Loading...
HomeMy WebLinkAbout330068_Compliance Evaluation Inspection_20190521 (2)S-zS-1 Division of Water Resources Facility Number - O Division of soil and Water Conservation O Other Agency Type of Visit: Com nce Inspection Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access _j S -;C Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: �% t r „ Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative:�Integrator: Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to Finish Wean to Feeder 17 eeder to Finish 77 Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Phone: Certification Number: Certification Number: Latitude: Wet Poultry Design Capacity Current Pop. Layer Non -La er Dry Poultry Design Capacity Current Pop. Layers Nan -La ers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts I. is any discharge observed from any part of the operation? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes �No❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes N NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ YesNA ❑ NE ?. Is there evidence of a past discharge from any part of the operation? ❑ YesVoEo] NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ YesNA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facili Number: 3 3 - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ;Yes ❑ No NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure I Structure 2 Structure 3 l Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on-site which are not properly addressed an&or managed through a waste management or closure plan? ❑ Yes o ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental rent, notify DWR 7. Do any of the structures need maintenance or improvement? [] YesE]NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ZNo ❑ NA ❑ NE t � main enance or improvement. 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s). 13e mi h d 4 - 13. Soil Type(s): I4. Do the receiving crops differ from those designated in the CAWMP? ❑ Yeso [:]NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? E:] Yes �o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes f No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ YesNo ❑ NA ❑ NE 18. is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ZN0 ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers [] Weather Code ❑ Rainfall []Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 2/4/2015 Continued Facili Number: 33 - Date of Inspection:_. 24. Did the facility fail to calibrate waste application equipment as required by the permit?s ❑YeeNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non-compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ YesVNo E]NA [:]NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? F] Yes -NA E] NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours an&or document [] Yes No _] NA E] NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? Ifyes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss reviewhrispection with an on-site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). '? -� -(� - 5 rtiCS e Su-r✓e- &z Reviewer! Inspector Name: Reviewer..'lnspector Signature: (-54,5 Page 3 of 3 Phone: -791 :?'o -e4 Date: 2/412015