HomeMy WebLinkAbout330067_Compliance Evaluation Inspection_20190521Facility Number
Sd lvlsion of Water Resources
O Division of Soil and Water Conservation
O Other Agency
Type of Visit: 0Co p�innce Inspection Operation Review Q Structure Evaluation Q Technical Assistance
Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: � Arrival Timc: 11-30 Departure Time: ..J County: Region:
Farm Name: / - Y '2-- Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative: T— Ore"z_
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wgan to Feeder
feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -La er
Pullets
Other
Poults
Design Current
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
,Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
�o ❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
Ef E] NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
�No
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ YesF
❑ NA
E] NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
o ❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
❑ No ❑ NA
❑ NE
of the State other than from a discharge?
Page 1 of 3
2/4/2015 Continued
Facility Number: 33 - Date of Inspection: r
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 2 No. ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ��No ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: weLy
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes�No
NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on-site which are not properly addressed and;`or managed through a ❑ Yes ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental( eat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes o ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [ZN ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? if yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Tota! Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): e vr, fid
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? [:]Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes CZN�j ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No- ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Yes Z>(0 ❑ NA ❑ NE
Yes o ❑ NA ❑ NE
❑ Yes�20
o
❑ Yes
❑Other:
❑ NA ❑ NE
❑ NA ❑ NE
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Flo ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? E—] Yes ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE
Page 2 of 3 214/2015 Continued
Facility Number: - k2 Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? if yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non-compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes �No
❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ED Yes ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal.,
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
G4 �)bj(WJt 0V s,2-� Lf_ y_ ( �
IS
o j
r
F
Rcviewer;`Inspector Name:
ReviewerlInspector Signature: (3 e, :54a& ( 2
Page 3 of 3
Phone: III/1' -7q yZDD
Date:
21412015