Loading...
HomeMy WebLinkAbout510063_Compliance Evaluation Inspection_201905231�: 0 Division of Water Resources Facility Number - L�� 0 Division of Soil and Water Conservation dry O Other Agency Type of Visit: eFCompliance Inspection 0 Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit: OrRoutine Q Complaint 0 Follow-up O Referral 0 Emergency Q Other 0 Denied Access Date of Visit: rg Arrival Time: wf 00 am I Departure Time: rb.5��'7 County: ;J1)Ln5fz5.1 Region: P R d Farm Name: DQVl CqAef(r6 Skvke filLr1 Owner Name: Dat, l Rerri n Mailing Address: Owner Email: Phone: Physical Address: 6q q � Ifor ler of a keiv ft) Facility Contact: l�rls _r►� Title: Phone: Onsite Representative: CU Iv1 dt Integrator: P to P_ Certified Operator: LA Hpert Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Boars Other Other Latitude: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Laver Non -La er Pullets Other Pou Design Current Discharees and Stream Impacts 1. is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow ,Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow [—]Yes 5DNo ❑NA ❑NE a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE ?. Is there evidence ora past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [C No ❑ NA ❑ NE of the State other than from a discharge? Page I rrj3 2/4/2015 Continued Facility Number: 5.1 - &3 Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes � No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 2 No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes CR No ❑ NA ❑ NE waste management or closure plan? � No ❑ NA E] NE the appropriate box. If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ® No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ® No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) ❑ Weather Code ❑ Rainfall [] Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? 9. Does any part of the waste management system other than the waste structures require ❑ Yes 21 No ❑ NA ❑ NE maintenance or improvement? � NA ❑ NE Page 2 of 3 Waste Aop[ication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes r5j'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drill ❑ Application Outside of Approved Area 12. Crop Type(s): (01A. M1 I106, WM0- Ahnval 13. Soil Type(s): I4. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ® No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ® No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [Z No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Reauired Records & Documents ❑ Yes © No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [S No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes � No ❑ NA E] NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements []Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [5j No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis [] Waste Transfers ❑ Weather Code ❑ Rainfall [] Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes C� No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E] No � NA ❑ NE Page 2 of 3 21412015 Continued Facili Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [�,No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? if yes, check ❑ Yes g No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels p Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ®No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA 53 NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document 0 Yes [,2 No [DNA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [�4 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office ofemergency situations as required by the ❑ Yes [5' No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ® No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ® No ❑ NA ❑ NE 33. Did the Reviewer/inspector fail to discuss review/inspection with an on-site representative? ❑ Yes JZ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes MNo ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional- recommendations or any other comments, Use drawings of facility to better explain situations (use additional pages as necessary). .�' . Ale) W ill n & � e5 CcA%npal Lod- before- the. &1d cf fh eyear. - stud es'vrv7CE is-�-tig .s�Ye_ s,9 La T�}-3�S-c�- so n, �a�l~ Cars;dP/ V&6 -Nr s d9,& l , (vrj?e'b&krf)I �. y 1 )1g W OtRM 111119 hYOOH'$7 Q13�))� w o �� (pllyl>S Y��S� a)1( kc vDD 9 C -gash 6v+of id -e&) Jeal W 1,e level is 10�v, Bei l h�j is u r -fo dafe �e�ewal er»flrk was recef i" ReviewedlnspectorName, ` �(� _ i)`f'jf'! t tele. cs).&acC �'-�1�r o? t j�' t{ Phone: Reviewerllnspector Signature: k'P A'_ ;�J l7 Lglel Date: May a- 0!.9 i Page 3 of 3 2/4/2015