Loading...
HomeMy WebLinkAboutNCC190451_NOI Signed Certification_20190603 NCG01 Notice of Intent (NOI) Certification Form Print this form, complete, scan and upload to the electronic NOI. Then, mail the original form to the NC DEIVILR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6 1h Floor 1612 Mail Service Center Raleigh, NC 27699-1612 Per NCGeneral Statute 143-21S.68(i), any person who knowingly makes onyfalse statement, representation, or certification in any application, record, report,plan, orother documentfiledm required tobemaintained under this Article or a rule implementing this Article. . . shall be guilty of a Class 2 misdemeanor which may include o fine not to exceed ten thousand dollars (S1L\DDU). Under penalty of law, I certify that (check all boxes to indicate your agreement): �� ua I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. / The information Submitted in this NO[ is,to the best of my knowledge and belief,true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. 01 | will abide by all conditions ofthe NCGOI,0000 General Permit and the approved Erosion and Sediment Control Plan. / m� If the approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan) ofthe NCGO10000 General P.ermit, | will nonetheless ensure that all conditions of Part || of the permit are met on the project at all times. / o� | hereby request coverage under the and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner asan individual permit. Name ofProject: CONTRACT 2018-O2O. SUMMIT AVENUE STREETSCApES Legally Responsible Organizational Entity: CITY DFGREEN8BORO * Legally Responsible Person: TEO KALLAM, PE Title of Legally Responsible Person: ENGINEERING DIVISION MANAGER Signature: AJ klage-�, Date: 126lq IMPORTANT NOTE: Thisform must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6)of the NCGO10000 permit. For more information on signatory requirements, see Part IV, Section 8, Item/61of the N[G02D0O0permit.