Loading...
HomeMy WebLinkAbout20190700 Ver 1_W-5706C Wetland Permit Drawings_Full_Flat_20190530See Stet fA For Index of Stets See Stet iB For Corrven Symbols STATE OF NORTH CARO]LINA ®. See Stets RW02C- i & RW02W02C-2 For Survey Control Stets N.C. t W-570 C I DUBLIN H[WAYS DIVISION OF HIGHWAYS ,�9.� V .�� TOWN LIMIT 44852.1.3 HSIP-0041110 PE o 44852.2.3 HSIP-0041110 ROW BLADED COUNTY 44852.3.3 HSIP-0041110 CONST � OI SRONo50NR01 1QpU�°P55 LOCATION. ROUNDABOUT O NDABOT AT INTERSECTION OF NC 41 O NC 410 Wetland Permit Drawings w y�° TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, Sheet 1 of 4 N PROJECT u AND PAVEMENT MARKING QSITE SN IGEME0.0.0) < o$. o P»�p01 EAy6Ea u p BEGIN CONSTRUCTION 4 -n- r .1 +oo.o0 'o Z 41 o r VICINITY MAP END TIP PROJECT W-5706C —L— STA 22 + 00.00 T� DENOTES OFF —SITE DETOUR TO LU_ MBERTON / BEGIN TIP PROJECT W-5706 , -L- INC HWY 41) I / TO EUI BETHTOWN _ I— STA 12+00.00 wO 'OO CONSTRUCTION ' OEND Oep'/ NCDOT CONTACT: JASON HATFIELD - DIVISION PROJECT ENGINEER GGGUMENT NGT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED U GRAPHIC GRAPHIC SCALES DESIGN DATA ADT 2016= PROJECT LENGTH Prepared for tle North Carolfna Department of rrons rtotfon in the offlae of: PARSONS SUNG4IEGEGIGNGAGLP,PA S ENGINEER ,.1j�••,,,,, „ooQlNRa/ q, 50 25 0 50 100 4,900 _ DHV = 5 0%PH LENGTH OF ROADWAY TIP PROJECT W-5706C = 0.189 MILES y�► _ _ AJ��^aW¢n� _�!= SEAL1/38/2019 i69i1 ?` T50 OF MART N �•y@ PLANS 1018 srnNnexn SPHCIPID9IION3 25 0 50 100 D = 65% T = 4% ` TOTAL LENGTH OF TIP PROJECT W-5706C = 0.189 MILES RIGIJT OF WAY DATE: MARCH 30, 2018 DAVID L. WIENER. PE Pno�ecr avcrxrsR ROADWAY DESIGN ENGINEER PROFILE HORIZONTAL (HORIZONTAL) ` TTST= 1% DUAL= 3% cutq. O 10 5 0 70 20 FUNC CLASS - LETTING DATE. J. MATTHEW PICKENS, PE P"vecr nE.vcx Exrrxeen _.•°•Q1H- a+; .. d�EALY`. iyza/zoL9 z 3/ GP TRL+°f U RURAL MINOR COLLECTOR -' ��p- a_L, F �w �i� APRIL 17, 2019 PROFILE (VERTICAL) STATEWIDE TIER - Wetland Permit Drawings Sheet 2 of 4 DENOTES FILL IN WETLAND ® DENOTES EXCAVATION IN WETLAND \ ® DENOTES HAND CLEARING O RUFUS 9 `}f SPEC SEE E BRPICH sP �ST EST 7 ISY OF� EC SFF DETULb DE.r5oa1= �F—\ 1. -L- PC Sla /2+r9_m O u Ea RIP RAP �11 Yl- PTr OF C. EST TO. ,f BEGIN CONSTADETW � o —SIT I DITCH ECDET.'3 STEVE 6 SUZANNE RIINBLEY \ z iC Sla 3+Tpf7 / V DITCH Q 0 Q Q Q fl 4 SEE DETAIL DITCH p Lfl G? k ,w0 .4r IN F , F — - --- TDD RDA MCE �, E-C Ec vsr F TF �ou�s a - - ' - _ �b - - - - �Fsr-3-,ey u PDT Vd. p+ODDD seebE:ali i - - - -- - c , , _ _ _ _ _ � P tv.55T FTPPar I 1 TI Pl ]DSY.yL TDI I o I TO'S0'E SPEC,a SEE DETAIL. �......... __ - DETAIL 3 N ,o� EST v F s M2T �iL�a+�532' ,L / SEE D—H. P Y NIL C-1 - _ _ ® x +1833 so"e4 of Nc, uc b s 2 Es azo TONS £ PB B156 PG 1561 �IeNLEY 6 C ROL BRISSON EST 39 Sr OF t , AT4 EARTH PEV. NROLEUN -n- PRc SIa 18+t6zD D TAIL' EESTST , SY S 4TL B NOPY f �l S" ISxeus W PB BI56 PG 1561 I SEE DSTAL ] ' ' FEMo� , L DETAIL 1 TCUT FITCH AIL FI .s"-7 A,' • SPECIAL sECI--M AM 29_tf1LGLL_ T D" � \ s.�° 1 FROM BTA,9+0DTO BTA.3.00 n-a �'�' • SEEDOEiNL 5 RCH f0.0M S e+00 -YI- L A A , DETAIL 3T SPECIAL pu ESL rtcry DETAIL 5 f- PRC S1a 19+82A5 SPECIALuq%PAM'DITcry kr SPEC uTERAM'-DITCH 3 \ Fa D.LT ' M SrA ,I. FROM STA ,3.5, TO STA ..80 {_ BT FROM 3TA 18+00 TO STA.31+00 _ _ I_ TO STA n "'LT SPEC -T' 'LT 11- \ S DETAIL 77 " 2s RC 41 FROM sTA.,T+,O -L- A 17.3D -YI SPED. aT.Y DRc IrpTE>I -rl- PGC 516. 22140m / SEE SHEET 5 FOR -L- PROFILE / E a CO srRucrro SEE SHEET 5 FOR -rl- PROFILE SEE SHEET 6 FOR -RAB- PROFILE Wetland Permit Drawings u°'`' : R Erv�,rv57 rvN HDIHEER wL« aN• wn,;..n,L..a Sheet 3 of 4 -Y/- PC SIG. 12,63D7 SUNGATE DESIGN GROUP, P.A.7 -YI- PT S1o. 15*5679 ', -Yl- POT SIG. 12fOOm F ¢/ © �/ BEGIN STRUCT DENOTES FILL IN WETLAND \ N DOCUMENT NOT CONSIDERED FINAL MADE S ROSELLA PAT , �/n UNLESS ALL SIGNATURES COMPLETED ALL ® EE E DENOTES EXCAVATION\ PE aT.v DIT \ La IN WETLAND STEVE S SUZANNE RI1I18LEx ® DENOTES HAND 3 �' z CLEARING \�. L -YI- PC 590. ls+mjr O/ see .—IL yl- �r r OF %n EST i JJfr / P Rurus N. SPEC, eLASS R RIP .1 sr oP C SS r Sx OF bL� °' + Q -L- POT SIG. 23+0536 - PT s%iE.°Eo 6 (�Q Q fl �� sEF of a DITCH SPEC. SEE DETML A ST ,RIPONS L \ CLASS E150EST ° RIP Sr°NS OF All ELIE E . --' � / _ E •, DUE DUfi� + Y •___'. c P 4-w--; _---z„__I 'L—WART" na rsn u ---- - - _ -Imo.:-�____. -1r-- -- _ ----____-__ JJ_____ _ B e _ _ _ _ _ _ .y_ _ IrI."-' ___:. \- J� � eres, esr qc Mh 4.- 1Ss,- _Yrt=-_1=--=--- -_ / _ ♦ ____ZI1_ ------=-- --- _ _-_ _ _ _ - -- — ______ _____--- __ _ _ _ I _ _ _ `y>-, ,•15 cc'Ius�� kIL AAa ° DI �� ai -'Icra:N„ -' SPEC. uT.v TA s _._ _ _ �> - i' `, r SEE DernlLs ' --e �--'ty \ Ty=NeosmE SPEC. UT. E'R45E Cu53B SEE DETML e ET sYGF-SSEDETAIL i m m avN I I WIL —Y/— slG. 16 5 A6„NC. LLC h - 2 ` sazo 1Hs / IGGINS -PB ERRI PE lSfi1 \Z \� IANLEY 6 CAROL BRISSON Si3 �'%/j ,� // +° PETROLEIIU I. -n- PAc sra la: TOo ;, ,. ; sa° CUT I ESTDITCH ET r 5x OF wL ENS P. f �l „Iy.I G SPECSEE DEDITCH IML a ,tr T. SMeus PB•BI55 PG 1561 �' \\ DETAIL 1 DETAIL 2 °;fL*` -.i. SPECIA- sea— ' _ +rIF E FROM FRO SEEDETMLS EH \ DM 5 sioo_ FROM 5T ,r.°°TD ST..,;ioo n-8. STA a NF SPFc. LAi. v DIT // . SPEC' DETAIL 3T ITcn SPECIAL pu ESL rtcry SPEC DETAIL 5 ITcn PRC SIG. 19*82A5 IA�'D „« *aHI iu -D FROM sTn.,x.55 TO srn I<• so -L- RT FROM +5 / / •• r M ST. z�+ n ; FROM srn.Ie+OO To STA. Sly+oox - ry ,/n \ sPEca4 IrcH sT DETAIL 7 H y, sEE`o : 3 DC ROM TA ,T.S° -L- ° -x IroTE> ST..1<+r11 s,.15+roAT SEE S-L- PROFILE _ _HEET 5 FOR n- Pac sm.22+aom \M s / SEE SHEET 5 FOR -YI- PROFILE I Huc D CO srro SEE SHEET 6 FOR -RAB- PROFILE WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPA T Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 near -Y1- STA. 18+46.20 Roadway Fill/Spec. Lat. V Ditch 0.02 0.03 0.03 TOTALS': 0.02 1 0.03 0.03 1 1 0 1 0 1 0 *Rounded totals are sum of actual impacts NOTES 2018 Feb