HomeMy WebLinkAbout710042_Plan of Action_20180731`11=�2 I DrW 131((�
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 71-42 Phillips
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 19.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 20.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 157216E ft2
e. line c/12 x line d x 7.48 gallons/ft3 979983 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 1039200 ft'
h. current herd # 2347 certified herd # , 2400
actual waste produced = current herd # x line g = 1016251 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 11216.E ft'
k. (lines h + i + j) x 7.48 x 30 days/line f= 1280910 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5/23/2018 1.39 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1 = 3142.6 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
t
II. TOTAL POUNDS OF PAN.STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES
FOR FACILITY
1.
Structure ID: 71-42 Phillips
line m = 3142.6 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
-lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines I + 2 + 3 + 4 + 5 + 6 = 3142.6lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN,CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p.'field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
1611
1 S
Coastal Bermuda
9.96
249.90
2489.0
Mar -Sept 30
2S
"
8.47
29.40
249.0
"
3S
"
8.83
261.90
2312.6
"
4S
"
9.12
220.40
2010.0
"
4N
"
3.55
266.30
945.4
"
5S
"
10.60
276.20
2927.7
"
5N
"
7.93
246.70
1956.3
"
Pivot
"
20.80
213.50
4440.8
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 17330.9 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 3142.6 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 17330.9 lb. PAN
y. Overall PAN balance (w - x) _ -14188 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Callled Sam Edwards on 7-27-18 tp report high freeboard due to heavy rainfall. Information provided by Angus
Phillips on 7-31-18 to PSWCD. Completed by Jason'Turner PSWCD techn.
on 7-31-18.
PoA (30 Day) 2/21/00