HomeMy WebLinkAbout710069_Plan of Action_2018011290 z13 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED, PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 71-69 Wooten Bear Ridge 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 741,778 ftZ e. line c/12 x line d x 7.48 gallons/ft3 1 462375 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 330480 ft3 h. current herd # 3600 . certified herd # 3672 actual waste produced = current herd # x line g = 324000 ft' certified herd # i. volume of wash water according to structural design � ft3 j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1/12/20 88 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 37,188 ft3 450281 gallons 1.93 Ibs/1000 gal. 1761.4 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 71-69 Wooten Bear Ridge 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: line m = 1761.4 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN n. lines 1 +2+3+4+5+6= 1761.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres S. remaining IRR t. TOTAL PAN 2 PAN balance B u. application wind BALANCE FOR (lb/acre) FIELD (Ibs.) 7189 Small Grain Overseed column r x s 3 Ocf-March 4" 6.54 80.00 523.2 " 5" 5.76 64.10 369.2 " 1Bermuda 3.87 78.70 304.E " 3.50 55.60 194.E " 4.30 � 2 6.42 3 6.54 4 ,. . 6 5.76 3.50 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t IV. FACILITY'S PoA OVERALL PAN BALANCE 1391.E lb. PAN w. Total PAN to be land applied (line n from section . ) = II 1761.4 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 1391.6 lb. PAN y. Overall PAN balance (w - x) = 369.8 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. This plan relfects going to a 30 day POA. Information was received to complete the POA on 2-12-18 by email from Chuck Wooten. POA completed by Jason Turner PSWCD Techn. on 2-13-18. Depopulation and/or pump & haul maybe needed if current land conditions do not alllow Irrigation. N POA (30 Day) 2/21/00