HomeMy WebLinkAbout20090907 Ver 1_401 Application_20090809eoSci???? & d®9 TO) A. _9? "PracticalEnghwering & Enviromwntal Solutions" August 14, 2009 Mr. John Thomas Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27586 Telephone (919) 554-4884 (Ext. 25) RE: Preconstruction Notification Application Southpark Boulevard Headwall Repair Winston-Salem, Forsyth County, NC Our Project #09.203 Dear Mr. Thomas: 2050 Northpoint Drive • Suite A Winston-Salem, NC 27106 Phone: (336) 896-1300 Fax: (336) 896-1020 geosci@geotec.com www.geotec.com QFg@NGVT2'= D AUG 1 7 2009 DENR - WATER QUALITY WETLANDS AND STORKWATER BRANCH By email we sent you a copy of the enclosed PCN for a project to repair the headwall. The headwall is at a 60 in. RCP that is in a creek, at Southpark Boulevard. The damage was the result of erosion caused by misalignment of the pipe with the stream. The project involves: 1) Placing a temporary cofferdam for diversion. 2) Removal of debris from the collapsed wall. 3) Placing a 30 ft. section of 48 in. CMP in the stream. Construction of a temporary work platform. This will involve straightening the stream alignment, which will shorten the steam by 5 ft. The new alignment will become permanent, to reduce likelihood of a recurrence of the failure. 4) Placing soil nails in the road embankment, attaching reinforcement, applying Shotcrete. 5) Replacing the segmental block retaining wall. 6) Removal of the work platform and CMP. 7) Dressing and seeding the banks of the stream, placing riprap on the banks for 10 ft. upstream of the headwall. The riprap will also help reduce the likelihood of recurrence of the failure. Ms. Sue Homewood of DWQ Winston-Salem Regional Office has visited the site with the writer. She determined that the stream is jurisdictional. A copy of the determination letter is enclosed. She stated that if this project fits under NW Permit #3, and if the impact can be kept to less that 40 ft., then no DWQ permit is required. You stated that the project qualifies for Permit #3. We have planned the work to keep the impact below 40 ft. Please let us know if you have any questions or require further information with regard to this application. With best regards, GEOSCIE E AND TECHNOLQ ?YJ P.A. Carl von Is rg, P. E_,' Senior Civil Engineer EX;- 09 enclosures: PCN cc: Robby Stone, PE, Streets Director, City of Winston-Salem Ms Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit NCDENR 2321 Crabtree Boulevard Raleigh, North Carolina 27604 Telephone (919) 733-1786 Sue Homewood, Winston-Salem Regional Office, NC DWQ o?0F 101A(rFR?Qc Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ? No For the record only for Corps Permit: ? Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ? No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ? No 2. Project Information 2a. Name of project: Repair of Headwall, Southpark Boulevard 2b. County: Forsyth 2c. Nearest municipality / town: Winston-Salem, NC 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Morgan Ridge Rs Llc Et Al City of Winston-Salem 3b. Deed Book and Page No. 2653-1349 Public Right of Way 3c. Responsible Party (for LLC if applicable): Greg Turner, Asst. City Manager 3d. Street address: 2089 Fort Union Blvd E 100 E Main Street 3e. City, state, zip: Salt Lake City, UT 84121 Winston-Salem, NC 27101 3f. Telephone no.: 725-2545 3g. Fax no.: 748-3060 3h. Email address: Page I of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: Carl von Isenburg 4c. Business name (if applicable): GeoScience & Technology, PA 4d. Street address: 2050 Northpoint Drive 4e. City, state, zip: Winston-Salem, NC 27106 4f. Telephone no.: 336-896-1300 4g. Fax no.: 336-896-1020 4h. Email address: cvi@geotec.com 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: Longitude: - (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 25.17 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Unnamed tributary to Salem Creek proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: Yadkin-Peedee 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Incised watercourse in common area of apartment complex. 3b. List the total estimated acreage of all existing wetlands on the property: 0.25 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: <200 ft 3d. Explain the purpose of the proposed project: Repair damaged headwall 3e. Describe the overall project in detail, including the type of equipment to be used: Install temporary coffer dam for diversion (pump-around); prepare bed, including straightening alignment; install temporary CMP in stream; fill to provide working platform; install soil nails, repair wall; remove fill and pipe, dress stream banks, place riprap. Equipment in stream: track hoe. Equipment on project: drill, concrete pump. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ? No X® Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for El Yes El No ®Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. There is the possibility of litigation. Prior consultants and contractors are not providing information. 6. Future Project Plans 6a. Is this a phased project? ? Yes X® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W 1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404 width (linear Temporary (T) (INT)? , other) (feet) feet) S1 ®P ? T alignment, riprap unnamed ® PER ® Corps 6 15 on bank ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 15 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below . If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for Stream name mitigation (square feet (square feet) or Temporary T impact required? B1 ?P?T ?Yes ? No B2 ? P ? T ? Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Unavoidable. Need access to repair washed out headwall. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Limit length of pipe to minimum 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ? No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: stormwater flow unchanged. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Repair of existing structure 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Winston-Salem ? Phase II ? NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ? No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ? No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes ? No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ? Yes ? No 5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ? Yes ? No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Carl von Isenburg, PE * 8/12/09 Applicant/Agent's Printed Name valid /AgeVSig re (Agent's signatuif an tter from t he applicant is provided.) Date Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version organ August 12, 2009 RE: Deed book & page # 2653-1349 To whom it may concern; Morgan Ridge RS LLC authorizes Carl van Isenburg PE, of GeoScience Technology PA to act as agent for the purpose of applying for permits (PCN) for the construction work required to repair a headwall on or near Morgan Ridge property. If you have any questions, please feel free to contact me. Warm regards, {U' - &e" Peggy B. Bolens Community Manager 100 Morgin Way - Wjn:ton-Salem, NIC 27127 - Ph 336-784.9242 - Fax 336.784-9677 MAT A NCDE NR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director Natural Resources Dee Freeman Secretary August 7, 2009 Mr. Carl von Isenburg, PE GeoScience & Technology PA 2050 Northpoint Dr Winston-Salem, NC 27106 Subject Property: Southpark Blvd culvert crossing, Forsyth County On-Site Determination for Applicability to the Mitigation Rules (15A NCAC 2H.0506(h) Dear Mr. von Isenburg: On August 7, 2009, at your request and in your attendance, Sue Homewood conducted an on-site determination to review features located on the subject property for intermittent/perennial determinations with regards to the above noted state regulations. The features that were reviewed are identified on the attached map. The feature identified as Stream A was found to be perennial from the stormwater pond outlet upstream of the culvert under Southpoint Blvd to downstream of the culvert beyond the road right-of-way. Please note that all perennial stream channels and jurisdictional wetlands found on the property are subject to the mitigation rules cited above. The owner (or future owners) should notify the DWQ (and other relevant agencies) of this decision in any future correspondences concerning this property. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Cyndi Karoly, DWQ, 401 Oversight/Express Review Permitting Unit, 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604-2260. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" surface water from the buffer rule may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. DWQ recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North North Carolina Division of Water Quality, Winston-Salem Regional Office Location. 585 Waughtown St. Winston-Salem. North Carolina 27107 Phone: 336-771-5000! FAX: 336-7714630'•. Customer Service: 1-877-623-6748 Internet wm,*w.ncwaterquelity.org An Equal Opportunity ; Affirmative Action Employer One NoahCarolina ?Ivaturallrf Carl von Isenburg August 7, 2009 Page 2 of 2 Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. This letter only addresses the applicability to the mitigation rules and the buffer rules and does not approve any activity within Waters of the United States or Waters of the State or their associated buffers. If you have any additional questions or require additional information please call me at 336-771-4964 Sincerely, c Sue Homewood DWQ Winston-Salem Regional Office Enclosures: USGS Topo Map cc: John Thomas, USACE Raleigh Regulatory Office DWQ, Winston-Salem Regional Office