Loading...
HomeMy WebLinkAbout710012_Response to Notice_20181009BARWI.CK AC SERVICES, LLC 103 COUNTRY CLUB CIRCLE CLINTON, NC 28328 October 9, 2018 North Carolina Division of Aquifer Protection Attn: Mrs. Kristin Miguez 127 Cardinal Drive Extension Wilmington, NC 28405-2845 Dear Kristin, Please find enclosed Plans of Action for the following farms. All were pumped down prior to Hurricane Florence but due to 25-30" of rain, all lagoons got in the red. Pre -and post -storm levels were as follow: 31-92 OR Blizzard- Farm: 36" pre; 7" post 31-368 Boyd Barfield Farm: #1, 35" pre; 12" post, #2, 34" pre; 12" post 31-656 Lynn & Annette Smith Farm: 38" pre; 12" post T1 Crooked Run: 30" pre; 4" post We have had an extremely wet 2018 and lagoons have been more difficult to manage than usual. Thank you for your attention to this matter. Sincerely, Curtis Barwick n Viola nlyq - - L,/ PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-12 County: Pender Facility Name: Crooked Run Farm Certified Operator Name: Joe Szaloky Operator Number: 999328 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without, spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. n, Lagoon Name/I D Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 4 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one'or more structures. A - 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not.covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/22/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. l Bandit 3, LLC Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-990-0062 Date: 10/9/2018 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY* DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 4.0 inches b. designed 25 yr./24 hr. storm-& structural freeboard 20.0 inches c. line b - line a (inches in red zone) = 16.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 195570 ft2 e. line c/12 x line d x 7.48 gallons/ft3 1950485 gallons 3. Projected volume of waste liquid produced during draw down period .f.-temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 252548 ft3 h. current herd # certified herd #1 4200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/31/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) ft3 0 ft3 51333 ft3 63995 gallons 0.09 Ibs/1000 gal. 181.3 Ibs. PAN PoA (30 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = 181.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines 1+2+3+4+5+6= 181.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' unk all wheat 84.60 100.00 8460.0 Sep -Apr 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period: v. Total PAN available for all fields (sum of column t) = 8460.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 181.3 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 8460.0 lb. PAN y. Overall PAN balance (w - x) _ -8279 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21/00