Loading...
HomeMy WebLinkAbout20051645 Ver 1_Complete File_20050830?CF W A TF?Q .Qua 7 ? r September 7, 2005 Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 05-1645 McDowell County Mary McCarthy 8112 Kit Lane Chapel Hill, NC 27516 Subject Property: The Arbor/ Phase VII / Lot #172 /';?i 9 ?_`+ Anchor Drive, Nebo, NC 28761 G? /5 Approval of 401 Water Quality Certification with Additional Conditions SEP 1 2 2005 Dear Mrs. McCarthy: O=t"R _ ?"t'._ P.tTLS A'dB S i GQ 1r nR Ejti t:CH You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 400 square feet of shoreline for the purpose of stabilization at the subject property, as described within your application received by the N.C. Division of Water Quality (DWQ) on August 30, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Ceriification Number(s) 3492 (GC3492). The Certification(s) allows you to use Regional Permit(s) 198200079 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, Stormwater and Buffer regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet http://h2o.enr. state.nc.us/ncwetlands Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources No ahCarolma Atitumily An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Mary McCarthy 1 Page 2 of 6 September 7, 2005 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Shoreline 400 (square feet A 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of. such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Mary McCarthy Page 3 of 6 September 7, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Riprap Installation All banks shall be laid back at a 2:1 slope and riprap applied at the water / land interface (at full pool). Riprap shall be placed as a linear protective measure upon the regarded slopes. Stone used in stabilization shall be a random size, varying from Class B riprap up to 6 feet in diameter to provide additional wildlife habitat. All exposed soils above the Riprap stabilized area shall be replanted in accordance with the attached Guidelines for Riparian Buffer Restoration. This authorization shall in no way be construed as allowing the installation of a bulkhead or seawall. 7. Equipment Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 8. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before being discharged. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. Mary McCarthy Page 4 of 6 September 7, 2005 9. Catawba Buffer Tree Protection No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within the construction access corridor. If trees are removed, forested vegetation shall be re-established -within the construction access or other temporary impact area occurring in the protected buffer zone within the next growing season following construction of the project; 10. Turbidity Standard The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 11. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre- construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 12. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. 13. Deed Restriction Deed Restriction or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to impacts to wetland, water and buffers located on the property. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401M/etlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. Mary McCarthy Page 5 of 6 September 7, 2005 14. Property Access As Duke Power Company owns part, or all, of the property on which this stabilization activity will be taking place, or it is within the Federal Energy Regulatory Commission Project Boundary, this Water Quality Certification is only valid after the written authorization of Duke Power Company has been obtained through their permitting process, granting access to perform these stabilization activities on their property or within the Federal Energy Regulatory Commission Project Boundary. Failure to obtain the above written authorization from Duke Power Company, any stabilization / fill / dredging which takes place on Duke Power Company property will be considered a violation of the issue Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Mary McCarthy Page 6 of 6 September 7, 2005 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, Alan W. Klimek, P.E. AW K/khb Enclosures: GC 3373 Certificate of Completion Guidelines to Riparian Buffer Restoration cc: Mrs. Sue Harmon Permits, Etc. Post Office Box 234 Boiling Springs, NC 28017-0234 USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office File Copy Central Files Filename: McCarthy. McDowell.GC3373.Approval Triage Check List Date: 09/01/05 To: Kevin Barnett, Asheville Regional Office 60-day Processing Time: 8/30/05 to 10/28/05 Project Name: Mary McCarthy DWQ #:05-1645 County: McDowell C r-A c''1 Li ?, Si Y L L:i J U From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern 1-1 Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide seven (7) copies of this application and supporting information as well as a non-refundable application fee to the Division of Water Quality of $200.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: Division of Water Quality Wetlands Unit 11550 Mail Service Center Raleigh, NC 27699-1650 L 1. 2 Applicant Information Owner/Applicant Information Name: Mailing Address MRS. MARY MCCARTHY _8112 KIT LANE CHAPEL HILL, NC 27516 Telephone Number: _919-929-1138 E-mail Address: 2 0 0 5 1 6 4 5 9@@LRflV@N AUG 3 0 2005 4E`OS DENR . WATER QUALITY ANO STOPJA iTER BRANCH Fax Number: Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: MRS. SUE HARMON Company Affiliation: PERMITS, ETC. Mailing Address: POST OFFICE BOX 234 BOILING SPRINGS, NC 28017 Telephone Number: _704-434-0706 Fax Number: 704-434-7100 E-mail Address: IL Project Information _permitsetc@carolina.rr.com Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. MARYMCCARTHY 1. Location County: MCDOWELL Nearest Town: NEBO Subdivision name or site address (include phase/lot number): THE ARBOR / PH. VII / LOT 172 (ANCHOR DRIVE, NEBO, NC 28761 Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate vicinity map is included): FROM MARION TAKE HWY 70 EAST / TL ON CEMETERY RD. / TL ON HIGH TRAIL DR. / TL ON TURNING LEAF DR. / TR ON ANCHOR DRIVE / PROPERTY IS ON LEFT 2. Describe the existing land use or condition of the site at the time of this application: THIS IS A VACANT, WOODED LAKE LOT. 3. Property size (acres): 0.87 ACRES 4. Nearest body of water (stream/river/sound/ocean/lake): LAKE JAMES 5. Describe the purpose of the proposed work: TO STABILIZE THE ERODING BANK ALONG THE ENTIRE SHORELINE OF THIS LOT BY APPLYING RIPRAP. THE RIPRAP WILL BE 4-5 FEET IN HEIGHT. 6. List the type of equipment to be used to construct the project: A BARGE, A BACKHOE AND HAND TOOLS 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level in square feet or acres: 2 FT. X 100 FT. = 200 SQUARE FEET 8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in square feet or acres: 2 FT. X 100 FT. = 200 SQUARE FEET (A CONSTRUCTION PATHWAY WILL NOT BE NECESSARY SINCE THIS PROJECT WILL BE DONE BY BARGE.) 8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted (number of trees for instance): SIX TREES LESS THAN 6 INCHES IN DIAMETER WILL NEED TO BE REMOVED. MULCH WILL BE APPLIED TO ANY REMAINING DISTURBED AREA. Applicant/Agent's Signature ' u i Date i I (Agent's signature is valid only if an authorization letter from the applicant is provided.) f -H-le Arbor Ph.V ko' I r- vNC2061 Lake (Full Pond) A barge. I Full Pond -- Proposed b,,? dock Shoreline Wet,-V-t r8 ?---' X 100 ? Ri r? <' X ICb" Cleared - f Bove- Fu I I OO I The Rrbor / Icy +? II d , (A ConSkucf^ion pafliattj w r)Dt be. needed . ? Please approximately sketch the following Information tio 10 ft. o xth100 is plan (please provide dimensions for each item, 1) All proposed vegetation clearing (provide dimensions) 2) Locatlon of rip rap or fill to be placed above the "wNorma) Pool" Pool" elevation 3) Location of rip rap or fill to be placed below the 4) The location of any proposed structures such as buildings, retain)ng walls, docks, etc. 3) The location of any excavation or dredging below the "Normal'Po-ol" elevation. 6) Location of construction access corridors. oP +he, ri praP w L I be, 4 -5 9 NVU? KcCa.rtk laf ? I?? ?- = Arbor IN. -mom l Nebo, 5cale 100' ?ezl' i n hu?? )('S - 6how 1co I i nmr Te,+ J ripra.p, 4-5 I?ro'eet Will be done, by barqe.., J _ 0: ISE ?10 try cl? boo 1 i s ??d7aa i'l:A 4! \ ti C131 / o 1.91` `?` ? t8? ? ` 7B? ate, `3 ?•, D /?, ?r L NIQr ?•1 u / /i coo rA 7 10 4 Z 197,E O •o/ 'NN •\\\\ \\\ \\\ W ?' \ \\\\\\\\\?\\\\?\ \ \ \\ N \\\ J ?+ lr \ IN, ;\\\\\ \\\\\\\?\ v 1162 9 1 "??'l? \\ \\ \\\\N, 154-C <i C l? 1 J??s' \\\\r N?20'55 NNX\ 94 -31' 116, 000, 9 .?\\\ (,6t \ \ w14 C40* So ?$' ?? ke 1/ X 09 F ? O ply y?a°q tbQc4 IL 71 261 O L52 I 040 (J1 Q+ _ 0 34 Nebo area, NC Mary McCarthy PIV ", zviA, Natlonal Forest 1662 wns 1648 l' the Arbor / Ph. VI I /Lot 172 1160 r r„:- .w Nebo, NC 23761 w .y Latihude 35.72111 •• .'' Long it-&-81.95517 1636 1644 Shi Fie u ?16?00 (160 ?I O ml 0.5 1 1.5 Copyright O 196&2001 Microsoft Corp. and/or its suppliers. All rights reserved. http://www.microsoftcom/streets O Copynght 2000 by Geographic Data Technology, Inc. All rights reserved. O 2000 Navigation Technologies. All rights reserved. This data includes information taken with permission from Canadian authorities 0 Her Majesty the Queen in Right of Canada. O Copyright 2000 by Compusearch Micromarketing Data and Systems Ltd. Kar? McCar+- q 1-he, Arbu/Ph•-YE Nebo, NC 010 To: North Carolina Division of Water Quality Act 14 1191 I give Sue Harmon, of Permits, Etc., permission to sign as my agent on my application for shoreline stabilization. Signature (s) Date Mary McCarthy The Arbor / Ph. VII Lot 172 DUKE POWER LAKE MANAGEMENT, EC12-Q P O BOX 1006 CHARLOTTE, NC 28201-1006 704-382-1567 or TOLL FREE 1-800-443-5193 APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE DUKE POWER FILING FEE, PAYABLE TO DUKE POWER, TO ABOVE ADDRESS. L H. III. IV. V. Applicant Information A. Name MARY MCCARTHY B. Mailing Address 8112 KIT LANE, CHAPEL HILL, NC 27516 C. Telephone: 919-929-1138 Location of Proposed Project A. Lake LAKE JAMES B. Street Address ANCHOR DRIVE, NEBO, NC 28761 C. CountyMCDOWELL D. City, town, community or landmark NEBO E. Section -PHASE VII- Lot # 172 Subdivision -THE ARBOR F. Directions to property by road -FROM MARION TAKE HWY. 70 EAST / TL ON CEMETERY RD. / TL ON HIGH TRAIL DR. / TL ON TURNING LEAF DR. / TR ON ANCHOR DR. / PROPERTY IS ON LEFT_ G. Latitude and longitude for the project site -LATITUDE 35.72111 LONGITUDE -81.96517 H. Please submit a map showing the coordinates or a detailed map (USGS quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude/ longitude coordinates can be found on internet site, www.mapsonus.com. Description of Project A. Length of wall 100 LINEAR FEET B. Material RIPRAP C. Distance from property line/shoreline-WILL FOLLOW EXISTING SHORELINE. Intended Use of Project Area A. Private YES B. Commercial Applicant Signatu Agent Signature e-rMl75? , 0 F YIN G: /?/ Date Ca • A COPY OF THE COMPLETED APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTONAVE. - ROOM 208, ASHEVILLE, NC 28801-5006 A COPY OF THE "DUKE POWER APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE- CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE TO: NC DIVISION OF JVA TER QUALITY ATTENTION. JOHNDORNEY PARKVIEJVBLDG., 2321 CRABTREEBLVD. RALEIGH, NC 27604 919-733-1786 08/18/05ssb