Loading...
HomeMy WebLinkAbout20050481 Ver 4_401 Application_2009082005 -oy S 1 v y DEPARTMENT OF THE ARMY US ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, FT BRAGG 2175 REILLY ROAD, STOP A REPLY TO FORT BRAGG NORTH CAROLINA 28310-5000 ATTENTION OF Directorate of Public Works Ms. Cyndi Karoly Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Dear Ms. Karoly: t a ''ir/?I U ! l 0 ??r ?errK ? ?4Np`r?NV ST irk ?C?pC?I "INCH Enclosed is a Pre-Construction Notification application for a Nationwide Permit Number 27 (Aquatic Habitat Restoration, Establishment, and Enhancement Activities), as required by Section 404 of the Clean Water Act, and for the North Carolina Division of Water Quality's associated General 401 Water Quality Certification (#3689). We understand the activities must comply with any regional conditions that have been added by the US Army Corps of Engineers (USAGE) and with any case specific conditions added by the USACE or by the State in its Section 401 water quality certification. This 401 certification requires notification to and written concurrence from the North Carolina Division of Water Quality. This permit action involves stream enhancement activities along an unnamed tributary in the Hammond Hills vicinity near Viking Way. Total temporary stream impacts are 1326 feet; 38 feet of stream that is currently piped is to be daylighted and stabilized/enhanced. If you have any questions, please contact Mr. Erich Hoffman, (910) 396-2867. Sincerely, To Gregory G. Bean Director of Public Works f I: ?oF wArF9Q v U1 OF ??, Office Use Only: Corps action ID no. DWQ project no. O J•CA%I 1?4 Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit F-1 Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? N Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): N 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes N No For the record only for Corps Permit: ? Yes N No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes N No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes N No 2. Project Information 2a. Name of project: Hammond Hills Stream Enhancement Project 2b. County: Cumberland 2c. Nearest municipality / town: Ft. Bragg 2d. Subdivision name: Hammond Hills 1EAk 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Ft. Bragg 3b. Deed Book and Page No. n/a 3c. Responsible Party (for LLC if applicable): Ft. Bragg 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: 4b. Name: Mr. Gregory G. Bean 4c. Business name (if applicable): Department of Army - Directorate of Public Works (IMSE-BRG-PW) 4d. Street address: 2175 Reilly Road Stop A 4e. City, state, zip: Fort Bragg, NC 28310-5000 4f. Telephone no.: 910-396-4009 4g. Fax no.: 910-432-6908 4h. Email address: Gregory. g.bean @us.army.mi1 5. Agent/Consultant Information (if applicable) 5a. Name: Ken Trefzger, Project Manager 5b. Business name (if applicable): HDR Engineering, Inc 5c. Street address: 3733 National Drive, Suite 207 5d. City, state, zip: Raleigh, NC 27612 5e. Telephone no.: 919-785-1118 5f. Fax no.: 919-785-1187 5g. Email address: Kenneth.Trefzger@hdrinc.com Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): n/a - Ft. Bragg; UTM Zone 17 coordinates: 3,889,458 N; 681,863 W 1 b. Site coordinates (in decimal degrees): Latitude: 35.131 Longitude: - 79.004 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 2,467 linear feet of stream, or 2.8 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Beaver Creek, a western tributary of Beaver Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project site is a degraded stream channel that exists in the low area of the Hammond Hills subdivision. The area is currently forested with houses just beyond the forested areas along much of the project. Other areas are mostly forested. 3b. List the total estimated acreage of all existing wetlands on the property: a small wetland lies downstream of the project, but is unaffected by the proposed enhancement 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2500 I.f. of perennial stream 3d. Explain the purpose of the proposed project: The purpose of this project is to take a proactive approach to the stream degradation and try to stop downstream sedimentation. 3e. Describe the overall project in detail, including the type of equipment to be used: Please see the attached Monitoring Plan Section 1 for the project details by sections. The project consists of stabilizing approximately 1326 total feet of a degraded channel at the Hammond Hills subdivision. Standard construction equipment will be used such as excavators, hauling trucks, pump for keeping the channel dry, etc. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: for the prior phases, yes; not for this phase 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ®Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: HDR Engineering, Inc. Name (if known): Vickie Miller of HDR for this phase Other: Kimley-Horn performed the prior delineation in '03 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. The stream was determined to be jurisdictional during on-site field reviews of the project (2-19-08 with Richard Spencer of USACE and 2-27-08 with Ken Averitte of DWQ and Richard Spencer). For the prior phase of work, the area was delineated and a JD was issued by the USACE on 10/22/2003, with an expiration of 10/22/2008. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. A JD, NWP #14 and ATF NWP #12 was authorized by the USACE for the Hammond Hills neighborhood housing project, adjacent to this proposed project. The prior phase of stream/wetland determination and permitting was necessary to support the construction of the Hammond Hills neighborhood housing development. This private military housing was constructed by Picerne under a 50-year lease agreement with the Army and provides additional housing requirements stemming from BRAC, Army Transformation, and Grow the Forces Initiatives. The Hammond Hills stream and its associated riparian areas were removed from the 50-year lease and given back to the Army so we could restore and enhance the current Beaver Creek stream degradation. 6. Future Project Plans 6a. Is this a phased project? ? Yes No 6b. If yes, explain. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ?No ?DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 2h. Comments: n/a 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or Temporary (T) intermittent (INT)? DWQ - non-404, width (linear f t other) (feet) ee ) S1 ? P ®T Stabilization Beaver Creek ® PER ? INT ® Corps ® DWQ 2-5' 1326 S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 1326 3i. Comments: temporary impacts only Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: n/a 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e Pond ID Proposed use or purpose number of pond Stream Impacts (feet) Flooded Filled I Excavated I Flooded I Filled I Excavated Upland (acres) Flooded P1 P2 5f. Total 5g. Comments: n/a 5h. Is a dam high hazard permit required? ? Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. F1 Neuse F1 Tar-Pamlico ? Other: Project is in which protected basin? dlem F1 Catawba F] Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: n/a Wetland Impacts (acres) Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Minimal stream relocation will be completed for the project. The project was designed to only impact areas that are not currently stable and to build a bench along the sections which are currenlty degrading. Several meetings and lots of coodination took place between the USACE, DWQ, Ft. Bragg staff, and the design team in order to mkinimize the footprint of the project while maximizing the benefits of the stream enhancement. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Stable reaches will not be impacted by the stabilization methods or construction equipment. Construction access has been laid out to avoid any additional or unneccessary impacts tot eh stream or riparian areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Stream restoration project. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply [_1 HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ® Yes ? No Comments: An REC will fulfill the NEPA documentation 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The Fort Bragg DPW Environmental Management Branch SME's have determined the project area is no longer federally protected species habitat because the area has been categorized as a "no longer' managed historic RCW cluster. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Evaluation of NMFS's Office of Habitat Conservation, Habitat Protection Division-Essential Fish Habitat website (http://www.nmfs.noaa.gov/habitat/habitatprotection/efh/GIS-inven.htm) and field review. No suitable habitat exists onsite for Essential Fish Habitat. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Register Information System was reviewed. The site has been altered from numerous sources including the surrounding housing areas and road/culverts/drop structures as well as possible stream channelization and ditching. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? El Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NCFMP website Gregory G. Bean Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version r r ?? .... fl. ? V ?Y i k y, V' (k ViU 41:.?J f M, Hammond Hills Vicinity Map ONE COMPANY I Many Solutions- Figure 1 Fort Bragg I Hammond Hills Stream Enhancement I Permit Application J �f MARKHAM STREET ��. ♦�s ! '1. A�IAM� O �a 44. s...A'. �{ Zabitosky, Road ,. Upper Reach `cos' Middle Reach J� B Virginia puce ate. Old Railroad 1 inch equals 500 feet A Feet r W F �r 0 250 500 _ �� Hammond Hills Site Map ONE COMPANY I Many Solutions • Figure 2 Fort Bragg I Hammond Hills Stream Enhancement I Permit Application NM a2 O' mU. 0 O J C O v co N N O L U 2 M C O E E m 2 ti 0 z 0 o U W z 0 Hammond Hills Stream Enhancement Project FORT BRAGG, NORTH CAROLINA February 2008 (Revised February 2009) Prepared By: HDR Engineering, Inc. of the Carolinas HDR Project No. 011236-70600 TABLE OF CONTENTS 1 Introduction ..........................................................................................................................................2 2 Site Description and Proposed Improvements ..................................................................................2 2.1 Upper Reach ..................................................................................................................................2 2.2 Middle Reach ................................................................................................................................4 2.3 Lower Reach .................................................................................................................................5 2.4 Existing Rain Gardens ...................................................................................................................7 3 Supporting Calculations ......................................................................................................................7 3.1 Hydrologic Model .........................................................................................................................8 3.2 Hydraulic Model .........................................................................................................................10 3.3 Proposed Bankfull Channel .........................................................................................................10 3.4 Proposed Cross Section ...............................................................................................................11 FIGURES Figure 1 - Site Map .......................................................................................................................... 3 Figure 2 - Drainage Area Map ......................................................................................................... 9 TABLES Table 1 - Rainfall ..................................................................................................... Table 2 - Land Use .................................................................................................. Table 3 - Summary of Drainage Area, TLag and RCN ........................................... Table 4 - Summary of Peak Discharges .................................................................. Table 5 - Bankfull Design Summary ....................................................................... Table 6 - 1-Year Existing and Proposed Channel Velocity and Shear Stress ......... Table 7 - 2-Year Existing and Proposed Channel Velocities and Shear Stress ...... Table 8 - 10 Year Proposed Channel ....................................................................... Table 9 - 100-Year Proposed Channel .................................................................... Table 10 - 100-Year Existing and Proposed Elevations .......................................... APPENDICES Appendix A - Miscellaneous Calculations 8 ..................... 8 ................... 10 ................... 10 ................... 11 ................... 12 ................... 13 ................... 14 ................... 15 ................... 16 Preliminary Design Report December 2007 (Revised February 2009) li iLJ 1 Introduction Hammond Hill Stream Enhancement Project includes the assessment and improvement recommendations for an unnamed stream that begins at a 60-inch storm sewer outfall and travels between Viking Court and Virginia Place to the culvert under Zabitosky Road as shown on Figure 1. The stream has severely eroded throughout the years with numerous locations where the stream is deeply incised. The purpose of the enhancement project is to stabilize the stream channel and banks using natural techniques where feasible. The design summary report describes the site, the proposed improvements and supporting calculations. 2 Site Description and Proposed Improvements Figure 1 shows the delineation of three distinct reaches of the stream, upper, middle and lower. This section summarizes the existing conditions as assessed on October 4, 2007 and the recommended improvements. 2.1 Upper Reach Station 10+00.00 to 13+87.46 (Upper Reach) - The existing conditions for this site are not favorable for water quality or habitat. The banks in this area are actively eroding and greatly incised. This reach currently has an approximately 68-foot long concrete lined ditch with a large scour hole just below the end of the concrete. A head cut is migrating upstream at this location and is undercutting the concrete lined ditch. See photos below. concrete ditch Hammond Hills Stream Enhancement Project -2- Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) 0-KHAM STREET O/ ALL AMERICq pCNlt POb? ? ?? 'V ^?? 5 EET ?\ IYI? Ns Zabitosky Road Old Railroad kI Upper Reach n9 Co4rt I J7 0 ?o d 3 O ? i r 7 0 76 ,r o `JJJ ? ? Jp//?OG? ' Q RKINGO ?G Middle Reach B Virginia ?.??? ?Sh 311'. r J ,ter 'J 00 00 p ®O ° '/ RG131 ? O OONOVAN V STREET Q ° 4WRKING ° 0 Q zzz?o (- ?0 0 MRKINC , ° 0 0 --? ORUBER ROgp IL^\\0 Q °PARKW6 ° ° ° O ,=J,-?,ower Reach }) II ice ORNE -SM NE - 113 n _ _ - J O I FZ Hammond Hills Site Map ONE COMPANY I Many Solutions- Finure 1 Client Client Client I Project Project Project I Document Document Document Document For the upper reach, it is recommended that the concrete lined section be removed and the existing storm sewer replaced with a 72-inch RCP set at the existing channel invert. This will require the replacement of the storm sewer manhole located approximately 38 feet upstream of the existing 60-inch storm sewer outlet. Increasing the storm sewer size reduces outlet velocities; however, rip rap will still be required to dissipate the energy at the outlet. It is recommended that a concrete headwall with wing walls be constructed and rip rap be buried 1 foot below the proposed stream invert and extend up on the banks for protection. Burying the rip rap will allow the natural channel bed to form during normal conditions and provide protection to the headwall and storm sewer during higher flow events. Due to the current incision of the stream, it is suggested that a 5 feet wide flat bench be maintained on both sides of the base channel and the banks be laid back at a 2:1 slope. The current stream banks are essentially vertical in this reach. With the banks laid back, vegetation will have a better chance to establish and help hold the banks. In one particular area of this section, there is a banded tree which indicates RCW habitat. Due to that banding, it is proposed that a rock filled gabion wall be installed on the overbank bench as well as a slight realignment of the channel to divert the water away from the left bank in order to reduce impacts to the tree. The remainder of this reach will have the slopes laid back at 2:1 slopes. Although, 3:1 slopes would be optimal, it was determined that 2:1 slopes would protect and save more trees along the channel for all reaches proposed for enhancement. This section ties into the existing culvert under Viking Road. The stream thalweg and flow will be slightly relocated in this area to allow better positioning of the stream with the culvert. 2.2 Middle Reach From Station 10+00.00 to 12+93.98 (Middle Reach), the stream will be modified by laying back the slopes (2:1) and slight alignment changes. This section currently contains the culvert and drop structure under Viking Road. The design attempts to realign the stream to better accommodate the outlet of the structure and will include some structures to help direct the flows away from the banks. See the following photographs for existing conditions. Hammond Hills Stream E Ft. Bragg, North Carolina Project - 4 - February 2008 (Revised Below the Middle Reach Station 12+93.98 to Lower Reach 10+00.00, it is recommended that no action be taken in this section. The stream is currently stable and construction in this area may impair the existing stability. Correcting the problems upstream of the stable section will also help maintain the stability in this area. 2.3 Lower Reach From Station 10+00.00 to 16+33.91 (Lower Reach), beginning at the utility crossing, it is recommended that several things be done to enhance the stream including laying the slopes back at 2:1, placing series of drop structures to restore the natural channel slope and planting to stabilize the stream banks. The utility crossing itself has a lot of rip rap that has stabilized this section and it is recommended to not disturb this reach Hammond Hills Stream Enhancement Project -5- Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Outlet of culvert at Viking Road Downstream of culvert outlet Sand crossing deposits at the upstream of utility crossing From Station 16+33.91 to the culvert under Zabitosky Road, it is proposed that very little construction take place. The area, although straightened, has over time become stable and minimum improvements are recommended. In the area where the old rail/road bed is located, it is recommended that the concrete abutments currently in the channel be removed and a double step rock cross vane be installed to prevent future headcutting. Also, this section currently has a trail leading up to the banks of the stream. Although the educational opportunities abound in that area, it is visible that the traffic from the trail to the stream is affecting the bank in this area and destroying the vegetation on the banks. It is recommended that a post and cable fence be installed to hinder trail goers from going down the stream banks and allow vegetation to establish. Although, this isn't going to keep them away from the stream, it may help to deter some of the traffic. Hammond Hills Stream Enhancement Project -6- Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Extreme bank erosion in Lower Reach banks in straightened section. 2.4 Existing Rain Gardens During the development of the stream enhancement project scope of work, Fort Bragg indicated that the rain gardens that were constructed throughout the Hammond Hills residential development were not functioning properly and these facilities could be retrofitted to benefit the proposed stream improvements. It was determined that only 10% of the entire stream drainage area drains to the rain gardens and therefore retrofitting these facilities would have minimum impact to the bankfull discharge. Improving the rain garden functionality will benefit the stream water quality. Although a detailed analysis and site survey was not performed as part of this project, the following observations were made during the field assessment. The top (surface) of the rain gardens appeared to be sloped towards the outlet structure. Typically rain gardens are flat so that storm water will pond evenly across the facility and drain through the media. Some of the outlet structures appeared to be set at the surface of the rain garden allowing storm water to immediately discharge out of the facility. Typically the outlet structures are constructed six to nine inches above the rain garden surface so that the first flush of stormwater runoff ponds up prior to overflowing into the outlet structure. It is recommended that detailed as-built surveys of these structures be performed and compared with the proposed design and the appropriate modifications be performed. 3 Supporting Calculations The proposed improvements discussed in Section 2 require the establishment of a base channel that will safely convey the bankfull discharge and allow the larger flows to access a floodplain section. A hydrologic model was produced for the watershed to determine various frequency peak discharges within the stream. A hydraulic model was produced to determine the existing Hammond Hills Stream Enhancement Project -7- Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Concrete abutments in channel to be removed channel capacities and velocities. These models were used along with the field observations to confirm the discharges and assist in the design of the stable base channel. This section describes these models and the proposed base channel design. 3.1 Hydrologic Model The HEC-HMS model was used to calculate peak discharges at various locations along the stream for various 24 hour duration storm events. The total 24- hour rainfall depths were obtained from NOAA Atlas 14 and are summarized in Table 1. The NRCS Type II rainfall distribution was used to develop the 24-hour 5 minute storm events. Drainage areas were delineated from the topographic map, the storm sewer map provided by the Fort Bragg Directorate of Public Works and the design drawings for the Hammond Hills Residential Development prepared by Kimley- Horn Associates. The NRCS Runoff Curve Number (RCN) was used to estimate the amount of rainfall that will runoff during a storm event. The RCNs were developed based on the soils map and landuse as reflected on the most recent aerial imagery provided by the Fort Bragg Directorate of Public Works. RCN values were obtained from the NRCS Technical Release No. 55 and summarized in Table 2. The runoff was transformed into flood hydrographs using the NRCS Unit Hydrograph method which uses a lag time to define the hydrograph shape. The lag times are based on the time of concentrations which were calculated using the NRCS time of concentration method presented in the Technical Release No. 55. A summary of the hydrologic parameters are presented in Table 3 and the subbasins shown on Figure 2. A summary of the HEC-HMS results are presented in Table 4. Table 1 - Rainfall Event Duration (hours) Distribution Total Rainfall (inches) 1- ear 24 Type II 3.06 2-year 24 Type II 3.71 10- year 24 Type II 5.44 50 - year 24 Type II 7.33 100- ear 24 Type II 8.20 Table 2 - Land Use Landus D i ti Soil Classif ication/RCN e escr p on A B C D Commercial 89.0 92.0 94.0 95.0 Industrial 81.0 88.0 91.0 93.0 Heavy Residential 77.0 85.0 90.0 92.0 Medium Residential 57.0 72.0 81.0 86.0 Light Residential 46.0 65.0 77.0 82.0 Open Space 39.0 61.0 74.0 80.0 Streets 83.0 89.0 92.0 93.0 Water 98.0 98.0 98.0 98.0 Hammond Hills Stream Enhancement Project -8- Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) .? Hammond Hills Subbasins Figure 2 ONE COMPANY I Many Solutions- Client Client Client I Project Project Project I Document Document Document Document Table 3 - Summary of Drainage Area, TI-ag and RCN B i Area Existing n as acre sq.mi. CN TL (min) 10 89 0.139 75.5 12 20 7.7 0.012 72.7 13 30 5.1 0.008 77.9 10 40 60.2 0.094 65.9 15 50 12.2 0.019 76.3 13 60 6.4 0.010 79.8 7 70 50.6 0.079 76.0 16 Table 4 - Summary of Peak Discharges Location 1-year 2-year 10-year 50-year 100-year Subbasin 10 101 149 291 457 535 Subbasin 20 9 13 25 39 45 Junction 20c 109 162 316 496 580 Subbasin 30 8 11 20 31 36 Junction 30C 117 172 335 525 615 Subbasin 40 62 91 177 278 325 Junction 40c 176 260 507 795 930 Subbasin 50 15 22 41 63 74 Subbasin 60 8 12 24 38 44 Junction 60c 197 291 566 886 1037 Subbasin 70 22 39 97 170 206 Junction 70c 216 326 657 1048 1233 3.2 Hydraulic Model The hydraulic model produces water surface elevations along the stream for given peak discharges. This model was used to determine the existing channel capacities and compare the calculated peak discharges to the field observations. This model is also used to assess the proposed channel improvements to ensure the base channel is properly designed and to confirm the proposed improvements will not increase flooding conditions. For the stream enhancement project, the HEC-RAS model was used for the hydraulic modeling. The HEC-RAS model cross sections only extend the width of the field surveying which covers 50 feet from the top of the banks; therefore, the entire floodplain was not captured throughout the project area. The results, however, do reflect the proposed channel changes and provide a general understanding of effects to the larger frequency flow events. 3.3 Proposed Bankfull Channel The hydraulic model in the existing stable stream reaches between the Middle and Lower (HEC- RAS Station 1841 to 1559) and downstream of the Lower reach (HEC-RAS Station 615 to 58) Hammond Hills Stream Enhancement Project - 10 - Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) confirmed the hydrologic model. The results of the model indicated that the channel capacities were between the 1 and 2-year peak discharge. The existing conditions hydraulic model also indicated the stable channel velocities were between 4 and 6 feet per second (fps). The proposed base channel dimensions were established by first determining an acceptable channel slope (0.012 ft/ft) based on the existing stable stream reaches and the upstream and downstream constraints and then sizing a trapezoidal channel that can handle between the 1 and 2-year discharge while maintaining a velocity between 4 and 6 fps. Channel dimensions were determined for the Upper, Middle and Lower reaches as shown in the following table. Table 5 - Bankfull Design Summary Dischar a Base Ch l D h Channel i V l Reach 1-year (cfs) 2-year (cfs) Width (feet) anne ept (feet) Capacity (cfs) e oc ty (fps) Upper 100 150 4 2.5 119 5.2 Middle 117 172 5 2.5 134 5.4 Lower 197 290 6 3 221 6.0 3.4 Proposed Cross Section The base channel was designed to convey between the 1- to 2-year peak discharge. The remaining channel section was designed to allow larger frequency floods to spread out into a wider section and armoring this area with vegetation that can withstand the projected velocities. In order to minimize the amount of tree removal, the floodplain bench was set at 5 feet on either side of the bankfull channel and then sloped to the natural grade. The proposed channel cross section was then incorporated into the existing conditions HEC-RAS to determine the larger frequency flood event water surface elevations and velocities. Tables 6 and 7 compare the existing and proposed channel velocity and shear stress for the 1- and 2-year storm events. The highlighted sections in the table were located at the top of the drop structures and reflect the higher velocity and shear stresses that are expected at these locations. Overall, the tables show that the proposed channel velocities and shear stresses are reduced and remain more consistent throughout the stream reach. Tables 8 and 9 present the proposed channel and total section velocities for the 10- and 100-year storm events. This table shows that between the drop structures the velocities during a 10-year storm event can get as high as 8 fps and 9.5 fps during the 100-year event. The proposed ground cover on the floodplain bench and side slopes will be thick vegetation of herbs and shrubs. Once established, this vegetation can withstand these high velocities. Table 10 compares the existing and proposed 100-year water surface elevations. This table shows that there are only 4 sections where the 100-year water surface elevation will increase more than 0.1 foot over the existing conditions; however, all of the increases will be contained within the larger channel section and will not increase adjacent flooding. Hammond Hills Stream Enhancement Project 11 Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Table 6 -1-Year Existing and Proposed Channel Velocity and Shear Stress Reach River Sta Existing Conditions Proposed Conditions Change Q Total (cfs) Velocity (ft/s) Shear Stress (Ibs/sq.ft) Velocity (ft/s) Shear Stress (Ibs/sq.ft) Velocity (ft/s) Shear Stress (Ibs/sq.ft) 58.49729 216 2.7 0.22 2.7 0.22 0 0 148.8313 216 3.06 0.31 3.06 0.31 0 0 205.2385 216 9.2 3.24 4.44 0.7 -4.76 -2.54 234.7547 216 2.91 0.27 4.48 0.71 1.57 0.44 276.7626 216 3.66 0.44 5.31 0.98 1.65 0.54 365.8161 216 6.27 1.39 7.72 2.21 1.45 0.82 476.3823 216 3.95 0.53 3.97 0.53 0.02 0 615.6145 197 5.81 1.22 5.82 1.22 0.01 0 Lower 717.7472 197 4.34 0.65 2.94 0.3 -1.4 -0.35 Lower 817.6475 197 3.82 0.49 4.93 0.99 1.11 0.5 Lower 884.4288 176 4.22 0.64 4.44 0.81 0.22 0.17 Lower 1029.667 176 6.54 1.56 5.51 1.14 -1.03 -0.42 Lower 1192.46 176 6.82 1.75 5.98 1.36 -0.84 -0.39 Lower 1196.053 176 6.94 1.82 7.23 2.07 0.29 0.25 Lower 1258.89 176 4.06 0.58 5.44 1.11 1.38 0.53 Lower 1262.363 176 4.13 0.6 7.23 2.07 3.1 1.47 Lower 1290.226 176 5.16 0.96 5.46 1.12 0.3 0.16 Lower 1294.08 176 4.74 0.8 7.23 2.07 2.49 1.27 Lower 1348.481 176 8.47 2.74 5.5 1.14 -2.97 -1.6 Lower 1354.292 176 5.37 1.06 7.23 2.07 1.86 1.01 Lower 1407.101 176 6.93 1.94 5.3 1.05 -1.63 -0.89 Lower 1504.299 176 6.55 1.81 6.52 1.79 -0.03 -0.02 1559.362 117 3.91 0.64 3.92 0.65 0.01 0.01 1641.851 117 5.33 1.1 5.33 1.1 0 0 1698.425 117 7.19 2.08 7.19 2.08 0 0 1791.112 117 4.72 0.89 4.72 0.89 0 0 1841.552 117 4.81 0.91 4.3 0.83 -0.51 -0.08 Middle 1928.452 117 7.54 2.34 4.11 0.74 -3.43 -1.6 Middle 2003.43 117 4.24 0.66 4.27 0.81 0.03 0.15 Middle 2028.629 117 5.38 1.1 4.22 0.79 -1.16 -0.31 Middle 2034.207 117 4.56 0.78 6.66 1.85 2.1 1.07 Middle 2069.357 117 4.39 0.74 4.89 0.94 0.5 0.2 Middle 2135.043 117 3.66 0.52 4.66 1 1 0.48 2205.193 Culvert Upper 2258.285 100 1.66 0.1 1.66 0.1 0 0 Upper 2340.584 100 2.22 0.16 2.98 0.37 0.76 0.21 Upper 2405.642 100 6.89 2.02 4.81 0.93 -2.08 -1.09 Upper 2519.765 100 3.19 0.37 5 1.01 1.81 0.64 Upper 2563.956 100 1.24 0.05 5.27 1.14 4.03 1.09 Upper 2588.809 100 8.09 1.29 5.52 0.71 -2.57 -0.58 Upper 2626.383 100 3.31 0.2 5.91 0.82 2.6 0.62 Hammond Hills Stream Enhancement Project - 12 - Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Table 7 - 2-Year Existing and Proposed Channel Velocities and Shear Stress Reach River Sta l Q T Existing Conditions Proposed Conditions Change ota cfs Velocity ft/s Shear Stress Ibs/s .ft Velocity ft/s Shear Stress Ibs/s .ft Velocity ft/s Shear Stress Ibs/s .ft 58.49729 216 3.08 0.26 3.08 0.26 0 0 148.8313 216 3.5 0.37 3.5 0.37 0 0 205.2385 216 10.57 4.04 5.12 0.87 -5.45 -3.17 234.7547 216 3.12 0.28 5.09 0.86 1.97 0.58 276.7626 216 3.59 0.38 6.28 1.29 2.69 0.91 365.8161 216 6.44 1.35 9.04 2.84 2.6 1.49 476.3823 216 4.25 0.55 4.34 0.58 0.09 0.03 615.6145 197 6.29 1.38 6.34 1.4 0.05 0.02 Lower 717.7472 197 4.88 0.76 3.24 0.33 -1.64 -0.43 Lower 817.6475 197 4.47 0.64 4.86 0.85 0.39 0.21 Lower 884.4288 176 4.45 0.68 5.11 0.98 0.66 0.3 Lower 1029.667 176 7.34 1.86 5.72 1.28 -1.62 -0.58 Lower 1192.46 176 7.39 1.94 5.5 1.17 -1.89 -0.77 Lower 1196.053 176 7.61 2.07 7.87 2.32 0.26 0.25 Lower 1258.89 176 4.6 0.7 5.21 1.03 0.61 0.33 Lower 1262.363 176 4.68 0.73 7.87 2.32 3.19 1.59 Lower 1290.226 176 5.97 1.22 5.16 1.01 -0.81 -0.21 Lower 1294.08 176 5.49 1.01 7.87 2.32 2.38 1.31 Lower 1348.481 176 9.31 3.14 5.25 1.05 -4.06 -2.09 Lower 1354.292 176 5.69 1.15 7.87 2.32 2.18 1.17 Lower 1407.101 176 7.54 2.13 5.06 0.96 -2.48 -1.17 Lower 1504.299 176 6.97 1.96 6.97 1.96 0 0 1559.362 117 4.22 0.69 4.21 0.69 -0.01 0 1641.851 117 6.68 1.66 6.69 1.67 0.01 0.01 1698.425 117 7.17 1.93 7.17 1.93 0 0 1791.112 117 5.33 1.09 5.33 1.09 0 0 1841.552 117 5.66 1.17 4.53 0.82 -1.13 -0.35 Middle 1928.452 117 8.05 2.53 4.97 1.02 -3.08 -1.51 Middle 2003.43 117 4.81 0.81 4.91 0.99 0.1 0.18 Middle 2028.629 117 6.03 1.32 4.91 0.99 -1.12 -0.33 Middle 2034.207 117 4.97 0.89 6.02 1.59 1.05 0.7 Middle 2069.357 117 4.96 0.89 4.58 0.84 -0.38 -0.05 Middle 2135.043 117 3.66 0.48 4.98 1.02 1.32 0.54 2205.193 Culvert Upper 2258.285 100 1.53 0.08 1.53 0.08 0 0 Upper 2340.584 100 2.52 0.2 2.51 0.21 -0.01 0.01 Upper 2405.642 100 7.13 1.98 3.68 0.52 -3.45 -1.46 Upper 2519.765 100 3.76 0.49 5.15 1.15 1.39 0.66 Upper 2563.956 100 1.49 0.07 4.81 0.98 3.32 0.91 U er 2588.809 100 9.19 1.55 5.1 0.63 -4.09 -0.92 U er 2626.383 100 3.74 0.24 5.44 0.73 1.7 0.49 Hammond Hills Stream Enhancement Project - 13- Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Table 8 -10 Year Proposed Channel Reach River Station 0 Total cfs Min Ch El ft W.S. Elev ft Velocity Channel ft/s Velocity Total ft/s Top Width ft 58.49729 657 235 241.29 3.86 1.73 99.7 148.8313 657 236 241.31 4.54 3.12 54.75 205.2385 657 236 241.19 6.63 6.54 24.69 234.7547 657 236.07 241.41 6.35 5.64 44.49 276.7626 657 236 241.63 6.94 4.14 77.57 365.8161 657 237 242.42 8.86 4.86 86.84 476.3823 657 237 243.7 5.37 2.96 94.2 615.6145 566 238 243.94 8.01 7.35 31.24 Lower 717.7472 566 238.7 245.1 4.17 3.54 48.92 Lower 817.6475 566 239.9 245.21 5.53 5.04 42.78 Lower 884.4288 507 240.7 245.51 5.79 5.44 35.23 Lower 1029.667 507 242.4 246.49 7.6 7.37 32.35 Lower 1192.46 507 244.4 248.66 7.08 6.82 33.02 Lower 1196.053 507 245.4 249.28 8.32 8.13 31.54 Lower 1258.89 507 246.2 250.51 6.92 6.65 33.25 Lower 1262.363 507 247.2 251.08 8.32 8.13 31.54 Lower 1290.226 507 247.5 251.84 6.85 6.57 33.36 Lower 1294.08 507 248.5 252.38 8.32 8.13 31.54 Lower 1348.481 507 249.2 253.5 6.97 6.7 33.18 Lower 1354.292 507 250.2 254.08 8.32 8.13 31.54 Lower 1407.101 507 250.8 255.21 6.54 5.65 51.11 Lower 1504.299 507 254 258.1 7.11 4.51 114.48 1559.362 335 255 259.04 4.82 2.51 86.74 1641.851 335 256 259.74 8.18 5.71 45.5 1698.425 335 257 260.71 8.16 3.99 76.42 1791.112 335 258 262.06 7.55 5.03 84.48 1841.552 335 259.1 262.98 5.45 4.44 62.18 Middle 1928.452 335 260.1 263.65 6.51 6.28 29.19 Middle 2003.43 335 261 264.59 6.38 6.14 29.34 Middle 2028.629 335 261.3 264.89 6.38 6.15 29.34 Middle 2034.207 335 261.8 265.08 7.52 7.35 28.1 Middle 2069.357 335 262.2 265.9 6.05 5.79 29.8 Middle 2135.043 335 263 266.58 6.42 6.18 29.3 2205.193 Culvert Upper 2258.285 291 275 282.14 1.31 1.26 67.81 Upper 2340.584 291 275.5 282.14 2.25 1.77 57.86 Upper 2405.642 291 276.3 282.15 2.72 2.32 37.41 Upper 2519.765 291 277.6 282.22 3.88 3.53 32.5 Upper 2563.956 291 278.2 282.3 4.71 4.4 30.41 Upper 2588.809 291 278.5 282.35 5.25 4.96 29.41 Upper 2626.383 291 278.9 282.44 6.11 5.87 28.15 Hammond Hills Stream Enhancement Project - 14 - Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Table 9 -100-Year Proposed Channel Reach River Station Q Total cfs Min Ch El ft W.S. Elev ft Velocity Channel ft/s Velocity Total ft/s Top Width ft 58.49729 1233 235 243.44 4.72 2.07 101.35 148.8313 1233 236 243.39 5.78 3.42 79.62 205.2385 1233 236 243.1 8.42 7.96 43.98 234.7547 1233 236.07 243.66 7.14 4.51 90.37 276.7626 1233 236 244.1 6.48 2.82 142.36 365.8161 1233 237 244.27 8.65 3.62 133.91 476.3823 1233 237 244.99 7.05 3.59 94.2 615.6145 1037 238 245.04 10.72 8.73 42.58 Lower 717.7472 1037 238.7 246.87 5.28 3.89 62.25 Lower 817.6475 1037 239.9 246.97 6.43 4.8 66.96 Lower 884.4288 930 240.7 247.21 6.5 4.61 95.91 Lower 1029.667 930 242.4 247.68 9.15 8.43 37.14 Lower 1192.46 930 244.4 249.64 9.28 8.56 36.94 Lower 1196.053 930 245.4 250.37 10.06 9.39 35.89 Lower 1258.89 930 246.2 251.57 8.92 8.19 37.48 Lower 1262.363 930 247.2 252.17 10.06 9.39 35.89 Lower 1290.226 930 247.5 252.96 8.7 7.95 37.83 Lower 1294.08 930 248.5 253.47 10.06 9.39 35.89 Lower 1348.481 930 249.2 254.55 8.99 8.24 37.93 Lower 1354.292 930 250.2 255.15 10.12 9.46 35.81 Lower 1407.101 930 250.8 256.51 7.65 5.16 101.04 Lower 1504.299 930 254 258.86 8.68 4.66 114.48 1559.362 614 255 259.96 5.72 2.89 86.74 1641.851 614 256 260.8 9.57 5.2 66.11 1698.425 614 257 262.03 7.42 3.1 88.13 1791.112 614 258 262.91 8.46 4.43 84.48 1841.552 614 259.1 263.53 7.69 5.38 71.99 Middle 1928.452 614 260.1 264.41 8.62 8 38.35 Middle 2003.43 614 261 265.54 7.92 7.27 33.17 Middle 2028.629 614 261.3 265.81 8.03 7.38 33.04 Middle 2034.207 614 261.8 265.96 9.1 8.51 31.65 Middle 2069.357 614 262.2 266.81 7.74 7.08 33.34 Middle 2135.043 614 263 267.49 8.08 7.44 32.94 2205.193 Culvert Upper 2258.285 535 275 283.48 1.8 1.5 103.84 Upper 2340.584 535 275.5 283.46 3.13 2.19 62.01 Upper 2405.642 535 276.3 283.47 3.74 3 42.67 Upper 2519.765 535 277.6 283.55 4.88 4.15 37.78 Upper 2563.956 535 278.2 283.6 5.62 4.91 35.61 Upper 2588.809 535 278.5 283.62 6.13 5.39 34.49 Upper 2626.383 535 278.9 283.66 6.86 6.16 33.02 Hammond Hills Stream Enhancement Project - 15 - Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Table 10 -100-Year Existing and Proposed Elevations Existing Pro osed Chan e Reach River Station Q Total cfs Min Ch El feet W.S. Elev feet Min Ch El feet W.S. Elev feet Min Ch El feet W.S. Elev feet 58.49729 1233 235 243.44 235 243.44 0 0 148.8313 1233 236 243.4 236 243.39 0 -0.01 205.2385 1233 236 244.59 236 243.1 0 -1.49 234.7547 1233 236.07 245.58 236.07 243.66 0 -1.92 276.7626 1233 236 245.77 236 244.1 0 -1.67 365.8161 1233 237 245.83 237 244.27 0 -1.56 476.3823 1233 237 246 237 244.99 0 -1.01 615.6145 1037 238 245.92 238 245.04 0 -0.88 Lower 717.7472 1037 239 246.88 238.7 246.87 -0.3 -0.01 Lower 817.6475 1037 239 247.24 239.9 246.97 0.9 -0.27 Lower 884.4288 930 240 247.92 240.7 247.21 0.7 -0.71 Lower 1029.667 930 241 247.91 242.4 247.68 1.4 -0.23 Lower 1192.46 930 244 251.2 244.4 249.64 0.4 -1.56 Lower 1196.053 930 243.73 251.17 245.4 250.37 1.67 -0.8 Lower 1258.89 930 245 252.18 246.2 251.57 1.2 -0.61 Lower 1262.363 930 245 252.18 247.2 252.17 2.2 -0.01 Lower 1290.226 930 245 251.87 247.5 252.96 2.5 1.09 Lower 1294.08 930 245 252.3 248.5 253.47 3.5 1.17 Lower 1348.481 930 246.11 254.39 249.2 254.55 3.09 0.16 Lower 1354.292 930 246.09 256 250.2 255.15 4.11 -0.85 Lower 1407.101 930 251 255.99 250.8 256.51 -0.2 0.52 Lower 1504.299 930 254 258.86 254 258.86 0 0 1559.362 614 255 259.96 255 259.96 0 0 1641.851 614 256 260.8 256 260.8 0 0 1698.425 614 257 262.03 257 262.03 0 0 1791.112 614 258 262.91 258 262.91 0 0 1841.552 614 258 263.83 259.1 263.53 1.1 -0.3 Middle 1928.452 614 259 265.74 260.1 264.41 1.1 -1.33 Middle 2003.43 614 261 266.47 261 265.54 0 -0.93 Middle 2028.629 614 261 267.57 261.3 265.81 0.3 -1.76 Middle 2034.207 614 261 268.24 261.8 265.96 0.8 -2.28 Middle 2069.357 614 261 268 262.2 266.81 1.2 -1.19 Middle 2135.043 614 263 269.51 263 267.49 0 -2.02 2205.193 Culvert Upper 2258.285 535 275 283.48 275 283.48 0 0 Upper 2340.584 535 274 283.43 275.5 283.46 1.5 0.03 Upper 2405.642 535 276 283.13 276.3 283.47 0.3 0.34 Upper 2519.765 535 277 284.29 277.6 283.55 0.6 -0.74 Upper 2563.956 535 277 284.75 278.2 283.6 1.2 -1.15 Upper 2588.809 535 284.51 290.34 278.5 283.62 -6.01 -6.72 Upper 2626.383 535 285 292.32 278.9 283.66 -6.1 -8.66 Hammond Hills Stream Enhancement Project - 16 - Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) 3.5 Rip Rap Outlet Protection The outlet of the 72-inch storm sewer shall be protected from undercutting using a 28 foot long Class I Rip Rap outlet protection that is buried 1 foot below the proposed channel bottom. The calculation for this outlet protection is provided in Appendix A. 3.6 Temporary Erosion Control Measures The channel improvements will be performed from the upstream section to the downstream section using the daily pump around method for controlling base flow and allowing for the work within the channel section. A detailed description of the construction sequencing and associated erosion control measures are provided in the construction drawings. In general, check dams located at the end of each reach will capture and filter sediment that runs off the disturbed construction corridor. The area of the channel that is worked on during the day is isolated by the pump around set up. Construction Entrances will be located within the construction corridors prior to the roadways. In addition a temporary access road will be constructed from the construction entrance down to the stream location. The temporary access road will protect the heavily traveled access corridor and reduce rutting and sediment runoff. A temporary stream crossing is proposed at the lower end of the lower improvements to allow the contractor to install the yard inlet and storm sewer and to access the very downstream drop structure. Calculations for the temporary crossing are presented in Appendix A. Hammond Hills Stream Enhancement Project - 17 - Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) APPENDIX A - MISCELLANEOUS CALCULATIONS Hammond Hills Stream Enhancement Project Design Summary Ft. Bragg, North Carolina February 2008 (Revised February 2009) Scour Hole Calculations Project Name: Hammond Hills - Stream Enhancement Project No. : Sheet Title : Scour Hole Calculations Originated By : KET Date: January 24, 2008 Checked By: Date: QA /QC Verification Date: Description Units Input Calculation Source Q10 cfs 290 From HMS Model - Subbasin 10 Diameter Pipe inches 72 Manning's "n" 0.013 Slope Pipe FT/FT 0.005 Outlet Invert Elevation FT 278.94 Set from profile Normal Depth FT 4.8 See partial flow depth chart at right Velocity at Normal Depth fps 12.01 Tailwater Elevation FT 282.35 Normal Depth TW/D 0.57 Q/D^2.5 3.3 Yo/D 0.77 HEC 14, Figure III-10 Yo=Ye FT 4.62 Area at Ye FT2 22.7448 From partial flow depth chart Velocity (V=Q/A) fps 12.75 RIP-RAP D50 FT 1.1 Class I D50/Ye 0.24 "FROUDE #" 1.05 hs/Ye 0.4 HEC 14, Figure X1-2 hs FT 1.85 Dispersion Pool Length FT 24.00 Apron Width FT 9.24 Depth of RIP-RAP Entrance Slope FT 3.30 Depth of RIP-RAP in Basin FT 2.20 Length of Rip Rap without scour hole FT 27.72 La = 15'hs or 4'D whichever is greater Trapezoidal or Triangular channel with same side slopes Width 4 Side Slope 2 Channel Slope 0.0120 To channel Depth 2.5 Cross Sectional Area 22.50 Wetted Perimeter 15.18 g Hydraulic Radius 1.48 Manning's "n" 0.05 Class I Rip-Rap Discharge 95.5 Velocity 4.2 Shear Stress lbs/FFT 1.87 ?x F = O z U O Z M } g• p `m ° " >- LL O co p o J 00 Cl) N n w - w of ri It N Q 7 O ° a. > rn U W 2 Z Q Q p co > z _ U } > (`) r+oo °o °o w Q ti 205 U 3: W xW (O LC) LO 00 TNN w N C7 Z Z) Z cn w (r Q O > = O I II QCL? > W Z Q U d z 0 Q 0 w C/) J w 0D V + 7 xx U' Z I- Z OC Q LL o w Q w Q W OC > o 0 o 2 1 o ° o z?0 c}} o do ¢ ir a w Q w = J Z Z Z 3 0 Qi r J O _ w 0 W ° E FL W a W x N ? U a o CL CL n mCE C? w O O O O ° x W p w Z C7 0 0 [C o[ oC Q tq °o oo w w W > x N > O O C7 _ p o p p O O O O O Z J O S W p Z O O = U o C6 i r _ W J Cp H N ? O Op O O M O O n w m m r w N N? A U (D CV Z F- LL o O U w W I D J ?f1 O II W N N _ LL > Cn Z Z) T- J > (n w z x Y O w U) r) O E v N U o ° 3 0 a ° Z=" v CL U d o O U 2 2 U 0 ui N 0 O N p W F J Z co c Z 00 M a d (n Z: -x O v Q cc U Q Q a z cc II II II a J J N w co J 00 F- CO J Q Q w , Cn D w J U) a C? U) w Z U) Q U Z a M p J U F U o Q p z O Q z o :3 O O o T- Cl) > p a p Z O w p m w O m C) cm Q p O D o C i a m z W -It Ill ui Oi N Cl) Jx M ¢ x O P: CO Z fn Q Q V n z 9 U W (n o J o Wp p O j p ~3 QZW ¢O a T- J z z o zx z?a v O w cnw Q? JO L o (JW Q C O U (wW x w zU N _ (?w O LUZ W U C7HQ W F,) W V 0 3 z a Z U O Q 0) o 2 E rnv o w7 wOW ~ (n -J Z 0) E Cl) 0 CC cc N ? `-' N g m CO g N ox (n Ud? v 3=0U O O w a w " w z 3:" w U p Q w O Z O wa Z ZLL Lj LD QLL w 00 w Q w a ? F- H Ye >- z Ir 0 3i >- Fn F- O in U) F15 H W p x 2 Z to MONITORING REPORT FOR [Insert Year] Insert map or photo of site Hammond Hills Stream Enhancement Project Cumberland County, NC Prepared By: Fort Bragg Directorate of Public Works Environmental Compliance Branch Building 3-1631 Butner Road Fort Bragg, NC 28310 Date Table of Contents ......................................................................................................................III SUMMARY 1. INTRODUCTION ...................................................................................................... 4 1.1 Project Description ............................................................................................4 1.2 Purpose ............................................................................................................ 5 1.3 Project History ................................................................................................... 5 2. STREAM ASSESSMENT ......................................................................................... 5 2.1 Success Criteria ................................................................................................ 5 2.2 Stream Description ........................................................................................... 6 2.3 Post Construction Conditions ............................................................................ 6 2.4 Monitoring Conditions ....................................................................................... 7 2.5 Results of Stream Monitoring ............................................................................ 8 2.6 Stream Buffer Vegetation (Species and Monitoring) ......................................... 8 3. OVERALL CONCLUSIONS AND RECOMMENDATIONS ....................................... 8 FIGURES ........................................................................................................................ 9 FIGURE 1 ................................................................................................................................ 10 FIGURE 2 ..................................................................................................................11 FIGURE 3 .................................................................................................................. 12 FIGURE 4 ..................................................................................................................13 APPENDICES ............................................................................................................................. 14 Appendix A - Photographs Pre-construction / Construction ...................................... 15 Appendix B - Photographs Year 1 Monitoring ........................................................... 18 Appendix C - Photographs Year 2 Monitoring ........................................................... 19 Appendix D - Photographs Year 3 Monitoring ........................................................... 20 Appendix E - Photographs Year 4 Monitoring ........................................................... 21 Appendix F - Photographs Year 5 Monitoring ........................................................... 22 Hammond Hills Stream Enhancement Project Page ii SUMMARY Hammond Hills Stream Enhancement Project Page iii 1. INTRODUCTION 1.1 Project Description The United States Army retained HDR Engineering, Inc. to review the Hammond Hills Stream Enhancement Project and develop a plan for stabilization of the stream. On May 2nd and October 4th, 2007, HDR reviewed the sites feasibility and provided the following summary of activities by stations for the stream enhancement project. Station 10+00.00 to 13+87.46 (Upper Reach) - The conditions for this site were not favorable for water quality or habitat. The banks in this area were actively eroding and greatly incised. This reach had an approximately 68-foot long concrete lined channel with a major scour hole just below the end of the concrete and the channel was undercutting the concrete stream section. In this upper reach section, the concrete lined channel section was removed and a drop structure put in place. This structure was designed to dissipate the energy that the stream incurs during storm events as well as dropping the water to the current stream elevation without causing further scour. Removing the concrete lined channel also helped to alleviate the additional velocity that stream gained in that section. At the end of the drop structure, outlet protection was installed to help stabilize the stream. In addition to the drop structure in this section and due to the incision of the stream, the stream banks were laid back with a constructed 5' bench on both sides. The stream banks were essentially vertical in this section and laying back the slopes allowed vegetation to take hold and provided additional capacity during high flows. Due to the potential RCW banded tree in this section (STATION 12+20), a rock-filled gabion wall was placed along the stream to hold the banks as well as a slight realignment of the channel to divert the water away from the left bank The remainder of this section had the slopes laid back at 2:1. Although, 3:1 slopes would have been optimal, it was determined that 2:1 slopes would protect and save more trees along the channel for all reaches proposed for enhancement. This section ties into the existing culvert under Viking Road. The stream thalweg and flow was slightly relocated in this area to allow better positioning of the stream with the culvert. From Station 10+00.00 to 12+93.98 (Middle Reach) - This section of stream was modified by laying back the slopes (2:1) and slight alignment changes. This section contains the culvert and drop structure under Viking Road. The design realigned the stream to better accommodate the outlet of the structure and included some additional structures to help direct the flows away from the banks. Below the Middle Reach Station 12+93.98 to Lower Reach 10+00.00, it was proposed that no action be taken in this section. The stream appeared very stable and construction in this area could have impaired the existing stability. Correcting the problems upstream of the stable section should have helped maintain the stability in this area. From Station 10+00.00 to 16+33.91 (Lower Reach) - Beginning at the utility crossing, several things were completed to enhance the stream including laying the slopes back at 2:1, placing structures in the channel, and planting to stabilize the stream banks. The utility crossing was not affected by the project. Hammond Hills Stream Enhancement Project Page 4 From Station 16+33.91 to the culvert under Zabitosky Road -Very little construction occurred in this reach. The area, although straightened, has over time become stable. The concrete abutments that existed in the area of the old rail/road bed were removed and the fill material was removed resulting in 3:1 slopes in that area. This allows the high volumes of water to pass through area without increasing velocity. This section also has a trail leading up to the banks of the stream. Although the educational opportunities abound in that area, it is visible that the traffic from the trail to the stream is affecting the bank in this area and destroying the vegetation on the banks. A section of post and cable fence was originally planned for this location; however, it was removed after discussions that it may not necessarily hinder trail goers from going down the stream banks and may be a safety concern for children along the trail. 1.2 Purpose The purpose of the Hammond Hills Stream Enhancement Project was to take a proactive approach to the actively degrading stream channel by reducing the sediment entering the channel and stabilizing the stream banks. The purpose of this report is to fulfill the monitoring requirements associated with the permit for building the project and to help determine if the site is successful in stabilizing the stream channel. 1.3 Project History Month Year Month Year Month Year Month Year Month Year Month Year Month Year Construction Completed Planting Complete Stream Channel Monitoring Report (Year 1) Stream Channel Monitoring Report (Year 2) Stream Channel Monitoring Report (Year 3) Stream Channel Monitoring Report (Year 4) Stream Channel Monitoring Report (Year 5) 2. STREAM ASSESSMENT 2.1 Success Criteria The following activities must occur in support of the monitoring required for this project: ¦ The stream shall be monitored for 5 years from construction completion ¦ The data shall be submitted to the USACE each year of monitoring ¦ The stream dimension shall be measured using one permanent cross-section established within the three reaches of enhancement (Permanent locations marked in field and GPS locations provided to assure accurate locations.) ¦ The measurement for dimension shall include a measurement of width/depth ratio, entrenchment ration, and low bank height ration (low bank height/max. bankfull depth) ¦ The vegetation will be monitored visually for any bare areas and an estimate of cover provided for each stratum (herb, shrub, and tree) Hammond Hills Stream Enhancement Project Page 5 2.2 Stream Description The stream was in degrading condition at the onset of the project. The three sections for enhancements were identified based on their level of impairment and need for stabilization measures as identified in the December 5, 2007 Assessment Memo and in Section 1.1. 2.3 Post Construction Conditions The Hammond Hills Stream Enhancement involved the construction of log vanes, rock cross vanes, and bank sloping. Coir fiber matting was installed along the banks throughout the three sections in any area where the existing ground was disturbed along with live staking and plantings (temporary and permanent). The following information is from the permanent cross- sections established in the 3 reaches: Cross Section 1 (Upper Reach) Year 1 Year 2 Year 3 Year 4 Yea r 5 Station ft Elev. Station ft Elev. Station ft Elev. Station ft Elev. Station Elev. Cross Section 2 Middle Reach Year 1 Year 2 Year 3 Year 4 Year 5 Station ft Elev. Station ft Elev. Station ft Elev. Station ft Elev. Station ft Elev. Hammond Hills Stream Enhancement Project Page 6 Cross Section 3 Lower Reach Year 1 Year 2 Year 3 Year 4 Year 5 Station ft Elev. Station Elev. Station Elev. Station Elev. Station it Elev. 2.4 Monitoring Conditions The objective of the Hammond Hills Stream Restoration Project was to stabilize the degrading reach and help with water quality from the active bank erosion. A total of three cross sections, one per enhanced reach, were established as permanent for monitoring. The following data was collected at each of the permanent monitoring locations: Cross Section 1 (Upper Reach) Variable Constructed Year 1 Year 2 Year 3 Year 4 Year 5 Drainage Area mi Bankfull Width ft Bankfull Mean Depth ft Width / Depth Ratio Maximum Bankfull Depth (ft) Entrenchment Ratio Cross Section 2 Middle Reach Variable Constructed Year 1 Year 2 Year 3 Year 4 Year 5 Drainage Area mi Bankfull Width ft Bankfull Mean Depth ft Width / Depth Ratio Maximum Bankfull Depth ft Entrenchment Ratio Cross Section 3 (Lower Reachl Variable Constructed Year 1 Year 2 Year 3 Year 4 Year 5 Drainage Area mi Bankfull Width ft Bankfull Mean Depth ft Width / Depth Ratio Maximum Bankfull Depth ft Entrenchment Ratio Hammond Hills Stream Enhancement Project Page 7 2.5 Results of Stream Monitoring The monitoring included the visual inspection and cross-sectional data on the three enhanced reaches. The locations of the cross sections are shown in Figure 3. Based on the comparisons of the constructed reaches to the Year X monitoring, cross sections appear to be unstable 1 stable with major, minor, little, no, etc. active bank erosion. Future survey data will vary depending on actual location of rod placement and alignment; however, this information should remain similar in appearance. [ ?tclude any additional statements describing any changes in the channel 2.6 Stream Buffer Vegetation (Species and Monitoring) The following species were planted on the stream bank: ¦ Salix nigra, black willow ¦ Cornus amomum, silky dogwood The following species were planted in the buffer areas: • To be included after construction ¦ X ¦ X ¦ X No permanent vegetation plots were incorporated into the monitoring for this enhancement project. Visual inspections of the enhanced reaches were conducted during each visit to the site to identify any potential issues with the project. The vegetation during this monitoring year includes [sparse, dense, highly, poorly, etc.] vegetated banks. Include any additional information as necessary to describe vegetation der. .. .... See Appendix X for the current monitoring year photographs. 3. OVERALL CONCLUSIONS AND RECOMMENDATIONS The Hammond Hills Stream Enhancement Project has met the required monitoring protocols for the [first, second, third, fourth, or fifth] formal year of monitoring. [Insert Text describing overall stability of the reach. Example: The channel and structures throughout the reaches are stable at this time. The stream banks and buffer area are highly vegetation for the [first, second, or third, fourth, or fifth] year of monitoring.] Hammond Hills Stream Enhancement Project Page 8 FIGURES Hammond Hills Stream Enhancement Project Page 9 Hammond Hills Vicinity Map fR Figure 1 ONE COMPANY I Many Solutions- - Fort Bragg I Hammond Hills Stream Enhancement I Monitoring Report k G r"tCA J1 y All; /L 9?p f fZ Hammond Hills Site Map ONE COMPANY I Many Solutions- Figure 2 Fort Bragg I Hammond Hills Stream Enhancement Monitoring Report N M i C O? . LM 4-+ LL V O J C O V n N N O L- L) U) O E E M 0 0 z ?o V W z 0 APPENDICES Hammond Hills Stream Enhancement Project Page 14 Appendix A - Photographs Pre- construction / Construction UDDer Reach - Larqe scour hole and eroded ba nks looking Hammond Hills Stream Enhancement Project Page 15 downstream. downstream of concrete ditch. of of section. stable Hammond Hills Stream Enhancement Project Page 16 utility crossing. channel to be removed. utility crossing. banks in straightened section. Hammond Hills Stream Enhancement Project Page 17 Appendix B - Photographs Year 1 Monitoring Hammond Hills Stream Enhancement Project Page 18 Appendix C - Photographs Year 2 Monitoring Hammond Hills Stream Enhancement Project Page 19 Appendix D - Photographs Year 3 Monitoring Hammond Hills Stream Enhancement Project Page 20 Appendix E - Photographs Year 4 Monitoring Hammond Hills Stream Enhancement Project Page 21 Appendix F -Photographs Year 5 Monitoring Hammond Hills Stream Enhancement Project Page 22 a C/D s w \ O z co C U w 1- C/:) _ U L CID M M L-U C/D - - - 31 ? ~ ?- r, T` L `/ o? Fr n' o r 0 0 o z O LJLo Q z z w w U z a z z w W rr U) C/J r? Ww Z 0 Q U C) Z M ? J Q M v ^ W Q ME _z I 0 nr- Q U Z F- cf: 0 z V 0 H U) W Q O M Z C'3 u U w c/3 m Q D m F- J H a Y z :3 (r O o U:3 W o m w 07 J Q a LL Og =z c n o uj ? w C) 0 g o? m o c U 2 w U) a D in, f HN? n 4 e i f? 6 w g?? o 2 z?ooooo?o ad???ada oo 1ao C/D C) Q C/D 3 WJ ? O O / N ZZ F E O z0F j Z C J O B N z O m N w z z F w ? U pOz U z 8 p 0 , $ Q N J J J J a s > > 0; 1 O N W W O ??// W R 5 9 [h r 5 V F9 J 0 J 0 5 ¢ W ¢ ¢¢ W ¢ W W ¢ ¢ W ¢ ¢W ¢ Z 0 N Q Z 0 N 2 Z 0 N ¢ Z 0 E No 2 Z 0 N /\ C7 µ O µ 11 O U U F Y- F .. .. 11 W S J J Z S S S S S ? s S S S 5 U 6 .. . . .. z O Q W W ' W W ¢ U m zq W zz ZZ zz W S Z S Z¢ S ¢z S Z¢ s U C7 U 0 (7 w a a 1 p, W y a a O f u i F o s r U O LL f PPS ???P 0 m' C7 .z.' z /a m _ z ~ ¢ o 0, L Ai1bONr W O z z o? O K m m Q Wi (pnn z Ckf W ?C-D ¢ W W U~ ¢ 1D cr W N 0 Q ¢ W O O 0 Er O cn Of W (n C) LL, of < oe LL, J [if L'i vi F- cn ¢ < Q r) U? Cif z V) J S • • Lij m • • 0 O O O un N p n O N W J U o c/) U 2 °o ¢ N (? J /) a? o y .2o ° 3 a o0 a o v mo ° ° ?O+^ of m « « ..° `y Y a o+ o v c « c N3° v Z W E O oc y c°m -O o n C? Es v E E a O To rn?? nN N EM v?vs. ?r v Cl) W n° = N p ° °? v` ? c 10 « O N N U O D C p t C ^ p Q _ -s,2 _ O O s .`n- Op E00 on y0yp d O w tn« a o.%yo3 , 30peo DEa ? aN'w3 ?w ?aa s Data a' °os Dow?mw o Z J E o a v m" o °O Ear u o m S c m° E ` - o a m? o ?' o c nv a O o rnw Q m E v° w a+ '0000c ° o c CL yam,. v c 3 a? c c E.c --I E -m' o > c -.°_ z.- 3 u.-oy rnao+ f as _ ° 3 E ? c° .. onp .0 a yo •-W,ir M .? . ..- 00- o v o"? °n U U J J 0;., C p o v °3? C. O -°? v° c - Eta o p o ° N O i - Em v '° y0=y w a? ? o E ° c o O c.?' 3o°O«o.ay« "° v , ?ca?O t? u v cn?w 3 ? o- oo_rn_ . yo -°ov o+?' c° 0 °jO °E Q ° O 0.? C E ' p .., d L O r- C O 2 O O? . ?n (n m o h N p d Q O -°a?o+ o v> ...u 'oa«uo «? °' vo o vvi ' u._o N-ya 0 aomv ° ny.- u?•-0 L?U N v ?.`. N E y E 3? 3m" 2 nu.N cn c.° w-o °? o? C NIOi o 5t o wv `^ 3? NCO•?UO r7 VOiE 7m?° viw°O +o Nyyo> O.., + T t a ? o Q CO z v T o z w 0 co z m U o 0 LL, O J r W z a fn in o ? N N ri U? 8 $ W H < Q i0 iD CD i i i i ?1 p1 0 z W :) I J D a. O a 0 w O I ? p 01 0 0 U Q_ p U 1 M a U i p O U J C7 1 O 0 1 w ? F- U i J J z' 0 ? Z Y LU C) W i U) U 1 a Z O O I W =) JFJd4Nn08 a ?kHV(]Nnoo ! O ° 3AViS 3dMS LL TiViS 3dOIS 1 N 0 1 N i CO O 1 0 Cl J cc: CJ J i t. ZH ' Z= Qd 1 Qd U? i U0 i zo J ? U i U z i Z ? O ? ; t. Z C7 w ? I O CL Cl ------- U O 2 - Z Z - --------- 1 CO o C/) g o z z z W (J) W 0 W= W 0 w J C/) CL z m°- J Q p O w Q0 Ir 0 o z a o L z m? O 00 U Ii a 00 = Ili O J U W z 0 r U CV w CO Q Q U_ Ir ui w Q Q _CO Z :E co zLO W~? 0 o z?0 Qp¢ ; co Q?¢ 2ww =Jaw UJa ? U i/ Z_W i i' O Owl LLJ 0 F-CflU i ~mw i O jc-y5- Cn Cn J i x0 (jj OO? X0Lu i M aO i O C Jkdb'aNnoi3 3NVB 3dOIS 1 1 0 M Z i W U i O Q] O m 3?iV1S 3dOlS Q UO ui p i O LLJ U) ~ J m C7 U LL0 Y mU W wm a0 F- F m r- N U 0 Y cr O ? W J ? m co 3 ? ¢ m a Z = Z= z w < a 0 o ? ? Q m Q O o (n w U_ p C7 ?j o 3: MOWN m Z O U w U)i f Lm ,. Z ? U o LLJ g :R g ?6 ? a 8 s 0 h J? ' I I I I II ' I 3g a ? ?g s S U) U) 0 cc: U Y / co 0 ` W 1 i 9 N 00 U w C) g a W Q a ~ U Z O UD C) z 0 J Q Cf) 0 oil O ..W Ta$$ 8 w? A 1 I I I I 1 1 1 I I > Z g _ a co J CD D U) 01 O O T 3¢ d (V II Sol n- w U) 1 W L / J M 0 0 1 ? 1 co O W !2 1 < flpaiil:io, ??5 I '? 1 x P, Rw IRMIP.?I ° g WIN 13 LLI i J Q CO z o co 6 o o ? 6 m O o C) 2 ?E z a \ C) -g o g? zW? b b S 3 1. $ LLI i ° Z O Z W R W .9l r Z i O U t; t Q U 4 W 'NIN A-.S 3N00 01H 30NOO SNOLLVON3NNO03tl 1?NO.1UN3.W003tl .9 d SH3U=V3nNVPi d3d B Stl3tln10VdnNVW Had Q ° 0 b [Ell El 0 .0 b aEIEI cr W w aao? O U p Z \ Q Z I H N w o Z Cf) J P S O k x ?ay $a w Z Cn t??{ ?? O ° 1111 1111 1I1?? Q Q _ d 5 £8 Z p o `N a W C Z W d e 5; Q g 66 a ?g M ? ?g Ng U C7 O „ndNNV9 ? ? ? o ? o w m U sag ~ z g IN P o q j 3 11 ? nndHNOa m ? ? L ?I > ? ? ? '? ° wY § wo a 74 m U N 0 d ?n Y g ? W ? = co 3 J o aT O o N o p o ? LL1 Z Z Z O W ,o F ? E F- m ? C7 ? ? U Z o ? ? o S fL o= w o m U N 0 d co Y z a W W J z A w C') f^) Q U T m F _ 2U z U 3 w 6 a. V w O VZ¢ QQ z 1 0 o Z G C) ° d O Z W Z p ?O F Y C) YY m o S C G ? C7 a j C7 a z w Q 2 i? co ° o E ? o F- ¢ U. g o Cn w u? z w a Z L S CO SN ? Q w w ? J U '¢ rr Cf) CO W ?? U vY Q 4 ?\ rr L ? Q ii O a 2 LU Loo z l R \ (n? X ? ?Q Q C}' V ,}jam S2 V ?lJ CY rrv3uis 3 d `s ti? O? 0 0 O O OO 4 0 ?, 00Oo BOO O O O O o ------- --------- \' l Z N m \ O 8 O O O > a ` U O d g O QZ g U Cn Q 0 Q O O O O N Cn c N k c ) O O O O ry cr W W ?c O ? ?? ? yyq i t ?62< 8??3q p?3 ky?? 4?9 MEW aW gmn z W z 0 U Ir I -- U) z 0 J w Q rr rr rr d w H Z Q Q Z O_ w w Cl) J m D Cl) O O O T 0 o > ? U Y - O ? ? ?I O sa f $ T? z ? t E y Y% g 15 ti a a s J? o o z a 3 m gz z U ` LLJ 0 z Z I I o S?s I I I I 2 I I I I I I I g?y? I I I I 1 I w > z g =o Qo ?poopooo0o ?ooo °00000°. p op?) 0° o Oo°p oa g pO Opo OQoO° g 0 0 000 0o?a? op 9 0 ° 0 op Qp po 0 o po b o00 O o 0 0 O 00 °- o 00 0'0 o Z yy O S ° °°O° Oo O d p o 0 0.. ° o ° 0 0 ° oo -000 0.0 S oUa p°oo. oo 0. O,oO g (00 . p o p ° oo p o o 'b, ooh°p°0° ° o Oo ?o O. ?0 °O ° ). s ° o poQ < 00 P o o ° g a ° 0% 0 0 °0 0 0 °Q 8 0°0 o 0 0 0° p °°? p? W W Y_ cn D O w n Z CO CO Ir J CC LL G O Q CL ALL] H Cf) a LLJ z z J m VJ 0 O O T z 0 U m w cf) o °o o? z 00 ° 0 O U o? o °o w =r II1 ?? ? II I I- ?? 111_111- z ,i: =111=1 1-I I I- 1111111 fit T o ill gig z B 1-I. U ? ? s LL LL w E ?- Z Q LL1 a. Y U LLJ U J_ U) Y U O rr cl: Q cc: O w Z g z O U w 0 cr U t6 61 g N m U 0 d C) Q ~ o o n W 7 z C?m N o m z 3 go ( J_ W ? z U = U 3 z l LLJ ¢w U) x QQ ¢ w o0 C) o a LL z O W Z C) 0 C) Es m i w QQ m p % j cn o = W o (13 Q $ o 0 o `O o 5 a W C7 z g o 0 oOC E 50 o w ap U (n pn N tl x w w a?? 0 a O 5. IL 0 ° ac d z ! o ),UVCNno a 2 3NViS 3dOIS E _ N ? LL U E m? Q N C µ c° N 'pp? d m N 'U N? N N F 6 w EL mm Em N U! o ro M M z d ro ° cg 3 W _? ° Ero oa ° 4 O W 0 O N f. z O E (n Z Z Q o E D O E 's c ? N ?- ?' c N a E, E D o R O U_J w SS L) a: (n CL 8 a 0= 2 OOm?2 C fr Z O N ?0 Q E?°goo r? d N co °9 J 8? mm? Q w W W W 0 ?x Q o w Q w -o y E (a Z a 16 15 a O U N N ° N?? ¢ c o E E ' ° E U) w X Z i Q m w w w Y E 0 - o Z oo Z U 3 w a B Cn O U) ?ro 0) 16 E°roEs0) ? & z Z a CL Z'S E o 58 o m y N o m mx N. > N>;w? KE O ° £ro w rn o C a of 73 E E E ? o o "D -0 E Z w w ui o _0 a) o cn00O:n cn_O N Cn v E ° N m 0 c W z c E E' N v c6 's 6 m 0 N cr o co o bo N rn E o-2 co Z (n Z ro> _' o o? Z y > E ?cN Z ?? A? w E 4) CL co 0) cm FL FL 0 O uo 0 o rn a Ntvo° a?? ` ci Eta w= U W cn id n d ag$ w a H Cn QO (n N d OcU d U OC O m 7C , p 5r?J U) 0 M g? 8.2 Z ) CL o?a o=a g CL r E ._ E 0 Z C c c E 0 E F? E 0 ? WE y E 0 - O Q o a go c N N j D m o m E m N c E ?o g rno ? Uv i 3'Jm`m(7 t E ro Q) ? ? 0 Z z E'D a L Cy z ?? m a ? N c') w Z in Q cn E°m _ ¢3 ¢ s?a E 9? o g ' n¢ O 3 t c x 3 $ Q Q N > N c ro? J CV o gg 2 E C\l w y} {{ uw o y? ?U W z ` w 7 _ w N N O N O (n m ro W m o ro ?° 'F i3 0 ro x E R c d o co ro m 'S o 0 v ?' m 0 U M w ro z §caAE E FF m 1 'ii Zoo? CO ?cm X z CV N m N N m ro E N E o a 8 c a a M 0 N .0 . 2 ?222 0) 0 5 5 ro22?=2N?2 2 E2 .0 .0 E _a o- U) CL ,,adaNn oo o 3NViS 3d0IS m p m 4EiroE N z I Z yy N I y N N Z 7 d (N/1 OTC i E t_ ol D g m ` ° d cl: Q W Z i m v cgAm mc7 J 0 N 0 1 I F- z (D 9 z o ?m ? z;?E _ I X w' o' E D o 9 c v a o E 0) ' E a ?ao Z Eros c`3mcn g3 E= g o a g Z ? 8 og c C c a) a aj r CO N may Zc o 0 w o w o f w N 9 d N ? 0 2? ro ro U) Z F N s - w O Q 0 w G CD a C n-0 -6 0 Q a ca w °El $ E E os ' 8 x E v gro ° 5; O N ro m m ro - ° E - E a Eoo? jca ro cm ? w cu ? _w E o v 00 ? ia m E ? .E?.a - d Q y rnv?cg : 0 rna??'dcdcr°n +a? cnI--a ?? a Qo.0 sItS LLI a_ Oo h r? cc LO Z J N N N. N N w0 Q ? r in a`TO N a ?oooi00t- oo aoNInrn N N N N N m V 00 ?mwxw? aJ U) D O O O O Q O O O O V V V C rn CO LO 0 ?Q N 0 M Z O O cn Cl) Q C\j can (O f? OD a00 m z t-: N n LLl 0) 0) C) a) < O mrnC rnci F W C7 O 0) O O N Z 2 N rn CO N 7 of N' Q m m c Oc rn 0 Q z m O O N O C\j O a_ rn cn LO LO O O) m L n. n M W r m g ON) go) a a oo+c+\IM Z N M W 0 r ¢ z > > > > ¢ m W 00 U z v o n cMo Q O rn V OD N N r W0 O O C6 LLLlllQ1JJ p a j O Q) z 0) ° M = o rn rn m Q(0 m00 M m Oc S cq N N N N N z voi N voi poop co O M V Q CO m L O "t N N +++++ U W S ?W =rm N v7 0 Z ? -3/V/7 ° W : ' `\ N?1 bW LU U) (n w ?WZ J Z Z q O ( F` '` \'\ \ ?_ U m ?? LLJ l / 1 \ \ / H C N ) 1 / - % / O i % 00 0 r O r Q o S S U) O m m N LLl z m U N 0 O w O 3 Cl) 0 W w M z o J U ?(D m = z U < w° a z = O w a o 0 W 0 Z LL) i W :E 2? 0 v O q co 5 -I z E wu O cl: ? 0 a 88 z 6 p Cl) U J? P'4 O Z W S 4 i W w '. m } 1¢ LC) \ l 0 , CD + I ; C?= or- m c } OW Uw F- I l \ '\ \? •\ \ e Q m r \ 1)r \ \ \ Q4 0 ?Z \ \` \ .\ \ \ \ \ W I I , \ \ \ \ \ J ` \ \ r \\ F W I j O C) W O z O? m Ir = O (D • D + O I J Z a Z U cnZ o --J W w IL ? oo°aa. m a 0wa: 0 Z ?=Ua U V-- "j) 0 Z - U 2 m Q Fl : i ? { -z - 10 -- o Q Z cc m CL p 'wr m 1 " -5;8w2 o? ? I w¢ O m? O L) 0=j z Ocn dzO (D CL / Z ? Z f W 0? O cr SW ? O=a p8=-j 0) ?2Z +7 •\ UU ~U= W(nmUQN C7 11 j ?1.. \\ \,\ \ \\ W ? O O p m0 w w LLJ ca LLI LL EL z ¢C7 \ \ O~mZ OFZwZm 0 W U? z O F?U-JZW m m J - r \ \ \ co Z?WW IZLLU,t m o I \ \. Wcn8 ?F=OOJ M2 LL 5 LLj O~ \ O Z ZmCnJ Zr aw= W W I \ \\ \)) 4 (0 OOU)= fizz C) co < I \ \ \ \ ?W z~m~ EU~am r Ci a a I \'\ U Z OfLLf 0ao00cr cc It _+ I \ O \ \ w 0 0 = Zzoz amOamw U) m r \ U ap 00 O i{ z M) 22<2 CO 0 Lu (1) 0 m QH a \ 1 m N \ \ ,? z CD Fn \ \ a ° a? F g \ \ a? Cl) o r U) \ Ir \ , \ 0 IL 0 U) vv ?v A S m \ Ir \ Q It \ \\ cn \ \ \ W cr- \\ m 0 \ \ d O ?\ /\ \ CL O d M O) l % \ \ , \ \ cli W < m 0 o J W 0 rn 0 N Fr L Z M Z W ILLS OO c') CC mcD? U?0 >> W W / LLJ JQ??Za?O ?cn I d F F C'j a_ CL cr Cl) g0= 11 II 00mm I?i930 CL L) ¢?Oz 0?a =z W n? t Z 0 W m 01 c-3.?/// NHS Ned 338 -3/0 N?1 bW J L m U) 0-01 O O r- l in / 00 Z O ° C Z U° W zZ co z 0 z wo ~ 44 ? zo o ? 0205° zO=UQm O C7 Z wC) U~=YQ CO w ONwZFQ?m?rz ¢ ?(n z§owww?w 0} ¢- O J W O a ¢m U-p =,z cr. o>[ ULLO< ZZa?OM ¢ WO O °L ¢? min a ON °W(nIxz UH Y Laq°? °wa¢O Ug(n m LL U Z m O ¢? U) O mO °OpLLiz(n O m H °U ZWUJZ_W, ZU W wg U Q LUm m 2- 0 (n zmrn 0-00 ¢ 0 0?? 2?Z?¢ 0 WO CL 0~ fn ?OHa¢ri a C) MF- (n Mrz wpQQZ¢> H Fr ow ?LL? oaOOOcl: C (n O C) °Q° aW¢a m w 2z w ¢ a 22¢M ?i mC)LUU)r _Z ¢ CZ" ?\ r Z (D a a? ¢ 0 ° 1 O 0 W N ?U) o' Lo 0) 00r"-?, co 00 C-q, a, P LO W z W - / \P i U) z O Q U O J W Ir D F -- c D ¢ w m w z J Yd H w CL O J U)I Z g a m 0 J LL _I w zm zr C) =j w ? w z¢ FFw U'U Z O w w O = w (n 3 a ? g o? O n U > U) ° W Y C7 O 0 Z 0 0 0 0° o L LI J LL (n J ? I I I I ' I ' I I 00 S ry S F- Z 0 Q U 0 w ¢ D U 2 ur ¢ ¢ w 0 J z W 2 Z C7 Q a2 u] ¢ cr3 0 --0 Z Q M n N CO U�z::I �wWa-w R \ m 00 z J 1 Lu ° t N 0 O In � I� o V'* In V' mONp Q N N t n N o M n In m n N ao � 0 co O N N N N N N N N N N N N N NNNNNNNN j EZQD Oz Z w d W wmL)LUU)� al W Q (o 0 co n 0 pp N aD z V O O pp M fD I� o Lo p 8 ° Ya M N N O 0 N N 0 N CD N O L N N V M N YO cV N � O M c+nD 0 m> LLJ M U')U) MO Ln I� LO V In M a 'T N V 13 w a J NN N N N N N N o LL, C)Q 0 00 z 0O U Q Q t�J (7 J¢ w C7 J w J C7 Y C7 I� F J L Q C(�t�t� J J C7 Ir Q CL i r. \ ? m U N \ ° w CY) r Za I a oZ a ° ¢ O Y z Z LU ° d w?? N aaC7C o Jw Qx T jM I = z? L I zi Z ?- o $ o - Z I cs u ° O w z Y 5; m $ L) 44 co 63 z 0- F- l\ / C) CD T o LL ZZ d (SNP I % a c rW g O cl: w j I 1 j °U 00 z 1 1\ ?? \ \ w w 9 z CC Q zY \ ? t I U) Z O = J w > wcn U O L) m ! I U z ?o cl: z w I i O a U co 1 no i I LU = o 0 0Z) 0 0 I i g ' w J i 0 ° w 1 I ! ? i I i ? 1 t I i I w I I z ? J aw° I U) (D U ° I Z 0FUQ? I t j ? ? cr F-: N ww°~w 11 O U?wllLLUl=)z -zo F?1 cr aloes ZZ t Z J t SQ -L? cC? j m wLLl n LL LL j z ° w cr Q LOU°0= z 6' I I N ? L/) O l=zwzw cn z w U co z m ( w m www2-¢ ? m 0 OW M°? ? ? ' 0E:j ? ? z ?aSZOZOO°U o 0L= °a? m 3 Z°0 ) H O a F°° z Z N Q~ QwwOzd LL, 5 U F w i ¢ Z cl:LU w _ 0? ¢ w w O Q w J m ¢ % z O _? ¢z¢> cr OC a a z w F- z LL O z 0 w? LEi a ww ¢ p a QU O ti°CL w ?m0= ? z LLJ u n i i 1 0 C) C7 LL O a? I j ? I' I ? a C) U l I U I ¢¢ CL I O W CC H U I j 1 t SN ?N ?G ?P L LU Z g LU LU LU Z J 2 U Q i ¢ Z 00 ¢ U ¢ O¢ U (/)0 ZU w UU Q w O ZN r Z O 0 0 ¢OO d Z U LU Y Z ¢¢0 J d C~J Q � Cl) ir O N OC70 Ir w oIr z a r oQo m N U o Y O w J� 0 a g W M g LTJ i co U i5L �_ 0 Ow Z Lu 2 C c U' C7 U Y Cn. I— LL U Q _r m z <�� = J) O a a o !L� O Z LLI cr LLIU 00 w LL O ¢ cc .. Z U > / W ZI ¢ U m m U U Z a H J J Q co 0 O O r oo'ssz=x'13 i ... I g , es'E6+ZC 1S + ;. H013H 31001. ON3 = C $ Q ... ° (v ?? O O i o W ? ? $ c L I I i 00'M -/313 -- - 5? 00 00+OL'V1S 25 H V38 3100111Y N199 + o o. app p 00'SLZ=h313 94'L6+.61.V1S HOV9H U dd ON3 } T ? 1 f ? S ryry?? LL Z ?---? O + N o LU COD / fU/gJi f f, I . 4684? =1313 fi 00'00+O1'V1S HOV3y 84ddfl NIJ39 yam' ! ?. + O 2 U N N 00.6Ed-/313 BCEE+gCV S HJIIJU U"U I UNJ + I h 1 _ W ? ? 8 2 U m (QYJ $ l.l.l 2 ? a Q ? + 7 O N aP ? I Z I ? I x I W I $ I? + f I 91 O9? =7373 0000+M V $ H MOl + 0 .a m ? N U o T ?j 1? ?N Ned 3 Z Z Cl) w o a " ?? Z J o M C) Z3 co z Q C) W O o O Z z 0 N o co W Q (7 Q LLJ i p O O U) > 0 .. LL z AIN r O / A C) Q r , ? i w 0 + O CY) 1 MQ®\\ \ w U) I 1 \ \ \ ,\ ? ?\ VII \ ?\ \J ? u? w i J cn ? ? \1 ``?? ? i O (nW? W I ? .. W 7 mW ZD¢ fF 7 0 O I )< '?? i 5go z1o z W3w 0W 9, 0 oWZp a mp0? jF- o w 'ca ?a?0¢ w? w WpQ O o mWz• ? O 0 z<,W U 3p UU ~zF ¢ ?¢w ? wwC7= p? MOOy < S WU ULL F> Z ?Zp o ¢ 00 °?UO m?m?w~ic Lu °w w03 uo z U aWHw> mmr ¢y uwm1U qgy (? U 0 w < w SviE ?¢ U0 WW?O W 0¢? W z z W J ??zd7c7 f8 Zqzg?? Ow = aip ¢O?xw F? m W?z m?F Z w~3p7 wm o?t- oa i5 W p, Z m ? 0 nz O W u? wwZa ? < zoz aW5 0' Z0 ?m -?o iz O? (..) OOU w 2L O COZpZ ?J¢w p0 W Q~ ?W C07ZQ LZQ WO°O U? n LLJ D?qp? W? m T<LL? Q ?O ~o?wf Uw? U FOOM NwO ooh oa 3g? SD ow FzW pE?zZU U2U UaZwm? ?p UD ?zw Wmz 00 M' UO< wC7 W-? 0? (gym ? G°? ?wtw ?f F3 ?zo° ?o CV 0 Y N O N, ?W z zp ¢ UZI O ¢ O w m ?_ z F- we OZ a crQ l 82w ®E] W \ \ \ O Z j O 1 \ `` C\ N Q w \ ® \ O U Zz z W LLJ ~ w z J W o D F- Z z w L ~ z o O ¢d O w ¢ Q w CO m O U0 0 a x F- v> \ U) U) \\ ® % r O cc: 1 kSl \\ \ \\ ¢ \ \\ O ' O U) LLI w o? o LU w O \ co Cl) CIO Cl) Egg 00 n._.-• 8 r r - r r.? T O M O `. !O z Z N 1- m CK5 x)x co W J 5 O 3 O W, 0 CAj OO ; O N ICI) CL 0 O ?. r O ¢ 2 z l p w LLI n co i '. K it _? r m U N o r` r Za y Z w Q Z n _ LIJ U U = c? °z i I Q 7m x a z z 0= O u 3 0 OW z pp ?Z/?) L L) T o r p fill O Q O I- cl) O > ?i O ¢ ¢¢ C) O '- LU ~5 Z S a z g a 1 cn W F Z OO W ? O O w 2 v~i O L) w n•? } O / Z ? ¢ ? w W CL O V) ! d ? J W w 00 z J / /? % I -1 0) o o M 0rn ZO F N IL R z W Co N LLJ ? J i E Zom - O1 o ? 3 w _.... Oo % i / ... mwZ?N w¢3 S 0Oy a ?a ?•? / F?g§? ~Z O 0 00 O OO ? % ® O CO LLJ 0 c?, J Ww W R W Ww o C w O a (90 ?J 16D5? % Z U? IZFgZa ?? pQU zg P, Wp fEU UW pp Z Fr w?3mf a,2;-o Q p? QU) Off Oa ta: ¢ `? ' W w w 0ZF 0 a{ O o ? z N i Z 0 U w 1 0 p 4W o mWZ ??p ? Q 6H U ?? o- WE ?o w U? ao O w O _)?I i O o O- 00 pp QQwN cc z ?O 1 ®% ? ??? ?N oo°zd E (J 8 ?Vl ? La ~ U o Lou ~? ??\I I1t ® 11 ZU?77 QpQ w 0 ? (7 2w ai qa3 Y07 m U Yww ;?F>cn w Z w ?O ?? U GLLIf 1 eh I1\ ,? 7LCVJI i ?? ®.... ( ? W¢m?s ?¢aplgi 8 mw Wa F?li? 0'= F? O OLL 85 w w? ?LLO J 0 i \ N LL J m Cn % 11 \\ \ ))?CC777(((( \ I? 1 0 w \ I? 0 % ` \ \? O UJ O ?+ _ \ 0 ?Q N . ? 1 II I ON/ / o 91 i QJ? 6[ 133HS NVld 33S 3NI I HOiVN R O % I' a m o / U Z U) W ; %- , I i yOTC i'' j/ LL O W 0? p r I / 3: ? Z 1 j® O + P i C) /yam/ W ?_ I Q? cr WCC W (n z Z O j U O LIJ LL m U N o 00 z Z ? b 3 Q W Z Q n gg 7 J O _ ° a z ?_ ¢ w z < 00 LL zz Z > m p W Q ? w m Y s T ? %Lp. 7 r?, d Q 1 3 S J O z G ? o ? o D U) W . S O O J y] W Z? ? \ 1 z o w F N w z J ` (r O 2 Y W N 0 Z O Z W W w a O ° w W ¢ a. Cl) LL 0 W o ? x \ O ?? ! ? ?';! ?fit i ,XI w z W 1 ? \\j t' ??/ Z [gyp Y l '' 0 W O N O a \ \ 0w tq \ W " D \\ --------- - ZO Q0 n `? i .- 11J \ \ i i W Cn w i D \, a w \\ I ?cx ,'. cn w ® ® i ' i O ! 'j z lb J W O z ¢ W LJ W- c/) L N a N N ¢z > V) U / o i ` i ow i EK:z 00 Do 2 T' f 1 w OW ow o N a v? ?? 5 wa w0 >? o o w ^i mw=FZ-N w3 w 00y ¢ a YNQ? X ; co Qwttwr ¢¢ w x n W O O j7C;•..e« , ?? w z5oo wm 0 °NZ QN °a Ocr Z ??? $ 4 j% W QoO?w c¢7 cjo ?O¢ ?F- ww / W ZQ ?-, 0 cc IL z \ ® \ ® wwoOP op FoF-a 3° ? oD Ow wu ", (jU Ua °U7 F ~ ? O ` \' F W w= w Yw Up 15° 0 a{ m /_.. O /`•?-? FwmZ 0m? OQ wOwx 00? OVm Lu? ?p _ Ada F-°? ZOO F-0 CV M O N N AE? O , yn1- m (D ® m CF) za I / oo O ? ? w?b w ? i o- a O O 0 w J = p z M U °" ? ?? I ® qa ?O J :3 cm w z Z ZZ Z O Uoo l11 co ww w ?$ d U) O o = @@ m ro g g 3 \ ® c o o o o p r o z o cL g \ 0 wa O s o? ?ro ? g m I ?-- ----? -- - - - I O ?° (I j ® ? ®° w Z J ¢ J w z > M U Er z w w ? w a ° ¢ I I ? I ?® ® J a I ?? j .. I ? ? ? 0 ? X o i ; I ®? mod. ° I o ® ® 11 \\ z a \1 \ f ?l 1 I 0 mwo woo ww w co o w I zo¢ zoo T? -O o p o ¢ y ~ ® w3W m °? ow o Owoz a v_i w j a zja-mo¢ w Oa o w OD 3 z LL 0 F 0 O ° ?® ® § o ? cc Fz p ¢ w O ? W zN O 3O¢ N Q °da E f?ZES ¢ rp ¢ w W UU wmw°r W o? w wOF OZ I I ® IIU 1 ? ® U u wh, aa: 33 aw0 0 ¢¢p Y oU z mw? w0 Qw? a w o N II? II ? 1 Z ujiEzow -7d' O d a w ow o wp -i ¢ o m Z 11' 1 H I ® Z w?m? z op ? ? m w ¢ w2 O w u U ?? S? o0 µµo?? z 6? LLa 0 O N h m d Fil I I w w O = Z I 1 ti 5 Q w W J z zO ww N w? LL Z ~F 0O ?¢ ¢ 0 WF Zo. ° PO ¢z O_? }I U U~ F Z LL W4- I U) L4 O a Q O 00 O Q m Lc11 W OoUaw o¢ ? w mwz qqq 16 zP< Up m 3Ow O 00 oo v ?g p Q W Q w (n - fn Z I ¢¢ VN F ? ? wU O p QQWw p Hp X O m 4 w w> / / R, Z nNN© O I a¢ wi W??? ?ro ¢¢ ¢Z °¢ nO OU ¢? ¢f / / d d z w 9 Z ~ Z IL LL z w _ % O Q / O U V No O w U Op O¢ ¢ 0 00 mwo o? LLI LL 0I?HW M. Q O ¢ H 00 Z wS w x YwZwU 0 C7 % ® O wmz omw oQ wmFF U¢ Um / c?i ni a iri <d % o o 0 ® ? N I IQ I ®? Fl- 1-9 0 U) Tj 0 1 \ 19 0 Fc-ol SSE ??N? MPA --0 J OD m U N 0 ? o ? ?2 cr W Z U) o d ? n 3 ? J L1_I O ? ? o z ? 3 > U W ° c g S < = Q w ¢ o C) L zz Z 0 w o O c? U ? 0 m ? $ o LL 4d, = w ¢ 3 till LLJ ¢ < 0 3 u o W Q F- 0 U) ] Q O O w Z U NW ES W W Z w?pZ ?w vwi O zoa - ZI Z z p / w3w °w Owwz as J O m °qg° ziE o oW¢O¢ co a Z w U U ° w Y Z / ?Ow¢ O ° Z<- ~ C7 v LL, M CC ¢ O UO.9 U ¢a U) Ir d W co co -i C) Q ?' ??FkZ?? O OUOw ¢ ?LL w~w N ~Wm?jU? 0Jp ¢?~ ?C Z J ¢ W Z J?wip is f¢ ty°W? WO? W°U 3 Y C W CO tL H O < O ?Wr Z CO Y ¢? Y mw W O Q Q LLJ M¢oj? ? f ¢rz-a F- o 0 (r F- d O U.I z w 1L w? U? U= CL 0 Om w OU O / Z fF-Oz ?p w °~UO wU Ow zg Oa ¢U o Z- 0 ZoZ Zo¢o o? 00 o O ww?¢ ?¢ ¢ a?O 4zz OLL J w0? w U? p F m U U yppm? ??p O¢O gyw Oz 00 % W cr °w Oza U°z `?jwoo ? z F- ocr LIJ U) Z i cr :P¢?v?F LLC?7 ? Q¢LLW o o U) O H U v?a¢Zjw U.0 N° ?a¢ U E 0 pwug 0&¢ O¢? 30iq 0o O1 O / LL Z UU Ua aCLdu F UH U° O Ya~?¢m>2vwi ZpQ ?- UT J % ¢mZ pU mYN UOa Np¢ ? OUa OOm ?L ?Z O S~ =O -OLL H ~LL CV M V 0 w k? w w 2 GO z n w w U) w z J 2 U Q a 8 O O a R ?\\ O O J co D CO 0 (D O T L L 0 0) C D) (f) c a d t C 4) ? .c O a N (Nn a CU U) D) L _ D) (u = (1) C W '0 co U) 15 a) 3) CD -0 a) .r- 0 m U O a co c Q 3 •C Q. Y ? fu cz co a DO cu '0 'a co .E co c _ N D co cz 0 CZ a c 0 E a) cu D) c o° 0. m? cu a) c (n m a) c u) E a) o U U L cn c 0 0 N a ° a O U p Cl) O U) (te) U 0 d a) 0 a) - Y o c`"0 3 c o d c D v v = au'i aoi ? c - a) a0i m c :3 p N `O ° p_ 0 (n ` 0 0 O `1 -D a 2 E C 3 o m a) a 2 v ro o M U) m3 E N 0U JS00 cu c a CO 0 .? N O C a 0 0 0 ?° •o = co a) m (n (n Q C T 0 cn 3? 0 c c C > ? CD " 8 r) C O i co J c O w 0 O 0 .? (n C O c O cDj) H (u 0= a p i C RS r- CD (D :3 U) U U a) }L O a) a) (n c m O (D (n cn E a OU C) N o p a c C U O Q -.? cn a •N 0 O c°j OU Q p p) N 'a E c Y ° ° cu 0 3 c c ro cn o c L 0 E 3 a) (u c°.S O aa) y(uy cu .- of i•? ?3.N- 0a?om E a co aiaa)) c mJ? u°-,? w c 0 a) (D U w 0 m O (n - L O c L N O p cd o a) d a a) 0.3 L C C > N L N cn (1) - a) Q a) a N O co c Y L M p a) a 0 (d C-) 0 cn co 75 co E a) ?o -0 0 (n - co 0 a) (D E (D d O Cp C- ? c c Co (n cz 7 C: 0) C c a) y :3 O 0- (a a Co a) U) .0 cU - co cz _0 C) (D L D O C: 0 0 CD N - U N C (°n C +? p U r a) - c L w CZ a° U6 C Q U O O c CD 7 a) O C N C> E g U a) 05 E :3 0 E CD CD cz cu (C 2 2_2 22 ? ,0 O C Q EO 3 c u) (Z O _N 'D w co 9 D) (d a) L 0. C O co O N to a) ? D C c 0'- O a) C cu a) t a) a) a) -O (u D -D () O C a) a) L D a C = co L L 0) C c O D ` c c C D' - 'D co -C a) U ? a) (n c fO 0'- co a) O Q ? L ?•? o)? U?Ca)° V) cu yEu, ?ocncu'? •- (u a)oso EUQ)Eu,oca)O_ - CD c U) cu ° 3 c a) L p cu (u ° -D 0 0 N m e O O) o E (u (u (u c' a) w n 6 0 (0 (u o C u) 4) L) p -0 .0 N a) c V a(D a Co c cu cn C vi D) C Y ° C O C ca O ?' c U) a -a t5 0 (z a) 2-6 CD c 0 0 -r z p in (n CL a) c coE U cu 0 y U C U () cn a) cu i ° U N E O a U p ° D C (a D r Y c D 3 0 7> D C N Y c Fn - a) U m (Z O 'v) U Q. O D -D C L v) - -D cu-„ 0° (n as p O U c U D (n W O o D O O •U) d C -O p a) n a c c N d U) a c 4 'N a) U 0 0 OL (d c o-0 cn O •° °' oEYcn ° 0 0c o0. _ a co C c (C (nE cc _Ile 0 L ° pC c O 0 cu . o c n e w 0° E `? N U (u °.c o 0. o O v a`ui m E d)0. L a) O cCu U (n O.0 O c uiQ ?? = co a) E? a) ?Q 0 0 oc o,0. N LU D u c a) c a) .9U. = c c Q) 0 N C a) 'O co U U i) O L p .C O (u a) ? L D 70-a) Y ci EO c D) U U O C 3 - Y W .?.. 7 (n m U = (A >. a) c c 0 L D) C N ° U a) rL CC -0 co - C U N c J O 3 O C E p C OL 0.'E CO 0) E(D a co Y a a c0 •C C O o -D O CO "O 0 c 0 .E Q m m c° c? cu c 3 o 0 o 0 O cu cu o v c o= - a) a) L a) c cu a) N a) c? U a a) c m- u) c o 0 c ?a ocu rn"' a xC' C:M a) na)E r0. E =3 v (M -0 Z E C: a) (D -CM g ? n (Ln D -° ?.mE D)0. ?? a) E a) c °nU i.o.0 aa))-0 o V; E (u > 0 > 0 m c O D E ' a) a) C `- u O =ompCE U a cn L??uEa £°) nc0.°i mJ a0.°i ° E- ° Q,c?Ea'X? °ccczD E - ° . o c E E a) o c o` ° ° c ° - vi (n a ,. N (D - (n cu E U) c a 0 c a) D v°)i o : E (La> ro ro? N °3, c°)VUa)0O°? o -mo(nO UQ.L ?a)a) a)c?p E a) a)° o 00 _ O U (n D U D a) w a) cif a) U c •a o 0 D o p C J (n E cu O (n- ` C O U 0 L O c L>> 3 cud - - O)N >'D > .ro (u [F U m aEU oc U o0 70m 0-0Y ??°).U.a)c ? aEc ° 0 c (D c E 70 C" -0 E.50.Eoc ?_ a) ? a) O 0. L p c 0 Z; 2 ?u c c o 0 O= co a) a) p 0 a) a) O a) c •X 0 0 a) 0 p p C cu a) O F- amoC 00 E(?N a) ?H 0- L 0. o(n 0. CL am?C cnU?fnN L C Q O c cps CIr Cr 8 EU) 0 Ca c c ? • • • • cCa • • • • • • • • • • • • • • 3 • • • • • • • • H U 0 r? 0 V J z 0 U (D rn ` ?o 0) a o0. a c a (nc L C 1 co co a) c CO a) a) C (n m c co ,> ui a a) ;E a) a) O . cn c C C) 0 d U 1-- a) ca p N C L .L. (z co -E cli o c aa))c?cL' a ooY co 70 a) M o3c 0 a)?0 3 ((n> CL a) (? a cr 0. ) 0 a) o O 0 Cc ° L .C L L (u D) cz a (Z a) a - C 0- co '°D C C °- O Oa a) U c (D L C O. a c U E a) C cn cn C a a) oC E N 0 C 70 co °c m ° cLD m>0.0.0.0 a)o(n3? D `n cu V5 tY cu ° o °ro?ao N °U U ` O C Q O U 0. a) C- a) a) j N d a) U> O L U -D 'D c ?0 a) W (n ? U E a) > ro .a O c .O o (u o m L L O i c c 70 U) L` s ?70 (n c (n0o 70 070 U ? m c cE 0C c =°)- Z = oo°a• - cu co - mo(n rn UE UO co °) m ?3 Q-0?o a c o?> N c Q co c U) _° Z C C C co Rf CD 'U) L c D) 3 a) U m` OU U .y U U a O U C O c o N o w CO S; 2 co m C ° N O O D c (u -° d cu C m O O •'-' ° c c ?' w 73 O U a) W w p C N O N U O ro? a) iu C) C O C L y in ?, o O a O .? u°j D 0) 0 (n= CjJ CO C o+ D? a) Co c c (D a) ?U v c (D ° O CZ a)? N v E 3 Q3 ° 0 ?M N D O C C O L cn O w 4 o i O D O o o CD E 70 p .c (D o 0) Q Y E a c c :? m a a 0.9 o 0.D a in C 0 a) c: Y 0 0 w ° (n i5 ° 0. L E o w 3 .N -0 j° 0 c Ir ° 75 a (emu co a Y 0 O c 0 c cu N cn W ooc 0? ``n°?m o0.Uv(ni yca n.0 0- ° ° vi oo i3g0? -c- Z w co E L) 0 U) U a) C) a) CU a) Q i NU 'D (u co C a) O (u L a) 4) i O C co Cl) =N fu (() s cz :5 > O (u w (1) cm 0.1 1575-0 C (co -6 Ch n CD N `) V) C ° D) E o .- U c N N N 0 0 'Q C C O D C N w U) -C (u D U C U= .? C L N N c '? D) .- O (u -E (u cu - Y O a) >1 p p o L C cz (?0 w D- cu cu va?i E O° cw>--0.)3 °)0c°0.c ??0- (cu °.>cu ca UY O o oaa)i'c OUDo pI a N O 0 cn 0-0- _U) cd o .0 fu y C c cn > c ..C a «-. U E y a) r_ cu Z c a) V) C a) X c cu a) (D 'n 0) a) (u N D -0 `O C O O UO U cn :3 co ++ O (n (n _? C a) F' Q w _0 U a) (u a) E (n a) (0 y C p C a- C a) 0 Ca L .0 ?.`-. c (u u) D L N N -D -0 Z 3 a) co Q) C C a C m (u L C 4) (n a) u) c 6 0) (n ?Q -C w ° (n ° ?" a) ° c 0.) Y 3roM °M? m c co o c)(n m ° a) (°n E ti c 0.0 ° (? - a) co U •0 d ` O N L 0 .? c > O-0 ccq ° D) Y C:0.- c cu E(D Q' O U CL U c u) 70 cn U C w d ro > U c u) w u) c° U N c ° C o - E 0) E c° C (S1 c p y Y C i U C c o U CL U 0. Z a O cz O a) a) - -0 c d X 0- 0 co (u (u (D - 0 0 0. 0 D U y () R) ? p 0' E ° 0 Q O O L n v? c? CL ro.o a CD Q?c ? c? o g'a's ° D o E y c m m C? (n c_ D°? roy 0 O (n V N 0.N N -0 O N O -0 = co -a N in cu 0 c N U T L ca a) E p) Od OC °- U E C m N •2 O- CD co C'5 o °-? C ?-0 a ?(D° '0.- m 0 o m a) ° oF-a in cu ?mQ V; co ?? a) o.?m a) m-0 m 0 ° 4 -a :S ° u) u) D o cQ ,? 3Y ca C ? :- U?E°O?o>o c r -D cuc (u :. -0c(n (n E a)c a) rovi N O N(D > O D (u 0 cu co C C O a) 0. (u a ui O N N C 3 c a) -D D U D U V) Z a_DD> c??m °): a O?a?NU N OX°o• ium .0 (1) Ed os E C:cE a>oEo O d cz E o N cu :3 c E aci E aEi a)Ua Z ? 0°° a- E ? a D E c? a c U o.0 a) co 0) p cu cu o U 0- U u)Yc m3 D) E D UD)mUt m(na)a a a)°DO o(u•D mt5' a Xc c0 (ncc° 0 o(E min a cuL m ° Oa)?a)Ycc'6 D ?ccuEY 0 o°Ein.50.°i caci E Q0.)oco.? LL a) (n C N C "O cu O (LS .Q O O a) o 0 w N D).L L D a) co U w- O i >(D a c O° O a) rtLp N ID CD N(D O 02 U U 'V N .? = U. C U Q a) in C M O p y a a) N U CL a) 0. O U "-. N p U L D) F? ` U =3 fu 0 U C D C C -D a) v t5 0 0 ° ?c a) a) a? u u- c o.c ?u 0'U) t'c N c 0 F° L ro? m $? 0)0 a)m 0 a) Y :3 0 0 0 0 a z c ?'ic U ?.° co c I°?) (u c c° a) F, E cc)- m X V)a? Ca or 0000 aai aEi Oyu a)0 O c? u ai a a) -- ?.5 o oc a) -6 0 i E c H a- L m Cn --D co m o co M U F U U U a H a oC OC U E (n N U a p in c a) Iz m in c ro 0 E U) -C E (D 'o U c c o0. oc? °DUH c o 0. U a) c c a) cu • • • • • • • • • • • • c = ~ 3 C/) H U ° U ° o U 0 • • • • • • • • s U ?CD o U C\j N z a ?Z NS N ?d ?? Y H z J? Z o d o MN W =r- m Q = J w¢ a = ? Z Z F - z z o 0 O - co p ? Q Q o co 0 ? a P- Li 0 < E l ? '\ o T z O g ..... p Z § 1 \ U ,\ ) O U I 1 I O \ U z I ` 0 I 9 \ O '\ •\ l \ \ ` \ Q W U ZZQ F O \ •\ ?\ O (t CO z W J Q co \ • d ? w UQ Z O } C C) co Q \ \ ¢ a ?Z O ai ? CO / w D / N a a D \ d C) \ w / \ O Z LL C) Ir O O LU vZ? m C:) a Z pQ a / i c ? F o a s ?U ?d ¢U o Y (n ?? O ? cnU ? r Q 0 O Uw Z >- a Z ¢cr O }¢ / / Q Z ILI = CO g F- LU O aw 2 a ? - C) a LU a CL 2 d Z Q? O? aw uiV)i ? U z rn wo % /; ?r W I I ?? v in ?Q J I ? / a l ? ? ® / a N w -m? ? w C3 m P- ? Z o }p Z ~Z ?g rY }cn 1-Y Uw m¢ O DO w Z) ¢ U D U)O ~a ?= 00 ?¢ ? U Own c9a OU am U a N aw 2d W M?- Ma- C a OUw w00 wz C/) ? J I I x J m D U) 0 0 T ii r • / i / r 1 / i i i ? i i % f '/ / I . i D ? i i i Z 8 Zw LL 0 N i C o m?w i cr L I ?¢ OC d i \ o° / 0 Z HOUS ¢ U)co(D0 \ r \ ` \\ ? W ?• I F Q P? S Ned ??S ? 1 b!N Z O g?w 0 \j a wo C? PP \P \P z 9Z 133HS Nb`ld 33S 3NIl HOIVN v N o ; N J n / % Y W j Z ¢ _ ?U M 2 ° z / / \J W o a LL o= z O z 0 0 0 O w O U ?i S = W m O z J R Q o U) u LLI e O O o > I / ° w O ! 1 51 U g LL 4 \ O O z Z \\ >- w O Y O c7 Z Z x \\ \? ;: \ m _ I O O Im J a (nU F- m 0 ?• ?U ?d \ \\ \.\ ?\ z L- W ? U= ai3 d mw wa ?- 13 I ~ - \ \ I w Cl) i i Z O 1 1 ! U 1 I 1 ? j it Z O i \ o j - Z ¢ O ; O ?\ \ a w \ D N i i W \ \ \ \ i i W I / y U) i i W W U) W z `r-'? ; 0 _ / ! ! ! i t i' ? ; 1 i i \ w co W w 1 1 i? ? Ln QNNO? V / Z F Sil?zoaZ Q % j % i \ m U N z a \ j 6J LO N w LLI z a ?Q?{ z ? I j I I ¢ = 2Z U Uoo d 0 CL I 1 M ° U- Z. ? ZZ O Lu z 22 w ? i 1 co D w I= 22 cs - z FJ5 _ fill U) oo =is m a wl y ` \\ \ / ° O o o ° H U) 0 ? LLI > o? a \ ` T 10 Z 4 I -- -------- r ----- ------- I I I O z z I ` ¢ w o z) r a. 2 r Y C7 ? P: zQ Q Z I w z =30 Y w ?0 g C U ? rO j j = m Z ll! aaU w aw w C J= a a a ¢va-i w 0 I ? W I J j j w ? m cc j j a 177 1 j 1 1 1 1 j 1 O j I ¢ I I 0 I j O j J I I I I I j' i ? 1 ? j j j j I ? ? I i i j I I I I I ? L j j I I i I a j i I j ra I j Paz CL U) I w U -?G ?P a Q CL O O U) LLI IL Q d' N tTi w 2 U) Z w w U) w z J U Q m i i LLI i w O I W Z O ?U a? g Z 0