Loading...
HomeMy WebLinkAbout20051541 Ver 1_Complete File_20050810?4. F VA TAR p 6wa ti Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality August 22, 2005 DWQ Project # 05-1541 Avery County Robert Wiseman, County Manager Avery County Post Office Box 640 Newland, NC 28657 a Subject Property: North Toe EWP (DSR - NT-18, FC-2, TMC-2, 4 & 5) AUG 3 1 2005 Approval of 401 Water Quality Certification with Additional CondittN IWATER QUALITY Dear Mr. Wiseman: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 1,800 feet of streams for the purpose of streambank stabilization and woody debris removal / trash removal at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on July 27, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3367 (3367). The Certification (s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose that you described in your application. (Nothing in this approval should be interpreted as giving permission to remove bedload material from the existing channel, nor allowing for the construction of berms which would not allow the stream access to it's floodplain.) As "stable" and "pre-storm" are not interchangeable terms, all work must be to ensure stability, regardless of channel location. Additionally, channels cannot be returned to it's pre-storm location unless there is documented instability is submitted and approved as part of the application package. If you change your project beyond the approval here, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 ?hone: 919-733-1786 / FAX 919-733-68931 Internet http7//h2o.enr.state.nc.us/navetlands NCDEN.: An Equal Opportunity/Affirmative Action Employer - 500,10 Recycled/10% Post Consumer Paper Avery County: Page 2 of 6 August 22, 2005 The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Plan Location or Reference Approved (Units) Stream 1,800 (feet) North Toe River & Three Mile River 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. !• Avery County: Page 3 of 6 August 22, 2005 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer, where applicable, should be avoided during the October 15 to April 15 trout spawning period to avoid adverse effects of sediment on eggs and larvae, where applicable. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition, because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. Avery County: A Page 4 of 6 August 22, 2005 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, new or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, . dog hobble, red maple, silky willow, tag alder, black willow, sycamore) to provide long-term bank stability and stream shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season. Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten 4 Avery County: Page 5 of 6 August 22, 2005 (10) to twelve (12) foot centers. Stream banks in these areas should also be seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 30 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please see attached.) 17. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 18. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 19. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. Avery County: Page 6 of 6 August 22, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr. Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, ' C r6-40 ?j 'le-4 zvtzc?'? A?'wAlan W. Klimek, P.E., Director ,;(LDivision of Water Quality AW Klkhb Enclosures: GC 3367 Certificate of Completion Guidelines for Riparian Buffer Restoration cc: Doug Smith, Buck Engineering, PC 8000 Regency Parkway Suite 200 Cary, NC 27511 USACE Asheville Regulatory Field Office DWQ 401 Central Office DLR Asheville Regional Office File Copy Central Files Filename: 05-1541. EWP.NorthToe&ThreeMileRiver.Approval Triage Check List Date: 08/15/05 Project Name: Avery County EWP - DSR 11 Sites NT-18, FC-2, TMC-2, TMC-4, TMC-5 DWQ #:05-1541 Kevin Barnett, Asheville Regional Office County: Avery To: 60-day Processing Time: 8/10/05 to 10/8/05 From: Cyndi Karoly Telephone: (919) 733-9721 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! EWP - Avery County, North Carolina DSR 11- Sites NT-18, FC-2, TMC-2, TMC-4 & TMC-5 French Broad River Basin Scope of Work These sites are part of DSR group 11 located in southwest Avery County. This submittal contains 5 of the total 10 sites for this group. Three sites NT-16, NT-17 and FC-1 have been previously submitted. TMC-4 will only require live staking, and debris removal, no permits are necessary for this site. NT-18, FC-2, TMC-2, and TMC-5 will require more extensive work for bank stability and will include a Preconstruction Notification (permit) to the United States Army Corps of Engineers. Site specific plans are attached and show site location, existing conditions, estimated repair quantities and planned repairs. All repair work is being proposed under the Emergency Watershed Protection Program that Avery County is administering. Questions about this package should be directed to Buck Engineering's Doug Smith, at 919-463-5488. Contents • Preconstruction Notification (Permit Application) • Avery County EWP Index Map of DSR Groups • Table 1. Property owners of sites proposed for repair under EWP. • Repair plan for site NT-18 • Repair plan for site FC-2 • Repair plan for site TMC-2 • Repair plan for site TMC-4 • Repair plan for site TMC-5 • Avery County Plant List and Riparian Seed Mix • Construction Details • Erosion and Sediment Control Plan AUG I n 2005 DENR - WATER QUALITY `?7C(JryyATERBRAjKCH f Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further detail 0 ck here:: M? IL Applicant Information ??" v D 1. Owner/Applicant Information AUG 1 0 2005 Name: Robert Wiseman (County Manager) P,^=r,p AN .-WAT&R Mailing Address: County Administrative Offices" YAT1a1f7_?c}I P.O. Box 640 Newland, NC 28657 Telephone Number: 828-733-8201 Fax Number: 828-737-9395 E-mail Address: Robert.wiseman(2ancmail.net 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Doug Smith Company Affiliation: Buck Engineering PC Mailing Address: 8000 Regency Parkway, Suite 200 Cary, NC 27511 Telephone Number: 919-463-5488 Fax Number: 919-463-5490 E-mail Address: dsmithambuckengineering.com Page 1 of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Avery County EWP, Group 11. 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): See attached Table 1. 4. Location County: Avery Nearest Town: Newland, NC Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): The location of each site is attached on the EWP Index Ma and provided in each individual site repair plan 5. Site coordinates, if available (UTM or Lat/Long):_ Attached in site repair plan. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): N/A 7. Nearest body of water (stream/river/sound/ocean/lake): North Toe River, Three Mile Creek, Fork Creek. 8. River Basin: French Broad River (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://l12o.enr.state.ne.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: A site specific description is in each site plan 10. Describe the overall project in detail, including the type of equipment to be used: Specific Page 2 of 9 repair activities for the site are provided in the site repair plans which are attached. Repair activities proposed for the site include: installing vane structures to protect unstable stream banks, and removing unstable woody debris. This work will require the use of a trackhoe with hydraulic thumb and a dump truck to haul and place boulders and remove woody debris. A bulldozer may be needed for some of the grading work. A logging winch will help debris removal easier 11. Explain the purpose of the proposed work: This work is being done as part of the Emergency Watershed Protection program that counties impacted by 2 Hurricanes in the Fall of 2004 are carrying out. The purpose of the work is to repair damaged stream reaches that are unstable and continuing to cause loses to personal and public property and to public resources by degrading water quality and other natural resources. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. To our knowledge permits have not been issued for work at these sites in the past. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream Page 3 of 9 1i mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Impacts from this work will be minimized whenever possible. However to accomplish these needed repairs impacts m4Y be realized from temporary increased turbidity, removal of aggraded bed material and temporary loss of herbaceous vegetation. Long-term impacts will be an increase in stream bank stability, stable dimension and profile, and improved vegetative cover. 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** (es/no Distance to Nearest Stream linear feet Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at li(tp://ww%v. [gma.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0 Total area of wetland impact proposed: 0 3. Individually list all intermittent and erennial stream impacts below: Stream Impact Length Impact Average Width of Perennial or Site Number Type of Impact* r (linear feet) Stream Name* * Stream Before Intermittent? indicate on ma Impact (leasespecify) NT-18 Riffle Stabilization 200' North Toe River 50'-60' Perennial FC-2 Channel dimension j 500' Fork Creek 30' Perennial ad ustment Stream bank TMC-2 stabilization, installing 1 rock 200' Three Mile Creek 25'-35' Perennial vane Stream bank stabilization, TMC-5 installing 5 rock 900' Three Mile Creek 25'-35' Perennial vanes, and 3 cross vanes " List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Page 4 of 9 ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at wt sas,aov. Several internet sites also allow direct download and printing of USGS maps (e.g., wwtv.topezone.coin, III t)(1uest,eom, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 1800' 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Access to each site will be over the most stable route possible and movement of vehicles over access routes will be minimized. Wherever possible equipment work will be done from the stream bank Operating equipment within the channel will be done when this is the only way to accomplish needed work. Excavated material will be moved directly to trucks for hauling to disposal sites when it will not be used on site. When excavated material will be used on site it will be handled as few times as possible. Work at each site will be accomplished as quickly as Page 5 of 9 possible and the site will be stabilized with erosion control matting and seeding within 5 days of site completion Trees will be planted during the next dormant season. Equipment leaking any fluids will not be used and if leaks occur during construction the equipment will be replaced or repaired immediately. Sediment and erosion control measures, including silt fence, stoned entrances protected stock pile areas diversions and check dams will be employed to minimize sediment movement off site. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmaide.litml. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the Page 6 of 9 NCWRP, check the NCWRP website at http://h2o.enr.state,ne.us/wrp/index.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Page 7 of 9 Zone* Impact (square feet Multiplier Required Miti ation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. There will be no chance in impervious acreage. Existing project sites are agricultural lands and will remain in this land use Proposed repair work will not alter runoff of stormwater from each site The end result of this proposed work will be stream banks that are better able to withstand the erosive forces generated by storm flows XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A waste water will not be generated bps project XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 8 of 9 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). AppLI&/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 9 of 9 Table 1. Property owners of sites proposed for repair under the EWP program in Avery County County. DSR site relates to the number shown on the Index Map. I nt A I nnn rr?ri riririril DSR NUMBER DSR SITE PIN NAME 1 ADDRESS 2 CITY/STATE ZIPCODE North West Type Length 11 NT-18 180100389784 HAWKINS, BRUCE & BETTY 1797 HANGING ROCK RD SPRUCE PINE, NC 26777 35.96242 82.02789 Debris removal. 100 ft 11 NT-18 180100490647 LOVELACE, LELA 57 DAN LN SPRUCE PINE, NC 28777 35.96463 82.02688 Debris removal and channel grading. 200 ft 11 TMC-2 181200546728 BELL, GERRY KENT & LISA 101 BRIDGE LN NEWLAND, NC 28657 35.9798 81.98921 Misc. debris removal 50 ft 11 TMC-2 181200544698 BELL, GERRY KENT & LISA 101 BRIDGE LN NEWLAND, NC 28657 35.9795 81.98971 Misc. debris removal 50 ft 11 TMC-2 181200543594 BELL, GERRY KENT & LISA 101 BRIDGE LN NEWLAND, NC 28657 35.97909 81.98998 Misc. debris removal 50 ft 11 TMC-2 181200549937 BUMGARNER, EDWARD JUNIOR & 67 BRIDGE LANE NEWLAND, NC 28657 35.98035 81.98827 Misc. debris removal 5011 11 TMC-2 181200438859 BURLESON, OLIN D & MARGARET 1461 OLD HWY 18 SOUTH MORGANTON, NC 28655 35.97792 81.99226 Minor grading. Live stake and container plant banks. 150 ft 11 TMC-2 181200436860 BURLESON, OLIN D & MARGARET 1461 OLD HWY 18 SOUTH MORGANTON, NC 28655 35.9777 81.99288 Minor grading. Live stake and container plant banks. 150 ft 11 TMC-2 181200449549 BUTLER, DAVID R. & 2697 THREE MILE HWY NEWLAND, NC 28657 35.9792 81.99152 Minor grading. Live stake and container plant banks. 50 ft 11 TMC-2 181200541471 CARPENTER, JEFFERY D. 98 BRIDGE LANE NEWLAND, NC 28657 35.97875 81.99071 Re grade stream banks, seed, mat, and live stake 150 ft 11 TMC-2 181200530978 CARPENTER, ROBY 106 GREENWAY LANE NEWLAND, NC 28657 35.97829 81.9915 Minor grading. Live stake and container plant banks. 200 ft 11 TMC-2 181200442261 FORBES, LINDA LOU 2825 THREE MILE HWY NEWLAND, NC 28657 35.97809 81.99381 Minor grading. Live stake and container plant banks. 100 ft 11 TMC-2 181200336461 HARTLEY, HOWARD 302 3 MILE HWY NEWLAND, NC 28657 35.97596 81.99566 Misc. debris removal 50 ft 11 TMC-2 181200335244 HARTLEY, HOWARD 302 3 MILE HWY NEWLAND, NC 28657 35.97537 81.99613 Misc. debris removal 50 ft 11 TMC-2 181200338981 INGRAM, CLIFTON RT 2 BOX 1090 BURNSVILLE, NC 28714 35.97716 81.99506 Misc. debris removal 50 ft 11 TMC-2 181200554075 INGRAM, LORENE RT 6, BOX 664-2 MARION, NC 38752 35.98052 81.98977 Misc. debris removal 50 ft 11 TMC-2 181200446490 JOHNSON, DUDLEY & PO BOX 123 MINNEAPOLIS, NC 28652 35.97866 81.9924 Minor grading. Live stake and container plant banks. 250 ft 11 TMC-2 181200556262 MC COURY, ZELLIAN & MYRTLE % ELWANDA LEDFORD BAKERSVILLE, NC 28705 35.98096 81.98917 Misc. debris removal 50 ft 11 TMC-2 181200543903 MC KINNEY, LARRY E 337 LITTLE BUCK HILL ROAD NEWLAND, NC 28657 35.98011 81.99036 Misc. debris removal 50 ft 11 TMC-2 181200547898 MOODY, RONNIE PO BOX 244 PINEOLA, NC 28662 35.9801 81.98864 Misc. debris removal 50 ft 11 TMC-2 181200339362 OSBORNE, HARMON & 2967 THREE MILE HWY NEWLAND, NC 28657 35.97566 81.99471 Minor grading. Seed, mat, live stake and container plant banks. 100 ft 11 TMC-2 181200444269 PITTMAN, DERRELL K & SHERRY 2787 THREE MILE HWY NEWLAND, NC 28657 35.97833 81.99311 Rip rap outlet. Minor grading. Live stake and container plant banks. 150 ft 11 TMC-2 181200440099 PITTMAN, SHERRILL & LANA 2839 THREE MILE HWY NEWLAND, NC 28657 35.97777 81.99435 Misc. debris removal 50 ft 11 TMC-2 181200337036 PRITCHARD, SCOTTY OTIS PO BOX 186 SPRUCE PINE, NC 28777 35.97509 81.99531 Misc. debris removal 50 ft 11 TMC-2 181200448542 SINGLETON, ROGER D. & 2715 THREE MILE HWY NEWLAND, NC 28657 35.97896 81.99184 Minor grading. Live stake and container plant banks. 200 ft 11 TMC-2 181200540781 TOWNSEND, HOWARD & 2639 THREE MILE HWY NEWLAND, NC 28657 35.97955 81.99109 Re grade stream banks, seed, mat, and live stake 150 ft 11 TMC-2 181200337752 WARD, DONNA S. 2963 THREE MILE HWY NEWLAND, NC 28657 35.97672 81.99549 Install 1 rock vane. Seed, mat and live stake. 100 ft. 11 TMC-2 181200431788 WISE, DAVID & CAROLYN 56 CHILDS LN NEWLAND, NC 28657 35.97686 81.99407 Minor grading. Live stake and container plant banks. 100 ft 11 TMC 4 & FC-2 181200748883 SPRY, JAMES & MARY 2145 THREE MILE RD NEWLAND, NC 28657 35.98064 81.98188 Debris removal TMC-4 . Channel grading, seed, mat and live stake FC-2 1000 ft 11 TMC-5 180200911794 MC KINNEY, LARRY E & NINA & 337 LITTLE BUCK HILL NEWLAND, NC 28657 35.97084 82.01056 Install 2 cross vanes. Re grade banks, seed, mat and live stake. 250 ft 11 TMC-5 180200920071 PHILLIPS, FRANK W JR & VIVIAN 105 ALTAPASS RD SPRUCE PINE, NC 28777 35.97149 82.01108 Install 2 cross vanes. Re grade banks, seed, mat and live stake. 250 ft 11 TMC-5 181200114857 PHILLIPS, FRANK W JR & VIVIAN 105 ALTAPASS RD SPRUCE PINE, NC 28777 35.97091 82.00403 Install 4 rock vanes, l cross vane. Re grade banks, seed, mat and live stake. 600 ft 11 TMC-5 180200915504 PHILLIPS, FRANK W JR & VIVIAN 105 ALTAPASS RD SPRUCE PINE, NC 28777 35.91029 82.00942 Install rock vane. Re grade bank, seed, mat, and live stake. 100 ft To Whom It May Concern: I, Robert Wiseman, County Manager for Avery County, attest to the fact that Avery County has entered into a contract with Buck Engineering PC, a North Carolina professional corporation. Buck Engineering will be providing engineering services and permitting assistance in support of the Emergency Watershed Protection Program. In this contractual relationship, Buck Engineering will act as the County's agent for the purpose of accomplishing this work. Specifically, employees of Buck Engineering may take those actions necessary to obtain environmental pen-nits from the U. S. Army Corps of Engineers, N. C. Division of Water Quality, and N. C. Division of Land Quality. i Robert Wiiseman, County Manager for Avery County Date: eq Office: Avery County Courthouse, Newland, NC 28657 Plan Review Checklist EWP-Avery County, North Carolina DSR IV l / 8? _- I ?Alif l/1J l/ the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table DSR Approve Disapprove Approve with Modifications summarizes my comments on these plans: Additional comments: ?J blal9,?,C ,/ -., Natural Resource Conservation Service Agent Ag nt's Sigaamut pJ V DSR No. NT-18 Site Assessed By: SDW, CLY Date Assessed: 6/8/2005 Length of Approximately 500 feet Assessment: X_ Debris removal _ Bank sloping Bank stabilization Location: Adjacent to Lovelace Ln. near Hanging Rock Rd. County: Avery Lat.: 35° 57'53" / Long.: 82° 01' 32" Waterbody: North Toe River (28.88 mi) Channel realignment Seeding In-stream structures Adjust channel dimension Riparian planting Summary Evaluation of Conditions: This reach is along the North Toe River just downstream from Hanging Rock Rd. Bridge adjacent to the Lovelace property. The Lovelace property experienced flooding which damaged an accessory structure (shed). A mid channel bar has formed and debris on this bar is directing stream energy to the outer stream bank. More debris is located on the inside of this meander bend. See attached photos for visual representation. Recommendations for Repair: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled; then installed or transported at the appropriate time. Access to the property should be made on Lovelace Ln. off Hanging Rock Rd. Heavy equipment accessing the stream should only do so in areas marked on the "Recommendations for Repair" Figure. Demolish accessory structure and remove from site (See photo 1). Remove woody debris from inside of meander bend (See photo 2). Remove mid channel bar and reshape channel thalweg (See photo 3). All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attached). Quantities: Item Unit Quantity Wood Debris Removal CY 20 Grading rock debris removal CY 50 ? LIY ib 1? I 'e I -it G.,Ik,- ' j Photo 1 - Demolish and NT-18 Ma ' , accessory structure. Photo Z - Remove woody debris from inside meander bend. NT-18 Photo 3 - Remove mid channel bar. Plan Review Checklist EWP-Avery County, North Carolina DSR FC- Z - I dwx? the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications Additional comments: Natural Resource Conservation Service Agent Agent's sipumur DSR No. FC-2 Site Assessed By: SDW, CLY Date Assessed: 6/8/2005 Length of Approximately 500 feet Assessment: _ Debris removal X Bank sloping X Bank stabilization Location: Adjacent to Three Mile Hwy (NC HWY 194). County: Avery Lat.: 35° 59' 01" / Long.: 81° 58' 55" Waterbody: _ Channel realignment _ In-stream structures X Riparian planting Fork Creek (0.8 mil) X Seeding X Adjust channel dimension Summary Evaluation of Conditions: This reach begins just downstream from Three Mile Highway (NC HWY 194) and flows approximately 500 ft. to it's confluence with Three Mile Creek. This reach experienced major aggradation. The property owner has excavated the excess material within the channel and stockpiled it on the stream banks. Recommendations for Repair: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled; then installed or transported at the appropriate time. Access to this site should be made on the Spry property as shown in the "Recommendations for Repair" Figure. Regrade and adjust channel dimensions according to the attached "Cross Section Design" sheets. The upper third of the reach should be designed according to cross-section "XS1." While the middle third should be designed to cross- section "XS2" and the lower third to "XS3." Permanent seed, mat, and livestake following earthwork. See photos for visual representation. All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attache Quantities: Item Unit Quantity Live Stakes EA 450 Excavation CY 100 Temporary Silt Fence LF 1000 Temporary Seeding LBS 40 Mulch Grain Straw BALES 25 Permanent Seeding LBS 5 Coir Matting SY 650 Vicinity Map Ay I ? ( 4 ? tlR rkw 1 S C r" yy?? k + 044 t sta. s, t 4 r y, R , ? w. aI H ?? ?? y, 5t ply I' 5r P ? ` ?. r r , °"t q??°f., ?.:. ? 11?lyytyPb._?M ? "?ti Y ?VH1 i ?/i ? r " r. i e t ? L t , yid •I,A .? ?' ??? f `tx ?f ?1? ' 77 I + Y ?1?,?fA 1 li qS s, .W :o,?^?'P Y'1 + ;t N K „7 y t+ " .. \ a to C. 60 wajill i X . . 11 h tY'?i r d? ,,./ '.. " " P 'i'•,Y'. - .f 'rye , 14? ? G?}?P,nv` I??? , 4L r .•r ^ k 5 r. 7 .. ? • ?Q?? ? ?.+ fir ? v t?:+y'>a ?' r , d n t9 N RECOMMENDATIONS FOR REPAIR A (Group 11) Site: FC-2 Avery County EWP 0 50 100 200 -9 1 Feet BUCK CLIENT PROJECT F6-2 PAGE PROJECT NO. SUBJECT Prepared By_ Gru33 SCG4--?c-, Oe. S k Approved By re Q C l?.M?? 1. p? ?? s OF Date Date scale: 4 sq./inch cross- Se-c-4-i- iV?P_ s 1 ti h Cross-section Data: Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle C 24.7 22.23 1.11 1.52 19.98 1.9 2.4 998.96 1000.38 1007 1006 1005 1004 0 1003 1002 d 1001 w 1000 999 998 997 996 Cross-section XS1 Fill ............. - - o - - Bankfull o Floodprone Proosed XS 115 125 135 145 155 165 175 Station Pt # North East Elevation Note Station 2 5085.229 5068.289 1000.212234 X1 RIFFLE 100 3 5090.041 5046.097 1000.380189 X1 LTB 122.5631 4 5091.288 5041.292 999.354115 X1 127.4699 5 5091.675 5038.198 997.976007 X1 LCH W 130.5867 6 5092.022 5034.824 997.68663 X1 133.9789 7 5093.3 5028.785 997.440468 X1 TWG 140.1154 8 5094.808 5022.517 997.740006 X1 RCH 146.503 9 5095.494 5016.671 999.494335 X1 152.3887 10 5097.767 5005.809 1005.800753 X1 RTB 163.4246 11 5098.137 5001.908 1003.522661 X1 167.3428 12 5098.612 4995.672 1000.513295 X1 173.5951 13 5095.554 4966.269 1000.370982 X1 202.5409 Bankfull Line Station Elevation 128.36 998.96 150.6 998.96 Flood prone Line Station Elevation 100 1000.48 154.11 1000.48 Proposed XS Bkf Area 20.4 ft^2 W/D ratio 13.3 Mean D th 1.2 ft Max D th 2 ft Station Elevatio NA NA 127 999.4 M 131.85 999.4 37.1 1 997.65 140.1 997.4 RCH 143.1 997.65 RTB 148.35 999.4 RB 154.1 999.4 R Tie in 162 1003.5 R Tie in 167 1003.5 Cross-section Data: Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio I R KF Elev OB Elev Riffle Gc 15.9 12.78 1.24 1.75 10.28 2.4 1.3 996.93 999.37 Cross-section XS 2 1003 1002 1001 c 1000 999 > 998 w 997 996 995 994 Cut Fill ................ \\ o- Bankfull -•----••••-- o - •Floodprone Proposed XS 100 110 120 130 140 150 160 170 180 190 Station Pt # North East Elevation Note Station 14 4972.169 5021.905 998.73853 X2 RIFFLE 100 15 4973.049 5005.534 998.912065 X2 116.1688 16 4973.349 4993.796 999.677963 X2 127.7985 17 4973.583 4992.371 999.370186 X2 LTB 129.1876 18 4973.517 4990.72 998.007845 X2 130.8361 19 4973.662 4988.667 995.941026 X2 LCH 132.8596 20 4973.942 4985.046 995.447624 X2 136.4262 21 4973.854 4981.625 995.177738 X2 TWG 139.8346 22 4972.763 4978.152 995.954033 X2 RCH W 143.4085 23 4972.636 4974.156 999.031322 X2 147.3937 24 4970.844 4968.507 1001.875523 X2 RTB 153.208 25 4968.91 4963.08 1001.699866 X2 158.8184 26 4962.603 4937.421 999.732928 X2 185.0245 Bankfull Line Station Elevation 131.89 996.93 144.67 996.93 Flood prone Line Station Elevation 130.02 998.68 146.94 998.68 Proposed XS Bkf Area 20.4 ft^2 W/D ratio 13.3 Mean D pt 1.2 ft Max D th 2 ft Station Elevatio L Tie in 116 999 LB 125 997.2 LTB 130.75 997.2 LCH 136 995.45 TWG 139 995.2 RCH 142 995.45 RTB 147.25 997.2 RB 160 1001.5 R Tie In 180 1001.5 1 165 1000 Cross-section Data: Feature Stream Type BKF Area BKF Width BKF Dept h Max BKF De th W/D BH Ratio I R I KF Elev OB Elev Riffle Bc 13.1 12.21 1.07 1.66 11.38 1.5 1.7 995.18 996.09 Cross-section XS3 999 998 0 997 w. 996 0 w 995 994 993 Cut 100 110 120 130 Station V_"7? Fill o • - Bankfull o - • Floodprone Proposed XS 140 150 160 Pt # North East Elevation Note Station 27 4868.549 5041.823 997.547362 X3 100 28 4865.976 5030.953 997.075124 X3 111.1482 29 4864.295 5025.461 996.093832 X3 LTB 116.8914 30 4863.662 5023.392 995.221397 X3 119.0554 31 4862.848 5021.365 994.204133 X3 LCH W 121.2313 32 4861.774 5018.816 993.925817 X3 123.9822 33 4860.636 5017.451 993.518091 X3 TWG 125.6196 34 4859.964 5015.007 993.831769 X3 128.1532 35 4859.142 5013.327 994.198775 X3 RCH 129.9999 36 4857.561 5007.555 998.533514 X3 RTB 135.9825 37 4855.584 5000.365 998.271613 X3 143.436 38 4853.972 4993.931 997.160464 X3 150.0607 Bankfull Line Station Elevation 119.14 995.18 131.35 995.18 [Flood prone Line Station Elevation 112.51 996.84 133.65 996.84 Proposed XS Bkf Area 20.4 ft^2 W/D ratio 13.3 Mean D pt 1.2 ft Max D th 2 ft Station Elevatio L Tie in 109 997.25 LB 111.6 995.5 LTB 117.35 995.5 LCH 122.6 993.75 TWG 125.6 993.5 RCH 128.6 993.75 RTB 133.85 995.5 RB 142 998.35 R Tie In 148 998.35 iwj ya/I r _ e vt' r. .. ca ?.. pie , r Y. w• •.:. •,. ;: It 1,r Y 1 k T f 4'.. 7 J a tis 't I ? t: , ; r / ? { may, ( M • \ Photo 1 - Adjust channel dimensions, permanent upstream). and live stake (Looking ?A 5 7154; ?•?? ,^ ??i;t` ?'? ?.'?2 r '? F ?o I;?( 1 ?t 4y?j'./J+{ }*{\Y.".'444} `jy { 1 ? .i r' r?: . 5 ( ?, ?fe ? 11 w 4+jY1 `9 `7•.•;??t r.. ?,Y`4 5 ?A?.?, I :? I'•. ?:ifd 4???ii+". 4'f?.`wr?,?r4?1??8gt r-..,? ?!4°1'r'?T`??.o .`n4?? ?• r t?411t I?4?1? .?i _. -. Photo 2 - Adjust channel dimensions, permanent seed, and live stake (Looking downstream). FC-2 Plan Review Checklist EWP-Avery County, North Carolina DSR %C - - I - the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications Additional comments: Natural Resource Conservation Service Agent Agent's Signani e DSR No. TMC-2 Location: Adjacent to Three Mile Hwy. Site Assessed By: KSM, CLY Date Assessed: 6/16/2005 County: Avery Lat.: 35° 59' 03" / Long.: 81 ° 58' 30" Length of Approximately 2800 feet Three Mile Creek (5.7 mil) Assessment: Waterbody: X Debris removal _ Bank sloping X Bank stabilization _ Channel realignment X In-stream structures X Riparian planting X Seeding Adjust channel dimension Summary Evaluation of Conditions: This reach begins at the bridge on Bridge Lane crossing over Three Mile Creek and ends approximately 2800 ft. downstream. The channel crosses under three bridges within the reach. This site experienced moderate aggradation and stream bank erosion, and also collected woody debris. Access to the site can be obtained on Bridge Lane just off of Three Mile Highway. Recommendations for Repair: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled; then installed or transported at the appropriate time. Refer to plan sheet for the location of each recommendation and for location of planting areas. Beginning at Bridge Lane, livestake bank slopes, container and bare root unvegetated stream banks, and eliminate mowing practices to edge of bank and allow for re-establishment of riparian buffer, minimum 15 feet from centerline of the stream (photos 1 and 2). Armor tributary outlet with Class 1 and 2 stones to protect area from further erosion and remove debris (photo 3). Just upstream of the third bridge, repair bank scour and install rock vane (see details). The exact location and tie in of these structures are to be verified by the field engineer. Use fiber matting and livestakes to stabilize bank (photo 4). Downstream of the second bridge (photo 5), remove excess debris, and perform minor grading in preparation of bank surface for live stake and matting (see associated details and plant species list). Remove all woody debris from the site (photo 6). All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attac Quantities: Item Unit Quantity Debris Removal CY 10 Live Stakes EA 150 Excavation CY 7 Container Plantings EA 75 t' ix1.l ?- y?f ? ? w ? 4 t?? ? i ? ? ?} I r 'tire ?. I i i . , J Q i " .. n . ?i Photo 1: Livestake along slopes. Container and bare root unvegetated stream bank No mow zone. Ly,b r Photo 2: Livestake along slopes. Container and bare root unvegetated stream bank No mow zone. TM-2 ' RI' t ?. 1 r 4 Photo 3: Armor outlet with a combination of Class 1 and 2 stones. RR 4 ? a i Photo 4: Extend bank. Install Rock Vane to direct flow from bank. Use fiber matting and live staking on the bank. TM-2 Photo 5 (taken facing downstream from bridge shown in photo 4): Remove excess debris and grade bank. Use fiber matting and livestaking to stabilize bank. Seed and mulch bank. Photo 6: Remove excess debris. TM-2 Plan Review Checklist EWP-Avery County, North Carolina DSR Z' ? _ 1 the Natural Resource Conservation Service Agent for Avery County, have reviewed the stream repair plans listed below. These plans have been prepared by Buck Engineering PC to accomplish stream repair under the Emergency Watershed Protection Program being administered by Avery County. The following table summarizes my comments on these plans: DSR Approve Disapprove Approve with Modifications Additional comments: . Natural Resource Conservation Service Agent Agcnt's Signamm v DSR No. TMC-4 Site Assessed By: KSM, CLY Date Assessed: 6/16/2005 Length of Approximately 4100 feet Assessment: X_ Debris removal _ Bank sloping Bank stabilization Location: Adjacent to NC Hwy 194. County: Avery Lat.: 35° 59' 05" / Long.: 81 ° 58' 37" Waterbody: _ Channel realignment _ In-stream structures X Riparian planting Three Mile Creek (1.32 mil) Seeding Adjust channel dimension Summary Evaluation of Conditions: This reach begins at the eastern most extent along Three Mile Creek on the Spry property near Hilltop Ln. The reach flows approximately 4100 ft. and ends at the western most extent of the Spry property. This site experienced moderate aggradation and stream bank erosion, and also collected a major amount of woody debris. Much of the repair work has been completed by the property owner. Much of the rocky aggradation has been removed from the stream and placed along the eroded banks (See photos 1, 2, & 6). All of the woody debris has been removed from the stream bed and stockpiled on the flood lain. Recommendations for Repair: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled; then installed or transported at the appropriate time. Remove all woody debris from the site. Stockpile all adequately sized root wads (per engineer) for other sites in need of bank stabilization along Three Mile Creek. Live stake (see details) areas identified in the "Recommendations for Repairs" figure (See photos 1, 2, & 6). Live stake areas should be verified by the field engineer. All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attach Quantities: Item Unit Quantity Debris Removal CY 250 Live Stakes EA 600 r i ,,,( r {' A ' + ' Alk - Ll �J. i ,t�J'' 'Y� r�ye• �w M1.�� f .1 TM-4 DSR No. TMC-5 Site Assessed By: KSM, CLY Date Assessed: 6/16/2005 Length of Assessment: Approximately 3800 feet _ Debris removal X Bank sloping X Bank stabilization Location: Adjacent to NC HWY 194. County: Avery Lat.: 35° 58' 15" / Long.: 82° 00' 24" Waterbody: Three Mile Creek (3.03 mil) _ Channel realignment X In-stream structures X Riparian planting X Seeding X Adjust channel dimension Summary Evaluation of Conditions: This reach of Three Mile Creek begins at the eastern most extend on the Phillips property (Laxton Biggerstaff Nursery). Three Mile Creek parallels NC Highway 194 and flows westward towards US Highway 19E. This reach ends at the US HWY 19E bridge. This reach has experienced moderate to severe bank erosion in several areas. As a result, the channel has over- widened. Due to the over-widened channel, the channel has aggraded following large storm flows. This material has been removed by the property owner (Phillips) and placed in the floodplain or used for armoring along the stream banks. In the lower part of this reach, the outside of a meander bend has experienced severe erosion and is approaching NC Hwy 194 (see photos 8 & 9). Just downstream along the McKinney property, much of the left bank has eroded and may threaten the foundation of a house (see photos 10, 11, & 12). Recommendations for Repair: Prior to performing any clearing, grubbing or debris removal activities, inventory, under engineer approval, any adequate root wad or transplant material. These items should be stockpiled; then installed or transported at the appropriate time. Three (3) cross vanes and four (5) rock vanes are to be installed (see details) throughout this reach. See the "Recommendations for Repair' figure for locations of these structures. NOTE: The exact location of these structures is to be verified by field engineer. Throughout the vicinity of the cross vane and rock vane structure installations perform grading to stabilize the structure at the tie-in to existing grade and to prepare banks for seeding, matting and live staking (see details and plant species list). If root wads are available, install (see details) downstream from rock vane structures as located by the field engineer. Reshape inner point bar feature and stream bank as directed by field engineer; for location see "Recommendations for Repair" figure. All work should be performed in conformance with the "Erosion & Sediment Control Plan" (see attached Quantities: Item Unit Quantity Grading bank preparation) CY 525 Live Stakes EA 1250 Erosion Control Matting SY 1050 Temporary Seeding LB 65 Grain Straw Mulch EA bales 40 Permanent Seeding LB 8 Ecostakes wood stakes 12" x 1", notched at to EA 650 Wood stakes 3' x 1" x 1", for toe of sloe EA 225 Boulders 2x3x4 in size Tons 410 } UCK r N G 1.N L: E R, I N G y CLIENT PROJECT 7ML-S _--ll PAGE OF PROJECT NO. SUBJECT CC-, s -t- Prepared By Date V I:f, ej'r: 4 ?Iy.iinch Approved By Date ? y .,,?}4y1J ks t ., r: y AW' 10?.._ .r _ _ ? /ti1 .•?'}r? 1 ??1, ,'?? 4t ???4,?,?y??Y?.A'?rti Photo 1 0%Cr widCIICd channel; install cross Photo 2 - Stable reach along "Three toile Crock (Site vanes. TMC - 5. 'Y1YIP.. • Photo 3 - Moderate bank erosion; install two rock Photo 4 - Reshape eroded stream bank and live vanes. stake. "Y +Y J ie'f s Photo 5 - Reshape eroded stream bank; seed and Photo G Stable reach along "Three mile Creek (Site mat, live stake and install rock vane. TMC - 5). TMC-5 TMC-5 PLANTING SPECIFICATIONS NOTES: 1. PLANT BARE ROOT SHRUBS AND TREES TO THE WIDTH OF THE BUFFER AS SHOWN ON THE PLANS. 2. ALLOW FOR 6-10 FEET BETWEEN PLANTINGS, DEPENDING ON SIZE 3. LOOSEN COMPACTED SOIL TOP OF STREAMBANK 4. PLANT IN HOLES MADE BY A MATTOCK DIBBLE, PLANTING BAR, OR OTHER APPROVED MEANS. 5. PLANT IN HOLES DEEP AND WIDE ENOUGH TO ALLOW THE ROOTS TO SPREAD OUT AND DOWN WITHOUTJ-ROOTING. 6. KEEP ROOTS MOIST WHILE DISTRIBUTING OR WAITING TO PLANT BY MEANS OF WET CANVAS, BURLAP, OR STRAW. 7. HEEL-IN PLANTS IN MOIST SOIL OR SAWDUST IF NOT PROMPTLY PLANTED UPON ARRIVAL TO PROJECT SITE NOTES: 1. WHEN PREPARING THE HOLE FOR A POTTED PLANT OR SHRUB DIG THE HOLE 8 -12 INCHES LARGER THAN THE DIAMETER OF THE POT AND THE SAME DEPTH AS THE POT. 2. REMOVE THE PLANT FROM THE POT. LAY THE PLANT ON ITS SIDE IF NECESSARY TO REMOVE THE POT. 3. F THE PLANT IS ROOTBOUND (ROOTS GROWING IN A SPIRAL AROUND THE ROOT BALL), MAKE VERTICAL CUTS WITH A KNIFE OR SPADE JUST DEEP ENOUGH TO CUT THE NET OF ROOTS. ALSO MAKE A CRISSCROSS CUT ACROSS THE BOTTOM OF THE BALL 4. PLACE THE PLANT IN THE HOLE OF STREAMBANK 5. FILL HALF OF THE HOLE WITH SOIL (SAME SOIL REMOVED FOR BACKFILL). 8. WATER THE SOIL TO REMOVE AIR POCKETS AND FILL THE REST OF THE HOLE WITH THE REMAINING SOIL BUCK 4 80 C P Regency on 81 B 483-548811 00 Fax: 619-463-USO BARE ROOT/ CONTAINER PLANTING EROSION CONTROL MATTING PLACE COIR FIBER MATTING IN 8 INCH DEEP TRENCH, STAKE, BACKFILL, AND COMPACT i-- TOP OF STREAMBANK DITCH TOP OF - - • - -- 0 - -- • -- - • -- - • -- - • -- - • -- - • -- - • -- - • -- - • -- STREAMBANK - - -- -- - -- - -- - -- - -- - -- - -- - -- - -- - - - • • • 0 0 • 0 • • 0 0 • 0 0 0 • 0 0 0 • 0 • 0 • 0 • • 0 • 0 • • • • 0 • PLAN VIEW Q 8000 Regency Parkway Suite 1200 Ls CK Cary, North Carolina 27 27511 Phone: 919-483-5488 Fax: 919-483-5490 NOTES: 1. BANKS SHOULD BE SEEDED PRIOR TO PLACEMENT OF MATTING. 2. PLACE COIR FIBER MATTING ACCORDING TO MANUFACTURER RECOMMENDATIONS. 3. MATTING STAKES SHOULD BE PLACED IN A DIAMOND SHAPED PATTERN. THE WOOD STAKE SHALL BE THE NORTH AMERICAN GREEN ECOSTAKE OR APPROVED EQUAL WITH THE FOLLOWING DIMENSIONS: LEG LENGTH 11.00 IN 27.94 CM HEAD WIDTH 1.25 IN 3.18 CM HEAD THICKNESS 0.40 IN 1.02 CM LEG WIDTH 0 80 IN 1.52 CM (TAPERED TO POIN LEG THICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12.00 IN 30.48 C DITCH TOP OF STREAMBANK STAKES COIR FIBER MATTING TO BE EXTENDED TO TOE OF SLOPE EROSION CONTROL MATTING LIVE STAKING TOP BOTTOM OF CHANNE TOE OF SLOPE CROSS SECTION VIEW 6'-8' SPACING 2'-3' SPACING TOP OF STREAMBANK TOE OF SLOPE PLAN VIEW TOP OF STREAMBANK PLANT STAKES FROM TOP OF BANK TO TOE OF BANK IN A DIAMOND SHAPED STAGGERED PATTERN SQUARE CUT TOP BUDS FACING UPWARD LIVE CUTTING MIN. 12" DIA 7 - 3' LENGTH ANGLE CUT 30-45 DEGREES LIVE STAKE DETAIL NOTES: PLAN VIEW Q 80 00 Regency Parkway Suite 00 North Ca Phry,one 91C9?31183-548811 LJCK 00 Fax: 919-483-5490 1. STAKES SHOULD BE CUT AND INSTALLED ON THE SAME DAY. 2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT. 3. STAKES MUST BE INSTALLED WITH BUDS POINTING UPWARDS. 4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK 5. STAKES SHOULD BE 12 TO 2 INCHES IN DIAMETER AND 2 TO 3 FT LONG. 6. STAKES SHOULD BE INSTALLED LEAVING 1/5 OF STAKE ABOVE GROUND. LIVE STAKING ROCK VANE w a Ca 113 BOTTOM WIDTH OF CHANNEL TOP OF FLOW -? STREAMBED ELEVATION BACKFILL(ONSITEALLUVIUM) ?. CLASS A STONE CLASS 1 STONE PROFILE VIEW NO GAPS - BETWEEN BOULDERS t- BOTTOM WIDTF WsFl PLAN VIEW SCOUR POOL(EXCAVATED)PER DIRECTION OF ENGINEER NOTES FOR ALL VANE STRUCTURES: 1. BOULDERS MUST BE AT LEAST 4'x3'xZ. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK S. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 6. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK 9. START SLOPE AT 213 TO 1 TIMES THE BANKFULL STAGE. BUCK Q 8000 Regency Parkway Suite Cary Ph, 91 63548811 00 Fax: 9194835490 CLASS A STONE BACKFILL (ON-SITE ALLUVIUM) I FILTER FABRIC 1a r HEADER ROCK FOOTER ROCK SCOURPOOL (EXCAVATED) HEADER ROCK Ilr ( x IS ta W?1-2,"'C?LASS O (,1 I?XIS FOOTER ROCK I 'STONE SECTION A - A DuL ak Ih y ab ° 3 ?i.i 11.5' 33.8' S °/o ROCK VANE (TAG -2) ROCK VANE w a N 113 BOTTOM WIDTH OF CHANNEL FLOW S• 1 O'TO30 _ ill (SCOUR Pi EEK NO BETWEEN BETW BOULDERS BOTTOM V PLAN VIEW SCOUR POOL (EXCAVATED) PER DIRECTION OF ENGINEER NOTES FOR ALL VANE STRUCTURES; 1. BOULDERS MUST BE AT LEAST 4' x T x Z. 2 INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK AND THEN UPSTREAM TO A MINIMUM OF TEN FEET. 3. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS AND PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK 4. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK 5. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 8. AN EXTRA BOULDER CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 7. USE CLASS 1 STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASS A STONE TO FILL GAPS ON UPSTREAM SIDE OF CLASS 1 STONE 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ON-SITE ALLUVIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK 9. START SLOPE AT 2!3 TO 1 TIMES THE BANKFULL STAGE. Ell M 8000 Regency Parkway Suite 200 BuCK, Cary, North Carolina 27811 Phone: 919-483-5488 Fax: 91983.5490 TOP OF FLOW -? STREAMBED ELEVATION BACKFILL(ONSITE ALLUVIUM) ?/ •/ CLASS A STONE CLASS 1 STONE CLASS A BACKFILL (ON-SITE ALLUVIUM) TO 1 2Y' PROFILE VIEW i-1=f FILTER FABRIC L -?I 1, 1-r 10' MINIMUM- SECTION A - A HEADER ROCK ' CHANNEL BED FOOTER ROCK SCOURPOOL (EXCAVATED) ,DED MIX `- HEADER ROCK STREAM BANK ? * B HEADER ROCK FOOTER ROCK FOOTER ROCK CLASS 1 STONE ROCK VANE (-Fm(- S) RIFF[ \ (-roc 3) ROOT WADS WITHOUT TRANSPLANTS ROOT WADS CROSS SECTION VIEW PLAN VIEW NTS NTS COIR FIBER MATTING ?O TOP OF BANK FLOOD PLAIN BERM (O.SMAX. HT.) BERMS) 7 NOT O EXTEND BEYOND / LIMITS OF ROOT WADS. OPTIONAL BANKFULL STAGE COVER LOG 1 '\7 BASEFLOW S Q e 1/3 OF- ROOT MASS HEIGHT. ANCHOR COVER LOG IS BELOW'. STREAM BED UNDER FOOTER LOGS _ OR WITH A BOULDER. 10-15 FEET LONG >10' DIAMETER FOOTER LOG > 12" DIAMETER INSTALLED BELOW STREAMBED ?]? yy (OPTIONAL PER DIRECTION OF ENGINEER) \? ROOT WAD ROOT WADS WITH TRANSPLANTS CROSS SECTION VIEW NTS TRANSPLANTS FLOOD PLAIN / BERM (0.5' MAX. HT.) BERMS) TOP OF BANK NOT TO EXTEND BEYOND 7 4T LIMITS OF ROOT WADS. i J i 6 FEET LONG TRUNK >12" DIAMETER aAsumw .113 OF- ROOT MASS HEIGHT IS BELOW . STREAM BED FOOTER LOG > 12" DIAMETER INSTALLED BELOW STREAMBED (OPTIONAL PER DIRECTION OF ENGINEER) 00 BUCK, 80 C Regency Parkway Suite 00 Cary, 19-483-548811 F" 919-483-5490 TRANSPLANTS OR BOULDERS FOOTER LOG FOR TRENCHING METHOD ONLY NOTES TRENCHING METHOD: IF THE ROOT WAD CANNOT BE DRIVEN INTO THE BANK OR THE BANK NEEDS TO BE RECONSTRUCTED, THE TRENCHING METHOD SHOULD BE USED. THIS METHOD REQUIRES THAT A TRENCH BE EXCAVATED FOR THE LOG PORTION OF THE ROOT WAD. IN THIS CASE, A FOOTER LOG SHOULD BE INSTALLED UNDERNEATH THE ROOT WAD IN A TRENCH EXCAVATED PARALLEL TO THE BANK AND WELL BELOW THE STREAMBED. ONE-THIRD OF THE ROOT WAD SHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS. NOTES DRIVE POINT METHOD: SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE "DRIVING" IT INTO THE BANK ORIENT ROOT WADS UPSTREAM SO THAT THE STREAM FLOW MEETS THE ROOT WAD AT A 90-DEGREE ANGLE, DEFLECTING THE WATER AWAY FROM THE BANK A TRANSPLANT OR BOULDER SHOULD BE PLACED ON THE DOWNSTREAM SIDE OF THE ROOT WAD IF A BACK EDDY IS FORMED BY THE ROOT WAD. THE BOULDER SHALL BE APPROXIMATELY ,V X TX 2'. ROOT WADS TEMPORARY SILT FENCE NOTES: FILTER FABRIC - 1. USE FILTER FABRIC A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRE AS DIRECTED COMPACTED FILL BY THE ENGINEER. 2 PROVIDE V STEEL POST OF THE SELF-FASTENER ANGLE STEEL TYPE. EXTENSION OF FABRIC INTO TRENCH Q 8001 Phone: Regency Parkway Suite 119-483548811 00 ary, North Fa)c 919-4635490 SILT FENCE 6' MAXIMUM w?nmr?rcruorarowm ? ?er a r.ue ?+.. is ie..vc r...an aww auca GROUNDCOVER PLANTING DETAIL l" 2761250 Q 8000 Ra Nor PO"ay L I C K Cary, North C-arolina 27611 Phone: 919.{8}.6468 Fax 91 9-4616490 RNP• r,iia .vw•, u.Y ae.?w?.eo emE?.enae MTA a[RMICN PRUNING CUTS ? co ou..cr awaai ewriemro?srm arr SHRUB BED PLANTING DETAIL vGUYING 8 STAKNG liRfRYa s.wl se ?rtxOTMi M lie 0/?R.wrMn Rx?W¢r rwl r'M boiMHAi1?01Y1Ua1aYYU WiN?ro?Nr- WAYLa eGYFD ?erow aRM IIIOY Td Oi a41Ie50'a eKJOUI4YO1/e1 aYl • ? CCYRtIi GUY SPACING DETAIL + O + aw° v'"+ 0 Q RANDOM PLANT SPACING DETAIL-PLAN VIEW M MMiW f4F1P/uttw a+i R.wr er.Wauq 1D e.YM wawa?? rCiu 112 MMI Fitn4A TREE & SHRUB PLANTING DETAILS GUY TYING DETAIL ..oe n.:en woe ww a.id TREE OR SHRUB PLANTING DETAIL STAKNG DETAIL FOR TREES V TO 10' TALL UteO RM W Y CC VL Oli I Ilf ?1ff i®f/ M UG?FFR (JQ© RM lY • a[i0arltD M eMiertFa M M 116II ro R TREE OR SHRUB PLANTING DETAIL LEE GUYING DETAIL FOR TREES 10' OR TALLER ARID OYYW CRALOIIYIaFOI.IRIII rIM WYEtR Erosion and Sediment Control Plan Emergency Watershed Protection Program Avery County The following erosion and sediment control measures will be incorporated into all stream repair sites. 1. The Contractor shall minimize vegetation disturbance by only working on the stream bank and channel that is in need of repair. Existing buffers shall not be disturbed unless directed by the designer. 2. The Contractor shall only enter the stream channel as shown on the plans or directed by the designer. These stream accesses shall conform to the design standards shown in the attached detail drawings. Timber mats may be used as a substitute for rock per the approval of the designer. 3. The Contractor shall limit all bank and channel disturbance to activities that can be completed by the end of each working day such that the work would remain in place during an overnight storm event. 4. All equipment and uninstalled materials shall be removed from the channel at the end of each working day and secured safely from potential out-of-bank flow events that may occur prior to performing additional work. 5. Graded stream banks shall be stabilized with temporary and permanent seed and coir fiber matting at the end of each working day. Seeding and coir fiber -- matting specifications are included with this plan. 6. Stockpiles shall remain at least fifteen feet from flowing water and outside of the top of bank. Silt fence shall be placed at the base of the stockpile between the stockpile and the channel and must function to receive stockpile runoff before entering the channel. Silt fence shall conform to design standards shown in the detail drawings. 7. Temporary vegetation and permanent herbaceous vegetation shall be established on all disturbed areas not already stabilized with matting, within five days after construction is completed. 8. Permanent woody vegetations species are listed in the vegetation specifications; planting details are also included. River Works 1 of 3 Buck Engineering TECHNICAL SPECIFICATION Velzetation Planting General Seeding Seeding should be done immediately upon completion of final grading. Apply seed prior to installing matting. Prepare the soil surface so that it is smooth and free from stones, clods, or debris that will prevent the contact of the matting with the soil. Fertilizer and lime are generally not necessary on most projects, particularly not on sites that have been used for agriculture production or cattle grazing. Urban soils may require amendments. Seed should be broadcast with a centrifugal seeder or by hand, at the full rate along stream banks and in stockpile areas. In all areas where permanent seeding is used in addition to the temporary seed, mixing of the seed for broadcasting is acceptable. Seed and amendments (if needed) should be covered to a depth of 1/2 to 1 inch with soil by using a hand rake, drag or other tillage equipment. Seeding may also be done with a hydroseeder. Wood cellulose fiber will not be acceptable as a substitute for straw mulch. A suitable tracer shall be used to clearly identify areas hydroseeded. A minimum of 500 lbs. per acre of wood cellulose fiber or a non-toxic water base dye may be used as a tracer. Seed shall not remain in water containing fertilizer more than 45 minutes before being used. All products used to hydroseed shall be non-toxic to aquatic organisms. Temporary Seeding For temporary seeding, apply the following vegetation at the listed rates and times. Temporary Seeding (September to March): Rye grain 3 lbs per 1,000 sq ft or 1301bs per acre Temporary Seeding (April to August): Foxtail Millet 1 lb per 1,000 sq ft or 40 lbs per acre A combination of the two temporary seed types shall be used during the boundary months of March, April, August and September to ensure survival. In all disturbed areas where no permanent seed is being used (i.e. yard or agricultural field) and temporary seed is not desired at the higher rate, broadcast temporary seed at the lower rate of approximately 1/2 the full lbs/acre stocking rate. When used in conjunction with permanent seed mix, apply at 1/2 the full lbs/acre rate. Permanent Seeding Permanent seeding will be accomplished using the mix listed below: Buck Engineering 2 of 8 River Works i Riparian Seed List Scientifie name Agrostis alba Carex vulpinoidea Elymus virginicus Juncus effisus Panicum clandestinum Polygonum pennsylvaticunt Bidens frondosa Coreopsis laicolata Cassia fasciculata Yerbesina alternifolia Common Name % of Mix Redtop 15% Fox Sedge 10% Virginia Wild Rye 20% Soft Rush 5% Deer Tongue 15% Smartweed 5% Beggers Ticks 5% Lance leafed Coreopsis 15% Partridge Pea 5% Wingstem 5% Seed at full rate of 15 lbs/acre along stream banks and in any stream buffer and wetland areas. Riparian Buffers Trees and Shrubs Trees and shrubs will be used to provide permanent vegetation for EWP repair sites. Species used shall be selected from the following list: Shrub and Small Trees Scientific naive Common name Sal& sericea Silky Willow Xanthorhiza simphcisslnla Yellowroot Physocarpus opulifolius Ninebark Coryus anonum Silky Dogwood Hanamelis virginiana Witch-hazel Carpinus caroliniana Ironwood Corylus americana Hazel-nut Alnus serrulata Tag Alder Ostrya virginiana Hornbeam Spirea tomentosa Hardhack Rhododendron arborescens Smooth Azalea Rhododendron maximum Rosebay Rhododendron Cephalaidw occidentalis Button Bush Itea virginica Virginia Sweetspire Calycaithusfloridus Sweet Shrub Leucothoe axillaris var. editorum Dog Hobble Hydrangea arborescens Mountain Hydrangea Sambucus canadensis Elderberry Buck Engineering 3 of 8 River Works LargeTrees Scientific name Common name Aesculus octandra Buckeye Tsuga canadensis Canadian Hemlock Platanus occidentalis Sycamore Acer rubrum Red Maple Quercus alba White Oak Quercus rubra Red Oak Liriodendron tulipifera Tulip Poplar Tsuga carolinianum Carolina Hemlock Betula lenta Cherry Birch Trees shall be planted as either bare rooted or containerized material. Trees should be planted at a rate of 400 stems/acre (roughly 10 feet on center) where EWP repairs have been accomplished. Planting of this material will be done during the dormant season (late fall and winter of 2005-2006). Refer to the attached details and specifications for more information. Stream banks Live Staking Species used for live staking shall be taken from the following species: Scientific name Common name Cornus aniomum Silky Dogwood Salix sericea Silky Willow Sambucus canadensis Elderberry Cephalanthus occidentalis Buttonbush Salix nigra Black Willow Stake at 2-3 foot spacing on the outside of all meander bends. Stake at 6-7 foot spacing on the inside of meander bends and all tangent sections. Note this is appropriate for most rural systems. Urban or flashy systems should be staked at higher rates. Utilize as diverse a species group as feasible and make sure that black willow constitutes less than 25% of total stakes used. Containerized Plants: Containerized shrub material may also be used on the stream banks to increase the diversity. Applications and spacing should reflect that of live stake material. Mulching Mulching shall be used to provide temporary protection of soil surfaces from erosion. Mulching should be performed within 48 hours of seeding. Grain straw mulch should be applied on seeded areas at a rate of 75 bales per acre. Apply mulch uniformly. Buck Engineering 4 of 8 River Works Erosion Control Matting Ecostakes Provide wooden stake not less than 12 in. (300 mm) in length with a notch cut 1 in. (25 mm) from the top. These stakes shall be used to stake the matting along the slopes. Wooden 3 ft. stakes spaced approximately 4 ft. apart shall be used to secure the matting at the toe of slope. The toe stakes shall have a minimum 1-inch by 1-inch cross-section and shall be designed so that the matting can not slide past the exposed end of the stake. Refer to the attached details and specifications for EWP work for more information. Coir Fiber Matting The erosion control matting shall be a machine-produced mat of 100% coconut fiber with the following properties: Matrix 100% Coconut Fiber Weight 20 oz/SY (678 gm/m2) Tensile Strength 1348 x 626 lb/ft minimum (1650.5 x 766.5 kg/m) Elongation 34% x 38% Open Area (measured) 50% Thickness 0.30 in minimum (7.6 mm) Flexibility (mg -cm) 65030 x 29590 Recommended Flow 11 feet/second (3.35 m/s) Size 6.6 x 164 ft (120 SY) or (100 SM) "C" Factor 0.002 Place the coir fiber matting immediately upon final grading. Provide a smooth soil surface free from stones, clods, or debris that will prevent the contact of the matting with the soil. Apply seed prior to installing matting. Begin at the bottom of the slope by anchoring the matting in a 6-inch (15 cm) deep by 6-inch (15 cm) wide trench. Backfill and compact the trench after staking. Walking backward down the stream, allow the matting to unroll slowly; ideally the matting roll will rest against your shin as you walk. Stake the matting according to recommended stake pattern for specific product and slope. (See stake pattern guide that comes with the product.) Place matting in full contact with the soil. The edges of the parallel matting must be staked with approximately 2 inches (5 cm) of overlap such that the edge of the downstream matting is under the one just upstream. When matting must be spliced down the slope, place matting end over end (shingle style) with approximately 6 inches overlap. Drive stakes through the overlapped area. Place stakes across the matting at ends, junctions and trenches approximately 1.3 ft apart. Place stakes along the outer edges, down the center of each strip of matting and along all lapped edges approximately 2 ft apart. Cut excess matting and anchor at the end of the slope. Buck Engineering 5 of 8 River Works Temporary Stream Access Ramps Stream access ramps shall be constructed using either rock or timber mats in locations as shown on the plans or as directed. Grading shall be performed only to the extent needed to form a stable ramp connecting the stream bank grade to the streambed. The Contractor shall determine the appropriate number of timber mats and ramp angle according to the equipment that will be using the ramp. Stream access ramps are temporary and shall be removed and the areas restored to their original state when they are no longer needed or permanent measures are installed. Sediment Fence Geotextile sediment fences shall be used to trap sediment from areas of limited runoff. Sediment fences shall be properly anchored to prevent erosion under them. These works are temporary and shall be removed and the areas restored to their original state when they are no longer needed or permanent measures are installed. Locations for sediment filters are shown on the plans. Refer to sediment fence specifications (6.62) in the NC Erosion and Sediment Control Planning and Design Manual for material and installation requirements. Gravel Construction Entrance/Exit Temporary gravel construction entrances shall be constructed as shown on the plans and according to specification 6.06 of the NC Erosion and Sediment Control Planning and Design Manual. In-stream Structures In-stream structures include w-weirs, cross vanes, j-hook vanes, log vanes, and wing deflectors. The quantity of in-stream structures to be constructed shall follow approved plans, but may be affected by conditions encountered during construction Boulders used for in-stream structures shall be relatively flat on either side in the same dimension, preferably the long dimension, and must have relatively smooth ends. No more than 5% of the boulders shall be smaller than 3'x2'x2'. Boulders larger than 6'x4'x3' shall be permitted. Boulders found on-site and approved for use by the Developer will be used to the extent feasible. The Contractor shall construct in-stream structures with equipment capable of moving and accurately placing boulders of approximate dimensions 6'x4'x3'. If suitable for backfill, excavated material shall be placed on the upstream side of structures or as directed. Unless otherwise approved by the Developer, excavation to prepare the subgrade for the installation of in-stream structures shall be consecutive and continuous. Once the excavation of a structure has begun, the structure shall be completed by the end of the workday. All equipment shall be removed from the stream at the end of each workday. Any accumulation of sediment in the channel shall be cleaned as needed during construction and at the end of construction. No separate payment will be made for this clean-up work. Buck Engineering 6 of 8 River Works Construction Sequence of Events Construction shall be performed at the EWP site in accordance with the plans and in general accordance with the following sequence: 1. Mobilize equipment and materials to the site. 2. Set up construction access pads, staging areas, haul roads, and silt fences. 3. Install stream access ramps. 4. Excavate and grade banks and construct in-stream structures. 5. Seed and mat graded banks and immediately upon reaching final grades. 6. Stabilize all disturbed soil with temporary and permanent seed prior to leaving the site each day and prior to moving to the next work area. 7. Dispose of excess materials at approved off-site locations. 8. Remove stream access ramps. 9. Remove silt fence and seed and mulch staging areas to restore these areas to pre- project conditions. 10. Demobilize grading equipment from the site. Remove construction access pads. 11. Plant bank, floodplain and buffer woody vegetation and live stakes during the dormant season. Buck Engineering 7 of 8 River Works 13 i Details and Specifications for EWP Work Planting • Bare Root/Container Planting • Brush Mattress • Tree & Shrub Planting Details • Live Staking Erosion Control • Erosion Control Matting • Silt Check • Silt Fence • Typical Pump Around Operation • Temporary Gravel Construction Entrance • Ford Stream Crossing • Ford Stream Crossing 2 • Temporary Ford Stream Crossing W/ Flume Pipe Stream Repair Structures • Typical Structure Placement • Typical Plan View & Profile • Constructed Riffle • Double Drop Rock Cross Vane • Double Wing Deflector • "J" Hook Vane • Log Vane • Log Vane 2 • Log Step Pool • Rock Vane • Rock Cross Vane Type 1 • Rock Cross Vane Type 2 • Root Wads • Single Wing Deflector • Step Pool Channel Buck Engineering 8 of 8 River Works 6/28/05 Subject: Cultural Resources Literature Search and Survey Results for Avery County NRCS Planned EWP Undertakings To: Jane Shaw, NRCS District Conservationist Date of Survey: 6/14 - 15/2005 From : Jim Errante USDA-NRCS, CRS SC & NC 1835 Assembly St., Rm 950 Columbia SC 29201 Phone: (803)253-3937 The following list of DSR's were reviewed by Jim Errante, NRCS Cultural Resources Specialist (CRS). A literature search for each planed practice location took place in the Archaeological Map room of the NC Office of State Archaeology. Each location was reviewed for the potential of NRCS planned activities to effect cultural resources (CR's). In addition, photographs of the APE's were reviewed and discussions were held with knowledgeable field office and the engineering staff in order to determine the potential of planned activities to effect CR's at each EWP practice location. Each practice location received a ranking of a low, medium or high potential to effect CR's. All EWP practice locations receiving a medium or high ranking to effect cultural resources were archeologically surveyed by the NRCS CRS. Archaeological survey procedures included reconnaissance survey of all visible soils in the area including river bank profiles, and shovel testing. All shovel tested soils were screened through '/4 inch hardware mesh. The following Excel file list of EWP locations includes a statement describing the results of this survey work. The NRCS CRS maintains the field work details of the archaeological survey at each APE. Any questions concerning the results of these survey results as listed below should contact the NRCS CRS for further explanation. DSR #s CR Review Comments BC 1 Elk Mills Low potential for impact to CR's FO to survey BC 1 Elk Park Low potential for impact to CR's FO to survey BC 2 Low potential for impact to CR's FO to survey CB 1 Low potential for impact to CR's FO to survey cc 1 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. CC 2 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. CC 3 No previous recorded CR's. Very low terrace over stream & disturbed soils in APE. Surveyed by CRS. Ok to proceed. w, DSR #s CR Review Comments CC 4 Low potential for impact to CR's FO to survey CH 1 Low potential for impact to CR's FO to survey Cross Cr 1 Low potential for impact to CR's FO to survey Cross Cr 2 Low potential for impact to CR's FO to survey Curtis Cr 1 Low potential for impact to CR's FO to survey Dellinger Br 1 Low potential for impact to CR's FO to survey ER 1 Low potential for impact to CR's FO to survey ER 2 Low potential for impact to CR's FO to survey ER 3 No impact to CR's in area. All CR's are outside of APE. All work planned in-stream. Primarily debris removal. Surveyed by CRS. Ok to proceed. ER 5 No previously recorded CR's in area. Very disturbed soils in APE. No CR's. Surveyed by CRS. OK to proceed. ER 6 Low potential for impact to CR's FO to survey ER 7 No previous recorded CR's. Alluvial, silty soils. Surveyed by CRS. Ok to proceed. FC 1 Small Area, OK for FO to Survey FC 2 Low potential for impact to CR's FO to survey GP 1 Low potential for impact to CR's FO to survey HB 1 Low potential for impact to CR's FO to survey HP 1 Low potential for impact to CR's FO to survey K 3 Low potential for impact to CR's FO to survey K 4 Low potential for impact to CR's FO to survey KC 1 Low potential for impact to CR's FO to survey KC 2 Low potential for impact to CR's FO to survey LEC 1 Low potential for impact to CR's FO to survey LHC 1 Low potential for impact to CR's FO to survey LL 1 Low potential for impact to CR's FO to survey LR 1 No previously recorded CR's area. APE is roadside. Soils are disturbed. No CR's. Surveyed by CR Specialist. OK to proceed. LR 2 No previously CR's recorded in APE. This reach is primarily just debris removal or requiring fill. No CR's in APE. Surveyed by CRS. Ok to proceed. LR 3 No previously recorded CR's in APE. Only debris removal scheduled. No CR's in APE. Surveyed by CRS. Ok to proceed. LR 4 Low potential for impact to CR's FO to survey LR 5 Low potential for impact to CR's FO to survey LR 6 Low potential for impact to CR's FO to survey LS 1 Low potential for impact to CR's FO to survey LS 2 Low potential for impact to CR's FO to survey LS 3 Low potential for impact to CR's FO to survey LS 5 Low potential for impact to CR's FO to survey LS 6 Low potential for impact to CR's FO to survey LS 7 Low potential for impact to CR's FO to survey LS 8 Low potential for impact to CR's FO to survey LS 9 Low potential for impact to CR's FO to survey LS 10 Low potential for impact to CR's FO to survey LS 11 Low potential for impact to CR's FO to survey LS 12 Low potential for impact to CR's FO to survey MB 1 Low potential for impact to CR's FO to survey Mrk 123 Low potential for impact to CR's FO to survey MT 1 Low potential for impact to CR's FO to survey MT 2 Low potential for impact to CR's FO to survey MT 3 Low potential for impact to CR's FO to survey MT 4 Low potential for impact to CR's FO to survey NT 1 Low potential for impact to CR's FO to survey NT 2 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. " M DSR #s CR Review Comments NT 3 Low potential for impact to CR's FO to survey - primarily debris removal. NT 4 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 5 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 6 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 7 Low potential for impact to CR's FO to survey (previously surveyed - No CR's) NT 8 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 9 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 10 No CR's previously recorded in area. Location will primarily involve debris removal. Low banks in area and no evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 11 No previously recorded CR's in area. Impacts planned are adjacent to bridge and are disturbed and heavily scoured. No CR's. Surveyed by CRS. Ok to proceed. NT 12 No previously recorded CR's in area. No CR's. Surveyed by CRS. Ok to proceed. NT 13 No previously recorded CR's in area. Survey focused on streambank stabilization areas. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 14 No previously recorded CR's in area. Survey focused on streambank stabilization areas. Significant nursery agricultural impacts in area. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 15 No previously recorded CR's in area. Survey focused on streambank stabilization areas. Significant nursery agricultural impacts in area. No CR's discovered. Location will primarily involve debris removal. Surveyed by CRS. Ok to proceed. NT 16 No CR's previously recorded in area. Location will primarily involve debris removal. No evidence of CR's found. Surveyed by CRS. Ok to proceed. NT 17 Low potential for impact to CR's FO to survey NT 18 No previously recorded CR's in area. Very low terrace, and very scoured area. Area floods frequently. No CR's. Surveyed by CRS. Ok to proceed. NT 19 Low potential for impact to CR's FO to survey PC 1 Low potential for impact to CR's FO to survey PM1 Low potential for impact to CR's FO to survey RB 1 Low potential for impact to CR's FO to survey RC 1 No previously recorded CR's in area. Very disturbed soils in APE - re-routed stream & scoured area. No CR's. Surveyed by CRS. OK to proceed. SB 1 Newland Low potential for impact to CR's FO to survey SB 1 V.Crucis Low potential for impact to CR's FO to survey Sc 1 Low potential for impact to CR's FO to survey Sol Low potential for impact to CR's FO to survey TMC 1 Low potential for impact to CR's FO to survey TMC 2 Low potential for impact to CR's FO to survey TMC 3 Low potential for impact to CR's FO to survey TMC 4 Low potential for impact to CR's FO to survey TMC 5 Low potential for impact to CR's FO to survey UNR 4 Low potential for impact to CR's FO to survey LINT 1 Low potential for impact to CR's FO to survey LINT 2 Low potential for impact to CR's FO to survey LINT 3 Low potential for impact to CR's FO to survey LINT 5 Low potential for impact to CR's FO to survey LINT 6 Low potential for impact to CR's FO to survey UNT 7 Low potential for impact to CR's FO to survey LINT 8 Low potential for impact to CR's FO to survey W 1, DSR #s CR Review Comments WC 1 Low potential for impact to CR's FO to survey WF 1 Low potential for impact to CR's FO to survey WF 2 Low potential for impact to CR's FO to survey (previously surveyed - No CR's) WO 1 Low potential for impact to CR's FO to survey WO 2 Low potential for impact to CR's FO to survey WO 3 Low potential for impact to CR's FO to survey WP 1 Low potential for impact to CR's FO to survey WP 2 Low potential for impact to CR's FO to survey BUCK 10 0 0 R c t; c n c y 1' a I- k w a v. S ti i t c 2 0 0 1 C a r v. N o r t h C a r o l i n a 2 7 5 1 1 I'Itonc 9 t 9 a 63 54 K ENGINEERING F > I t> >•61 541)0 w w%v. b u c kc ti inccri n? coin July 12, 2005 Mr. Mark Cantrell US Fish and Wildlife Service 160 Zillicoa Street Asheville, NC 28801 Dear Mr. Cantrell: Subject: USFWS concerns for EWP DSR sites in Avery County In an USFWS memo, dated June 21, 2005, the USFWS listed a table of EWP DSR sites in Avery County that could potentially impact protected species. Sites NT-13 through 19 and TMC-5 from that list are located upstream of the Appalachian elktoe and therefore may serve as critical habitat for the Appalachian elktoe. However, from a conversation made on June 20, 2005 with Steve Frayley of NC Wildlife Resources Commission, Mr. Frayley stated that the above mentioned sites are too far upstream of existing populations of Appalachian elktoe and therefore would not affect those populations. Mr. Frayley's most recent monitoring data is from 2004. He recommended that additional surveys in the mentioned above sites are not necessary. The USFWS concern for EWP DSR site KC-1 is Gray's lily. It was determined that no work is proposed for this site. Therefore the Gray's lily will not be affected. Debris removal is only work being proposed for EWP DSR LR-4. Debris is woody material (trees and leaf pack) on the riverbanks and should not affect the USFWS concerns for that site. The EWP DSR LS-8 is a residential yard and is not located in or near an area of USFWS concern (swamp-forest bog complex). EWP DSR LL-1 (Squirrel Creek) is'the only site from the list that may require an additional survey. Once final designs are made for this site, a biologist from Buck Engineering will perform any necessary surveys to determine if site exists in or near a Southern Appalachian mountain bog and determine potential impacts from proposed work. Table 1 below lists the federally threatened and endangered species for Avery County. No habitat exists for these listed species at the above mentioned sites except for DSR LL- 1 (potential bog turtle habitat) and therefore construction should not impact the listed species. Please contact me at 919-459-9009 for any questions you may have regarding the Avery County EWP DSR sites. R ?• s /? n rf i b!. G rr ?' i n <• c• r i n ;, n rt ?1 S' r• i t rr r- r I rr r .r 11 c! t c• r 1: n r i r u rr ur r rr C I r a r I o t t c. N C -A , I ?• i I I c t ? C A t 1? n;: l . C i: ti. BUCK A Table 1. Federally Threatened and Endangered Species in Avery County Common Name Scientific Name Status Vertebrates Bog turtle Clemniys nwhlenbergii T(S/A) Carolina northern flying squirrel Glaucomys sabrinus coloratzss Endangered Virginia big-eared bat Corynorhinus townsendii virginianus Endangered Invertebrates Spruce-fir moss spider Microhexura montivaga Endangered Vascular Plants Blue Ridge goldenrod Solidago spithamaea Threatened Heller's blazing star Liatris helleri Threatened Roan Mountain bluet Houstonia niontana Endangered Spreading avens Geum radiatun2 Endangered Nonvascular Plants Rock Gnome Lichen Gylnnodenna lineare Endangered Sincerely, Gregory W. Price, PWS 2 0 0 5 1 5 "