 11.17 12.26 13.40 14.53 15.67 646.50 6716 CF REQUIRED 1066S SF REQUIRED 21472 CF REQUIRED C. OUTLET STRUCTURES 1. PRINCIPLE SPILLWAY INVERT ELEVATION 846.5 ASSUME RISOR ELEVATION = 850.5 SOLVE FOR ROUGH RISOR SIZE i 30.0 CFS DIAMETER(in)=Qs12/(Cw*(H-3/2)s 3.14159) ROUGH DIAMETER = 41 in SOLVE FOR ROUGH BARREL SIZE DIAMETER(in)- (0s4/(3.14159sCd :(2sgsh). .5)•.5 ROUGH DIAMETER = 24 in ASSUME RISOR DIA 36 in 36 ASSUME BARREL DIA 24 in 24 ASSUME ORIFICE PLATE DIA 24 in 24 2. EMERGEN CY SPILLWAY SOLVE FOR WEIR LENGTH USE h= 1.0 ft ASSUME SPILLWAY ELEV = 651.5 L-Q/(Cwsh•3/2) where Q(100) 69.0 cfs RISOR Q i ELEV 850.50 = 26.2 cfs EMERGENCY SPILLWAY Q = 42.6 cfs WEIR LGTH (ft) 14 ft 100-YEAR H.W.L. 851.90 TOP OF DAM = 853.5 WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL ELEV RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 650.5 0.0 26.2 0.0 0.0 0.0 0.0 850.7 2.6 27.1 15.2 2.6 0.0 2.6 650.9 7.9 27.9 21.5 7.9 0.0 7.9 851.1 14.5 28.7 26.4 14.5 0.0 14.5 851.3 22.3 29.5 30.4 22.3 0.0 22.3 851.5 31.1 30.3 34.0 30.3 0.0 30.3 851.7 40.9 31.0 37.3 31.0 2.7 33.7 851.9 51.5 31.7 40.3 31.7 7.6 39.3 852.1 62.9 32.4 43.1 32.4 13.9 46.4 652.3 75.1 33.1 45.7 33.1 21.5 54.6 652.5 88.0 33.8 48.1 33.6 30.0 63.8 652.7 101.5 34.5 50.5 34.5 39.4 73.9 652.9 115.6 35.2 52.7 35.2 49.7 84.8 653.1 130.4 35.8 54.9 35.8 60.7 96.5 ALLOWABLE OUTFLOW = 30.0 CFS II t r D. ROUTING 2. 10 L 100 YEAR POST-DEVELOPEMENT STORM TNRU POND 1. INPUT DA TA FOR 2-YEAR STO RM Q(2) 37.1 TO 16.54 TIME INCREMENT 2.00 min Ks 6371 b 1.57 INVERT ELEVATION 643.00 ORIFICE ELEVATIO N 849.50 RISOR ELEVATION 650.50 PERMANENT STORAG E 151532 En SPILLWAY ELEV 651.50 TIME INFLOW STORAGE STAGE 0.00 0.0 120992 649.50 2.00 1.0 121055 849.50 4.00 4.1 121363 849.51 6.00 6.7 122132 649.54 6.00 14.5 123529 649.59 10.00 20.6 125646 649.66 12.00 26.7 126496 849.75 14.00 31.6 132009 849.67 16.00 35.4 136038 650.00 16.00 37.0 140361 650.14 20.00 36.6 144797 850.24 22.00 34.1 149039 650.42 24.00 30.1 152674 850.54 26.00 26.1 156129 650.64 28.00 22.7 156759 650.73 30.00 19.6 160819 650.79 32.00 17.2 162361 650.84 34.00 14.9 163520 650.67 36.00 13.0 164307 850.90 36.00 11.3 164807 850.91 40.00 9.6 165075 850.92 42.00 8.5 165156 850.92 44.00 7.4 165096 650.92 46.00 6.5 164922 850.91 46.00 5.6 164663 650.91 50.00 4.4 164341 650.90 52.00 4.2 163974 850.89 54.00 3.7 163577 850.87 56.00 3.2 163159 850.66 58.00 2.6 162732 650.65 60.00 2.4 162300 850.63 62.00 2.1 161871 850.82 64.00 1.6 161446 650.61 66.00 1.6 161034 850.60 68.00 1.4 160631 850.76 70.00 1.2 160242 650.77 72.00 1.0 159666 650.76 74.00 0.9 159506 850.75 76.00 0.8 159160 850.74 78.00 0.7 158830 850.73 60.00 0.6 158514 850.72 62.00 0.5 156214 850.71 64.00 0.5 157926 650.70 PEAK INFLOW 37.1 CFS PEAK OUTFLOW = 8.5 CFS PEAK ALLOWABLE OUTFLOW 22.3 CFS PEAK ELEV 650.92 PEAK STORAGE = 165156 CF WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 26.4 7.0 0.3 0.0 0.3 1.7 26.8 12.9 1.7 0.0 1.7 3.3 27.2 16.2 3.3 0.0 3.3 4.6 27.4 18.3 4.8 0.0 4.8 6.1 27.6 19.8 6.1 0.0 6.1 7.1 27.6 20.6 7.1 0.0 7.1 7.6 27.9 21.4 7.6 0.0 7.8 8.2 27.9 21.6 8.2 0.0 8.2 6.5 28.0 22.0 8.5 0.0 8.5 6.5 26.0 22.1 6.5 0.0 6.5 6.5 26.0 22.1 6.5 0.0 6.5 6.3 28.0 21.9 8.3 0.0 8.3 6.1 27.9 21.7 6.1 0.0 6.1 7.8 27.9 21.4 7.6 0.0 7.8 7.5 27.6 21.1 7.5 0.0 7.5 7.1 27.6 20.6 7.1 0.0 7.1 6.7 27.7 20.4 6.7 0.0 6.7 6.4 27.7 20.1 6.4 0.0 6.4 6.0 27.6 19.7 6.0 0.0 6.0 5.7 27.6 19.3 5.7 0.0 S.7 5.3 27.5 16.9 5.3 0.0 5.3 5.0 27.5 18.5 5.0 0.0 5.0 4.7 27.4 18.1 4.7 0.0 4.7 4.4 27.4 17.7 4.4 0.0 4.4 4.1 27.3 17.3 4.1 0.0 4.1 3.4 27.3 17.0 3.9 0.0 3.9 3.6 27.2 16.6 3.6 0.0 3.6 3.4 27.2 16.2 3.4 0.0 3.4 3.2 27.1 15.9 3.2 0.0 3.2 3.0 27.1 15.5 3.0 0.0 3.0 2.6 27.1 15.2 2.8 0.0 2.8 ' 2. INPUT DA TA FOR 10-YEAR ST ORM 9(10) so Tp 26.21 min TIME INCREMENT 2.00 min , Ks 6371 t b 1.57 INVERT ELEVATION 643.00 ORIFICE ELEVATION 649.50 RISOR ELEVATION 850.50 PERMANENT STORAGE 120992 ' EM SPILLWAY ELEV 651.50 TIME INFLOW STORAGE STAGE 0.00 0.0 120992 649.50 2.00 0.7 121035 649.50 4.00 2.8 121247 649.51 6.00 6.2 121766 849.53 ' 6.00 10.7 122799 649.56 10.00 15.9 124394 649.62 12.00 21.7 126653 849.69 14.00 27.7 129619 649.79 e 16.00 33.5 133294 849.91 18.00 38.9 137640 850.06 20.00 43.4 142579 650.22 22.00 46.9 146002 650.39 24.00 49.2 153735 850.57 26.00 50.0 159427 650.75 28.00 49.5 164665 650.91 30.00 32.00 47.5 44.3 169264 173017 851.05 651.16 34.00 40.2 175665 651.25 36.aa 36.4 177932 651.31 36.00 33.0 179292 651.35 1 40.00 29.9 160095 651.37 42.00 27.1 160452 651.36 44.00 24.5 180456 651.36 46.00 22.2 160193 651.37 46.00 20.1 179720 651.36 50.00 18.2 179091 651.34 52.00 16.5 176350 651.32 54.00 14.4 177530 651.29 56.00 13.5 176657 651.27 58.00 12.2 175753 651.24 60.00 11.1 174634 851.21 62.00 10.0 173913 851.19 64.00 9.1 172999 651.16 66.00 6.2 172101 651.13 68.00 7.4 171224 651.11 70-Oa 6.7 170371 651.08 72.00 6.1 169545 651.06 74.00 5.5 168749 851.03 76.00 5.0 167984 651.01 76.00 4.5 167249 850.99 80.00 4.1 166546 650.96 62.00 3.7 165873 650.94 84.00 3.4 165231 650.42 86.00 3.1 164616 850.91 66.00 2.6 164035 650.69 PEAK INFLOW = 50.05 CFS ' PEAK OUTFLOW = 25.72 CFS PEAK ALLOWABLE OUTFLOW 30.04 CFS PEAK ELEV = 651.38 PEAK STORAGE = 180456 CF WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 0.0 0.0 11.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 a-a 0.0 0.0 0.0 B-0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 B.0 0.0 0.0 0.0 a.o 0.0 0.0 o.B 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.0 a-a a-a 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 26.5 8.9 0.6 0.0 0.6 3.8 27.3 16.9 3.8 0.0 3.8 8.1 27.9 21.7 8.1 0.0 6.1 12.6 26.5 25.2 12.6 0.0 12.6 16.7 26.9 27.6 16.7 0.0 16.7 20.0 29.3 29.4 20.0 0.0 20.0 22.5 29.5 30.6 22.5 0.0 22.5 24.2 29.7 31.3 24.2 0.0 24.2 25.3 29.6 31.8 25.3 0.0 25.3 25.7 29.6 31.9 25.7 0.0 25.7 25.7 29.6 31.9 25.7 0.0 25.7 25.4 29.6 31.8 25.4 0.0 25.4 24.6 29.7 31.5 24.8 0.0 24.8 24.0 29.6 31.2 24.0 0.0 24.0 23.0 29.6 30.8 23.0 0.0 23-a 22.0 29.5 30.3 22.0 0.0 22.0 21.0 29.4 29.6 21.0 0.0 21.0 19.9 29.3 29.3 19.9 0.0 19.9 18.8 29.2 26.8 16.6 0.0 18.8 17.7 29.0 28.2 17.7 0.0 17.7 16.6 26.9 27.6 16.6 0.0 16.6 15.6 28.6 27.1 15.6 0.0 15.6 14.7 28.7 26.5 14.7 0.0 14.7 13.7 28.6 25.9 13.7 0.0 13.7 12.9 26.5 25.4 12.9 0.0 12.9 12.0 26.4 24.8 12.0 0.0 12.0 11.3 28.3 24.3 11.3 0.0 11.3 10.5 28.2 23.7 10.5 0.0 10.5 9.6 28.2 23.2 9.6 0.0 9.8 9.2 26.1 22.7 9.2 0.0 9.2 8.6 28.0 22.2 6.6 0.0 8.6 6.0 27.9 21.7 8.0 0.0 8.0 7.5 27.6 21.2 7.5 a-a 7.5 3. INPUT DATA FOR 100-YEAR STORM 9(100) Tp TIME INCREMENT Ks 6 INVERT ELEVATION ORIFICE ELEVATION RISOR ELEVATION PERMANENT STORA GE EM SPILLWAY ELE V TIME INFLOW STORAGE 0.00 0.0 120992 2.00 0.6 121040 4.00 3.2 121280 6.00 7.0 121892 6-Oa 12.2 12304 10.00 16.3 12467 12.00 25.2 12744 14.00 32.6 13095 16.00 40.1 13531 16.00 47.2 14055 20.00 53.8 14662 22.00 59.5 15339 24-DO 64.1 16050 26.00 67.2 16746 26.00 66.6 17392 30.00 66.8 17%3 32.00 67.3 18451 34.00 64.2 16866 36.00 59.7 19211 38.00 54.6 19475 40.00 49.4 1%56 42.00 45.7 19773 44.00 41.8 19829 46.00 38.2 19637 48.00 34.9 19805 50.00 31.9 19741 52.00 24.2 19650 54.00 26.7 19539 56.00 24.4 19411 58.00 22.3 19269 60.00 20.4 19116 62.00 18.6 18954 64.00 17.0 16764 66.00 15.6 16606 66.00 14.3 18420 70.00 13.0 16233 72.00 11.9 16056 74.00 10.9 17897 76.00 10.0 17747 78.00 9.1 17606 60.00 6.3 17479 62.00 7.6 17356 84.00 7.0 17246 86.00 6.4 17140 88.00 5.8 17041 90.00 5.3 1694q 92.00 4.9 16861 94.00 4.4 16779 96.00 4.1 16702 98.00 3.7 1662 PEAK INFLOW = PEAK OUTFLOW = PEAK ELEV = PEAK STORAGE _ 69 29.03 min 2.00 min 6371 1.57 843-00 649.50 650.50 120992 851.50 STAGE 649.50 849.50 849.51 849.53 3 849.57 2 849.63 6 849.72 7 649.64 7 849.96 5 850.15 0 650.34 5 850.56 9 850.78 4 850.99 0 851.19 9 851.36 0 851.50 1 851.62 9 651.72 1 851.80 7 651.65 3 651.68 5 651.90 4 851.90 4 851.89 1 853.67 7 651.85 2 851.82 0 651.76 2 851.74 4 651.69 4 851.65 4 651.60 7 651.55 1 651.49 4 851.44 6 651.38 2 851.34 7 651.29 6 851.25 5 651.21 9 851.16 2 851.14 7 651.31 9 851.08 1 851.05 9 651.03 9 851.00 7 850.96 99 850.96 69.04 CFS 39.35 CFS WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 0.0 0.0 0.0 0.0 0.0 0.0 a.a 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.a 0.0 0.0 0.0 0.a 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 26.5 6.2 0.4 0.0 0.4 4.6 27.4 18.0 4.6 0.0 4.6 10.7 28.3 23.9 30.7 0.0 10.7 17.7 29.0 26.2 17.7 0.0 17.7 24.7 29.7 31.5 24.7 0.0 24.7 31.1 30.3 34.0 30.3 0.0 30.3 36.9 30.7 36.0 30.7 1.3 32.0 42.0 31.1 37.6 31.1 3.1 34.2 46.0 31.4 36.8 31.4 4.9 36.2 46.6 31.5 39.5 31.5 6.2 37.8 50.6 31.7 40.0 31.7 7.1 38.6 51.5 31.7 40.3 31.7 7.6 39.3 51.6 31.7 40.3 31.7 7.6 39.4 51.1 31.7 40.2 31.7 7.4 39.1 50.1 31.6 39.9 31.6 6.6 38.5 48.7 31.5 39.5 31.5 6.1 37.7 46.9 31.4 39.0 31.4 5.3 36.7 45.0 31.3 36.5 31.3 4.4 35.7 42.6 31.1 37.9 31.1 3.5 34.6 40.6 31.0 37.2 31.0 2.6 33.5 36.2 30.8 36.5 30.6 1.7 32.5 35.8 30.6 35.7 30.6 0.9 31.5 33.3 30.4 34.8 30.4 0.3 30.7 30.7 30.2 33.9 30.2 0.0 30.2 26.2 30.0 32.9 26.2 0.0 28.2 25.9 29.8 32.0 25.9 0.0 25.9 23.6 29.6 31.1 23.8 0.0 23.6 22.0 29.5 30.3 22.0 0.0 22.0 20.3 29.3 29.5 20.3 0.0 20.3 16.7 29.1 28.7 16.7 0.0 16.7 17.3 29.0 26.0 17.3 0.0 17.3 16.0 26.9 27.3 16.0 0.0 16.0 14.9 26.7 26.6 14.9 0.0 14.9 13.6 28.6 26.0 13.8 0.0 13.6 12.8 28.5 25.3 12.6 0.0 12.6 11.9 26.4 24.7 11.9 0.0 11.9 11.1 26.3 24.1 11.1 0.0 11.1 10.3 28.2 23.6 10.3 0.0 10.3 9.6 26.1 23.0 9.6 0.0 9.6 851.90 EMERGENCY SPILLWAY ACTIVATED 196374 CF t t E. ORIFICE HOLE 4 -DAY RELEASE NUMBER OF HOLES 2 AVERAGE SURFACE AREA 30540 SF DETENTION DEPTH 1.00 FT a 0.415/t*As(h)w.5 a = 5.28 SQ IN d = 1.83 IN 8 -DAY RELEASE NUMBER OF HOLES 2 AVERAGE SURFACE AREA 30540 SF DETENTION DEPTH 1.00 FT a = 0.415/t*A=(h)A•5 a = 2.64 SQ IN d = 1.30 IN AVE d = 1.57 IN F. FLOTATION OF RISOR VOLUME OF RISOR ASSUME INVERT ELEV = ASSUME RISOR ELEV RISOR DIAMETER = V = 3.14159irA2th V = 28.3 CF VOLUME OF BARREL i 1 1 1 1 1 1 i ASSUME LENGTH = BARREL DIAMETER = V = 3.14159:r•2:L V = 47.1 CF TOTAL VOLUME CONCRETE REQ'D DISPLACED WATER WEIGHT OF CONCRETE (BOUYANT) CONCRETE REQ'D RISOR AREA CONCRETE REQ'D ADD 15% SAFETY FACTOR 1 13/16 in 1 5/16 in 1 9/16 in 846.5 650.5 36 in 15.00 ft 24 in = 75.4 CF = 4705 LB = 67.60 LB/CF = 53.7 CF = 7.1 SF = 7.6 LF = 8.7 LF 61.6 CF e SUMMARY TOP OF DAM 300-YEAR HIGH WATER 10-YEAR HIGH WATER ' EMERGENCY SPILLWAY ELEV RISOR ELEV ORIFICE ELEV INVERT ELEV SEDIMENT STORAGE REQUIRED SEDIMENT STORAGE PROVIDED SURFACE AREA REQUIRED 1 SURFACE AREA PROVIDED RISOR DIAMETER BARREL DIAMETER ORIFICE PLATE DIAMETER ORIFICE HOLE #/DIAMETER WEIR LENGTH 2 a 853.5 651.9 851.4 851.5 650.50 841.50 846.5 6716 CF 33557 CF 10865 SF 56242 SF 36 in 24 in 24 in 1.83 in 14 ft JAMESTOWN ENGINEERING GROUP, INC. 117 E. MAIN STREET JAMESTOWN, NC 27282 DESIGN OF WATER QUALITY POND NO. 2 GT""'RAL DESIGN CRITERIA DESIGN IS BASED UPON CITY OF HIGH POINT STORMWATER GUIDELINES ' FOR WATER QUALITY AND FLOOD CONTROL, IN CONJUNCTION WITH ENVIRONMENTAL REGULATIONS. ARTICLE A. SECTION 9-7-5 FOR WATERSHED CRITICAL AREAS. B. SITE INFORMATION THE PROPOSED SITE IS LOCATED WITHIN THE OAK HOLLOW GENERAL WATERSHED GENERAL SITE DATA IS LISTED BELOW: POND $2 SITE AREA 16.5 ' OFF-SITE AREA 0.00 16.50 TOTAL SITE AREA OFF-SITE DRAINAGE AREA 0.00 SITE DRAINAGE AREA 16.5 DISTURBED AREA 16.5 s UNITS PROPOSED (MULTI-FAMILY) I1S.S s UNITS PROPOSED (SINGLE FAMILY) 10 IMPERVIOUS AREA SF/UNIT (SINGLE FAMILY) 3000 SF/UNIT (MULTI-FAMILY) 2200 IMPERVIOUS AREA (SINGLE FAMI 0.69 IMPERVIOUS AREA (MULTI- FAMI 5.83 UNITS (TOTAL) 6.52 SIDEWALKS. POOL STREETS 2.36 , 0%: ADJACENT LOT @ .00 AC 0.00 TOTAL 8.88 % BUILT UPON (FOR SITE DRAINAGE AREA) 53.83: % BUILT UPON (FOR TOTAL SITE AREA) 53.83: DU/ACRE (SITE) 7.6 IN ACCORDANCE WITH TABLE 7-5-1 A WET DETENTION POND IS REQU IRED C. WET POND INFORMATION/REQUIREMENTS 1 3 VOLUME REQUIREMENTS OF POND 1 8% IMPERVIOUS @ 3.4 ft 53 2.03% OF DRAINAGE AREA . POOL SURFACE AREA REQUIRED .020 x 16.50 x 43560 - 14573 SF 1/8 PERM SED STORAGE .125 x 16.50 x 3630 7487 CF 29948 CF 1 1/2 TEMP SED STORAGE S00 x 16.50 x 3630 37434 CF TOTAISEDIMENT STORAGE VOLUME REQUIRED RUNOFF VOLUME - 1.0in x Rv x DA where Rv - 0.05 + 0.009 (I) CF 0 in 1 x 0.53 x 16.50 - 32012 . TEMPORARY VOLUME - I I' METHOD OF ANALYSIS D . INFLOW HYDROGRAPHS: SMALL WATERSHED METHOD ' PEAK INFLOWS: RATIONAL METHOD REGRESSION ANALYSIS FOR STAGE STORAGE RELATIONSHIP POND ROUTING: P,,,.d it DESIGN A. INFLOW HYDROGRAPHS 1. PRE-DEVELOPEMENT OFF-SITE AREA 0.00 ACRES C. 0.35 (<1/4 AC LOTS) ON-SITE AREA 16.50 ACRES (UNIMPROVED) C. 16.S ACRES C. 0.35 0.35 TIME OF CONCENTRATION HYDRAULIC PATH VELOCITY LENGTH TIME 1 SHEET FLOW 5 fps 300 ft 600 sec CHANNEL FLOW 8.0 fps ft sec 600 sec Tc 10.0 sin Q - CIA PEAK FLOW 1(2) 4.3 in/hr I(10) - S.8 in/hr ' I(100) 8.0 in/hr Q(2) 24.8 CFS Q(SO) 33.5 CFS Q(100) - 46.2 CFS 2. POST-DEVELOPEMENT OFF-SITE AREA (<1/4 AC LOTS) 0 ACRES C. 0.35 ON-SITE AREA 53.83: IMPERVIOUS IMPERVIOUS 8.68 ACRES C- 0.95 LAWN 7.62 ACRES 0.35 SITE DRAINAGE AREA AVERAGE 0.67 COMPOSITE 16.S ACRES C. 0.67 TIME OF CONCENTRATION HYDRAULIC PATH VELOCITY LENGTH TIME SHEET FLOW S fps 2S0 ft S00 sec CHANNEL FLOW B.0 fps 800 ft 100 sec 600 sec Tc - 10.0 sin PEAK FLOW Q CIA 1(2) 4.3 in/hr I(10) - S.S in/hr 8 0 in/hr I(100)- - 0(2) 47.7 CFS Q(10) - 64.4 CFS 0(100) - BB.8 CFS DEPTH OF RUNOFF 2-YEAR 6-HOUR PRECIPATION (P) - 2.52 in 10-YEAR 6-HOUR PRECIPATION (P) - 3.71 in 100-YEAR 6-HOUR PRECIPATION (P) - 4.93 in ' CH - 83 S . (1000/CN)-10 - 2.05 in YEAR 6-HOUR RUNOFF DEPTH 2 RUNOFF DEPTH(Q-) - (P-0.2 x S)"2/(P+0.8 x S) • 1.07 in - RUNOFF DEPTH(Q•) - (P-0.2 x S)"2/(P+0.8 x S) - 2.04 in 10-YEAR 6-HOUR RUNOFF DEPTH RUNOFF DEPTH(Q•) - (P-0.2 x S)"2/(P+0.8 x S) - 3.11 in 100-YEAR 6-HOUR RUNOFF DEPTH TIME OT PEAK - RUNOFF VOLUME/(1.39 x Qp:2-YEAR 16.11 sin TIME OT PEAK - RUNOFF VOLUMF/(1.39 x Qp.10-YEAR 22.71 sin TIME OT PEAK - RUNOFF VOLUME/(1.39 x Op. 100-YEAR 2S.1S sin 1 D. ESTIMATE STORAGE 1. S - (Q(Post)-Q(Pre)) • TP S - 13749 CF POND ELEVATIONS/AREA/VOLUME 2 . CUMULATIVE j TEMP\PERM SID STORAGE REQ'D 37434 CF 37434 CF PERMANENT STORAGE REQ'D 7487 CF 44921 CF ESTIMATED STAGE STORAGE 13749 CF 58671 CF ASSUME POND INVERT (DOTIOM OF POND) 843.0 SEDIMENT STORAGE REQUIRED 7487 CF VATER QUALITY SURFACE AREA REQUIRED - 14573 SF ACCUHALATID Z ELEV AREA VOLUME VOLUME STAGE In S In Z 843.00 4056 0 0 0.0 844.00 5081 4559 4559 1.0 8.425 0.000 845.00 6180 5622 10180 2.0 9.228 0.693 846.00 7368 6765 16946 3.0 9.738 1.099 847.00 8642 7997 24942 4.0 10.124 1.386 848.00 10095 9359 34301 5.0 10.443 1.609 849.00 11828 10950 45251 6.0 10.720 1.792 850.00 13623 12715 57966 7.0 10.968 1.946 851.00 21473 17400 71,366 8.0 11.230 2.079 652.00 23900 22676 98042 9.0 11.493 2.197 853.00 26463 25171 123212 10.0 11.722 2.303 854.00 28637 27543 150755 11.0 11.923 2.390 855.00 31119 29869 180625 12.0 12.104 2.485 856.00 32500 31807 212432 13.0 12.266 2.565 857.00 35000 33742 246174 14.0 12.414 2.639 858.00 38000 70428 282860 15.0 12.553 2.708 AVERAGE - 11.078 1.964 ASSUME SEDIMENT STORAGE ELEVATION 847.0 SEDIMENT STORAGE VOLUME PERMANENT = 21986 CF ASSUME ORIFICE ELEVATION 850.40 SURFACE AREA PROVIDED - 16763 SF PERMANENT VATER QUALITY VOLUME - 47921 CF ASSUME RISOR ELEVATI02l 852.30 1 TEMPORARY VATER QUALITY VOLUME = 36269 CF ASSUME EMERGENCY SPILLVAY ELEVATION 853.70 ASSUME BARREL INVERT ELEVATION 847.0 3. REGRESSION ANALYSIS SUMMARY OUTPUT PERFORMED ON LAST 8 ENTRIES where b-(sus(ln(Z)•ln(Z))-1/n•sum(ln(Z)).sum(ln(S)))/(sua(ln(Z)'2)-1 /n•(sun (ln (S)))"2) b. 1.83 a-1/n-sum(ln(S))-b/nmsum(In(Z)) a- 7.49 R"2-(sus(In(Z)+ln(S))-n•ln(Z)_ln(S)_)"2/((sua(ln (z)"2)-n+ln(Z) _"2)-(sus( ln(S)"2)-n +ln(S)_"2) R"2. 0.99 Ks-e"a Ks- 1798 I SEDIMENT Z STORAGE est ELEV 0.00 1.66 847.10 2.58 3.41 4.21 5.01 5.83 6.68 7.71 8.90 10.09 11.27 12.44 13.59 14.73 15.89 847.10 7487 CF REQUIRED 14573 SF REQUIRED 32012 CF REQUIRED C. OUTLET STRUCTURES 1. PRINCIPLE SPILLWAY INVERT ELEVATION 847.0 ASSUME RISOR ELEVATION 852.3 SOLVE FOR ROUGH RISOR SIZE P 33.5 CFS DIAMETER(in)-Q-12/(Cv-(H"3/2)• 3.14159) ROUGH DIAMETER - 33 in SOLVE FOR ROUGH BARREL SIZE DIAMETER(in)- (Q-4/(3.14159-Cd -(2-9-h)". 5)".5 ROUGH DIAMETER - 24 in ASSUME RISOR DIA - 36 in 36 ASSUME BARREL DIA 24 in 24 ASSUME ORIFICE PLATE DIA 22 in 24 2. EMERGEN CY SPILLWAY 1 SOLVE FOR WEIR LENGTH USE h- 1.0 ft ASSUME SPILLWAY ELEV = 853.7 L-Q/(Cv-h'3/2) vhere Q(100) - 88.8 cfs RISOR 0 @ ELEV 852.30 26.4 cfs EMERGENCY SPILLWAY 0 62.S cfs WEIR LGTH (ft) 21 ft 100-YEAR H.Y.L. 854.30 TOP OF DAM 855.7 ' WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL ELEV RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 852.3 0.0 26.4 0.0 0.0 0.0 0.0 8S2.S 2.8 27.0 15.2 2.8 0.0 2.8 852.7 7.9 27.6 21.5 7.9 0.0 7.9 852.9 14.S 28.1 26.4 14.S 0.0 14.S 853.1 22.3 28.7 30.4 22.3 0.0 22.3 853.3 31.1 29.3 34.0 29.3 0.0 29.3 853.5 40.9 29.8 37.3 29.8 0.0 29.8 853.7 51.S 30.3 40.3 30.3 0.0 30.3 853.9 62.9 30.9 43.1 30.9 S.4 36.2 854.1 7S.1 31.4 45.7 31.4 1S.2 46.6 BS4.3 88.0 31.9 48.1 31.9 27.9 59.8 854.5 101.5 32.4 50.5 32.4 42.9 75.3 854.7 115.6 32.9 S2.7 32.9 60.0 92.9 BS4.9 130.4 33.4 54.9 33.4 78.9 112.3 ALLOWABLE OUTFLOW - 33.5 CFS D. ROUTING 2. 10 & 100 YEAR POST-DEVELOPEHENT STORH TRRU POND 1 INPUT DATA FOR 2-YEAR STOR K O(2) 47.7 T 16.11 TINE INCREMENT 2.00 in Ks 1798 b 1.83 INVERT ELEVATION 843.00 ORIFICE ELEVATION 850.40 RISOR ELEVATION 852.30 PERKAHEHT STORAGE 106177 EX SPILLWAY ELEV 853.70 WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL INFLOW STORAGE STAGE RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW TIKE 0 00 0 0 69907 850.40 0.0 0.0 0.0 0.0 0.0 0.0 . . 8 00 1 2 70015 850.41 0.0 0.0 0.0 0.0 0.0 0.0 . . 9 00 6 4 70537 BS0.44 0.0 0.0 0.0 0.0 0.0 0.0 I . . 6 00 14 6 71825 850.51 0.0 0.0 0.0 0.0 0.0 0.0 a . . 00 23.6 8 74116 850.64 0.0 0.0 0.0 0.0 0.0 0.0 II . 7 00 32 10 77496 BS0.83 0.0 0.0 0.0 0.0 0.0 0.0 . . 5 00 40 12 81889 BS1.07 0.0 0.0 0.0 0.0 0.0 0.0 . . 8 00 45 14 87064 851.34 0.0 0.0 0.0 0.0 0.0 0.0 1 . . 16.00 47.7 92674 851.63 92 851 0.0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.00 46.1 98307 . . 0 0 2 00 41 20 103547 852.17 0.0 0.0 0.0 0.0 0.0 . . . 00 35.1 22 108074 852.39 0.8 26.6 10.2 0.0 0.0 0.8 . 00 29.9 24 111674 BS2.S6 4.1 27.1 17.4 4.1 0.0 4.1 ' . 00 25.4 26 114301 852.68 7.4 27.5 21.1 7.4 0.0 7.4 . 00 21.6 28 116090 852.77 9.9 27.7 23.2 9.9 0.0 9.9 . 00 18.4 30 117208 852.82 11.5 27.9 24.5 11.5 0.0 11.5 . 00 15.7 32 117810 852.84 12.5 28.0 25.1 12.5 0.0 12.5 . 00 13.3 34 118031 852.85 12.8 28.0 25.3 12.8 0.0 12.8 ' . 00 11.3 36 117977 852.85 12.7 28.0 25.3 12.7 0.0 12.7 . 00 9.7 38 117730 852.84 12.4 28.0 25.0 12.4 0.0 12.4 . 00 8.2 40 117354 852.82 11.8 27.9 24.6 11.8 0.0 11.8 I . 00 7.0 42 116896 852.80 11.1 27.9 24.1 11.1 0.0 11.1 . 9 00 5 44 116389 852.78 10.3 27.8 23.6 10.3 0.0 10.3 II . . 00 S.1 46 115059 852.75 9.5 27.7 22.9 9.5 0.0 9.5 . 00 4.3 48 115323 852.73 8.8 27.6 22.3 0.8 0.0 8.8 . 00 3.7 50 114794 852.71 8.0 27.6 21.7 8.0 0.0 8.0 ) . 52.00 3.1 114279 113765 852.68 66 852 7.3 7 6 27.5 27.4 21.0 20.4 7.3 6.7 0.0 0.0 7.3 6.7 - 54.00 2.7 00 2.3 56 113314 . 852.64 . 6.1 27.4 19.8 6.1 0.0 6.1 . 00 1.9 58 112868 852.62 5.5 27.3 19.1 S.S 0.0 S.5 . 00 1.6 60 112449 BS2.60 S.0 27.3 18.5 S.0 0.0 5.0 . 00 1.4 62 112055 852.58 4.6 27.2 17.9 4.6 0.0 4.6 . 00 1.2 64 111687 852.56 4.1 27.1 17.4 4.1 0.0 4.1 . 00 1.0 66 111344 852.54 3.8 27.1 16.8 3.8 0.0 3.8 . 00 0.9 68 111024 BS2.53 3.4 27.1 16.3 3.4 0.0 3.4 ' . 70.00 0.7 110727 110450 852.52 50 852 3.1 6 2 27.0 27.0 15.8 15.3 3.1 2.8 0.0 0.0 3.1 2.8 72.00 0.6 00 0.5 74 110193 . BS2.49 . 2.6 26.9 14.9 2.6 0.0 2.6 . 00 0.4 76 109954 852.48 2.4 26.9 14.4 2.4 0.0 2.4 . 00 0.4 78 109732 852.47 2.2 26.9 14.0 2.2 0.0 2.2 . 00 0.3 80 109527 852.46 2.0 26.8 13.6 2.0 0.0 2.0 . 00 0.3 82 109335 852.45 1.8 26.8 13.2 1.8 0.0 1.8 . 84.00 0.2 109158 852.44 1.7 26.8 12.8 1.7 0.0 1.7 PEAK INFLOW 47.7 CFS ' PEAK OUTFLOV 12.8 CFS PEAK ALLOWABLE OUTFLOW 24.8 CFS PEAK ELEV - BS2.85 ' PEAK STORAGE - 118031 CF I L 2. INPUT DATA FOR 10-YEAR STORM 0(10) 64 Tp 22.71 %in TIME INCREMENT 2.00 ¦in Ks 1798 b 1.83 INVERT ELEVATION 843.00 ORIFICE ELEVATION 850.40 RISOR ELEVATION 852.30 PERMANENT STORAGE 69907 E34 SPILLWAY ELEV 8S3.70 TIME INFLOW STORAGE STAGE 0.00 0.0 69907 850.40 2.00 1.2 69981 850.40 4.00 4.8 70342 850.43 6.00 10.5 71259 850.48 8.00 17.8 72955 850.57 10.00 26.2 75594 050.72 12.00 35.1 79271 850.93 14.00 43.7 83999 051.18 16.00 S1.5 89713 851.48 e 18.00 57.8 96271 851.82 20.00 62.2 103470 852.17 22.00 64.2 110860 852.52 24.00 63.9 117622 852.84 26.00 61.1 123098 853.08 28.00 56.2 127092 853.26 30.00 50.2 129953 853.39 32.00 44.8 132094 853.48 34.00 39.9 133593 853.54 36.00 35.6 134525 853.58 38.00 31.7 134958 8S3.60 40.00 28.3 134951 853.60 42.00 2S.2 134556 853.59 44.00 22.5 133822 853.55 46.00 20.1 132791 853.51 48.00 17.9 131499 853.45 50.00 16.0 129980 853.39 52.00 14.2 128265 853.31 i 54.00 12.7 126444 853.23 56.00 11.3 124728 853.16 58.00 10.1 123228 853.09 60.00 9.0 121904 853.03 ' 62.00 8.0 12072S 852.98 64.00 7.2 119668 BS2.93 66.00 6.4 118716 852.89 68.00 5.7 117853 852.85 70.00 5.1 117067 852.81 ' 72.00 4.5 116349 852.78 74.00 4.0 115691 852.7S 76.00 3.6 115087 852.72 I 78.00 3.2 114530 852.69 , I 80.00 2.9 114016 052.67 I 82.00 2.6 113540 852.65 84.00 2.3 113100 852.63 86.00 2.0 112691 852.61 ' 88.00 1.8 112312 852.59 PEAK INFLOW - 64. 40 CFS PEAK OUTFLOW - 30. 09 CFS PEAK ALLOWABLE OUTFLOW, 33. 50 CFS ' PEAK ELEV 853. 60 PEAK STOR AGE - 134958 CF WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLO9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.3 27.0 16.0 3.3 0.0 3.3 12.2 28.0 24.9 12.2 0.0 12.2 21.6 28.7 30.1 21.6 0.0 21.6 29.3 29.2 33.4 29.2 0.0 29.2 35.2 29.S 35.5 29.5 0.0 29.5 39.9 29.8 37.0 29.8 0.0 29.8 43.2 29.9 38.0 29.9 0.0 29.9 45.3 30.0 38.6 30.0 0.0 30.0 46.3 30.1 38.9 30.1 0.0 30.1 46.3 30.1 38.9 30.1 0.0 30.1 45.4 30.0 38.6 30.0 0.0 30.0 43.7 30.0 38.1 30.0 0.0 30.0 41.4 29.8 37.4 29.8 0.0 29.8 38.6 29.7 36.6 29.7 0.0 29.7 35.3 29.S 35.5 29.5 0.0 29.5 31.7 29.3 34.2 29.3 0.0 29.3 28.0 29.1 32.9 28.0 0.0 28.0 24.6 28.9 31.5 24.6 0.0 24.6 21.8 28.7 30.2 21.8 0.0 21.8 19.4 28.5 29.1 19.4 0.0 19.4 17.3 28.4 28.0 17.3 0.0 17.3 15.5 28.2 27.0 15.5 0.0 15.5 13.9 28.1 26.0 13.9 0.0 13.9 12.S 28.0 25.1 12.5 0.0 12.5 11.3 27.9 24.3 11.3 0.0 11.3 10.2 27.8 23.S 10.2 0.0 10.2 9.3 27.7 22.0 9.3 0.0 9.3 8.4 27.6 22.0 8.4 0.0 8.4 7.7 27.S 21.3 7.7 0.0 7.7 7.0 27.5 20.7 7.0 0.0 7.0 6.4 27.4 20.1 6.4 0.0 6.4 5.8 27.3 19.5 5.8 0.0 5.8 5.3 27.3 18.9 S.3 0.0 S.3 4.9 27.2 18.3 4.9 0.0 4.9 3. INPUT DATA FOR 100-YEAR STORK 0(100) 89 Tp 25.15 %in TIME INCREMENT 2.00 ¦in Ks 1798 b 1.83 e INVERT ELEVATION 813.00 ORIFICE ELEVATION 850.40 J RISOR ELEVATION 852.30 PERMANENT STORAGE 69907 EM SPILLWAY ELEV BS3.70 TIME INFLOW STORAGE STAGE 0.00 0.0 69907 850.40 2.00 1.4 69990 850.40 4.00 5.4 70398 850.43 6.00 11.9 71438 850.49 8.00 20.4 73376 850.60 10.00 30.4 76422 850.77 12.00 41.2 80719 851.01 14.00 S2.3 86330 851.31 16.00 62.8 93238 851.66 18.00 72.3 10134S 852.07 ' 20.00 80.0 110316 652.SO 22.00 85.4 119194 852.91 24.00 88.4 126995 853.26 26.00 88.6 134067 8S3.S7 ' 28.00 86.0 140698 053.85 30.00 80.9 145983 654.07 32.00 73.7 149373 854.21 34.00 66.S 151086 BS4.28 36.00 60.0 151595 854.30 ' 38.00 S4.1 1S1317 854.29 40.00 48.8 150549 854.26 42.00 44.0 149487 854.21 44.00 39.7 1482SS 854.16 46.00 35.8 146932 854.11 48.00 32.2 145564 BS4.OS 50.00 29.1 144179 853.99 S2.00 26.2 142788 853.94 54.00 23.6 141394 853.88 i 56.00 21.3 139990 853.82 58.00 19.2 138560 853.76 60.00 17.3 137055 8S3.69 62.00 15.6 135406 853.62 64.00 14.1 133S86 853.54 66.00 12.7 131618 BS3.46 68.00 11.5 129520 053.37 70.00 10.3 127311 853.27 72.00 9.3 125207 8S3.18 74.00 8.4 123409 853.10 76.00 7.6 121880 053.03 78.00 6.8 120564 852.97 80.00 6.2 119417 852.92 82.00 S.6 118410 852.87 84.00 5.0 117S17 852.83 86.00 4.5 116720 852.79 88.00 4.1 116003 852.76 90.00 3.7 115356 052.73 ' 92.00 3.3 114767 852.70 94.00 3.0 114230 652.68 96.00 2.7 113738 852.66 98.00 2.4 113286 852.64 PEAK INFLOW - 88 .83 CFS PEAK OUTFLOW = 59 .74 CFS WEIR ORIFICE ORIFICE PRINCIPAL EMERGENCY TOTAL RISOR BARREL RISOR SPILLWAY SPILLWAY OUTFLOW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.7 27.0 15.1 2.7 0.0 2.7 14.7 28.2 26.S 14.7 0.0 14.7 29.1 29.1 33.3 29.1 0.0 29.1 44.3 30.0 38.3 30.0 0.0 30.0 59.9 30.7 42.3 30.7 3.4 34.1 73.2 31.3 45.3 31.3 13.4 44.7 82.0 31.7 47.0 31.7 21.8 53.4 86.6 31.8 47.9 31.8 26.4 58.3 87.9 31.9 48.1 31.9 27.8 S9.7 87.2 31.9 48.0 31.9 27.1 58.9 85.1 31.8 47.6 31.8 24.9 56.7 82.3 31.7 47.1 31.7 22.1 S3.7 79.1 31.6 46.4 31.6 18.9 50.4 75.6 31.4 45.8 31.4 15.6 47.0 72.1 31.3 45.0 31.3 12.S 43.8 68.5 31.1 44.3 31.1 9.5 40.7 65.1 31.0 43.S 31.0 6.9 37.8 61.6 30.8 42.7 30.8 4.5 35.3 58.2 30.7 41.9 30.7 2.4 33.1 54.7 30.5 41.1 30.5 0.8 31.3 51.1 30.3 40.2 30.3 0.0 30.3 47.3 30.1 39.1 30.1 0.0 30.1 43.2 29.9 30.0 29.9 0.0 29.9 38.8 29.7 36.6 29.7 0.0 29.7 34.3 29.4 35.2 29.4 0.0 29.4 29.7 29.2 33.S 29.2 0.0 29.2 2S.6 28.9 31.9 2S.6 0.0 25.6 22.1 28.7 30.4 22.1 0.0 22.1 19.3 20.S 29.1 19.3 0.0 19.3 17.0 28.3 27.8 17.0 0.0 17.0 15.1 28.2 26.7 15.1 0.0 15.1 13.4 28.1 25.7 13.4 0.0 13.4 12.0 27.9 24.8 12.0 0.0 12.0 10.8 27.8 23.9 10.8 0.0 10.8 9.7 27.7 23.1 9.7 0.0 9.7 8.0 27.6 22.4 8.8 0.0 B.B 8.0 27.6 21.6 8.0 0.0 8.0 7.3 27.5 21.0 7.3 0.0 7.3 6.6 27.4 20.3 6.6 0.0 6.6 6.0 27.4 19.7 6.0 0.0 6.0 PEAK ELEV 854.30 EMERGENCY SPILLWAY ACTIVATED ' PEAK STORAGE - ISiS9S CF I E. ORIFICE HOLE 4 -DAY RELEASE NUMBER OF BOLES 2 AVERAGE SURFACE AREA 19089 SF DETENTION DEPTH 1.90 FT a - 0.415/t.h.(h)".5 a . 4.55 SQ IN d . 1.70 IN 1 11/16 in 8 -DAY RELEASE NUMBER OF HOLES 2 AVERAGE SURFACE AREA 19089 SF DETENTION DEPTH 1.90 FT a - 0.415/t-A-(h)".5 a - 2.27 SQ IN d - 1.20 IN 1 3/16 in AVE d - 1.45 IN 1 7/16 in FLOTATION OF RISOR VOLUME OF RISOR ASSUME INVERT ELEV - 847.0 ASSUME RISOR ELEV - 052.3 RISOR DIAMETER - 36 in V - 3.14159-r"2•h V 37.5 CF VOLUME OF BARREL ASSUME LENGTH . IS.00 ft BARREL DIAMETER - 24 in V - 3.14159-r"2•L V . 47.1 CF TOTAL VOLUME = 84.6 CF CONCRETE REQ'D DISPLACED PATER 5278 LB VEIGHT OF CONCRETE (BOUYANT) - 87.60 LB/CF CONCRETE REQ'D - 60.3 CF RISOR AREA - 7.1 SF CONCRETE REQ'D - 8.5 LF ADD IS% SAFETY FACTOR - 9.8 LF 69.3 CF t t t SUMMARY TOP OF DAM 100-YEAR HIGH WATER 10-YEAR HIGH WATER EMERGENCY SPILLWAY ELEV RISOR ELEV ORIFICE ELEV INVERT ELEV SEDIMENT STORAGE REQUIRED SEDIMENT STORAGE PROVIDED SURFACE AREA REQUIRED SURFACE AREA PROVIDED RISOR DIAMETER BARREL DIAMETER ORIFICE PLATE DIAMETER ORIFICE HOLE S/DIAMETER WEIR LENGTH 2 855.7 BS4.3 BS3.6 853.7 852.30 850.40 847.0 7487 CF 21986 CF 14573 SF 16763 SF 36 in 24 in 22 in 1.70 in 21 ft o?o? W A r?RQ? >_ b,u-.G, -1 CERTIFIED MAIL: 7003 3110 0003 6489 8186 Return Receipt Requested Mr. Ken Lindholm Faith Properties 10410-50OG Park Road Charlotte, NC 28210 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 19, 2005 DWQ# 05-1881 D R ford County OCT 2 1 2005 DENR - WATER QUALITY ?VETW,DS AND STO Rl WATER BRANCH APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Lindholm: Faith Properties has our approval, in accordance with the attached conditions, to place permanent fill in 149 linear feet of perennial stream and to place temporary fill in 30 linear feet of perennial stream and 0.09 acre of wetlands in order to construct a road crossing and install a sanitary sewer line for the Piedmont Crossing (also known as Lilliefield Subdivision) single-family and multi-family residential subdivision located on Barrow Road, in High Point, Guilford County, as described in your application received by the Division of Water Quality (DWQ) on October 10, 2005. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Numbers 3374 and 3402, which can be viewed on our web site at http://12o.enr.state.nc.us/ncwetlands. These Certifications allow you to use Nationwide Permit Numbers 12 and 39 respectively when they are issued by the U.S. Army Corps of Engineers. hi addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certifications. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of these Certifications and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached Certifications, as well as the additional conditions listed below: 1. The following impacts are hereby approved as long as all other specific and general conditions of these Certifications are met. No other impacts, including incidental impacts, are approved: Na` Caroli ona Ntcrrally North Carolina Division of Water Quality Wetlands Certification Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Phone (919) 733-1786 FAX (919) 733-2496 2321 Crabtree Blvd. Raleigh, NC 27604-2260 Intemet httpl/ h2o.enrstate nc.us/ncwetlands Customer Service Number: 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer- 50% Recycled/10% Post Consumer Paper Mr. Ken Lindholm Page 2, DWQ# 05-1881 October 19, 2005 Amount Approved Plan Location or Reference Streams 179 linear feet Unnamed tributaries to Oak Hollow Lake located near Barrow Road in High Point, Guilford County. Reference: "Overall Watershed Delineation Map for Lilliefield Subdivision". Headwater wetlands located near Barrow Road in High Point, Wetlands 0.09 acre Guilford County. Reference: "Overall Watershed Delineation Ma for Lilliefield Subdivision". 2. A final, written stormwater management plan must be approved in writing by this Office before the impacts specified in this authorization occur, per condition No. 4 in General Certification 3402. The stormwater management plan must include plans and specifications for stormwater management facilities that are appropriate for surface waters classified as Class WS-IV and designed to remove, at a minimum, 85% Total Suspended Solids according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any new permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stonnwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office, as well as drainage patterns, must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. This stormwater management plan must be submitted to the Central Office of the Wetlands/401 Certification Unit in Raleigh within 60 days of receiving this letter. 3. The proposed project must comply with the local water supply ordinance approved by the N.C. Environmental Management Commission (EMC) as required under the Randleman Lake Water Supply Watershed Rule (Randleman Buffer Rule): 15A NCAC 02B .0250, Protection and Maintenance of Riparian Areas, and 15A NCAC 02B .025 1, Stonnwater Requirements. (Local Governments include Archdale, Greensboro, High Point, Randleman, Jamestown, Randolph County and Guilford County.) 4. Appropriate sediment and erosion control measures which equal or exceed those outlined in the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North Carolina Surface Mining Manual (available from the Division of Land Resources at NCDENR regional offices or the central office), whichever is more appropriate, shall be designed, installed and maintained properly to assure compliance at all times with the North Carolina water quality standards that are applicable to Class WS-IV waters as described in 15A NCAC 02B .0216 Fresh Surface Water Quality Standards For Class WS-1V Waters. Such measures must equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. These measures must be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor owned and leased borrow pits, which are associated with this project. 11 5. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control measures in wetlands or waters is unavoidable, Mr. Ken Lindholm Page 3, DWQ# 05-1881 October 19, 2005 they shall be removed and the natural grade restored within six months of the date that the project is completed or, if applicable, within six months of the date that the project is released by the North Carolina Division of Land Resources. 6. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control "Best Management Practices" shall be performed so that no violations of state water quality standards, statutes, or rules occur. 7. The culvert required for this project shall be installed in such a manner that the original stream profile is not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions (including the pattern and profile) are to be maintained above and below the location of the culvert. The culvert shall be designed and installed to prevent head cutting of the stream. If the culvert becomes perched, the appropriate stream grade shall be re-established or, if the culvert is installed in a perched manner, the culvert shall be removed and re-installed correctly. The Applicant must submit a plan and receive written approval from this Office to address any head cutting that will occur as a result of this project (e.g., use of cross vanes downstream of the culvert). 8. Where riprap is required for energy dissipation and scour protection, it shall be limited to the minimum dimensions specified by appropriate engineering calculations. Riprap may only be used below the normal high water level. The original grade and elevation of the stream's cross-section must be maintained. Riprap placed in the stream bottom must be inserted into the bottom matrix to a depth sufficient to provide the thickness of riprap required for scour protection. The elevation of the stream bottom must not be increased by the placement of riprap. Placement of riprap must not result in destabilization of the streambed or banks upstream or downstream. 9. All construction activities associated with this project shall minimize built-upon surface area, direct stormwater runoff away from surface waters, and incorporate best management practices to minimize water quality impacts. If concrete is used with any fill material, it shall not be allowed to come in contact with surface waters until it has cured. If any stormwater must be collected for discharge into a stream channel, it shall not enter the stream as a point source, but shall be slowed and discharged as sheet flow prior to entering the riparian buffer on either side of the stream. 10. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been finished. This certificate should be sent to the 401/Wetlands Unit of the NC Division of Water Quality at the address listed on the form. Along with the Certificate of Completion form, please send photographs upstream and downstream of the culvert site and utility line crossing to document correct installation. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Mr. Ken Lindholm Page 4, DWQ# 05-1881 October 19, 2005 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Daryl Lamb in the DWQ Winston-Salem Regional Office at 336-771- 4600, extension 293, or Ian McMillan in the Wetlands/401 Central Office in Raleigh at 919-715-4631. Sincerely, Alan W. Klimek, P.E. AWK/cdl Attachments cc: Mr. Todd Tugwell, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office Winston-Salem DWQ Regional Office Central Files Wetlands/401 File Copy Mr. Wendell Overby, Soil &Environmental Consultants, PA, 236 LePhillip Court, Suite C, Concord, NC 28025