HomeMy WebLinkAbout710027_Plan of Action_20180521D(1 PIOCR2
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 71-27 Fennell #3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
16.0 inches
20.0 inches
4.0 inches
497083 ftz
1239394 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 3304801 ft3
h. current herd # 2892 certified herd # 2448
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5/21/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
ngnagn ft'
ft3
37,188 ft3
533085 gallons
1.03 Ibs/1000 gal.
1825.7 Ibs. PAN
PoA (30 Day) 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN'STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 71-27 Fennell #3
line m = 1825.7 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 1825.7lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
=
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column rxs
U. application window'
7919
P8A
DC SB
4.36
137.76
600.6
P9A
"
4.37
122.70
536.2
P1C
"
1.60
137.00
219.2
P 1 D
"
3.10
124'.50
386.0
P3A
"
3.64
77.50
-282.1
P313
"
2.92
137.00
400.0
P4A
"
4.30
89.40
384.4
P46
"
2.66
114.40
304.3
P5
"
3.10
91.90
284.9
P6
"
4.18
137.40
574.3
P7
"
4.39
137.60
604.1
P10
"
3.30
121.70
401.6
P11
3.13
128.40
401.9
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down.period.
v. Total PAN available for all fields (sum of column t) = 5379.6 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1825.7 lb. PAN
PoA (30 Day) 2/21/00
J
x. Crop's remaining PAN balance (line v from section III) = 5379.6 lb. PAN
y. Overall PAN balance (w - x) _ -3554 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Mr. Fennell called on 7-23-18 to report high freeboard. Information and plan was completed by Jason Turner
PSWCD on 7-25-18
PoA (30 Day) 2/21/00