Loading...
HomeMy WebLinkAbout710044_Plan of Action_20180730PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY -DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): 1 -2. Current liquid volume in 25 yr:124 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr, storm & structural freeboard 19.0 inches c. line b - line a -(inches in red zone) = 4.0'inches d. top of dike surface area according to design (area at below structural freeboard elevation) -29380 ft2 e, line c/12 x lined x 7.48 gallons/ft3 73254, gallons 3. Projected volume of waste liquid produced during -draw down period f, temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 59342 ft3 h. current herd # �1800 certified herd-# 1800 actual waste produced = current herd # x line g = 59342 ft3 certified herd-# i; volume of wash water according to structural design ft3 j. excess rainfall -over evaporation according to design 19586 ft3 k. (lines h + i + jj x T48 x 30 days/line f= 98397 gallons 4. Total PAN to be, land applied during draw down period I. current waste analysis' -dated 6/15/2018 2.42 1 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1= 415.4 lbs. PAN- . REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on "the next Structure tab shown below) PoA (30 Day) 2/21100 6 i> x. Crop's remaining PAN balance (line v from section 111) = lb. PAN y. Overall PAN balance (w - x) = 415.4 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Com is planted so there is no receiving crop at this time. Water will be hauled to Greenwood 3 71-6 which has ample capacity (35") to accept waste from this farm since this is a small lagoon. 14" rain in 10 days. i PoA (30 Day) 2/21 /00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 415.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = -lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+g= 415.4lbPAN 111. TOTAL PAN'BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING'THIR nn nav aFRlnn o. tract # p. field # q. crop r. acres s. remaining IRR t. TOTAL PAN U. application window' 2 PAN balance BALANCE FOR (lb/acre) FIELD (lbs.) column r x s -OLO« Uu11 V11L.4A VN cI w1119 dNNmrduun uate or next crop appncation beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section 11) = 415.4 lb. PAN PoA (30 Day) 2/21/00 A PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITII Facility Number: 71-44 Facility Name: Ham Right Farm Certified Operator Name: County: Pender Glenn Register Operator Number: 1001455 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon lowest point on the top of the dam for lagoons without spillways; -and from the current liquil in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon -1 Lagoon 2 Lagoon 2 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 15 2. Check all applicable items X Liquid level Is within the designed structural freeboard elevations of one or more Five and 30 day Plans of Action are attached. Hydraulic and agronomic balance within acceptable ranges, Liquid level is within the 25 year 24 hour storm elevations for one or more structi 30 day Plan of Action is attached. Agronomic balance is within acceptable range Waste is to be pumped and -hauled to off site locations. Volume and PAN contei to be pumped and hauled is reflected In section IIi tables. Included within this pi of the proposed sites with related facility numbers, number of acres and receivin Information, Contact and.secure approval from the DWQ prior to transfer of was not covered In thwfacility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depi If animals are to be moved to another permitted facility,. provide facility number, freeboard levels and herd population for -the receiving facility , 3., Earliest possible date to begin land application -of waste: I hereby certify that I have reviewed the Information listed above and Included withll attached Plan of Action_, and to the best of my knowledge and ability, the Informatio accurate and correct. Ham vility arm David Mix Manager . Phone: 910-385-5617 Owner/Manager (print) j r / / te: 7/30/2018 Facility wn r/ anager (signatu ) .