PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 71-27 Fennell #3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard 20.0 inches
c. line b -.line a (inches in red zone) = 3.0 inches
d. top of dike -surface area according to 'design
(area at below structural freeboard elevation) - 145,638 ft2
e. line c/12 x line d x 7.48 gallonsfft3 272343 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage -period according to structural design 180 days
g, volume of waste produced according to structural design 130,048 ft3-
h. current herd # 2848 certified herd #1 2600
actual waste produced = current herd # x line-g = 1424,53 ft3
certified herd, #
1. volume of wash water according to structural design v.lft3
j. excess rainfall over -evaporation according to design 73,320 ft3
K. (fines h + i-+Jj) x,7.48 x 30 .days/line f= 268996 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5/31/2018 1'.03 Ibs/1000 gal
M. ((lines e + k)/1000) x line I = 657.6 lbs. PAN
v-
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21100
1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25•YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 71-27 Fennell #3
line m = 557.6 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4, Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
Ib PAN
6. Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 557.6lbPAN
III. TOTAL PAN BALANCE, REMAINING' FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRInn nn NnT LIST FIFI nS Tn WI41Ci4 PAN PANNnT RG ADor 1=n n"D1n1r± re.uc -29% nAv orr%1^M
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column,r x s
u. application window-
P26
Corn
1.29.
125.96
162.5
Mar -July
P2A
"
2.73
127.49
348.0
"
P1 B
"
1.10
48.74
53.6
"
P1A
"
2.70
44.25
119.5
"
P86
"
2.81
96.44
271.0
"
P913
"
3.13
97.37
304.8
"
1C
Doublee-Cro SB
1.60
137.00
219.2
Jun-Spet _
1 D
"
3.10
137.00
424.7
"
3A
"
3.64
137.00
498.7
"
313-
"
2.92
137,00
400.0
"
4A
"
4.30
137.00
589.1
"
4B
"
2.60
137.00
356.2
"
orate current crop enaing appucat►on oate or next crop application, Deginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3747.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to ,be land applied (line n from section II) = 557.6 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 3747.3 lb. PAN
y. Overall PAN balance'(w - x) _ -3190 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump'and
haul, depopulation, herd reduction, etc. Yor pump &,haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard'levels at the
receiving facility.
Contracted this office on 5-30-18 about high freeboard. Received waste lagoon information on 6-7-18.
POA was completed 6-8-18 by Jason Turner, Pender SWCD Techn.
PoA (30 Day) 2/21/00