Loading...
HomeMy WebLinkAbout20190734 Ver 1_W-5710Y_Permit Drawings_20190531_20190605c I E a I T O t` Ln In IT c .3 L i c E c O L c w Lu Ir i 0 C, o See Sheet 9-A For Index of Sheets See Sheet 1-B For Conventional Svmbols PERMIT DRAWINGS STATIC OF NORTH CAROL INA DIVISION OF HIGHWAYS UNION COUNTY STA'EE STATE PROIP.CT REPERENC6 NO.I .. T SX S W-5 710Y I TQ PROl.N0. -P— I—RIPTION 44856.1.25 HSIP-1315 021 PE 44856.2.25 HSIP-1315 021 ROW/UTIL 44856.3.25 HSIP-1315 021 CONST LOCATION: INTERSECTION OF WAXHAW INDIAN TRAIL ROAD (SR 1008) AT NEW TOWN ROAD (SR 1315) TYPE OF WORK: GRADING, PAVEMENT REMOVAL, DRAINAGE, PAVING, CONCRETE ISLANDS & THERMOPLASTIC PAVEMENT MARKINGS END TIP PROJECT W-5710Y -L- STA. 22+05.00 a oci z� Z a a z a 3 tO�N TO MONROE SITE 1 R NEB END CONSTRUCTION -L- Sta. 15+81.56= -Yl- STA. 21+80.00 -Y1- Sta. 15+74.28= ' BEGIN CONSTRUCTION -Yl- STA. 10+75.00 I I 0 2 i BEGIN TIP PROJECT W-5710Y -L- STA. 10+30.00 NOTE: 1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III 2. DESIGN EXCEPTION REQUIRED FOR SAG VERTICAL AND SSD ON -L- PROFILE. a �a Z PERMIT DRAWING SHEET 1 OF 6 4PRIIH[dN.�R�Y Il�1L.5�NS OT USE FOR CONSTRUCTION ENT NOT CONSIDERED FINAL ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED BY:LUP HYDRAULICS ENGINEER RAC �C RUM , N KRTH C R KAHL, 27 900 RIDGEFIELD DRIVE, SUITE 350 RALEIG C NORTH C O. F-011 27609 NC LICENSE NO. F-0112 1-888-521-4455 OR 919-878-9560 50 25 0 50 100 ADT 2019 = 15,000 � W®gyp ADT 2040 = WA LENGTH ROADWAY TIP PROJECT W-5710Y............ 0.223 mile FOR NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PLANS DHV = WA TOTAL LENGTH OF PROJECT W-5710Y................... 0.223 mile 2018 STANDARD SPECIFICATIONS a� a D = WA RIGHT OF WAY DATE: Michael Merritt, P.E.PROJECT ENGINEER SIGNATURE: Pam. a 50 25 0 50 100 T = WA March 8 2019 V = 50 MPH ROADWAY DESIGN LETTING DATE: ENGINEER Scott Blevins, P.E. PROFILE (HORIZONTAL) FUNC CLASS = MAJOR June 19, 2019 PROJECT DESIGN ENGINEER OP, TR R�� 10 5 0 10 20 COLLECTOR NCDOT CONTACT: Randy Bowers PROFILE (VERTICAL) A, PROJECT ENGINEER -DIVISION 10 P.E. SIGNATURE DETAIL A SPECIAL CUT DITCH ( Not to Scale) Front at Ditch Natural �'� het Slope Ground ?•j D\o Min. D= 1.5 Ft. -L- STA. 10 + 00 TO STA. 10 + 50 RT -L- STA. 10 + 00 TO STA. 10 + 50 LT -L- STA. 12 + 00 TO STA. 15 + 00 RT -L- STA. 18 + 00 TO STA. 19 + 69 RT -L- STA. 21 + 50 TO STA. 22 + 00 RT -L- STA. 21 + 50 TO STA. 22 + 00 LT -Yl- STA. 10 + 50 TO STA. 11 + 00 LT -Yl- STA. 12 + 00 TO STA. 13 + 50 LT -Yl- STA. 17 + 00 TO STA. 21 + 00 LT -Yl- STA. 19+50 TO STA. 20+50 RT -Yl- STA. 21 + 00 TO STA. 22 + 00 RT -Yl- STA. 21 + 50 TO STA. 22 + 00 LT DETAIL D LATERAL BASE DITCH ( Not to Scale) Natural Ground 2.j D r) \ III/Ft. Fill Slope a Min. D= 1.5 Ft. I. �►I B = 2 Ft. b = 5 Ft. -L- STA. 15 + 00 TO STA. 16 + 00 RT -Yl- STA. 16 + 62 TO STA. 19 + 50 RT DETAIL G FALSE SUMP ( Not to Scale) �1 O E Outside Ditch --- �2 0 Traffic Flow A 20:1 N13 7etc. K— S — S=Ditch Slope Proposed tc STA. 19 + 00.00 RT DETAIL B CUT DITCH ( Not to Scale) t Front a Ditch Natural \ het Slope Ground .7 D F\� d Geotextile Min. D= 1.5 Ft. Type of Liner= Cl B Rip —Rap Max. d= 1.5 Ft. -L- STA. 19 + 69 TO STA. 21 + 50 RT -L- STA. 19 + 69 TO STA. 21 + 50 LT DETAIL E LATERAL 'V' DITCH ( Not to Scale) Natural � �— Fill Ground ?• j D Slope Min. D= 1.5 Ft. b = 5 Ft. -L- STA. 17 + 3 8 TO STA. 18 + 00 RT -Yl- STA. 16 + 71 TO STA. 17 + 00 LT DETAIL C LATERAL BASE DITCH ( Not to Scale) Natural Ground ?.j D 7A 1'iFt. Fill Slope a Min. D= 2.0 Ft. I<"�I B = 4 Ft. b = 5 Ft. -L- STA. 18 + 88 TO STA. 19 + 69 LT DETAIL F LATERAL BASE DITCH ( Not to Scale) Natural Fill Ground d ?'% D % 1' Ft. Slope GEOTEXTILE B ON BANKS EMBEDDED Min. D= 2.0 Ft. RIP RAP Max. d = 2.0 Ft. *When B is < 6.0' B = 2-4' Ft. Type of Liner= Cl B Rip -Rap b= 5 Ft. -L- STA. 17 + 14 TO STA. 17 + 38 LT -Yl- STA. 13 + 30 TO STA. 15 + 00 RT -Yl- STA. 13 + 50 TO STA. 15 + 35 LT PROJECT REFERENCE NO. SHEET NO. W -5710Y DITCH DE. W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 2 OF b ENGLISM RK.%K P:(919)878-9560 900 Ridgefield Drive Suite 350 I Raleigh, N., a'., lue 27609-3960 NC License No. F-0112 4'-4" 1r Orr V-6e l'-B"(TYP.) 4" TYP. V-6" C&G 12'r DRAINAGE TROUGH IN TRUCK MOUNTABLE APRON AS DIRECTED BY ENGINEER INSET FOR SITE 1 EIP I O SITE 1 —RAB— POC Si —Yl— POT Jro./.7*bz. SHIRLEY DAVIS WALSER TRUSTEE —Yl— PC St0.12+52.20 —Yl— PT Sta.13+96.01 LATERAL BASE DITCH SEE DETAIL F -Yl- POT Sta. /0+00.00 I=dmant Natural - s Company Inc., 8 ", Plastic SPECIAL C T DITCH 1 SEE DE AIL A 1 � SPECIAL CUT DITCH SEE DETAILA ' Windstream �I,Nc R/w' — Communications Inc.. Unknown Size EIP I _ 34�— ' $� 21 / .6� zo.00 asr co„n+y wa+er and sXeY Is Windstream exlslt Comm unlcations Inc.. Unknown Size e END CONST — — .11 C SPECIAL CUT DITCH SEE DETAIL A SPECIAL CUT DITCH SEE DETAIL B O ERRY JILL DAVIS Em ATERAL BASE DITCH SEE DETAIL C ° -L- POT Sta 22+20.19 / I J I JERRY GILL DAVIS / \V SPECIAL CUT DITCH / SEE DETAIL j h L r I I I WI I I w i Ito Oj I SPECIAL CUT DITCH N) SEE DETAIL B 31 I� Io 0 )FINE // I I I 3- POC Sta. lI 7.08= —L— POT S +/8.36a 7� �v F NOW Ci- UAS VENT PIPE O FII Piedman+ Nntaral — o oUE�_�i�CrE a.. 0 XII o� LATERAL BASE DITCH T I SEE DETAIL F .,� -L- PT Sta. 15+88b6 I GRADE TO Conform Networks, Unknown Size and motor �y� I IIII V 3 I I E X Union county water and Sewer Dlstrlat, 11 '. U.I. 2 I �I LEE DONALD DAVIS ET AL I C�l II IF, II II FS ELEV=588.74 O DORIS DAVIS THURMAN ET AL SPECIAL CUT DITCH SEE DETAIL A PROJECT REFERENCE NO. SHEET NO. W -5710Y 4 r. RMT SHEET NO. p p N ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 00 00 Z DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DENOTES IMPACTS IN SURFACE WATER PERMIT D RAW I N G ® IM AOCTSS TEMPO S RACRY E WATER SHEET 3 OF 6 GLI 25 0 25 50 SCALE FOR INSETS SPECIAL CUT DITCH SEE DETAIL A Windstream COMMUnicatlons Inc., Unknown Sze_ 6 P\ost\c CH � a"\na" LATERAL E SEE DETTAILAIL E c SPECIAL CUT DITCH —L— PC Sto. 18+06b4 SEE DETAIL A E p e\edma" E LATERAL V DITCH SEE DETAIL E aB- POC Sta. 10+85.18= / -Yl- POT Sta.16+62.2/ i / // �� / SPECIAL CUT DITCH �j� / SEE DETAIL A 0. pD /��� �E END CONS -Yl- POT / P i315 N 5 SPECIAL CUT DITCH SEE DETAIL A a� aIII P -Yl- PC sta. 2/+3f W'A / JE/ LATERAL BASE DITCH SEE ID POT Sta. /6+68.36= -Yl- POT Sta.16+12.2/ OJT Conterra Networks, Unknown Size and material �� RAB PC Sta 10+0000 -RAB- PT Sta.13+14.16= l -L- POT Sta.16+18,36 LATERAL BASE DITCH O SEE DETAIL D GEORGE H. WINCHELL : SANDRA A. FENN CAROL SUE GATES Iand MARGARET W. THE!WES I Iw I A II SPECIAL CUT DITCH W SEE DETAIL A II MATCHLINE —L— STA. 12+50 III F( I�II w I LEE DONALD DAVIS ET AL II I 1 —L— PC Stc.11+44.93 II I III I I I I O I DOUGLAS ALVIN HORNE III IIII III w o 8 I �m I III � C II _ Ic SPECIAL CUT DITCH SEE DETAIL A ; A BEGIN CONSTRUCTION — — + I I —L— POT Sta.10+30.00 SPECIAL CUT DITCH SEE DETAIL A K III ,1 �W \ f ull Wlrids ream Communications Inc., UMwo n Si.o O IIV I I REMOVE \ 5"1 _ NOTE: MATCHLINE —L— STA. 12+50 INCIDENTAL MILL APPROX. 25' AT EACH \ TIE IN TO PROVIDE A SMOOTH TRANSITION TO THE EXISTING ASPHALT PAVEMENT. FOR —L— PROFILE SEE SHT. 5 FOR —RAB— PROFILE SEE SHT. FOR —Yl— PROFILE SEE SHT. 6 R#Cl%fC P: (919)878-9560 900 Ridgefield Drive Suite 3501 Raleigh, North Carolina 27609-3960 NC License N0. F-0112 Engineers I Construction Managers I Planners I Scientists ww Ak.com Responsive People I Creative Solutions 4'-4" 1' 0" V-6e 1'-8"(TYP.I 4" TYP. 1'-6" C&G 12" DRAINAGE TROUGH IN TRUCK MOUNTABLE APRON AS DIRECTED BY ENGINEER INSET FOR SITE 1 PROJECT REFERENCE NO. SHEET NO. END CONSTRUC W-5710Y 4 -L- POT Sfa.22+0 . -=L- POT Sto. 22+20.19 / o ROADWAY RMI SHEET NO. DESIGN HYDRAULICS JERRY GILL DAVIS / N ENGINEER ENGINEER SPECIAL CUT DITCH H SEE DETAIL A m / \ } SPECIAL CUT DITCH / N /SEE DETAIL A 00 I Q Z W L DOCUMENT NOT CONSIDERED FINAL SPECIAL CUT DI CH N Ito W 1 UNLESS ALL SIGNATURES COMPLETED SEE SPECIAL CUT DITCH s � � SEE DEFAIL B DENOTES WTS IN SURFACEA ERPERMIT D RAW I N G ERRY JILL DAVIS 6 SHEET 4 OF 6 IW ® DENOTES TEMPORARY 1Q IMPACTS IN SURFACE WATER E t= II _ GLI 10" CPrV a Id - 87.25 —L— PT Sta.19+62.40 EM VE F ATERAL BASE DITCH SEE DETAIL C / 25 U 25 50 I � / Qa° ww — FS ELEV=568.74 O SCALE FOR INSETS DORIS DAVIS THURMAN ET AL '? SPECIAL CUT DITCH SPECIAL CUT DITCH 1 SEE DETAIL A — SEE DETAIL A 1 1 Windstream Communications Inc., Unknown Size — I EDDIE HORNE Iy 11 LATERAL V DITCH `� SEE DETAIL E —L— PC Sta. 18+06.64 SPECIAL CUT DITCH EIP I SEE DETAIL A pie LATERAL V DITCH �_ SEE DETAIL E i -RAB- POC Sta.10+85.18S I -RAB- POC Sto. lI 7.08� -L- POT St +18.36 \ -, 0) -Yl- POT Sto. 16+622/ �` SPECIAL CUT DITCH ° „�,sN SEE DETAIL A O SITE 1 —RAB— POC Sta. 12+4226= N P —Yl— POT Sto.15+622/ SHIRLEY DAVIS WALSER TRUSTEE —Yl— PC Sto. 12+5220 F 16" R 5 6' CIA CUT i . S DETA 01 I -Yl- PT Sta. /3+96,0/ ° e LATERAL BASE DITCH MC \ SEE DETAIL F —Yl— POT Sta. /0+00.00 d t Natural 8 pias�i cInc., SPECIAL C T DITCH HW 00 1 v� LATERAL DETAIL D CH i SEE DE AIL A —L _ — — ncF R 1 —Y - POT aSto.l68 7T e /2.2/ m E _ 5 p Q Unknown Size Nand material E SEE LDETAI CUT DITCH i — _ _ — — d ^� — — " RAB- PC Sto. 10+00.00= Wintlstream rNG ai _ — y�� _ — _ __� — — _ c _ 7 Stol 6+ 18-3 communications Inc.. L POT 6 � RAB PT Unknown Size y' @ + UP - - - - AZ I R�2�—p I NS aD e er i O 1 T,N a X E RD. \ — S3i`' N�� � Pi d Na+ j LATERAL BASE DITCH 4 Inc., I SEE DETAIL D — s6 GEORGE H. WINCHELL : SANDRA A. FENN windstream exrs�nc eiw CAROL SUE GATES ; and MARGARET W. THEWES communications Inc.. LATERAL BASE DITCH rn SEE DETAIL F —L— PT Sto. 15+88156 G Gomorra Networks,Unknown Si X I FI union county water and sewer District, I2 D.I. O I I I i W LEE DONALD DAVIS ET AL CI A SPECIAL CUT DITCH W SEE DETAIL A —L— PRC Sto.13+53.53 ,1 II W \ II hide r ommunlcations Inc., 11. n Size ea w OV \ NOTE: MATC H LI N E -L- STA. 12 + 50 INCIDENTAL MILL APPROX. 25' AT EACH \ TIE IN TO PROVIDE A SMOOTH TRANSITION TO THE EXISTING ASPHALT PAVEMENT. 71MI11 J© FOR —Yl— PROFILE SEE SHT. 6 R#C%fC P: (919)878-9560 900 Ridgefield Drive Suite 3501 Raleigh, North Carollne 27609-3960 NC License N0. F-0112 Engineers I Construction Managers I Planners I Scientists ww Ak.com Responsive People I Creative Solutions WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -Y1- 13+11 TO 14+38 ROADWAY FILL 0.01 < 0.01 150 18 PROPOSED 48" PIPE REMOVE EXISTING 24" PIPE TOTALS*: 0.01 < 0.01 150 18 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb