PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED, PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 71-69 Wooten Bear Ridge
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 741,778 ftZ
e. line c/12 x line d x 7.48 gallons/ft3 1 462375 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 330480 ft3
h. current herd # 3600 . certified herd # 3672
actual waste produced = current herd # x line g = 324000 ft'
certified herd #
i. volume of wash water according to structural design � ft3
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1/12/20 88
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
37,188 ft3
450281 gallons
1.93 Ibs/1000 gal.
1761.4 lbs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 71-69 Wooten Bear Ridge
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m =
1761.4 lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 1761.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract # p. field # q. crop r. acres S. remaining IRR t. TOTAL PAN
2 PAN balance B u. application wind
BALANCE FOR
(lb/acre) FIELD (Ibs.)
7189 Small Grain Overseed column r x s
3 Ocf-March
4"
6.54
80.00
523.2 "
5"
5.76
64.10
369.2 "
1Bermuda
3.87
78.70
304.E "
3.50
55.60
194.E "
4.30
�
2
6.42
3
6.54
4
,. .
6
5.76
3.50
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t
IV. FACILITY'S PoA OVERALL PAN BALANCE 1391.E lb. PAN
w. Total PAN to be land applied (line n from section
. ) = II 1761.4 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 1391.6 lb. PAN
y. Overall PAN balance (w - x) = 369.8 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
This plan relfects going to a 30 day POA. Information was received to complete the POA on 2-12-18 by email
from Chuck Wooten. POA completed by Jason Turner PSWCD Techn. on 2-13-18.
Depopulation and/or pump & haul maybe needed if current land conditions do not alllow Irrigation.
N
POA (30 Day) 2/21/00