HomeMy WebLinkAbout20051645 Ver 1_Complete File_20050830?CF W A TF?Q
.Qua 7
? r
September 7, 2005
Alan W. Klimek, P.E. Director
Division of Water Quality
DWQ Project # 05-1645
McDowell County
Mary McCarthy
8112 Kit Lane
Chapel Hill, NC 27516
Subject Property: The Arbor/ Phase VII / Lot #172 /';?i 9 ?_`+
Anchor Drive, Nebo, NC 28761 G? /5
Approval of 401 Water Quality Certification with Additional Conditions SEP 1 2 2005
Dear Mrs. McCarthy:
O=t"R _ ?"t'._
P.tTLS A'dB S i GQ 1r nR Ejti t:CH
You have our approval, in accordance with the attached conditions and those listed
below, to place fill within or otherwise impact 400 square feet of shoreline for the
purpose of stabilization at the subject property, as described within your application
received by the N.C. Division of Water Quality (DWQ) on August 30, 2005. After
reviewing your application, we have decided that the impacts are covered by General
Water Quality Ceriification Number(s) 3492 (GC3492). The Certification(s) allows you
to use Regional Permit(s) 198200079 when issued by the US Army Corps of Engineers
(USACE). In addition, you should obtain or otherwise comply with any other required
federal, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, Non-discharge, Stormwater and Buffer
regulations. Also, this approval to proceed with your proposed impacts or to
conduct impacts to waters as depicted in your application shall expire upon
expiration of the 404 or CAMA Permit.
This approval is for the purpose that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application.
If the property is sold, the new owner must be given a copy of this Certification and
approval letter and is thereby responsible for complying with all conditions. If total fills
for this project (now or in the future) exceed one acre of wetland or 150 linear feet of
stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506
(h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
401 Wetlands Certification Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 / Internet http://h2o.enr. state.nc.us/ncwetlands
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
No ahCarolma
Atitumily
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
Mary McCarthy 1
Page 2 of 6
September 7, 2005
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific
and general conditions of this Certification (or Isolated Wetland Permit) are met.
No other impacts are approved including incidental impacts:
Amount Approved
Units Plan Location or Reference
Shoreline 400 (square feet A
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all
specifications governing the proper design, installation and operation and
maintenance of. such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Sediment and Erosion Control Planning
and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and
erosion control measures must be such that they equal, or exceed, the
requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on
all construction sites, borrow sites, and waste pile (spoil) projects, including
contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be
designed, installed, operated, and maintained in accordance with the most
recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the
reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the Pre-Construction
Notification. All construction activities, including the design, installation, operation,
and maintenance of sediment and erosion control Best Management Practices,
shall be performed so that no violations of state water quality standards, statutes,
or rules occur.
Mary McCarthy
Page 3 of 6
September 7, 2005
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources has released the project.
5. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification
or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650.
6. Riprap Installation
All banks shall be laid back at a 2:1 slope and riprap applied at the water / land
interface (at full pool). Riprap shall be placed as a linear protective measure
upon the regarded slopes. Stone used in stabilization shall be a random size,
varying from Class B riprap up to 6 feet in diameter to provide additional wildlife
habitat. All exposed soils above the Riprap stabilized area shall be replanted in
accordance with the attached Guidelines for Riparian Buffer Restoration.
This authorization shall in no way be construed as allowing the installation of a
bulkhead or seawall.
7. Equipment
Heavy equipment should be operated from the bank whenever possible. All
mechanized equipment operated near surface waters should be inspected and
maintained regularly to prevent contamination of stream waters from fuels,
lubricants, hydraulic fluids or other toxic materials. Equipment used in stream
channel must be clean, new or low hour equipment.
8. Diffuse Flow
All constructed stormwater conveyance outlets shall be directed and maintained
as diffuse flow at non-erosive velocities through the protected stream buffers
such that it will not re-concentrate before being discharged. If this is not possible,
it may be necessary to provide stormwater facilities that are considered to
remove nitrogen. This may require additional approval from this Office.
Mary McCarthy
Page 4 of 6
September 7, 2005
9. Catawba Buffer Tree Protection
No trees shall be removed from Zone 1 of the Catawba Buffer unless they are
directly within the construction access corridor. If trees are removed, forested
vegetation shall be re-established -within the construction access or other
temporary impact area occurring in the protected buffer zone within the next
growing season following construction of the project;
10. Turbidity Standard
The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be
exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and
erosion control practices must be used to meet this standard.
11. No Impacts Beyond those in Application
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or
riparian areas beyond the footprint of the impacts depicted in the Pre-
construction Notification. All construction activities, including the design,
installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water
quality standards, statutes, or rules occur.
12. No Sediment and Erosion Control Measures in Wetlands
Sediment and erosion control measures shall not be placed in wetlands or waters
to the maximum extent practicable. If placement of sediment and erosion control
devices in wetlands and waters is unavoidable, they shall be removed and the
natural grade restored within six months of the date that the Division of Land
Resources or locally delegated program has released the project.
13. Deed Restriction
Deed Restriction or similar mechanisms shall be placed on all retained
jurisdictional wetlands, waters and protective buffers in order to impacts to
wetland, water and buffers located on the property. These mechanisms shall be
put in place prior to impacting any wetlands, waters and/or buffers approved for
impact under this Certification Approval and Authorization Certificate. A sample
deed notification can be downloaded from the 401M/etlands Unit web site at
http://h2o.enr.state.nc.us/ncwetlands.
Mary McCarthy
Page 5 of 6
September 7, 2005
14. Property Access
As Duke Power Company owns part, or all, of the property on which this
stabilization activity will be taking place, or it is within the Federal Energy
Regulatory Commission Project Boundary, this Water Quality Certification is only
valid after the written authorization of Duke Power Company has been obtained
through their permitting process, granting access to perform these stabilization
activities on their property or within the Federal Energy Regulatory Commission
Project Boundary. Failure to obtain the above written authorization from Duke
Power Company, any stabilization / fill / dredging which takes place on Duke
Power Company property will be considered a violation of the issue Water
Quality Certification.
Violations of any condition herein set forth may result in revocation of this Certification
and may result in criminal and/or civil penalties. The authorization to proceed with your
proposed impacts or to conduct impacts to waters as depicted in your application and
as authorized by this Certification, shall expire upon expiration of the 404 or CAMA
Permit.
If you do not accept any of the conditions of this Certification (associated with the
approved wetland or stream impacts), you may ask for an adjudicatory hearing. You
must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
N.C. 27699-6714. This certification and its conditions are final and binding unless you
ask for a hearing.
Mary McCarthy
Page 6 of 6
September 7, 2005
This letter completes the review of the Division of Water Quality under Section 401 of
the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the
Central Office in Raleigh at 919-733-9721 or Kevin Barnett in the DWQ Asheville
Regional Office at 828-296-4657.
Sincerely,
Alan W. Klimek, P.E.
AW K/khb
Enclosures: GC 3373
Certificate of Completion
Guidelines to Riparian Buffer Restoration
cc: Mrs. Sue Harmon
Permits, Etc.
Post Office Box 234
Boiling Springs, NC 28017-0234
USACE Asheville Regulatory Field Office
DWQ 401 Central Office
DLR Asheville Regional Office
File Copy
Central Files
Filename: McCarthy. McDowell.GC3373.Approval
Triage Check List
Date: 09/01/05
To:
Kevin Barnett, Asheville Regional Office
60-day Processing Time: 8/30/05 to 10/28/05
Project Name: Mary McCarthy
DWQ #:05-1645
County: McDowell
C r-A c''1
Li ?,
Si
Y L L:i J U
From: Cyndi Karoly Telephone: (919) 733-9721
The file attached is being forwarded to you for your evaluation.
Please call if you need assistance.
? Stream length impacted
? Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
? Minimization/avoidance issues
? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman)
? Pond fill
Mitigation Ratios
? Ditching
? Are the stream and or wetland mitigation sites available and viable?
? Check drawings for accuracy
Is the application consistent with pre-application meetings?
? Cumulative impact concern
1-1
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!
The following is an abbreviated application form for those applying for a 401 Water Quality
Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or
bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used
for wetland or stream impacts. Please provide seven (7) copies of this application and supporting
information as well as a non-refundable application fee to the Division of Water Quality of $200.00
for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater
or equal to 1 acre.
Applications should be sent to:
Division of Water Quality Wetlands Unit
11550 Mail Service Center
Raleigh, NC 27699-1650
L
1.
2
Applicant Information
Owner/Applicant Information
Name:
Mailing Address
MRS. MARY MCCARTHY
_8112 KIT LANE
CHAPEL HILL, NC 27516
Telephone Number: _919-929-1138
E-mail Address:
2 0 0 5 1 6 4 5
9@@LRflV@N
AUG 3 0 2005
4E`OS DENR . WATER QUALITY
ANO STOPJA iTER BRANCH
Fax Number:
Agent Information (A signed and dated copy of the Agent Authorization letter must be attached
if the Agent has signatory authority for the owner/applicant.)
Name:
MRS. SUE HARMON
Company Affiliation: PERMITS, ETC.
Mailing Address: POST OFFICE BOX 234
BOILING SPRINGS, NC 28017
Telephone Number: _704-434-0706 Fax Number: 704-434-7100
E-mail Address:
IL Project Information
_permitsetc@carolina.rr.com
Attach a vicinity map clearly showing the location of the property with respect to local landmarks such
as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and
development plans in relation to surrounding properties. You may use the diagram below to make a
hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site
plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other
facilities must be included.
MARYMCCARTHY
1. Location
County: MCDOWELL Nearest Town:
NEBO
Subdivision name or site address (include phase/lot number): THE ARBOR / PH. VII / LOT 172
(ANCHOR DRIVE, NEBO, NC 28761
Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate
vicinity map is included): FROM MARION TAKE HWY 70 EAST / TL ON CEMETERY RD. /
TL ON HIGH TRAIL DR. / TL ON TURNING LEAF DR. / TR ON ANCHOR DRIVE / PROPERTY
IS ON LEFT
2. Describe the existing land use or condition of the site at the time of this application:
THIS IS A VACANT, WOODED LAKE LOT.
3. Property size (acres): 0.87 ACRES
4. Nearest body of water (stream/river/sound/ocean/lake): LAKE JAMES
5. Describe the purpose of the proposed work: TO STABILIZE THE ERODING BANK
ALONG THE ENTIRE SHORELINE OF THIS LOT BY APPLYING RIPRAP. THE RIPRAP WILL
BE 4-5 FEET IN HEIGHT.
6. List the type of equipment to be used to construct the project: A BARGE, A BACKHOE AND
HAND TOOLS
7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the
normal pool lake level in square feet or acres: 2 FT. X 100 FT. = 200 SQUARE FEET
8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
above the normal pool lake level and 50 feet land-ward in square feet or acres:
2 FT. X 100 FT. = 200 SQUARE FEET (A CONSTRUCTION PATHWAY WILL NOT BE
NECESSARY SINCE THIS PROJECT WILL BE DONE BY BARGE.)
8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted
(number of trees for instance): SIX TREES LESS THAN 6 INCHES IN DIAMETER
WILL NEED TO BE REMOVED. MULCH WILL BE APPLIED TO ANY REMAINING
DISTURBED AREA.
Applicant/Agent's Signature ' u i Date i I
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
f
-H-le Arbor Ph.V ko' I r-
vNC2061
Lake (Full Pond)
A barge. I
Full Pond -- Proposed b,,? dock
Shoreline
Wet,-V-t r8
?---' X 100 ? Ri r?
<' X ICb" Cleared -
f Bove- Fu I I OO I
The Rrbor / Icy +? II d ,
(A ConSkucf^ion pafliattj w
r)Dt be. needed . ?
Please approximately sketch the following Information tio 10 ft. o xth100 is plan
(please provide dimensions for each item,
1) All proposed vegetation clearing (provide dimensions)
2) Locatlon of rip rap or fill to be placed above the "wNorma) Pool"
Pool" elevation
3) Location of rip rap or fill to be placed below the
4) The location of any proposed structures such as buildings, retain)ng
walls, docks, etc.
3) The location of any excavation or dredging below the "Normal'Po-ol"
elevation.
6) Location of construction access corridors.
oP +he, ri praP w L I be, 4 -5
9
NVU? KcCa.rtk
laf ? I??
?- = Arbor IN.
-mom l
Nebo,
5cale 100'
?ezl' i n hu??
)('S - 6how 1co I i nmr Te,+ J ripra.p, 4-5
I?ro'eet Will be done, by barqe..,
J _
0: ISE
?10 try
cl?
boo
1
i s ??d7aa i'l:A 4!
\ ti C131 / o 1.91`
`?` ? t8? ? ` 7B? ate, `3 ?•, D /?,
?r L NIQr ?•1 u / /i
coo rA 7
10 4
Z 197,E
O •o/
'NN
•\\\\ \\\ \\\ W ?' \
\\\\\\\\\?\\\\?\ \
\ \\ N \\\ J ?+ lr \ IN,
;\\\\\ \\\\\\\?\ v 1162 9 1 "??'l? \\
\\ \\\\N, 154-C <i C l? 1 J??s'
\\\\r N?20'55
NNX\ 94 -31'
116,
000, 9 .?\\\ (,6t \ \ w14 C40* So ?$' ?? ke 1/ X 09 F
? O
ply y?a°q tbQc4
IL 71
261
O
L52 I
040
(J1 Q+ _ 0 34
Nebo area, NC Mary McCarthy
PIV
", zviA,
Natlonal Forest
1662
wns 1648
l' the Arbor / Ph. VI I /Lot 172
1160 r r„:- .w Nebo, NC 23761
w .y
Latihude 35.72111 ••
.'' Long it-&-81.95517
1636
1644
Shi
Fie
u ?16?00
(160
?I
O ml 0.5 1 1.5
Copyright O 196&2001 Microsoft Corp. and/or its suppliers. All rights reserved. http://www.microsoftcom/streets
O Copynght 2000 by Geographic Data Technology, Inc. All rights reserved. O 2000 Navigation Technologies. All rights reserved. This data includes information taken with permission from
Canadian authorities 0 Her Majesty the Queen in Right of Canada. O Copyright 2000 by Compusearch Micromarketing Data and Systems Ltd.
Kar? McCar+- q
1-he, Arbu/Ph•-YE
Nebo, NC 010
To: North Carolina Division of Water Quality
Act 14 1191
I give Sue Harmon, of Permits, Etc., permission to sign as my agent on my
application for shoreline stabilization.
Signature (s)
Date
Mary McCarthy
The Arbor / Ph. VII
Lot 172
DUKE POWER LAKE MANAGEMENT, EC12-Q
P O BOX 1006
CHARLOTTE, NC 28201-1006
704-382-1567 or TOLL FREE 1-800-443-5193
APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in blank. PLEASE
SUBMIT APPLICATION AND APPROPRIATE DUKE POWER FILING FEE, PAYABLE TO DUKE POWER,
TO ABOVE ADDRESS.
L
H.
III.
IV.
V.
Applicant Information
A. Name MARY MCCARTHY
B. Mailing Address 8112 KIT LANE, CHAPEL HILL, NC 27516
C. Telephone: 919-929-1138
Location of Proposed Project
A. Lake LAKE JAMES
B. Street Address ANCHOR DRIVE, NEBO, NC 28761
C. CountyMCDOWELL
D. City, town, community or landmark NEBO
E. Section -PHASE VII- Lot # 172 Subdivision -THE ARBOR
F. Directions to property by road -FROM MARION TAKE HWY. 70 EAST / TL ON CEMETERY RD. / TL ON
HIGH TRAIL DR. / TL ON TURNING LEAF DR. / TR ON ANCHOR DR. / PROPERTY IS ON LEFT_
G. Latitude and longitude for the project site -LATITUDE 35.72111 LONGITUDE -81.96517
H. Please submit a map showing the coordinates or a detailed map (USGS quad map, city map, etc.) showing the
exact location of the project site. (NOTE: Latitude/ longitude coordinates can be found on internet site,
www.mapsonus.com.
Description of Project
A. Length of wall 100 LINEAR FEET
B. Material RIPRAP
C. Distance from property line/shoreline-WILL FOLLOW EXISTING SHORELINE.
Intended Use of Project Area
A. Private YES
B. Commercial
Applicant Signatu
Agent Signature
e-rMl75? ,
0 F YIN G:
/?/
Date
Ca
• A COPY OF THE COMPLETED APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY
MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTONAVE. - ROOM 208,
ASHEVILLE, NC 28801-5006
A COPY OF THE "DUKE POWER APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH
CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE-
CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER
QUALITY APPLICATION FEE TO:
NC DIVISION OF JVA TER QUALITY
ATTENTION. JOHNDORNEY
PARKVIEJVBLDG., 2321 CRABTREEBLVD.
RALEIGH, NC 27604
919-733-1786
08/18/05ssb