HomeMy WebLinkAbout710017_Correspondence_20181010BARWICK AG SERVICES, LLC
103 COUNTRY CLUB CIRCLE
CLINTON, NC 28328
October 10, 2018
North Carolina Division of Aquifer Protection
Attn: Mrs. Kristin Miguez
127 Cardinal Drive Extension
Wilmington, NC 28405-2845
Dear Kristin,
Please find enclosed Plans of Action for the following farms. All were pumped down prior to
Hurricane Florence but due to 25-30+" of rain, all, lagoons got in the red. Pre -and post -storm
levels were as follow:
24-17 HD3 Farms Wright Farm: 40" pre; 14" post
71-90 Greenwood Finishing #1: 36" pre; 9" post
,:!!2�12_NGreenwood Finishing #2: 40" pre; 5" post
71-6 Greenwood Finishing #3: all 47" pre; 4" post
We have had an extremely wet 2018 and lagoons have been more difficult to manage than
usual.
Thank you for your attention to this matter. Call 910-385-1000 with questions.
Sincerely,
Curtis Barwick
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
71-17
County: Pender
Facility Name: Greenwood Finishing #2
Certified Operator Name: Glenn Register Operator Number:
1001491
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 5'
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/22/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Greenwood Livestock, LLC Phone:
Facility Owner/Manager (print)
910-862-2252
Date: 10/10/2018
Facility Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARDAND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 1
line m = 162.8 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID-
line m =
lb PAN
n. lines I + 2 + 3 + 4 + 5 + 6 = 162.8lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column rxs
u. application window'
1
1
small grain overseed
8.41
50.00
420.5
Oct -Mar
1
2
small grain overseed
7.00
50.00
350.0
Oct -Mar
1
3
small grain overseed
5.07
50.00
253.5
Oct -Mar
1
4
small grain overseed
2.47
_ 50.00
123.5
Oct -Mar
1
5
small grain overseed
1.45
50.00
72.5
Oct -Mar
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1220.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section ll) = 162.8 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 1220.0 lb. PAN
y. Overall PAN balance (w - x) _ -1057 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface areiaccording to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
9.0 inches
19.5 inches
10.5 inches
80656 1ftz
527894 gallons
f. temporary storage period according to structural design 180 days
g volume of waste produced according to structural design 121058 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 9/25/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121058 ft'
0 ft3
49058 ft3
212078 gallons.
0.22 Ibs/1000 gala
162.8 Ibs. PAN
PoA (30 Day) 2/21 /00