Loading...
HomeMy WebLinkAboutNCC190433_ESC Approval Submitted_20190529Engineering Services Department B. Keith Pugh, P.E. DIRECTOR NORTH CAROLINA 6 INTERNATIONAL C1T'YT May 24, 2019 P financially Responsible Party & Re¢istered Aeent EBSCO Enclave Phase II, LLC 5724 Highway 280 Last Birmingham, Ala. 35242 Corporation Service Company c/o Leslie Yielding 2626 Glenwood Ave. Raleigh, N.C. 27608 RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN Project: The Enclave@ Deep River Plantation, Phase II Location: 4203 River Birch Loop / 1238 Tarrant RD. Jamestown, N.C. 27409 Land -Disturbing Permit # EN49=0134 Dear Sir or Madame: The Engineering Services Department has completed the review process for the Soil Erosion Sedimentation Control Plan submitted on May 24, 2019 for the project referenced above. Based on our review, the plan is hereby approved. This plan will specifically cover the Erosion and Sediment Control Measures during the Grading and Building Phases. If a different identity executes the Building Phase, this approved Erosion and Sediment Control Plan may be transferred to the firm/person executing the Building Phase. Prior to transferring the plan, written authorization and a Financial Responsibility Form must be submitted to our office for review. The terms and conditions of the approved plan shall remain in place unless otherwise noted. The Erosion Control Measures shown on the plans) are approximate. Some field adjustment may be required to make the measures work correctly. This letter will serve notice that: • Asper NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be carried out by the staff of Department of Environmental Quality or other qualified persons authorized by the Commission or Department of Environmental as necessary to carry out its duties under the Act and No person shall refuse entry or access to any representative of the Commission or any representative of a local government who requests entry for purposes of inspection. *Asper High Point Development Ordinance 2.5.10.G.1 and 2, this permit will become null and void one (1) year from the date of issuance. You may request in writing, 180-day permit extension 30 days prior to the expiration date, for good cause. • The Land Disturbing Permit issued by the City of High Point is conditional based on the applicant's compliance with Federal and State water quality laws, regulations, and rules. • Approval of the Erosion and Sediment Control Plan authorizes the permittee to discharge stormwater in accordance with the standard and regulations of current General Permit NCGO10 and the National Pollutant Elimination System (NPDES). • This Letter of Approval must be posted at the site of the land disturbing activity along with the Land -Disturbing Permit, and the approved Erosion and Sediment Control Plan. • Only minor deviation from the approved plan can be approved by the Erosion Control Inspector prior to address the following deficiencies: o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam, rolled erosion control practices, etc.). o Relocation of E&SC Measures that improve the overall Stormwater and sediment control. • As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.govINCG01. Please direct questions about the NOI form to Annette Lucas at Annette.hor Paul Clark at PauLclark t ncdencgov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. • Erosion Control Measures must be maintained until site is stabilized with sufficient ground cover. • A condition of this approval is that the streets in this phase must be kept free of sediment. Daily cleaning of streets will be required. Erosion Control Measures to prevent. construction traffic tracking sediment onto the streets must be maintained. Any debris or sediment on River Birch Loop, Hanging Leaf Point or Tarrant Road will be cleaned from the street surface immediately. • All applicable fees must be paid prior to the issuance of the Land -Disturbing Permit. Please call me if you have any questions or comments. Sincerely, Kathy Blalce Engineering Services Department (336) 883-3194 Cc: file; CPT Engineering, Steve Webb, 4400 Tyning Street, High Point, N.C. 27265 2