HomeMy WebLinkAbout710044_Plan of Action_20180730PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY -DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): 1
-2. Current liquid volume in 25 yr:124 hr. storm storage & structural freeboard
a. current liquid level according to marker
15.0 inches
b. designed 25 yr./24 hr, storm & structural freeboard
19.0 inches
c. line b - line a -(inches in red zone) =
4.0'inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
-29380 ft2
e, line c/12 x lined x 7.48 gallons/ft3
73254, gallons
3. Projected volume of waste liquid produced during -draw down period
f, temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design 59342 ft3
h. current herd # �1800 certified herd-# 1800
actual waste produced = current herd # x line g = 59342 ft3
certified herd-#
i; volume of wash water according to structural design ft3
j. excess rainfall -over evaporation according to design 19586 ft3
k. (lines h + i + jj x T48 x 30 days/line f= 98397 gallons
4. Total PAN to be, land applied during draw down period
I. current waste analysis' -dated 6/15/2018 2.42 1 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1= 415.4 lbs. PAN-
.
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on "the next Structure tab shown below)
PoA (30 Day) 2/21100 6
i>
x. Crop's remaining PAN balance (line v from section 111) = lb. PAN
y. Overall PAN balance (w - x) = 415.4 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Com is planted so there is no receiving crop at this time. Water will be hauled to Greenwood 3 71-6 which has
ample capacity (35") to accept waste from this farm since this is a small lagoon. 14" rain in 10 days.
i
PoA (30 Day) 2/21 /00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 1
line m =
415.4 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
-lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+g= 415.4lbPAN
111. TOTAL PAN'BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING'THIR nn nav aFRlnn
o. tract # p. field # q. crop r. acres s. remaining IRR t. TOTAL PAN U. application window'
2 PAN balance BALANCE FOR
(lb/acre) FIELD (lbs.)
column r x s
-OLO« Uu11 V11L.4A VN cI w1119 dNNmrduun uate or next crop appncation beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line In from section 11) = 415.4 lb. PAN
PoA (30 Day) 2/21/00
A
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITII
Facility Number: 71-44
Facility Name: Ham Right Farm
Certified Operator Name:
County: Pender
Glenn Register Operator Number: 1001455
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon
lowest point on the top of the dam for lagoons without spillways; -and from the current liquil
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon -1 Lagoon 2 Lagoon 2 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 15
2. Check all applicable items
X Liquid level Is within the designed structural freeboard elevations of one or more
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balance
within acceptable ranges,
Liquid level is within the 25 year 24 hour storm elevations for one or more structi
30 day Plan of Action is attached. Agronomic balance is within acceptable range
Waste is to be pumped and -hauled to off site locations. Volume and PAN contei
to be pumped and hauled is reflected In section IIi tables. Included within this pi
of the proposed sites with related facility numbers, number of acres and receivin
Information, Contact and.secure approval from the DWQ prior to transfer of was
not covered In thwfacility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depi
If animals are to be moved to another permitted facility,. provide facility number,
freeboard levels and herd population for -the receiving facility
,
3., Earliest possible date to begin land application -of waste:
I hereby certify that I have reviewed the Information listed above and Included withll
attached Plan of Action_, and to the best of my knowledge and ability, the Informatio
accurate and correct.
Ham vility
arm David Mix Manager . Phone: 910-385-5617
Owner/Manager (print) j
r / / te: 7/30/2018
Facility wn r/ anager (signatu ) .