HomeMy WebLinkAbout20051652 Ver 1_Complete File_20050831FWArF O?0 RpG Michael P. Easley, Governor William G. Ross Jr., Sccrctary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of WaterQuality September 8, 2005 DWQ Project # 05-1652 Avery County Robert Wiseman, County Manager Avery County Post Office Box 640 ??0 V Newland, NC 28657 0 V D Subject Property: Linville River EWP (DSR - LR1) SEP 2 0 2005 Approval of 401 Water Quality Certification with Additional Conditf?f1 ?S?oSTERQUA Dear Mr. Wiseman: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 850 feet of streams for the purpose of streambank stabilization and woody debris removal / trash removal at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on August 31, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification(s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. (Nothing in this approval should be interpreted as giving permission to remove bedload material from the existing channel, nor allowing for the construction of berms which would not allow the stream access to it's floodplain.) As "stable" and "pre-storm" are not interchangeable terms, all work must be to ensure stability, regardless of channel location. Additionally, channels cannot be returned to it's pre-storm location unless there is documented instability is submitted and approved as part of the application package. If you change your project beyond the approval here, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Intemet: http://h2o.enr.state.nc.us/ncvvetlanos 1CDEP,zZ An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Avery County: Pabe2 of6 September S, 2005 The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Stream 850 feet Linville River 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Avery County: Page3 of6 September 8, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer, where applicable, should be avoided during the October 15 to April 15 trout spawning period to avoid adverse effects of sediment on eggs and larvae, where applicable. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2)-placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Avery County: Paged of6 September 8, 2005 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be Avery County: Pages of 6 September 8, 2005 seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 30 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 17. Deed Notifications Deed notifications or similar mechanisms shall be placed on' all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/ Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Avery County: Page 6 of 6 September 8, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality AW K/khb Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Steve Glickauf, Buck Engineering, PC 8000 Regency Parkway Suite 200 Cary, NC 27511 USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office File Copy Central Files Filename: 05-1652. EWP. LinvilleRiver.Approval Triage Check List Date: 09/01/05 To: Kevin Barnett, Asheville Regional Office 60-day Processing Time: 8/31/05 to 10/29/05 DWQ #:05-1652 County: Avery From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! Project Name: Avery County EWP DSR LRl EWP-Avery County, Forth Carolina DSR Site LRI - Linville River Catawba River Basin Scope of Work This site is on the Linville River off Linville Falls HWY, north of the intersection of Stamey Branch Rd. and Linville Falls HWY. Site specific plans, which are attached, show site location, existing conditions and planned repairs. All repair work is being proposed under the Emergency Watershed Protection Program that Avery County is administering. Questions relative to this package should be directed to Buck Engineering's Greg Price at 919.459.9009. Contents • Preconstruction Notification (Permit Application). • Plan Review Checklist of NRCS's review. • Agent Authorization Letter for Avery County. • Vicinity Map • Repair Plan • Table 1. Property owners of sites proposed for repair • Cultural Resources Review. • Threatened and Endangered Species Review. • Erosion and Sediment Control Plan • Details and Specifications .I ',)006-1652 AUG 3 1 2005 DENR - WATER QUALITY IrER 11103 A w TOiWATER BRANCH Office Use Only: Form Version March 05 ?0051 u52 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Pen-nit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further detail RMIROVq II. Applicant Information AUG 3 1 2005 1. Owner/Applicant Information DENR - WATER QUALITY Name: Robert Wiseman VVETLANDS MD STORMWATER BRMCH Mailing Address: County Manager County Administrative Offices PO Box 640 Newland, NC 28657 Telephone Number: 828-733-8201 Fax Number: E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Steve Glickauf Company Affiliation: Buck Enaineerint, Mailing Address: 200 Arizona Avenue, Suite 114 Atlanta, Georgia 30307 Telephone Number: 404-371-4495 Fax Number: 404-653-0186 E-mail Address: s lickauf(a?buckenQineering.com Page I of 9 III. Project Information Attach` a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: DSR numbers LR1 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): See Table 1. 4. Location County: Avery Nearest Town: Linville Falls Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): DSR number LRl is on the Linville River. The location of each site is attached on each individual site map. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): Each individual site summary contains the coordinates. Also Table 1 has each individual landowners coordinates for each DSR. 6. Property size (acres): N/A 7. Name of nearest receiving body of water: Linville River. 8. River Basin: Catawba (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://112o.enr.state.nc.us/adinin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: A site specific description is included with each site plan. Landuse on these sites is a mixture of residential and agriculture. 10. Describe the overall project in detail, including the type of equipment to be used: Specific Page 2 o£9 repair activities for each site are provided in the site repair plans which are attached. Repair activities proposed for these sites include: removing aggraded rocky debris from the channel to return the channel to the proper dimension and profile installing vane structures to protect unstable stream banks grading bankfull benches in areas where the channel can no loner access its floodplain removing unstable woody debris grading and planting unstable stream banks to provide long-teen stability, and moving structures that are too close to the stream. This work will require the use of a trackhoe with hydraulic thumb and a dump truck to haul boulders to the site and to remove rock debris from the site. Bulldozers may be needed for grading, work. 11. Explain the purpose of the proposed work: This work is being done as part of the Emergency Watershed Protection program that counties impacted by 2 hurricanes in the fall of 2004 are carrying out. The purpose of the work is to repair damaged stream reaches that are unstable and continuing to cause loses to personal and public property and to public resources by degrading water quality and other natural resources. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. To our knowledge permits have not been issued for work at these sites in V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future yen-nit requests are anticipated for this project. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Page 3 0£9 Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Impacts from this work will be minimized whenever possible. However, to accomplish these needed repairs, impacts may be realized from temporary increased turbidity and short-term loss of herbaceous vegetation. Long-term impacts will be an increase in stream bank, bridge, and building stability, stable dimension, and improved vegetative cover. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain es/no Distance to Nearest Stream linear feet) Area of Impact (acres) Total Wetland Impact (acres) 0 3. List the total acreage (estimated) of all existing wetlands on the property: 0.00 acres 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Perennial or Average Stream Width Impact Number Type of Impact Intermittent? Before Impact Length indicate on ma (linear feet) LRl install structures, slope, seed, Perennial 80-90 feet 850' mat, and plant 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Page 4 of 9 Open Water Impact Site Number indicate on ma Name Waterbody (if applicable) e) ap Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. Area of Impact acres Total Open Water Impact (acres) 0 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0 Total Stream Impact (linear feet): 850' 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/etnbankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Access to each site will be over the most stable route possible and movement of vehicles over access routes will be minimized. Wherever possible equipment work will be done from the stream bank. Operating equipment within the channel will be done when this is the only way to accomplish needed work. Page 5 of 9 Excavated material will be moved directly to trucks for hauling to disposal sites when it will not be used on site. When excavated material will be used on site it will be handled as few times as possible. Work at each site will be accomplished as quickly as possible and the site will be stabilized with erosion control matting and seeding within 5 days of site completion. Trees will be planted during the next dormant season. Equipment leaking any fluids will not be used and if leaks occur during construction the equipment will be replaced or repaired immediately. Sediment and erosion control measures including silt fences, stoned entrances, protected stock pile areas, diversions, and check dams will be employed where appropriate to minimize sediment movement off site. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp://h2o.enr.state.me.us/ncwetiands/stmigide.lhtml. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. NA Page 6 of 9 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to detennine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at httl2://h2o.enr.state.nc.us/wrL/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following infonnation: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify. V Yes ? No Page 7 of 9 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet) Mitigation 3 (2 for Catawba) 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what Donation of Property, Riparian Buffer Restoration Riparian Buffer Restoration Fund). Please attach all within 15A NCAC 213.0242 or.0244, or.0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. There will be no change in impervious acreage. Existing project sites will remain in their described land use. Proposed repair work will not alter runoff of stormwater from each site. The end result of this proposed work will be stream banks that are better able to withstand the erosive forces generated by storm flows. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A, wastewater will not be generated by this project. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) type of mitigation is proposed (i.e., Enhancement, or Payment into the appropriate information as identified Page 8 of 9 Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A jy licant/Agent's Signature ' Date signature is valid only if an authorization letter from the applicant is provided.) Page 9 of 9 Plan Review Cheeklist EWP-Avery County, North Carolina DSR PMI, SC1, NTII,,LRI X I , the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below: These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications PM1 SCI NT 11 LR1 ?J Additional comments: 6AYIJJ)' ILa Natural Resource Conservation Service Agent Agmt's Signature r` To Whom It May Concern: I, Robert Wiseman, County Manager for Avery County, attest to the fact that Avery County has entered into a contract with Buck Engineering PC, a North Carolina professional corporation. Buck Engineering will be providing engineering services and permitting assistance in support of the Emergency Watershed Protection Program. In this contractual relationship, Buck Engineering will act as the County's agent for the purpose of accomplishing this work. Specifically, employees of Buck Engineering may take those actions necessary to obtain environmental permits from the U. S. Army Corps of Engineers, N. C. Division of Water Quality, and N. C. Division of Land Quality. i Robert Wiisemaa t L-e- County Manager for Avery County Date: Office: Avery County Courthouse, Newland, NC 28657 ,tee Map Inset ••' Benfleld Bridge La •'''••.• } 183300118636 BENFIELD, COLLINS & •• `?evc:re erosion ALMA % % y 3 ?'AS r 183300118275 ?'k- BENFIELD, COLLINS & ALMA O yf k "'? r $enfleld Ra crtc r t MU _ r ------------ A, IMF., tt- ?? • • £a - ?? _ ?.. ??' r- ..§1 ? __e- . ,tip ? ? ,,? ?.._h i? = T Debris has been cleared by r? } t Linville River Farms a` - .-ash r t 343$ 4 '? 3395;. `-?? IN! Alp a - , r ?. `to y 4W oil ?. r ?. a ? ? ? _ 1 • ? .. ? ' ? ? .?!y 4th ? - _ ?" r a l' 4F i ` T ' - 'U. li YlIlk v J cc, a Avery C'unty sz LEGEND (Group 12) Site: LR-1 Avery County EWP BUCKA F, N (i f N ri F. R I N C. S1°E S22 O DSR Site Parcels cIr.cl 5H-1 G c LR-5 Field Crew: } tR.3 u-1 Topo (5' Contours) 0 150 300 600 w-a LR-, Streams Feet Time/Date:,e;; ?? ' Date of aerial photography: 1998 DSR No. LR-1 Site Assessed By: WH, AC Date Assessed: 5/16/2005 Location: Linville Falls Hwy. 0.33 miles north of the intersection of Stamey Brach Rd and Linville Falls Hwy. Upstream from the Benfield bridge. Latitude 35.99414020 Longitude-81.93719771 Length of Approximately 850 feet Waterbody: Linville River Assessment: _ Debris removal X Bank sloping X Bank stabilization _ Channel realignment X_ In-stream structures Riparian planting X Seeding X Adjust channel dimension Summary Evaluation of Conditions: There are two sections within this DSR that were identified as needing repair. Across from the Linville River Farm woody and rocky debris has been deposited in the river. About 1000 feet upstream from the farm the right bank is actively eroding for approximately 12 vertical feet and 400 linear feet. The erosion comes within approximately 4 feet of the highway. A mid-channel bar has also formed upstream from the bridge. According to the Economic Evaluation the project will protect 8 cottages valued at $900,000, Christmas tree agriculture valued at $25,000, 4 acres of property valued at $40,000, 2 utility poles valued at $30,000, and a section of highway valued at $40,000. According to the Damage Survey Report the installation cost of emergency work would be $85,400. The recommendations for improvements listed below would cost approximately $111,970. Recommendations for Improvements: The in-stream debris by Linville River Farms has already been removed by the property owner. No work is proposed for this section of the reach. The upstream erosion by the Benfield bridge shall be addressed by reestablishing a stable profile and dimension as shown by the design detail. A new thalweg shall be excavated. The mid-channel bar shall be removed. The construction of 3 J-Hooks, 1 cross vane, and 1 double wing deflector will help to maintain a centered thalweg and protect the right bank and the road. Brush mattresses shall be used to further stabilize the right bank. Disturbed areas shall be seeded as necessary. It is recommended that a guard rail be installed on Linville Falls Hwy at the top of the bank where the erosion has taken much of the shoulder. This design will not include a guard rail as that is beyond the scope of this contract. I 00+8L OO+LL 00+9L 00+9L 00+6L 00+£L OO+U OO+LL OO+OL I N, Dc. .U 0 3 0 n 0 m v 0 i m N .N. E v m 2 0 7 CL) glvDs 3 9 a a 9 os ov o of ob ZNOWV17V s-aaAVI HSn'69- ?/tr7 Clc-7JJ'VW a$ 1-71M 71NVa 1f4c)]?L a}I.1. m(::)QI V, O1 004 h I Noy-Lo-IS \9(0r?d8 m) N I Q412d-eD -A Nlq lL Q agocl0?,-4. -Job SNo21??S SSOb:D -=n3S Dare<s s -i oNIY77NloN7? serstweie •ooud 002451eWJ -'aN0003 NOI1JfIXUN03 vw Zen JAN OO SMVId XIIVNI Wi-I3xa 833NION3 ONOW4 --# 1 i .. •,,r? Ire ..- -= HWY 194 _- 71 wC.WSW roo ^, ? ter` _ -..._ •. ,7 i .O0. \? H i._ Do+pi r?-7.. l- L OS 0109 :. -:OS 0V OC: rt '.: OCt -OZI 01t . 00t 06 09 :. OZ 0 Ot, :'. 0 `- O[ OZ' 0£ 017 05' 09 OL .. 09 06 001 OIL. OZt OCC` 06lOSI: t 00'00±0 , 3 0 r .. - . 9ZE , N , n , N i m v - 777 ?- ... .._ s9ZE ., ;e. _.. :,.., s9i£ -OLZE _00'00+LL. 09ZE 09ZE? , S9ZE S9ZE OL£E 0 0'0'g+LL _--? _ 09ZE N U3 99zc .'.. OLZC. OLZ£'. :. .. 00'00+Z1 ?• oqzC 09ZE c 59ZE'. S9ZE 1 OLZC OLZE _ _ 06 02 OZ 09 09 OY OC OZ O OI Ot Ol 0 OE Ot7 09 09 OL 02 06 001 Oll OZI OEt Ol'l 09l'.'.: . OSI OYl OCt OZl OIL C L , OSI .., OVl OEl . 0A -OIL OOl 06.:- 08 OL. .,_ 09 -.05. Oh o£- Ol -- Ol = O •.- OL OZ .:' OC , OV OS 09:- : UL 08: :- Ob.. :001 - OlC' .': OZt OEI:OVL 091* I : E. . 3 o9ZE ogzc N S9ZE" s9iE oLZ£ _ .- ? ? - _... .. OLZE- m 0 00'00+,i.. _ , 09ZE 09ZE 'S9ZE S9Z£ , .. OLZE. OLZ£ 00 05+Ei 09ZE ?. 09Z£ m S9ZE 99Z£ OLZE _ ozzc 00'00+ t- l . 0 9tE cr) 09Z£ ? . S9ZE . 59ZE. QLZCI OLZE 00,05 tL ???---- -- 09Z£ ?09ZE .' ? .. S9ZE _ S9ZE OLZC o?aE` 091 OVl GEL 'OZC OIL 001 06 08 OZ' 09 09 OV '` OE 0Z OL 0 OL OZ 0E 017 09 09 OL 02 06 OOI " OIL OZL OEl OVl 05 C OSl OEL-. ::OZ[ OIL : OOL : .06::: 09 - :OZ.. 09 'I05 OZ , 0[:.{ :OZ .:. OE or 05 OZ : 09' 0(I' OtL OL:Ott :OSC 06 ,:: 00[ iti LNO 1 00 00 . -- •, . Y I •95ZE_ ggzc t -09ZE ? .. ,. ,.. i ? S9ZE• ?. , .. ? ?\ v .. OZZE OLZE _, __ - a .1 - - _ - ZE S J _ ? 77 .. 09ZE - D9ZC - OLZC OLZC 00.00- 9i - ?. ssaE, sSZE _ - 09ZC" -09ZE ? - ? S9ZE? s9zc OLZE• : OLZE • .0 D9ZE 09ZE _. : - ?_ S9ZE "- S9ZE _ - OLZC 'OLZ£::, O 0 0 9' oil 0£ 0 OL. OZ OF Or OZ ' Ol 09 09 OZ 09 06 00l OIL OZL OCL 04L OSC OSL 04G OR OZL Oil OOl 06 09 L 9 . .. 041: 0£[ :-OZC Oll ` - 0CL 06:: 0E OL. 09 OS. :. -0V :. : OE: OZ=:-. 0(. 0 Ol .: :OZ.. 0£ .. Ob: 09 : 09:=-' OZ ..09. -:, _06,: .:' COL .. :DU OZC j 0£L : O?L .:OSL- , DNJ ? ° . 3 r F _ sszE ggzc _ 1 .:_ . ., _ o9zC u N -09zE z , S9 = S9zE O?zc OLZE i L . .. 00'O?+LI „ a. ' sszE . . SSZE . . 09zE 09LE / OLzE OLZE 00'00 + 8L SZE 09N 09 . ? 9 , zE S ggzc OLZE= OLZE OSL ' OEl OZI Olt 06I 001 06 08 OL 09 09 07 OE' OZ Ol 0 OL OZ OE 017 OS 09 OL 08 06 OOL Olt 06L OEL' OVL OSl . l? 5 0 Ol -ON 133H5 -ON 30N3M333d TOMB )(7n8 1 Photo 1: Right bank erosion looking upstream w: _ r'ticrs3.. ` L ? sf r? i ?. F r ae, the Benfield bridge. Photo 2: Mid-channel bar. BUCK (Group 12) LR-1 Photographs Avery County EWP 5/17/05 Phi Photo 4: Looking downstream. BUCK (Group 12) LR-1 Photographs Avery County EWP 5i17ro5 TABLE 1 Landowners, Avery County, NC EW P GROUP DSR PARCEL NUM NAM ADDRESS CITY STATE ZIP Latitude Lon itude IMPACT FT IMPACTTYPE 1 BENFIELD, COLLINS 8 ALMA PO BOX 187 CROSSNORE NC 28616 35.999771 81.935261 250 structures 12 1 LR1 183300118275 BENFIELD, COLLINS & ALMA PO BOX 187 CROSSNORE NC 28616 35.998645 -81.935307 250 structures 6/28/05 Subject: Cultural Resources Literature Search and Survey Results for Avery County NRCS Planned EWP Undertakings To: Jane Shaw, NRCS District Conservationist Date of Survey: 6/14 - 15/2005 From. Jim Errante USDA-NRCS, CRS SC & NC 1835 Assembly St., Rm 950 Columbia SC 29201 Phone: (803)253-3937 The following list of DSR's were reviewed by Jim Errante, NRCS Cultural Resources Specialist (CRS). A literature search for each planed practice location took place in the Archaeological Map room of the NC Office of State Archaeology. Each location was reviewed for the potential of NRCS planned activities to effect cultural resources (CR's). In addition, photographs of the APE's were reviewed and discussions were held with knowledgeable field office and the engineering staff in order to determine the potential of planned activities to effect CR's at each EWP practice location. Each practice location received a ranking of a low, medium or high potential to effect CR's. All EWP practice locations receiving a medium or high ranking to effect cultural resources were archeologically surveyed by the NRCS CRS. Archaeological survey procedures included reconnaissance survey of all visible soils in the area including river bank profiles, and shovel testing. All shovel tested soils were screened through'/4 inch hardware mesh. The following Excel file list of EWP locations includes a statement describing the results of this survey work. The NRCS CRS maintains the field work details of the archaeological survey at each APE. Any questions concerning the results of these survey results as listed below should contact the NRCS CRS for further explanation. DSR #s CR Review Comments BC 1 Elk Mills Low potential for impact to CR's FO to survey BC 1 Elk Park Low potential for impact to CR's FO to survey BC 2 Low potential for impact to CR's FO to survey CB 1 Low potential for impact to CR's FO to survey cc 1 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. CC 2 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. CC 3 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. DSR #s CR Review Comments CC 4 Low potential for impact to CR's FO to survey CH 1 Low potential for impact to CR's FO to survey Cross Cr 1 Low potential for impact to CR's FO to survey Cross Cr 2 Low potential for impact to CR's FO to survey Curtis Cr 1 Low potential for impact to CR's FO to survey Dellinger Br 1 Low potential for impact to CR's FO to survey ER 1 Low potential for impact to CR's FO to survey ER 2 Low potential for impact to CR's FO to survey ER 3 No impact to CR's in area. All CR's are outside of APE. All work planned in-stream. Primarily debris removal. Surveyed by CRS. Ok to proceed. ER 5 No previously recorded CR's in area. Very disturbed soils in APE. No CR's. Surveyed by CRS. OK to proceed. ER 6 Low potential for impact to CR's FO to survey ER 7 No previous recorded CR's. Alluvial, silty soils. Surveyed by CRS. Ok to proceed. FC 1 Small Area, OK for FO to Survey FC 2 Low potential for impact to CR's FO to survey GP 1 Low potential for impact to CR's FO to survey HB 1 Low potential for impact to CR's FO to survey HP 1 Low potential for impact to CR's FO to survey K 3 Low potential for impact to CR's FO to survey K 4 Low potential for impact to CR's FO to survey KC 1 Low potential for impact to CR's FO to survey KC 2 Low potential for impact to CR's FO to survey LEC 1 Low potential for impact to CR's FO to survey LHC 1 Low potential for impact to CR's FO to survey LL 1 Low potential for impact to CR's FO to survey LR 1 No previously recorded CR's area. APE is roadside. Soils are disturbed. No CR's. Surveyed by CR Specialist. OK to proceed. LR 2 No previously CR's recorded in APE. This reach is primarilyjust debris removal or requiring fill. No CR's in APE. Surveyed by CRS. Ok to proceed. LR 3 No previously recorded CR's in APE. Only debris removal scheduled. No CR's in APE. Surveyed by CRS. Ok to proceed. LR 4 Low potential for impact to CR's FO to survey LR 5 Low potential for impact to CR's FO to survey LR 6 Low potential for impact to CR's FO to survey LS 1 Low potential for impact to CR's FO to survey LS 2 Low potential for impact to CR's FO to survey LS 3 Low potential for impact to CR's FO to survey LS 5 Low potential for impact to CR's FO to survey LS 6 Low potential for impact to CR's FO to survey LS 7 Low potential for impact to CR's FO to survey LS 8 Low potential for impact to CR's FO to survey LS 9 Low potential for impact to CR's FO to survey LS 10 Low potential for impact to CR's FO to survey LS 11 Low potential for impact to CR's FO to survey LS 12 Low potential for impact to CR's FO to survey MB 1 Low potential for impact to CR's FO to survey Mrk 123 Low potential for impact to CR's FO to survey MT 1 Low potential for impact to CR's FO to survey MT 2 Low potential for impact to CR's FO to survey MT 3 Low potential for impact to CR's FO to survey MT 4 Low potential for impact to CR's FO to survey NT 1 Low potential for impact to CR's FO to survey NT 2 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. DSR #s CR Review Comments NT 3 Low potential for impact to CR's FO to survey - primarily debris removal. NT 4 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 5 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 6 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 7 Low potential for impact to CR's FO to survey (previously surveyed - No CR's) NT 8 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 9 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 10 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 11 No previously recorded CR's in area. Impacts planned are adjacent to bridge and are disturbed and heavily scoured. No CR's. Surveyed by CRS. Ok to proceed. NT 12 No previously recorded CR's in area. No CR's. Surveyed by CRS. Ok to proceed. NT 13 No previously recorded CR's in area. Survey focused on streambank stabilization areas. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 14 No previously recorded CR's in area. Survey focused on streambank stabilization areas. Significant nursery agricultural impacts in area. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 15 No previously recorded CR's in area. Survey focused on streambank stabilization areas. Significant nursery agricultural impacts in area. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 16 No CR's previously recorded in area. Location will primarily involve debris removal. No evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 17 Low potential for impact to CR's FO to survey NT 18 No previously recorded CR's in area. Very low terrace, and very scoured area. Area floods frequently. No CR's. Surveyed by CRS. Ok to proceed. NT 19 Low potential for impact to CR's FO to survey PC 1 Low potential for impact to CR's FO to survey PM1 Low potential for impact to CR's FO to survey RB 1 Low potential for impact to CR's FO to survey RC 1 No previously recorded CR's in area. Very disturbed soils in APE - re-routed stream & scoured area. No CR's. Surveyed by CRS. OK to proceed. SB 1 Newland Low potential for impact to CR's FO to survey SB 1 V.Crucis Low potential for impact to CR's FO to survey SC 1 Low potential for impact to CR's FO to survey Sol Low potential for impact to CR's FO to survey TMC 1 Low potential for impact to CR's FO to survey TMC 2 Low potential for impact to CR's FO to survey TMC 3 Low potential for impact to CR's FO to survey TMC 4 Low potential for impact to CR's FO to survey TMC 5 Low potential for impact to CR's FO to survey UNR 4 Low potential for impact to CR's FO to survey UNT 1 Low potential for impact to CR's FO to survey UNT 2 Low potential for impact to CR's FO to survey UNT 3 Low potential for impact to CR's FO to survey UNT 5 Low potential for impact to CR's FO to survey UNT 6 Low potential for impact to CR's FO to survey UNT 7 Low potential for impact to CR's FO to survey UNT 8 Low potential for impact to CR's FO to survey DSR #s CR Review Comments WC 1 Low potential for impact to CR's FO to survey WF 1 Low potential for impact to CR's FO to survey W F 2 Low potential for impact to CR's FO to survey (previously surveyed - No CR's) WO 1 Low potential for impact to CR's FO to survey WO 2 Low potential for impact to CR's FO to survey WO 3 Low potential for impact to CR's FO to survey WP 1 Low potential for impact to CR's FO to survey WP 2 Low potential for impact to CR's FO to survey Federally Threatened and Endangered Species Review Based upon a memo submitted by Brian Cole of the United States Fish and Wildlife Service (USFWS), dated June 21, 2005, no listed species or their habitats occur on this site. The USFWS concur with the determination that the activities proposed at this site will not affect endangered or threatened species or their habitats. Erosion and Sediment Control Plan Emergency Watershed Protection Program Avery County The following erosion and sediment control measures will be incorporated into all stream repair sites. 1. The Contractor shall minimize vegetation disturbance by only working on the stream bank and channel that is in need of repair. Existing buffers shall not be disturbed unless directed by the designer. 2. The Contractor shall only enter the stream channel as shown on the plans or directed by the designer. These stream accesses shall conform to the design standards shown in the attached detail drawings. Timber mats may be used as a substitute for rock per the approval of the designer. 3. The Contractor shall limit all bank and channel disturbance to activities that can be completed by the end of each working day such that the work would remain in place during an overnight storm event. 4. All equipment and uninstalled materials shall be removed from the channel at the end of each working day and secured safely from potential out-of-bank flow events that may occur prior to performing additional work. 5. Graded stream banks shall be stabilized with temporary and permanent seed and coir fiber matting at the end of each working day. Seeding and coir fiber matting specifications are included with this plan. 6. Stockpiles shall remain at least fifteen feet from flowing water and outside of the top of bank. Silt fence shall be placed at the base of the stockpile between the stockpile and the channel and must function to receive stockpile runoff before entering the channel. Silt fence shall conform to design standards shown in the detail drawings. 7. Temporary vegetation and permanent herbaceous vegetation shall be established on all disturbed areas not already stabilized with matting, within five days after construction is completed. 8. Permanent woody vegetations species are listed in the vegetation specifications; planting details are also included. Buck Engineering 1 of 8 River Works TECHNICAL SPECIFICATION Vel4etation Planting General Seeding Seeding should be done immediately upon completion of final grading. Apply seed prior to installing matting. Prepare the soil surface so that it is smooth and free from stones, clods, or debris that will prevent the contact of the matting with the soil. Fertilizer and lime are generally not necessary on most projects, particularly not on sites that have been used for agriculture production or cattle grazing. Urban soils may require amendments. Seed should be broadcast with a centrifugal seeder or by hand, at the full rate along stream banks and in stockpile areas. In all areas where permanent seeding is used in addition to the temporary seed, mixing of the seed for broadcasting is acceptable. Seed and amendments (if needed) should be covered to a depth of 1/2 to 1 inch with soil by using a hand rake, drag or other tillage equipment. Seeding may also be done with a hydroseeder. Wood cellulose fiber will not be acceptable as a substitute for straw mulch. A suitable tracer shall be used to clearly identify areas hydroseeded. A minimum of 500 lbs. per acre of wood cellulose fiber or a non-toxic water base dye may be used as a tracer. Seed shall not remain in water containing fertilizer more than 45 minutes before being used. All products used to hydroseed shall be non-toxic to aquatic organisms. Temporary Seeding For temporary seeding, apply the following vegetation at the listed rates and times. Temporary Seeding (September to March): Rye grain 3 lbs per 1,000 sq ft or 130 lbs per acre Temporary Seeding (April to August): Foxtail Millet 1 lb per 1,000 sq ft or 40 lbs per acre A combination of the two temporary seed types shall be used during the boundary months of March, April, August and September to ensure survival. In all disturbed areas where no permanent seed is being used (i.e. yard or agricultural field) and temporary seed is not desired at the higher rate, broadcast temporary seed at the lower rate of approximately 1/2 the full lbs/acre stocking rate. When used in conjunction with permanent seed mix, apply at %2 the full lbs/acre rate. Permanent Seeding Permanent seeding will be accomplished using the mix listed below: Buck Engineering 2 of 8 River Works Riparian Seed List Scientific name Agrostis alba Carex vulpinoidea Elyinus virginicus Juncus effzsus Panicum clandestinum Polygonum pennsylvanicum Bidens frondosa Coreopsis lancolata Cassia fasciculata Verbesina alternifolia Common Name % of Mix Redtop 15% Fox Sedge 10% Virginia Wild Rye 20% Soft Rusli 5% Deer Tongue 15% Smartweed 5% Beggers Ticks 5% Lance leafed Coreopsis 15% Partridge Pea 5% Wingstem 5% Seed at full rate of 15 lbs/acre along stream banks and in any stream buffer and wetland areas. Riparian Buffers Trees and Shrubs Trees and shrubs will be used to provide permanent vegetation for EWP repair sites. Species used shall be selected from the following list: Shrub and Small Trees Scientific name Common name Salix sericea Silky Willow Xanthorhiza sinzplicissizna Yellowroot Physocarpus opulifolizis Ninebark Cornus anzonum Silky Dogwood Haznaznells vlrgmlana Wltcli-hazel Carpinus caroliniana Ironwood Corylus americana Hazel-nut Alms serrulata Tag Alder Ostrya virginiana Hornbeam Spirea tomentosa Hardback Rhododendron arborescens Smooth Azalea Rhododendron maximum Rosebay Rhododendron Cephalanlhus occidentalis Button Busli Itea virginica Virginia Sweetspire Calycanthus,loridus Sweet Shrub Leucothoe axillaris var. editorunz Dog Hobble Hydrangea arborescens Mountain Hydrangea Saznbucus canadensis Elderberry Buck Engineering 3 of 8 River Works LargeTrees Scientific name Common name Aesculus octandra Buckeye Tsuga canadensis Canadian Hemlock Platanus occidentalis Sycamore Acer rubrum Red Maple Quercus alba White Oak Quercus rubra Red Oak Liriodendron tulipifera Tulip Poplar Tsuga carolinianum Carolina Hemlock Betula lenta Cherry Birch Trees shall be planted as either bare rooted or containerized material. Trees should be planted at a rate of 400 stems/acre (roughly 10 feet on center) where EWP repairs have been accomplished. Planting of this material will be done during the dormant season (late fall and winter of 2005-2006). Refer to the attached details and specifications for more information. Stream banks Live Staking Species used for live staking shall be taken from the following species: Scientific name Common name Cornus amomum Silky Dogwood Salix sericea Silky Willow Sambucus canadensis Elderberry Cephalanthus occidentalis Buttonbush Salix nigra Black Willow Stake at 2-3 foot spacing on the outside of all meander bends. Stake at 6-7 foot spacing on the inside of meander bends and all tangent sections. Note this is appropriate for most rural systems. Urban or flashy systems should be staked at higher rates. Utilize as diverse a species group as feasible and make sure that black willow constitutes less than 25% of total stakes used. Containerized Plants: Containerized shrub material may also be used on the stream banks to increase the diversity. Applications and spacing should reflect that of live stake material. Mulching Mulching shall be used to provide temporary protection of soil surfaces from erosion. Mulching should be performed within 48 hours of seeding. Grain straw mulch should be applied on seeded areas at a rate of 75 bales per acre. Apply mulch uniformly. Buck Engineering 4 of 8 River Works Erosion Control Mattinli Ecostakes Provide wooden stake not less than 12 in. (300 mm) in length with a notch cut 1 in. (25 mm) from the top. These stakes shall be used to stake the matting along the slopes. Wooden 3 ft. stakes spaced approximately 4 ft. apart shall be used to secure the matting at the toe of slope. The toe stakes shall have a minimum 1-inch by 1-inch cross-section and shall be designed so that the matting can not slide past the exposed end of the stake. Refer to the attached details and specifications for EWP work for more information. Coir Fiber Matting The erosion control matting shall be a machine-produced mat of 100% coconut fiber with the following properties: Matrix 100% Coconut Fiber Weight 20 oz/SY (678 gm/m2) Tensile Strength 1348 x 626 lb/ft minimum (1650.5 x 766.5 kg/m) Elongation 34% x 38% Open Area (measured) 50% Thickness 0.30 in minimum (7.6 mm) Flexibility (mg --em) 65030 x 29590 Recommended Flow 11 feet/second (3.35 m/s) Size 6.6 x 164 ft (120 SY) or (100 SM) "C" Factor 0.002 Place the coir fiber matting immediately upon final grading. Provide a smooth soil surface free from stones, clods, or debris that will prevent the contact of the matting with the soil. Apply seed prior to installing matting. Begin at the bottom of the slope by anchoring the matting in a 6-inch (15 cm) deep by 6-inch (15 cm) wide trench. Backfill and compact the trench after staking. Walking backward down the stream, allow the matting to unroll slowly; ideally the matting roll will rest against your shin as you walk. Stake the matting according to recommended stake pattern for specific product and slope. (See stake pattern guide that comes with the product.) Place matting in full contact with the soil. The edges of the parallel matting must be staked with approximately 2 inches (5 cm) of overlap such that the edge of the downstream matting is under the one just upstream. When matting must be spliced down the slope, place matting end over end (shingle style) with approximately 6 inches overlap. Drive stakes through the overlapped area. Place stakes across the matting at ends, junctions and trenches approximately 1.3 ft apart. Place stakes along the outer edges, down the center of each strip of matting and along all lapped edges approximately 2 ft apart. Cut excess matting and anchor at the end of the slope. Buck Engineering 5 of 8 River Works Temporary Stream Access Ramps Stream access ramps shall be constructed using either rock or timber mats in locations as shown on the plans or as directed. Grading shall be performed only to the extent needed to form a stable ramp connecting the stream bank grade to the streambed. The Contractor shall determine the appropriate number of timber mats and ramp angle according to the equipment that will be using the ramp. Stream access ramps are temporary and shall be removed and the areas restored to their original state when they are no longer needed or permanent measures are installed. Sediment Fence - Geotextile sediment fences shall be used to trap sediment from areas of limited runoff. Sediment fences shall be properly anchored to prevent erosion under them. These works are temporary and shall be removed and the areas restored to their original state when they are no longer needed or permanent measures are installed. Locations for sediment filters are shown on the plans. Refer to sediment fence specifications (6.62) in the NC Erosion and Sediment Control Planning and Design Manual for material and installation requirements. Gravel Construction Entrance[El At Temporary gravel construction entrances shall be constructed as shown on the plans and according to specification 6.06 of the NC Erosion and Sediment Control Planning and Design Manual. In-stream Structures In-stream structures include w-weirs, cross vanes, j-hook vanes, log vanes, and wing deflectors. The quantity of in-stream structures to be constructed shall follow approved plans, but may be affected by conditions encountered during construction Boulders used for in-stream structures shall be relatively flat on either side in the same dimension, preferably the long dimension, and must have relatively smooth ends. No more than 5% of the boulders shall be smaller than 3'x2'x2'. Boulders larger than 6'x4'x3' shall be permitted. Boulders found on-site and approved for use by the Developer will be used to the extent feasible. The Contractor shall construct in-stream structures with equipment capable of moving and accurately placing boulders of approximate dimensions 6'x4'x3'. If suitable for backfill, excavated material shall be placed on the upstream side of structures or as directed. Unless otherwise approved by the Developer, excavation to prepare the subgrade for the installation of in-stream structures shall be consecutive and continuous. Once the excavation of a structure has begun, the structure shall be completed by the end of the workday. All equipment shall be removed from the stream at the end of each workday. Any accumulation of sediment in the channel shall be cleaned as needed during construction and at the end of construction. No separate payment will be made for this clean-up work. Buck Engineering 6 of 8 River Works Construction Sequence of Events Construction shall be performed at the EWP site in accordance with the plans and in general accordance with the following sequence: 1. Mobilize equipment and materials to the site. 2. Set up construction access pads, staging areas, haul roads, and silt fences. 3. Install stream access ramps. 4. Excavate and grade banks and construct in-stream structures. 5. Seed and mat graded banks and immediately upon reaching final grades. 6. Stabilize all disturbed soil with temporary and permanent seed prior to leaving the site each day and prior to moving to the next work area. 7. Dispose of excess materials at approved off-site locations. 8. Remove stream access ramps. 9. Remove silt fence and seed and mulch staging areas to restore these areas to pre- project conditions. 10. Demobilize grading equipment from the site. Remove construction access pads. 11. Plant bank, floodplain and buffer woody vegetation and live stakes during the dormant season. Buck Engineering 7 of 8 River Works Details and Specifications for EWP Work Planting • Bare Root/Container Planting • Brush Mattress • Tree & Shrub Planting Details • Live Staking Erosion Control • Erosion Control Matting • Silt Check • Silt Fence • Typical Pump Around Operation • Temporary Gravel Construction Entrance • Ford Stream Crossing • Ford Stream Crossing 2 • Temporary Ford Stream Crossing W/ Flume Pipe Stream Repair Structures • Typical Structure Placement • Typical Plan View & Profile • Constructed Riffle • Double Drop Rock Cross Vane • Double Wing Deflector • "J" Hook Vane • Log Vane • Log Vane 2 • Log Step Pool • Rock Vane • Rock Cross Vane Type 1 • Rock Cross Vane Type 2 • Root Wads • Single Wing Deflector • Step Pool Channel Buck Engineering 8 of 8 River Works PLANTING SPECIFICATIONS NOTES: 1. PLANT BARE ROOT SHRUBS AND TREES TO THE WIDTH OF THE BUFFER AS SHOWN ON THE PLANS. 2. ALLOW FOR 6-10 FEET BETWEEN PLANTINGS, DEPENDING ON SIZE. 3. LOOSEN COMPACTED SOIL TOP OF STREAMBANK 4. PLANT IN HOLES MADE BY A MATTOCK DIBBLE, PLANTING BAR, OR OTHER APPROVED MEANS. 5. PLANT IN HOLES DEEP AND WIDE ENOUGH TO ALLOW THE ROOTS TO SPREAD OUT AND DOWN WITHOUT J-ROOTING. 6. KEEP ROOTS MOIST WHILE DISTRIBUTING OR WAKING TO PLANT BY MEANS OF WET CANVAS, BURLAP, OR STRAW. 7. HEEL-IN PLANTS IN MOIST SOIL OR SAWDUST IF NOT PROMPTLY PLANTED UPON ARRIVAL TO PROJECT SITE. NOTES: 1. WHEN PREPARING THE HOLE FOR A POTTED PLANT OR SHRUB DIG THE HOLE 8 -12 INCHES LARGER THAN THE DIAMETER OF THE PLANTINGS POT AND THE SAME DEPTH AS THE POT. 2. REMOVE THE PLANT FROM THE POT. LAY THE PLANT ON ITS SIDE IF NECESSARY TO REMOVE THE POT. 3. IF THE PLANT IS ROOTBOUND (ROOTS GROWING IN A SPIRAL AROUND THE ROOT BALL), MAKE VERTICAL CUTS WITH A KNIFE OR SPADE JUST DEEP ENOUGH TO CUT THE NET OF ROOTS. ALSO MAKE A CRISS-CROSS CUT ACROSS THE BOTTOM OF THE BALL 4. PLACE THE PLANT IN THE HOLE TOP OF STREAMBANK 5. FILL HALF OF THE HOLE WITH SOIL (SAME SOIL REMOVED FOR BACKFILL). 6. WATER THE SOIL TO REMOVE AIR POCKETS AND FILL THE REST OF THE HOLE WITH THE REMAINING SOIL BOTTOM OF CHANNEL CROSS SECTION VIEW OF CONTAINER PLANTING `jam 8000 Regency Parkway Suite 200 Phone: 919-483-5488 k3,?>v?*? Cary, North 63i 5490 1 BARE ROOT/ CONTAINER PLANTING +' } Fax: x: 91 91983-5490 ZY Q m 0 M 0 I A t- 20' TO 30' FOOTER ROCK - BOULDER CLUSTER PLAN VIEW DOUBLE WING DEFLECTOR Y 0 a 0 ?- BACK FILL WITH WELL GRADED CLASS A & B STONE MIX COARSE MATERIAL FROM STREAMED A NO GAPS BETWEEN ROCKS FIRST ROCK TIED INTO STREAMBANK M 13ANKFULL FLOW STREAMED ELEVATION _____////// 8000 Regency Parkway Suite 1200 MUCK Cary, North Carolina 27 27511 Phone: 919-483-5488 Fax: 919-483-5490 ARM 'X' PROFILE VIEW NOTE NO SLOPE FOR ARMS Y & Z A BANKFULLSTAGE A 113 TO 112 BANKFULL SECTION A - A HEADER ROCK FOOTER ROCK DOUBLE WING DEFLECTOR 1/3 1/3 1/3 BOTTOM BOTTOM BOTTOM CONSTRUCTED RIFFLE C ? A TOP ?I OF BANK OJ LL 112 Wbkf $ 213-1 69 Wbkf ego ?? aC) IA PLAN VIEW B C CEN.E -------.- BELOW ADJACENT BOULDERS SECTION B - B HEAD OF RIFFLE BURY BOULDERS 2-4" BELOW BED 18" NOM. THICKNESS WELL GRADED MIX OF CLASS A, 8, AND 1 STONE \OE RIFFLE FILTER 5' MINIMUM -1•-?{ FABRIC 8 PROFILE A - A 18" NOM. THICKNESS WELL GRADED MUC OF CLASS A, B, AND 1 STONE SECTION C - C 8000 Regency Parkway 51200 Cary, North Carolina 27 27511 Phone: 919-483-5488 Fax: 919-483-5490 ELEVATION POINT TOE REACH 1 2 Wbkf (ft) Dmax ft CONSTRUCTED RIFFLE EROSION CONTROL EROSION CONTROL I ? - ;: ]e nHriTnEmen Eton[ w?.a.n a.ea,Ta „ m?aar ro, nwu' cc.rN or s on r oEE.r>, n..n cartwrc] r GROVNDCOVER PLANTING DETAIL 'ti co.c uaau ¦ TREE OR SHRUB PLANTING DETAIL onouo rc.a i STAKNG DETAIL FOR TREES 6TO 19 TALL .Twab Dark aar s .en anen n me en.mi. RwE r?T?w arM.oor av?nu uwaE armor, ]carer, izrurtnx norm aw]oe ?? ? co rur car.ecr ucol. II •., ?? ."?."? Il+a+l' ]cwuer em ro w ocvrH a SHRUB BED PLANTING DETAIL vGUYING & STAIQNG ?. ]O?C..L WM R.VIT MIXl: ]? CO].wMEV Cw appT ]wl tof 1 • ] Ts4] M awwEfEV M MWrirwrE.90A M POpr ]wLaINQTFII 1 iIXR>gn awLL E N?nlra AT M rwE M el/urnM rEmlut] PWl ]E?0.0W ]9FyeeEl/FTM TMIff iQWIJ{/?TK .tMLLIf H4MQ?F9 1 M ?6H?w1.E.En WNl•CRAEna KtY:r+?6.1w[ve w+e w?rrto er M e.rrmarwnuairYa wrH roe.aw r?cuu on ]warn .o? nenee euw' mw rov n.]u eesane unawrrrowa]io srai • cawni GUY SPACING DETAIL + O + RANDOM PLANT SPACING DETAIL-PLAN VIEW r. µ owui r?swm acr.o anwa room e.eeroren ro M ewrta1o aafauunox (]FE RINi GFAIq. 1 •n vava>K u..rw oP.cri a]rw«f c.m w.agr4D ro Finw aon]o?.u aEGFI PF£ I1NIT.atpllE1 ?na..wair ?rFwow art PRUNING CUTS GUY TYING DETAIL ?s w Q P one: 91&433-648811 I F.91948354DO TREE & SHRUB PLANTING DETAILS TREE OR SHRUB PLANTING DETAIL nnr.n anus TREE GUYING DETAIL FOR TREES 19 OR TALLER unm Duna o-airv near+}®n T1! - TYPICAL STRUCTURE PLACEMENT LOO VANE MAT BANKS WITH COIR FIBER MATTING (SEE SPECS) y MAT BANKS WITH COIR FIBER MATTING (SEE SPECS) / LOG WEIR . ' P% MAT BANKS WITH COIR FIBER MATTINO (SEE SPECS) 01 O MAT BANKS WITH COIR FIBER MATTING (SEE SPECS) S ROOT WADS (NUMBERAND SIZE TO SE DETERMINED IN THE FIELD) i TOP OF BANK STRU=RE NOTES: 1. GENERALLY LOG WEIRS, ROOT WADS, LOG VANES AND COIR FIBER MATTING WILL BE INSTALLED IN THE LOCATION AND SEQUENCE AS SHOWN. 2. ADDITIONAL STRUCTURES OR CHANGES TO STRUCTURE LOCATIONS MAY BE MADE BY THE DESIGN ENGINEER DURING CONSTRUCTION. LM ? ?"J (C K 8000 Regency Parkway Suite 200 f?? i6i?? L`?/ Cary, North Canolina 27511 Phone: 9194815488 rv+; i n; s. Fax 919483-8490 MAT BANKS WITH COIR FIBER (SEE SPECS) NOTES: 1. COIR FIBER MATTING TO BE INSTALLED ON ALL RESTORED STREAMBANKS. 2. IF ROOT WADS DO NOT COVER ENTIRE SLOPE ON OUTSIDE OF MEANDER BENDS, COIR FIBER MATTING IS NEEDED. TYPICAL STRUCTURE PLACEMENT FLOW 1 BOULDERS FOR OPEN CHANNEL INVERT OF CULVERT FOR PIPES [ (') t"] C m 8000 Regency Parkway Suite 200 el ?r'?awy ? Cary, North Carolina 27511 Q Phone: 919-483-5488 VFax: 919-483-5490 STEP POOL STREA161BED OR HEADER CULVERTINVERT ROCK zzlllz? FOOTER ROCK WELL GRADED MIX OF CLASS A & B STONE - ra C FLOW -? H d PROFILE VIEW CROSS SECTION STEP POOL CHANNEL FILTER FABRIC PLAN VIEW 1. USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRE AS DIRECTED BY THE ENGINEER. 2. PROVIDE 5 STEEL POST OF THE SELF-FASTENER ANGLE STEEL TYPE. F1 17 8000 Regency Parkway Suite 200 Lam(: 3 Cary, North Carolina 27511 Phone: 919-483-5488 Fax: 919483-5490 TEMPORARY SILT FENCE FILTER FABRIC COMPACTED FILL III I I I 8' I I l I I I? _ - ? STEEL POST - 2'-0" EXTENSION OF FABRIC INTO TRENCH SILT FENCE 8' MAXIMUM ROOT WADS WITHOUT TRANSPLANTS CROSS SECTION VIEW NTS COIR FIBER MATTING FLOOD PLAIN BERM (0.SMAX. HT.) BERM(S) NOT TO EXTEND BEYOND LIMITS OF ROOT WADS. TOP OF BANK ROOT WADS PLAN VIEW NTS O? /- OPTIONAL / COVER LOG ANCHOR COVER LOG UNDER FOOTER LOGS OR WITH A BOULDER 10.15 FEET LONG >10" DIAMETER - FOOTER LOG > 12" DIAMETER INSTALLED BELOW STREAMBED (OPTIONAL PER DIRECTION OF ENGINEER) ROOT WAD TRANSPLANTS OR BOULDERS ROOT WADS WITH TRANSPLANTS CROSS SECTION VIEW NTS TRANSPLANTS FLOOD PLAIN BERM (0.5' MAX. HT.) BERM(S) NOT TO EXTEND BEYOND LIMITS OF ROOT WADS. Z .. IS: BELOW. STREA 6 FEET LONG TRUNK >12" DIAMETER TOP OF BANK FOOTER LOG > 12" DIAMETER INSTALLED BELOW STREAMBED (OPTIONAL PER DIRECTION OF ENGINEER) ?"? ("I C m Q 8000 Regency Parkway Suite 1200 U I?,fJ( Cary. North Caroline 27 27511 Phone: 919483-5488 -? Fax: 919483-5490 FOOTER LOG FOR TRENCHING METHOD ONLY NOTES TRENCHING METHOD: IF THE ROOT WAD CANNOT BE DRIVEN INTO THE BANK OR THE BANK NEEDS TO BE RECONSTRUCTED, THE TRENCHING METHOD SHOULD BE USED. THIS METHOD REQUIRES THAT A TRENCH BE EXCAVATED FOR THE LOG PORTION OF THE ROOT WAD. IN THIS CASE, A FOOTER LOG SHOULD BE INSTALLED UNDERNEATH THE ROOT WAD IN A TRENCH EXCAVATED PARALLEL TO THE BANK AND WELL BELOW THE STREAMBED. ONE-THIRD OF THE ROOT WAD SHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS. NOTES DRIVE POINT METHOD: SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE 'DRIVING" IT INTO THE BANK ORIENT ROOT WADS UPSTREAM SO THAT THE STREAM FLOW MEETS THE ROOT WAD AT A GO-DEGREE ANGLE, DEFLECTING THE WATER AWAY FROM THE BANK A TRANSPLANT OR BOULDER SHOULD BE PLACED ON THE DOWNSTREAM SIDE OF THE ROOT WAD IF A BACK EDDY IS FORMED BY THE ROOT WAD. THE BOULDER SHALL BE APPROXIMATELY 4'X XX Z. ROOT WADS FLOW ROCK CROSS VANE TYPE 2 113 OF TOP WIDTH TYPE 2 CROSS VANE FOR GRAVEL/SAND BED STREAMS OF CHANNEL WITH DRAINAGE ARES LESS THAN 12mi' MIN C Y GRADE Y J Y B PO NT m CHANNEL BED LL z 0 - A 0 WELL GRADED MIX E° ?yo z Z O .. ... ? ? .?yy O Y 0 O a I A J, * 0- FILTER FABIC 0 0 e' MINIMUM A VANE y_ ARM SECTION A - A SCOUR POOL I BANKFULL STAGE I B SILL .. ,' SILL FLOW ? 4Y. TO 7X VANE ARAI SLOPE STREAM BED NO GAPS ETWEEN ELEVATION \/ B VANE ANGLE B 20' TO 30' BOULDERS C PROFILE VIEW B - B VANE ARM LENGTH PLAN VIEW INVERT WIDTH VANE ARM SLOPE VANE ANGLE FT FT ova 0 VANE ARM CROSS VANE INVERTIGRADE POINT NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4' x Tx 2. 2 INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF SLY FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. CONSTRUCT FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 5. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF ONE HALF THE HEADER ROCK FILTER FABIC FOR DRAINAGE (SEE SPECIFICATIONS) - PROFILE VIEW C - C HEADER ROCK STREAM BANK 1 B FOOTER ROCK 8000 Regency Parkway Suite 200 Cary, North Carolina 27511 ROCK CROSS VA f ? E TYPE 2 4 Phone: 919-483-5488 `=? Fax: 918-463-5490 FLOOW 1 113 TOP WIDTH C B GRADE ? POINT 0 Ld 0 A SCOUR POOL SILL B VANE ANGLE NO GAPS BETWEEN I20* I Lm- TO 30' BOULDERS C VANE \ ARM ROCK CROSS VANE TYPE 1 TYPE 1 CROSS VANE FOR GRAVEL/COBBLE BED RIVERS WITH DRAINAGE AREAS GREATER THAN 12mi' FLOW - .. SILL TOE OF BANK SECTION A - A BANKFULL FLOW -? STREAM BED ELEVATION PROFILE VIEW B - B VANE ARM PLAN VIEW VANE ARM LENGTH FT INVERT WIDTH FT VANE ARM SLOPE % VANE ANGLE o NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4'x 3'x 2'. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF SL< FEET. 3. DIG ATRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. CONSTRUCT FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 5. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF ONE HALF THE HEADER ROCK FI n,.,, FILTER FABIC CROSS VANE INVERTIGRADE POINT 4X TO 7X V-E PROFILE VIEW C - C 2' 2 MIN ' -1 WELL GRADED MIX HEADER ROCK STREAM BANK B FOOTER ROCK 8000 Regency Parkway Suite 00 Phone 81 83-548811 Fax: 919-483-5490 ROCK CROSS VA N E TYPE 1 TYPICAL PUMP AROUND OPERATION TEM. IMPERVIOUS DIKE (SEE PROJECT SPECIAL SPECIAL BTU-LING BK (SEE PROJECT SPECM STABBIZED OUTLET) MOM, 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORKAREAS FROM STREAM FLOW. E PROJECT SPECIAL PROVISIONS) 1 THE CONTRACTOR SMALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED 'ERVIOUS DIKE IN ONE WORKING DAY. ? THE PUMP-AROUND PUMP SHOULD ADEQUATELY CONVEY 0.1 CFS (45 GALLONS PER MINUTE). I t NS) SPECIAL STILLING BASIN EXISTING GROUND FILTER FABRIC I5-20F1 SIC, 'ONCE CF CCNSTR'_OTICY FCR TYPCAL PU`0- AROUND 1. INSTALL SPECIAL STILLING BASINS AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY FLEXIBLE HOSE THAT WILL CONVEY THE BASE ROW FROM UPSTREAM OF THE WORK SITE TO THE SPECIAL STILLING BASIN OR STABILIZED OUTLET. ]. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. A. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PIMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SUE TO DEWATER THE WORK AREA THIS WATER WILL FLAW INTO A SPECIAL STILLING BASIN. 5. THE CONTRACTOR WALL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE RAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE Q THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS D11a=. REMOVE IMPERVIOUS DIKES. PUMPS, AND TEMPORARY FLEXIBLE HOSE STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. THE CONTRACTOR WILL COMPLETE ALL GRADING AND STABILIZATION IN ONE DAY WITHIN THE PUMP AROUND AREA BETWEEN THE IMPERVIOUS DIKES 8. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE STILLING BASINS AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 8000 Regency Parkway Suite Cary, Phone 919-463-5488 C2511 00 ( Fen: 919-463-5490 TYPICAL PUMP AROUND OPERATION TYPICAL PLAN VIEW AND PROFILE B POOL MAX DEPTH POOL HEAD OF POOL- OF RIFFLE NOTES: B ?(? 1. THE POINTS SHOWN, e.9. HEAD OF RIFFLE, HEAD OF POOL AND MAX DEPTH OF POOL ARE THE CONTROL POINTS USED TO CUT THE PROFILE; HOWEVER, THE CONTRACTOR SHOULD CREATE SMOOTH TRANSITIONS BETWEEN CONTROL POINTS AS SHOWN ABOVE. 2. USE THE FACET SLOPES IN THE TABLE AS A GUIDE TO ENSURE THAT THE FEATURES A ARE APPROPRIATELY GRADED. 3. THE HEAD OF RIFFLE ELEVATION SHOULD NOT EXCEED THE HEAD OF POOL ELEVATION. BANKFULL 4. THE CHANGE IN WIDTH BETWEEN THE RIFFLES AND POOLS SHOULD OCCUR GRADUALLY LIMITS OVER THE ENTIRE LENGTH OF THE BEND. CENTERLINE BANKFULL3 PROFILE VIEW STAGE FLOW HEAD OF RIFFLE MAX DEPTH OF POOL ?,f? ^ 8000 Regency Parkway Suite 200 {{,1+„( Cary, North Carolina 27511 Phone: 919483-5488 - %? Fax: 919-463-5490 D:72a'x? RIFFLE) r-THALWEG HEAD OF RIFFLE FACET SLOPE RANGE RIFFLE 0019-.0069 RUN .018-.030 POOL 0007 - .002 GLIDE 013-.028 TYPICAL PLAN VIEW & PROFILE BANKFULL 12" DIAMETER OR GREATER / / frc -?. 12" DLAMETER OR GREATER LOG STEP / POOL / BURY INTO BED/BANK 5 FEET OR GREATER A (TYPICAL) PROTECT BANK USING SEE DETAIL BURY INTO BEMANK 5 FEET OR GREATER (TYPICAL) R:?\1 ' A PLAN VIEW 8000 Regency Parkway Suite 200 Cary, North Carolina 2751 27511 y Phone: 919-483-5488 4 L. Fax: 919483-5490 F?Ow FILTER FABRIC (TYPICAL) SECTION A - A' BANKFULL FLOW -? STREAMED 1' BELOW MAX POOL DEPTH FOOTER LOG PROFILE VIEW NOTES: 1. LOGS WITHOUT ROOT MASS MAY BE USED IF APPROVED BY PROJECT ENGINEER. LOG STEP / POOL ?- THALWEG A' 12 TO 213 BANKFULL LIVE STAKING TOP OF STREAMBANK TOE OF SLOPE BOTTOM OF CHANNE 7 7 CROSS SECTION VIEW 6'-B' SPACING 2'-3' SPACING TOP OF STREAMBANK TOE OF :a.::.::a ::.:: s PLAN VIEW TOP OF STREAMBANK PLANT STAKES FROM TOP OF BANK TO TOE OF BANK IN A DIAMOND SHAPED STAGGERED PATTERN SQUARE CUT TOP BUDS FACING UPWARD UVE CUTTING MIN. 12" DIA 2' - 3' LENGTH ANGLE CUT 30 - 45 DEGREES LIVE STAKE DETAIL NOTES: PLAN VIEW 1. STAKES SHOULD BE CUT AND INSTALLED ON THE SAME DAY. 2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT. 3. STAKES MUST BE INSTALLED WITH BUDS POINTING UPWARDS. 4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK 5. STAKES SHOULD BE 12 TO 2 INCHES IN DIAMETER AND 2 TO 3 FT LONG. 8. STAKES SHOULD BE INSTALLED LEAVING 115 OF STAKE ABOVE GROUND. 8000 Regency Parkway Suite 1200 SUCK Cary, North Carolina 27 27511 LIVE STAKING Phone: 819-483-5488 !? • ? Fax: 919-483-5490 J-HOOK VANE w c? D z Co M a 1f3 BOTTOM 1!3 BOTTOM WIDTH OF WIDTH OF CHANNEL CHANNEL FLOW LEAVE T- 2' 20' TO 30° GAPS A J NO GAPS DL AAI %1IMA/ BETWEEN BOULDERS SCOUR POOL 1 1 SCOUR POOL (EXCAVATED) PER DIRECTION OF ENGINEER 12 TO 213 BANKFULL FLOW STREAMBED ELEVATION BACKFILL (ON-SITE ALLUVIUM OR NO. 57 STONE)) CLASS A STONE- CLASS 1 STONE PROFILE VIEW CLASS A STONE STREAMBED BACKFILL (ON-SITE ALLUVIUM OR NO. 57 STONE) FILTER FABRIC ? NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4'x 3'x2'. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 8. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK 1' 10' MINIMUM 1' SECTION A - A ?T 8000 Regency Parkway Suite 200 1' ,ly??ir'?i? Cary, North Carolina 27511 "J" HOOK VA ?! E Phone: 91983-5488 ,. Fax: 919-483-5490 HEADER ROCK FOOTER ROCK SCOURPOOL (EXCAVATED) HEADER ROCK ROCK CLASS 1 STONE EROSION CONTROL MATTING PLACE COIR FIBER MATTING IN B INCH DEEP TRENCH, STAKE, BACKFILL, AND COMPACT /-- TOP OF STREAMBANK TYPICAL MATTING STAKE NOTES: 1. BANKS SHOULD BE SEEDED PRIOR TO PLACEMENT OF MATTING. 2. PLACE COIR FIBER MATTING ACCORDING TO MANUFACTURER RECOMMENDATIONS. 3. MATTING STAKES SHOULD BE PLACED IN A DIAMOND SHAPED PATTERN. THE WOOD STAKE SHALL BE THE NORTH AMERICAN GREEN EGO-STAKE OR APPROVED EQUAL WITH THE FOLLOWING DIMENSIONS: LEG LENGTH 11.00 IN 27.94 CM HEAD WIDTH 1.25 IN 3.18 CM HEAD THICKNESS 0.40 IN 1.02 CM LEG WIDTH 0.60 IN 1.52 CM (TAPERED TO POINT) LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN 30.48 CM DITCH 0 0 0 0 0 0 0 0 0 0 0 0 TOP 0 0 0 0 0 0 0 0 0 0 0 AMBANK STREA - - - - -- -- -- -_ - - _ - - _ - _ - - - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PLAN VIEW DITCH TOP OF STREAMBANK STAKES COIR FIBER MATTING TO BE EXTENDED TO TOE OF SLOPE 8000 Regency Parkway Suite 00 Phone: 919-483-548811 F_ Q Fax: 919-483-5490 EROSION CONTROL MATTING BANKFULL FLOW----,.. STREAM BED ELEVATION I BACKFILL (ON-SITE ALLUVIUM)- #57 STONE - CLASS A STONE CLASS 1 STONE HEADER ROCK 4% -TO 8% SLOPE FABRIC FOOTER ROCK PROFILE VIEW # 57 STONE CLASS 1 STONE BACKFILL (ON-SITE ALLUVIUM) 1 STREAMBED 1 CLASS A STONE r d" FILTER FABRIC 1 1=: 10' MINIMUM - SECTION A - A BETWEEN 1 BOULDERS PLAN VIEW FLOODPLAIN SILL POOLS(EXCAVATED)PER DIRECTION OF ENGINEER DEPTH = AVERAGE BANKFULL DEPTH x 1.5 TO 2.0 NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4' x Tx 2'. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAM BANK 4. START AT BANKFULL AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 8. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK ILIHI? U(C W W 4 8000 Regency Parkway Suite Cary, Phone: 19-4813548811 00 r : Fax: 919.483-5490 DOUBLE DROP ROCK CROSS VANE 1/3 1/3 1/3 BOTTOM BOTTOM BOTTOM WIDTH OF WIDTH OF WIDTH OF TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PUBLIC ROAD 8" MINIMUM THICKNESS OF WASHED CLASS A STONE NOTES: SPECIFICATION NO. 6.06 - CONSTRUCTION ACCESS 'N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL DECEMBER 1993" 4 8000 Regency Parkway Suite 200 TEMPO RA RY GRAVEL SUCK Cary, North Carolina 27511 Suite Phone: 919-483-5488 ::: ?.? Fax: 919-463-5490 CONSTRUCTION ENTRANCE BRUSH MATTRESS FLOW PLAN VIEW DETAIL STAKES 3 FT GUAGE GALVANIZED IRE SECURED TO STAKES JCHES MIN PER 3.3 FT. TES OF 1 INCH OR LESS BANKFUL CROSS SECTION -?{ 2" f. 4" JQ??v WOODEN STAKE NOTCHED FOR WIRE OR ROPE W/ MIN. 3-FT LENGTH iv co L ?A NI TYPICAL STAKE {1 n 8000 e 1 PRegency hone 919 Parkway 00 3-5488 11 [??*-?? 4} Fax: 919463-5490 : NOTES 1. BOARD FOR STAKE SHOULD BE 2"x 4"x 18" 2. SAW 2 x 4 TIMBER DIAGONALLY TO PRODUCE 2 DEAD STOUT STAKES BRUSH MATTRESS NOTES: 1. CREATE 12" DEEP TRENCH 2. STAKE AND WIRE BRUSH LAYER INTO TRENCH 3. BACK FILL 3" OF ON-SITE ALLUVIUM OVER BRUSH LAYER