HomeMy WebLinkAboutNCC190490_ESC Approval Submitted_20190605ROY COOPER
Governor
MICHAEL S. REGAN
se�rerary
S. DANIEL SMITH
lnrerlm D(recror
NORTH CAROLINA
Environmental Quality
April 29, 2019
LETTER OF APPROVAL
Westchester Country Day School
ATTN: Headmaster Cobb Atkinson
2045 N. Old Greensboro Rd.
High Point, NC 27625
RE: Project Name: Westchester Country Day School
Acres Approved: 14.3
Project ID: DAVID-2019-022
County: Davidson
City: High Point
Address: 2045 N. Old Greensboro Rd.
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: The Isaacs Group, Brent Cowan
Date Received by LQS: Apri123, 2019
Plan Type: Institutional -New
Dear Mr. Atkinson
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and hereby issue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
North Carolina Department of Environmental Quality Drvtswn of Energy Mineral and Land Resources
Winston Salem Re9ronal Office -050 Hanes Miil Road, Suite 30O Winston Salem North Carolina 21103
336.776.9800
Letter of Approval
Westchester Country Day School
April 29, 2019
Page 2 of 3
As of March 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage
(CDC) under the NCG010000 Construction Stormwater General Permit.
This form MUST be submitted prior to the commencement of any land disturbing
activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucasPncdenngov or Paul Clark at Paul.clarkPncdenr.gov. After you submit
a complete and correct NOI Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to
be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Letter of Approval
Westchester Country Day School
1pri129, 2019
Page 3 of 3
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are
requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction
conference. Your cooperation is,appreciated.
Sincerely,
Zachary Lenz EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
cc: The Isaacs Group
ATTN: Brent Cowan
8720 Red Oak Blvd.
Suite 420
Charlotte, NC 28217
WSRO File
W o
kn u w o
v
'404� o
04
�a ® o
0
.,d Y
e�
rwl� CS $Not
•� Q �
ORO
m
*ma p c� as
Cal
�ma ,�