Loading...
HomeMy WebLinkAbout20190700 Ver 1_W-5706C_Roadway_Plans_20190530DocuSign Envelope ID: 4430B449-C2BC-464B-87BO-CD7C59DE40EO u 7 C 0 0 U CD Ln O L 0 0W a--� m�Q o�� Cv O W z � Q i � C C\ \o 0 U O v See Sheet 1 A For Index of Sheets See Sheet 1 B For Conventional Symbol s See Sheets RW 02C- 9 & RW 02C-2 For Survey Control Sheets 410 SR 1105 N x'Dl P PuL 6R�SSG l U PROJECT SITE 410 13 SR _,a FZOI SR A 100 `CENTER Rol DUBLIN TOWN LIMIT �8> 00 �O NCDOT CONTACT: JASON HATFIELD — DIVISION PROJECT ENGINEER STATE OF N( .. R C if , [ !° . , DIVISION OF HIGHWAYS BIADEN COUNTY LOCATION: ROUNDABOUT AT INTERSECTION OF NC 41 AND NC 410 TYPE OF WORD: GRADING, DRAINAGE, PAVING, SIGNING, AND PAVEMENT MARKING STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. W-5706C I STATE PROD. NO. F.A. PROD. NO. DESCRIPTION 44852.1.3 HSIP-0041(110) PE 44852.2.3 HSIP-0041(110) ROW 44852.3.3 HSIP-0041(110) CONST DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared for the North Carolina Department HYDRAULICS ENGINEER GRAPHIC SCALES DESIGN DATA PROJECT LENGTH of Transportation In the office of: ,„�ARo,,,,,,,, ADT 2016 = 4 900 PARSONS SUNGATE DESIGN GROUP, P.A. oQ� .�'� Ess�o ss4o Ce�ce��ew owe, 6 m Raleigh NM&S C 2J61 905 JONES FRANKLIN ROAO 50 25 0 50 100 Bus919-864-134 RNO,19-861-2103 TEL(19)85RTHCAROLINA2>6o5 SEAL : 1/38/2019 00� �0�p� �5 5•/ NC LICENSENO. 1-0246 RA (iGH, NORTH RCIHAX N97859-6258 FOR NORTH CAROLINA DEPT. OF TRANSPORTATION ENG FIRM LICENSE NO. C-899 V = 50 MPH = - 2018 STANDARD SPECIFICATIONS - 026971g�0 ° LENGTH OF ROADWAY TIP PROJECT W-5706C = 0.189 MILES DocuSignedby i .' �tiGiNEE� ,�� Qo PLANS = - .Joslwa P.E. � 50 25 0 50 100 D = 65% RIGHT OF WAY DATE: DAVI D L. WI LVER PE A PROJECT ENGINEER ROADWAY DESIGN ENGINEER, o T = 4% TOTAL LENGTH OF TIP PROJECT W-5706C = 0.189 MILES MARCH 30, 2018 * TTST = 1 % DUAL = 3% •••.. :�''o��N PROFILE (HORIZONTAL) ; �• ���ss,oti•;�q ; � 1 20 = LETTING DATE: J. MATTHEW PICKENS, PE Q S E AL 9l 7=�28/2019 0 5 0 10 F U N C CLASS PROJECT DESIGN ENGINEER 37950 RURAL MINOR COLLECTOR APRIL 17, 2019 DocuSignedby: - �aSbin, k p l- v NG i NEED���' P.E. PROFILE (VERTICAL) STATEWIDE TIER S 5�- ,;1;10\1 J DocuSign Envelope ID: OA9F2DAC-F8A4-46DO-9C60-9B9FE3062D94 INDEX OF SHEETS SHEET NUMBER SHEET 1 TITLE SHEET 1A INDEX OF SHEETS, GENERAL NOTES, AND STANDARD DRAWINGS 1B CONVENTIONAL SYMBOLS RW02C-1 & RW02C-2 SURVEY CONTROL SHEETS 2A-1 PAVEMENT SCHEDULE AND TYPICAL SECTIONS 2B-1 ROUNDABOUT DETAIL SHEET 2C-1 MODIFIED CONCRETE FLUME DETAIL 3B-1 ROADWAY SUMMARIES 3D-1 DRAINAGE SUMMARIES 3G-1 GEOTECHNICAL SUMMARIES 4 PLAN SHEET 5 & 6 PROFILE SHEETS TMP-1 THRU TMP-4 TRAFFIC MANAGEMENT PLANS PMP-1 THRU PMP-4 PAVEMENT MARKING PLANS EC-1 THRU EC-5 EROSION CONTROL PLANS SIGN-1 THRU SIGN-4A SIGNING PLANS UC-1 THRU UC-9 UTILITIES CONSTRUCTION PLANS UO-1 & UO-2 UTILITIES BY OTHERS PLANS X-1A THRU X-1B CROSS-SECTION TITLE & SUMMARY SHEETS X-1 THRU X-11 CROSS -SECTIONS GENERAL NOTES: 2018 SPECIFICATIONS EFFECTIVE: 01 -1 6-201 8 REVISED: GRADING AND SURFACING OR RESURFACING AND WIDENING: CLEARING: THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. SUPERELEVATION: ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH STD. NO. 225.04 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS. SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. SHOULDER CONSTRUCTION: ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01 SIDE ROADS: THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS PROJECT. THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS INVOLVED. UTILITIES: UTILITY OWNERS ON THIS PROJECT ARE WATER - BLADEN COUNTY WATER (RANDY GARNER), PHONE - CENTURYLINK, PHONE - STAR TELEPHONE (KENNETH MELVIN), SEWER - TOWN OF DUBLIN (JANE STARNES), GAS - PIEDMONT NATURAL GAS ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS, EXCEPT AS SHOWN ON THE PLANS. RIGHT-OF-WAY MARKERS: ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT. PLAINS PREPARED BY : PARSONS RALEIGH, NORTH CAROLINA, (919) 854-1345 NC LICENSE NO. F-0246 FOR NORTH CAROLINA DEPT. OF TRANSPORTATION EFF . 01 -1 6-201 8 REV. 2018 ROADWAY ENGLISH STANDARD DRAWINGS The following Roadway Standards as appear in "Roadway Standard Drawings" Highway Design Branch - N. C. Department of Transportation - Raleigh, N. C., Dated January, 2018 are applicable to this project and by reference hereby are considered a part of these plans: STD -NO. TITLE DIVISION 2 -EARTHWORK 200.03 Method of Clearing - Method III 225.02 Guide for Grading Subgrade - Secondary and Local 225.04 Method of Obtaining Superelevation - Two Lane Pavement DIVISION 3 - PIPE CULVERTS 300.01 Method of Pipe Installation 310.03 Cross Pipe End Section - Precast Concrete Section for 18" to 30" Pipe 310.10 Driveway Pipe Construction DIVISION 5 - SUBGRADE, BASES AND SHOULDERS 560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I DIVISION 8 - INCIDENTALS 806.01 Concrete Right -of -Way Marker 806.02 Granite Right -of -Way Marker 838.01 Concrete Endwall for Single and Double Pipe Culverts - 15" thru 48 Pipe 90 Skew 838.11 Brick Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90 Skew 840.00 Concrete Base Pad for Drainage Structures 840.14 Concrete Drop Inlet - 12" thru 30" Pipe 840.15 Brick Drop Inlet - 12" thru 30" Pipe 840.16 Drop Inlet Frame and Grates - for use with Std. Dwg 840.14 and 840.15 840.29 Frames and Narrow Slot Flat Grates 840.35 Traffic Bearing Grated Drop Inlet - for Cast Iron Double Frame and Grates 840.66 Drainage Structure Steps 846.01 Concrete Curb, Gutter and Curb & Gutter 852.01 Concrete Islands 876.02 Guide for Rip Rap at Pipe Outlets 876.04 Drainage Ditches with Class 'B' Rip Rap Qu BOUNDARIES AND PROPERTY.- State Line County Line Township Line ----- ----- City Line Reservation Line Property Line Existing Iron Pin O Computed Property Corner Property Monument ECM Parcel/Sequence Number @ Existing Fence Line X X X Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary WEB Proposed Wetland Boundary WEB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB Existing Historic Property Boundary HPB Known Contamination Area: Soil S- Potential Contamination Area: Soil - S - Known Contamination Area: Water W Potential Contamination Area: Water - W - Contaminated Site: Known or Potential BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap O Sign CD Well ° Small Mine O Foundation 0 Area Outline Cemetery t Building School Church Dam HYDROLOGY.' Stream or Body of Water Hydro, Pool or Reservoir F__ O Jurisdictional Stream ,S Buffer Zone 1 Bz I Buffer Zone 2 Bz 2 Flow Arrow < -- --- Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head Ditch FLOW False Sump <�> RAILROADS: Standard Gauge - RR Signal Milepost Switch RR Abandoned RR Dismantled STATE OF NORTFI CAROLIN A, DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS Note: Not to Scale *S. U.E. = Subsurface Utility Engineering CSX TRANSPORTATION O MILEPOST 35 O SWITCH RIGHT OF WAY & PROJECT CONTROL: Secondary Horiz and Vert Control Point Primary Horiz Control Point Primary Horiz and Vert Control Point ' Exist Permanent Easment Pin and Cap New Permanent Easement Pin and Cap 0 Vertical Benchmark Existing Right of Way Marker O Existing Right of Way Line New Right of Way Line R New Right of Way Line with Pin and Cap N, New Right of Way Line with Concrete or Granite R/W Marker New Control of Access Line with Concrete C/A Marker Existing Control of Access New Control of Access Existing Easement Line New Temporary Construction Easement New Temporary Drainage Easement New Permanent Drainage Easement New Permanent Drainage / Utility Easement New Permanent Utility Easement New Temporary Utility Easement New Aerial Utility Easement W N,fA%,fA% F ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb — ,-c\ n E- -E- TDE PDE DUE PUE TUE AUE Proposed Slope Stakes Cut - - - C - - - Proposed Slope Stakes Fill - - - F - - - Proposed Curb Ramp cR Existing Metal Guardrail T T T Proposed Guardrail T T T T Existing Cable Guiderail Proposed Cable Guiderail H Equality Symbol 0 Pavement Removal VEGETATION.- Single Tree O Single Shrub Hedge Woods Line Orchard Vineyard EXISTING STR UCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole U/G Power Line LOS B (S.U.E.*) U/G Power Line LOS C (S.U.E.*) U/G Power Line LOS D (S.U.E.*) TELEPHONE: Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal Telephone Cell Tower U/G Telephone Cable Hand Hole U/G Telephone Cable LOS B (S.U.E.*) - U/G Telephone Cable LOS C (S.U.E.*) - U/G Telephone Cable LOS D (S.U.E.*) - U/G Telephone Conduit LOS B (S.U.E.*) U/G Telephone Conduit LOS C (S.U.E.*) U/G Telephone Conduit LOS D (S.U.E.*) U/G Fiber Optics Cable LOS B (S.U.E.*) U/G Fiber Optics Cable LOS C (S.U.E.*) U/G Fiber Optics Cable LOS D (S.U.E.*) Vineyard CONC ) CONC WW CONC HW \ >----------< OCB O S P P P T - T - - T ----TC---- — —TC— — TC -T FO- - - --T FO-- T FO WATER: Water Manhole Water Meter Water Valve Water Hydrant U/G Water Line LOS B (S.U.E*) U/G Water Line LOS C (S.U.E*) U/G Water Line LOS D (S.U.E*) Above Ground Water Line ILI 0 O -W- - W W A/C Water TV Pedestal TV Tower O U/G TV Cable Hand Hole Iq U/G TV Cable LOS B (S.U.E.*) - - - -TV- - - - U/G TV Cable LOS C (S.U.E.*) - -TV- - U/G TV Cable LOS D (S.U.E.*) TV U/G Fiber Optic Cable LOS B (S.U.E.*) - TV FO - U/G Fiber Optic Cable LOS C (S.U.E.*) - -TV FO- U/G Fiber Optic Cable LOS D (S.U.E.*) TV FO- GAS: Gas Valve O Gas Meter 0 U/G Gas Line LOS B (S.U.E.*) - - - -°- - - - U/G Gas Line LOS C (S.U.E.*) - -°- - U/G Gas Line LOS D (S.U.E.*) ° Above Ground Gas Line A/C Gas SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer SS Forced Main Line LOS B (S.U.E.*) SS Forced Main Line LOS C (S.U.E.*) SS Forced Main Line LOS D (S.U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line LOS B (S.U.E.*) U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. - A/G Tank; Water, Gas, Oil Geoenvironmental Boring U/G Test Hole LOS A (S.U.E.*) Abandoned According to Utility Records - End of Information O A/C Sanitary Sewer - - - -FSS- - - - - - FSS - - FSS is El O ❑s SURVEY CONTROL SHEET WIEXISTING CENTERLINE ALIGNMENTS PRIOR TO CONSTRUCTION .m NAB NC CRip 83 NA 2011 / „x v s� Ivus I OWN slcK oai .a NLQKKT 000 d Q a je No id fl d �pQ aas •ais away Fr 8 N-------- •I��✓ JJ V-��, -Y� sip ---Tb NC H�y�h�L-- _--_------- — — — — — TO CROMARTIE RD1 _ __ w �_— 34'NARIESI BSNC MM' 4% � /,30/.99' - 40'NARlES1 BST NC HWY 4/ __ _--_ r WI --- �— Mv.wseo �/ ftV.WQ°• 1 wu• a wa w a 4w goo C +) O U C U c� D 3 O� 3� U� CD 0 (E;)0- r-, ('\l L 3 � �cf� 0+-�J o. a)� C-C:OC)� 00 N C > O O O� zU� NN 3 NOTES: PROJECT REFERENCE NO. SHEET NO. W-5706C RW02C-1 Location and Survevs NCDOT I. PROJECT CONTROL WAS ESTABLISHED USING GNSS, THE GLOBAL NAVIGATION SATELLITE SYSTEM. 2. THE SURVEY CONTROL DATA FOR THIS PROJECT HAS BEEN COMPILED FROM VARIOUS SOURCES. IF FURTHER INFORMATION REGARDING PROJECT CONTROL IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT. DocuSign Envelope ID: 11456E97-FF02-4EC6-ACCC-90000016CEE3 DocuSign Envelope ID: 4430B449-C2BC-464B-87BO-CD7C59DE40EO a-, 00 I\ L4{ O 3\ C\� C z E0L NC0{ 1O PLANS PREPARED BY : PROJECT REFERENCE NO. SHEET NO. 00, / PARSONS W -5706C 2B-1 -Yl- 14 + 17. 8 /�\ RALEIGH, NORTH CAROLINA, (919) 854-1345 R(W SHEET NO. 1.18' LT NC LICENSE NO. F-0246 FOR NORTH CAROLINA DEPT. OF TRANSPORTATION ROADWAY DESIGN 146.34' ENGINEER ROUNDABOUT DETAIL SHEET -Yl- 14 + 51.62 Z' CARo�;- 0.84' RT E.S ' ' 146.43 = .Q SEAL -Yl- 14 + 76.88 D D 37950 0.6 5' LT �' o�,e'► NEED: =��, 14 6.4 9' ?SO' D aSbL.lt��'„• -Yl - 14 + 17.81 ^ 1/220CE 8838222FA4D� . -Yl - 15 + 2 7.81 8/2019 5.16 LT N 90' Q�' o ° 146.30 DOCUMENT NOT CONSIDERED FINAL 8.RT 90' UNLESS ALL SIGNATURES COMPLETED 146.59 -Yl- 15 + 2 .22 7.8 7RT �' G 00 146.50 00 -Yl - PT Sta. l5 +44.14 Z -Yl - POT Sta. l5 +48.10= R 250, -RAB - POC Sta. 11 +16.65 � D D -Yl - 14 + 7.6 4 -L- 15 + 67.44 D D 121 2 0.64 LT 146.09 2 7.9 8' LT -L- 15 + 71.2 3 0 0 -Yl - 15 + 2 6.02 146.09 24.64 LT D; D 26.94' LT 146.33 D � ° ° 0 146.36' I o c o D v G /S -L- POT Sta.17+02.32= -L - PT Sta. 15 +50.20 07-Yl- 15 + 3 0.0 6 -RAB- POC Sta.11 +94.47 2 3.2 9' LT ^h ° 146.66' -L- 15 + 2 8.2 8 ° 21.04' LT 16.7' 145.67' D D D D D -L- 17+21.51 o D D 7.06' LT -L- 14 + 76.06 �o D ° \ w 146.81' 14.91 LT w M a 145.51 v,� •� D �, oD-L-17+22.7 O - D � � � D D 8.09' LT ° D D 146.80' G o N L -L- PC Sta. 17+40.44 _L- 18 + 24.70 04 `n n R 75 0 150' a �b �, 147.23' D C G o D D D D D D 2` �4, 33.3" E N 87° 43, 3 j 0„ N 7 E °: D 8 :1 ° ° ° ° ° ° '2 7 3 e5 D D D D ° O D° D 7XI°° ° �I D D D D D D D D D �LD o D D D D D D j D D D C D D D D G D 4 D D D D D u 6 D D D °� � � �° D D D �` D D D D �D �D �' �D D � D ° ° o ° ° ° ° ° ° p ° ° ° ° ° ° ° ° ° ° ° ° L D D D D D m D D I \o D D D 1 D D D D D n D D D D D D D D D 21, o I D D D D D p p p I 4 Li ° 4 ° ° � -L- 15 + 66.6 D `�'- D o o °- 11.9 6' RT �h p 8 $�1 146.27' -L- 14+88.31 ; D L- 17+23.22 6.17' RT -L- 15 + 68.0 0 , G D R ° 2 7.83 RT -L- 17 + 72.05 -L- 13 + 54.2 8 ul 145. 80' 11.12' RT D i ° o ° p D D 146.58' 19.57' RT 11.12' RT o 146.38' �, -L- 17+1 .53 146.58 144.90' G 15.3, D°p p . Q°o ° 24.03' RT ° D ' L D � ' -Yl- 16+82.65 0 0 0 146.79 38.72' RT J ° D D -Yl- 16 + 81.43 -L- PT Sta.16+45.32= 146.19 fl o / 2.5 9' LT -Yl - PT Sta. l6 +05.10 -Yl- 17 + 2 7.11 a / D 146.60 ' -Yl - PC Sta. l6 +18.33 °. 3 0.18' RT R D n oR-Yl- POT Sta. 16 +62.15 = -L- POT Sta. 15 +88.32 = 14 5.7 0' 300' o o p?0 -Yl- 16 + 8 2.8 3 -RAB - POC Sta. 12 +89.12 RAB POC Sta. l0 00.00 D 3.68' LT 146.58' D D D D 11 �° 00, -Yl- 16 + 78.76 34.53' RT ° D D 146.48' D � G C6 D -Y1 17+21.65 20' 0' 20' 40' -Yl- 18 + 18. 8 P 5.00 RT -Yl- PRC Sta.18 +46.20 9.10' RT D P 146.351 145.66 D10 / op-Y1-17+43.10 /y� s 5.00"RT (ENGLISH) 0' 146.261 -Yl- 18+18.43-Y1-�17+74.42 5.15' RT 4.68 RT 145.76' 146.15 DocuSign Envelope ID: 1 EABAE25-5024-4BAF-8983-6C783951636C i I 0 0 s 3 0 N� (n o� �o L� 0 �uQ e/ v � O 0 '0 o +)+) U O O �U 3 O �co .� 0 om H � C � yHO0 H z rn 0 m � � H z = D = 0 n rn mz > V =c/)00 oi- m n=�z I- 4 cf) H O z HO -I p m =�..�z c� m r 0 M H z cn ern= �v m 0 m � O O Z H �v r F-4rn> 1 �v rn H z mn -1 o H r 0 � C � n =rn ISHEET 1 OF 1 1 MODFLMDTCH VARIABLE LENGTH SEE PLANS co SEE PLANS FOR PLACEMENT OR BEGINNING WATER FLOW DOWNGRADE OR SAG OUTLET WATER FLOW FLOW DIVERSION NOTES: X CONCRETE OR RIP -RAP DITCH SEE ROADWAY PLANS BEGIN MODIFIED CONCRETE FLUME EDGE OF LANE SHOULDER BERM GUTTER OPTIONAL SEE RDY. PLANS WATER FLOW (4) 12" #6 DOWEL BARS 21t8„ z OUTLET/3 N DEPRESSION PAVED SHOULDER —� 15'-off TRANSITION CURB DOWN AS DIRECTED BY THE ENGINEER END MODIFIED B /CONCRETE FLUME PAY LIMITS - PER EACH 4" CONC. PAVED DITCH FLOW DIVERSION. SHOULDER BERM GUTTER OPTIONAL SEE RDY. PLANS PLAN VIEW F:1 I_1 4►_0►► ►_0►► 2 o. �o WATER FLOW ~ FLOW DIVERSION EXAMPLES SECTION C-C OUTLET OUTLET DOWN GRADE . BRIDGE APPROACH SLAB 8" X 4" LIP CURB w cc U cc U) 8" 2'-4" MIN. 1/8" RADIUS o o. o SECTION A -A 71I 8►► 21-8►► 8►► WATER o o . FLOW SECTION B-B FLOW DIVERSION - CONSTRUCT MODIFIED CONCRETE FLUME AND SHOULDER BERM GUTTER IN ACCORDANCE WITH THIS DETAIL. - CONSTRUCT CONCRETE DITCH IN ACCORDANCE WITH STD. DWG. NO. 850.01. - CONSTRUCT RIP RAP LINED DITCH IN ACCORDANCE WITH THIS DETAIL, IF CALLED FOR IN PLANS. - CONCRETE OR RIP RAP LINED DITCH SHALL BE THE TYPE AND LENGTH SPECIFIED BY THE ROADWAY PLANS. THE DITCH SHALL TERMINATE AS SHOWN ON THE PLANS. IF NO TERMINATION IS INDICATED PLACE RIP -RAP AT THE END OF THE DITCH AS INDICATED BY STD. DWG. 876.02 FOR AN 18" PIPE. TRANSITIONS FROM THE DITCH TO TERMINATION SHALL BE AS DIRECTED BY THE ENGINEER. - MODIFICATIONS SHALL BE AS DICTATED BY SITE CONDITIONS AND DIRECTED BY THE ENGINEER. 4►-off +� 2►-0►► (0 o �o RIP -RAP LINED DITCH �`�`,��N•CAR01 0 s /pN ;y9�''. SEAL 022966 j.4e",,, Jj 1873F3D17DCDC45F 3/27/2019 z 0U) H i— Q LL —1� H z 00U= wQQU= U � 0 Q F-- H Lu 00�u-o-1 0 O U) z H , F— > 0-1-1 Lu 0 W Z = U M 0 = H L.L. LL 0 H W =< W CL � H cr_ o V Z oC H QLu 0 Lu Lu cr Luz C= H " O J LL U 0 z Lu SHEET 1 OF 1 MODFLMDTCH DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1,. III I ugl DIVISION OF HIGHWAYS SUMMARY OF EARTHWORK STATION STATION UNCL. EXCAV. UNDERCUT EMBANK. BORROW WASTE —L— 12 + 00.00 —L— 15 + 70.2 7 439 981 542 —L— 17+20.32 —L— 22+00.00 272 150 534 262 150 —Y1— 12+00.00 —Y1— 15+30.10 493 229 264 —Yl— 16+80.23 —Y1— 22+40.00 524 891 367 —RAB— 10+00.00 —RAB— 13+58.00 10 2,961 2,951 SUBTOTALS: 1,738 150 5,596 4,122 414 PROJECT TOTALS: 1,738 150 5,596 4,122 414 LOSS DUE TO CLEARING & GRUBBING (PER GEOTECH REPORT) —100 100 WASTE IN LIEU OF BORROW —264 —264 EST. SHOULDER MATERIAL 625 625 PROJECT TOTAL 1,638 150 6,221 4,583 150 EST. 5% TO REPLACE TOP SOIL ON BORROW PIT 229 GRAND TOTALS: 1,638 150 6,221 4,812 150 SAY: 1,640 4,820 UNCLASSIFIED EXCAVATION — ACCEPTABLE, BUT NOT TO BE IN THE TOP 3' OF EMBANKMENT OR BACKFILL —L— 17 + 35 TO 19 + 75 (150 CY) PER GEOTECH UNDERCUT CONTINGENCY PER GEOTECH RECS: 400 CY GRADE POINT UNDERCUT CONTINGENCY PER GEOTECH RECS: 50 CY SELECT GRANULAR MATERIAL CONTINGENCY PER GEOTECH RECS: 200 CY GEOTEXTILE FOR SOIL STABILIZATION PER GEOTECH RECS: 575 SY GEOTEXTILE FOR SOIL STABILIZATION CONTINGENCY PER GEOTECH RECS: 600 SY SHALLOW UNDERCUT CONTINGENCY PER GEOTECH RECS: 100 CY CLASS IV SUBGRADE STABLIZATION PER GEOTECH RECS: 300 TONS CLASS IV SUBGRADE STABLIZATION CONTINGENCY PER GEOTECH RECS: 100 TONS Note: Approximate quantities only. Unclassified Excavation, Borrow Excavation, Fine Grading, Removal of Existing Asphalt Pavement, and Clearing and Grubbing will be paid for at the contract lump sum price for "Grading." Note: Earthwork quantities are calculated by the Roadway Design Units. These quantities are based in part on subsurface data provided by the Geotechnical Engineering Unit. PAVEMENT REMOVAL S UMMAR Y SURVEY LINE STATION STATION LOCATION LT/ RT/CL 2 YD —Yl— 13+00 14+94 LT 273.47 TOTAL: 273.47 SAY: 280 1■ IIII 1�� lip 1111111 ' •. .. ' ■ • . • .. 'ri ■• • I '• .. • • . , 1 ������ ����� m • • m■■■■ ��� :1 .1 m■�■■■■ • 111 = 0� ■ ■■■■ ■■ 00■■■■■■■■■■©■■■■■©■■■■■■■0■E 0�� 1: 0 ED SUMMARY OF SUBSURFACE SlC,l[]Cb' .]FA\(C]E ]D>RA INA\G]E LINE Station Station Location LT/RT/CL Drain Type* UD/BD/SD LF -L- 12+00 22+00 LT/RT SD 2000 -Y1- 12+00 22+40 LT/RT SD 2080 CONTINGENCY SD 500 TOTAL LF: 4580 *UD = Underdrain *BD = Blind Drain *SD = Subsurface Drain ING SUMMARY OF (Gr]E(O T EX7C EL]E ]FOR. ]P'A\w]EMIENIF TA\IREL][7 A\T][ON LINE Station Station Geotextile for Pavement Stabilization SY Class IV Subgrade Stabilization TONS CONTINGENCY TOTAL SY/TONS: 0 0* *Total tons of "Class IV Subgrade Stabilization" is only the estimated quantity for pavement stabilization and may only represent a portion of the subgrade stabilization quantity shown in the Item Sheets of the Proposal. SlU[MMAJK"Y OF ROCK ]PLATING LINE Beginning Slope (H:V) Approx. Station Ending Slope (H:V) Approx. Station Location LT/RT Rock Plating Detail No. 1/2/3/4 Riprap Class* 1/2/13 Rock Plating SY TOTAL SY: 0 *Use Class 1, 2 or B riprap if riprap class is not shown for rock plating location. SUMMARY OF ]P'][b' .]E- S]P']L][7C'7C'IN Gr OF ROCK LINE Beginning Rock Cut Slope (H:V) Approx. Station Ending Rock Cut Slope (H:V) Approx. Station Location LT/RT Pre-splittin g of Rock SY TOTAL SY: 0 Sl[.l[MMAJR. Y OF A\(GrG1R.]E(GrA\7C']E SU[]B>(GrI A\]D)]E/ S FA\]B>][]L][7LA IF]ION LINE Station Station Aggregate Type* ASU(1/2)/ AST Aggregate Thickness INCHES [8 for ASU(2)] Shallow Undercut CY Class IV Subgrade Stabilization TONS Geotextile for Soil Stabilization SY Stabilizer aggregate TONS Class IV Aggregate Stabilization TONS -L- 17+35 20+25 ASU (1) 12 150 300 575 CONTINGENCY ASU 1 12 100 100 200 TOTAL Y/TONS/SY: 250 400** 775** 0 0 *ASU(1/2) = Aggregate Subgrade (Type 1 or 2) *AST = Aggregate Stabilization **Total tons of "Class IV Subgrade Stabilization" and total square yards of "Geotextile for Soil Stabilization" are only the estimated quantities for ASU(1/2)/AST and may only represent a portion of the subgrade stabilization and geotextile quantities shown in the Item Sheets of the Proposal. SUMMARY OF ][b.]EINIF(0)][b.C]ED S0111L S]L(0)]P']E S AND S]L(0)]P']E ]EROSION S][ON CONTROL LINE Beginning Slope/ RSS (H:V) Approx. Station Ending Slope/ RSS (H:V) Approx. Station Location LT/RT Reinforced Soil Slope (RSS) SY Geocells SY Coir FibS Mat Matting for Erosion Control SY TOTAL SY: 0 0 0* 0** *Total square yards of "Coir Fiber Mat" is only the estimated quantity for slopes steeper than 2:1 (H:V) and may only represent a portion of the coir fiber mat quantity shown in the Item Sheets of the Proposal. **Total square yards of "Matting for Erosion Control" is only the estimated quantity for RSS and may only represent a portion of the matting quantity shown in the Item Sheets of the Proposal. SUMMARY OF SlU[][b' .(C]H[A\R(G IES AND SlU[R(C]H[A.,R G IE WAITING (Gr ]P']ER][OD LINE Station Station Surcharge Height FT MONTHS SUMMARY OF ]EMBA\NKMLENT \OVAJ[TING ]P']E]Eb.][0]D LINE Station Station MONTHS -L- 14+75 16+05 1 SUMMARY OF SETTLEMENT (GrAIC,I[(GE Gauge No. LINE and Station Offset Distance FT Direction LT/RT TOTAL GAUGES (EACH): SlU[MMA\]C�' .Y OF BRIDGE D>G]E WA\][7['IN Gr ]P']E][.110]D Bridge Description End Bent/ MONTHS Bent No. DocuSign Envelope ID: FCED323F-42B8-4A14-89D5-3026F01DCC54 6' 00 C 01 I cn I LD I c9 ED 3 0 L i r- 3- 00-- 0 0-) oC-0' CVC� I � Qom'` I -RAB - PI Sto /0 +57.00 PI Sto 11 +46.54 0 = 90° 00' 00.0" (RT) 0 = 90° 00' 00.0" (RT) D = l00.3/' 08.1" D = l00.3/' 08.1" L = 89.54' L = 89.54' T = 57.00' T = 57.00' R = 57.00' R = 57.00' PI Sto 12 +56.07 PI Sto l3 +25.6I 0 = 90.00' 00.0" (RT) p = 90° 00' 00.0" (RT) D = 100.3/' 08.1" D = 100.3/' 08.1" L = 89.54' L = 89.54' T = 57.00' T = 57.00' R = 57.00' R = 57.00' P 96, PLANS PREPARED BY PROJECT REFERENCE NO. SHEET NO. i0000 / // RALPEIGH, NO/�V7 A� 1091N5S45 W -5706C 4 RONALD & CHARLENE GOODEN `�} �� ��NC LICENSE NO. F-0246 R�VN SHEET NO. nQ zFz or 286 % �/ �� FOR NORTH CAROLINA DEPT. OF TRANSPORTATION ROADWAY DESIGN HYDRAULICS �v �� ENGINEER ENGINEER SUNGATE DESIGN GROUP, P.A. %0011111tt1to,, „�, CAR 4''',., ,.�` C A R -Yl PC Sto. 12 +63.07 / (Lh// 905 JONES FRANKLIN ROAD \O� �S 1O , �41 / / RALEIGH, NORTH CAROLINA 27606 \ /Ij .:•9 ��J. OjL•'.• TEL (919) 859-2243 FAX (919) 859-6258 ENG FIRM LICENSE NO. C-890 = S E A L _ _ S E A L 6 = 37950 = = 026971 = -Yl - PT Sto. l3 +36.79 / r �So ' r r � r � -Yl - POT Sto. 12 +00.00 0-� t , �d�� i NEED 4 / ,� � � ,�asoG�.111� � Josi,ws�,,,'`I-���pP`,• . O<O OD `Q(7 BEGIN CONSTRUCTION 20CE483822FA4D�... 1089AD8C14994C... \oo. \ IC-) io ^ 5/23/2019 5/23/2019 DOCUMENT NOT CONSIDERED FINAL WADE & _-A PAIT \ ��� S >>° N UNLESS ALL SIGNATURES COMPLETED 69° / / SPEC. LAT. V DITCH 02, DB 331 PG 516 ,399 // / SEE DETAIL 3 2/8,8j 92°F 9 F / PROP. CONC. MONOLITHIC ISLAND ,, / / 5 00 -Y1- + 38.63 �/ �� / / 34.28' RT. / / STEVE & SUZANNE RUMBLEY REST PROP. 24" RCP ON PROP. CONC. FOOTER DB 353 PG 281 Z FOR EXIST. GAS LINE CROSSING -Yl- + 00 / c�� / 'k%/ -Yl- PC Sto. 13+70.17 (SEE DETAIL ON THIS SHEET) 35.28' RT. CLASS B RIP RAP 9g SPEC. CUT V DITCH / SEE DETAIL 1 RONALD & CHARLENE GOODEN 3 / BEGIN PROP. CONC. 4' APRON & .5' C&G DB 353 PG 286 -Y1- STA. 14 + 76.40 LT. & RT. 0405 / .00 CFI / / / -Y1- +50.00 SPEC. CUT V DITCH °°„ / 2 / 624"2RCP-III MONOLIITTH C ISLAND P T t + S �s SEE DETAIL 2 -L- + 91. S 9 29, 58.2 W ? ' o v -L- POT Sto. 17 +02.32 = END TIP PROJECT W -5706C 91.6 & 05 IT SPEC. LAT. V DITCH 0 141.43' (BOTTOM OF PIPE) 24" MIN 2'x2'xl' CLASS B 24" CONCRETE FOOTER MIN. 140.77' (APPROX. TOP OF GAS LINE) EXIST. 61" GAS LINE 2'x2'xl' CLASS B CONCRETE FOOTER NOTE: BACKFILL WITH SAND USE A CONTINOUS B'SECTION OF 24" RCP CONCRETE FOOTER FOR GAS LINE CROSSING (:f) RUFUS W° GARNER DB 310 PG 34 EST 2 TONS EST 7 SY GF -Yl - PT Sto. 15 +44.1 CLASS B RIP RAP EST 5 TONS EST 14 SY GF 466-POT Sto. 15 +48.10 = -Y1- + 10 A - POC St/7 11 +l6 65 .08' RT ■ ��/ % o �y • 50.00 SPEC. CUT DITCH T. Q) SEE DETAIL I • • I •• •46q • e _►may I -- - a� � '� �� Cam, \� " _' �\ ,;�'/ �I .� e�u���- � � � .� • -• -. r sin If Em ►' ♦ 1 , 1', 1. �� � + � � , ��I� /� .I • • a� �� III f MON LITHIC ISLAND I - - + O SEE DETAIL 7 -L- +20.70 -L- +30.84 N 70.75' & 60.80' RT. 81.69' RT. R 42 SO .06' 26.7" W 50.21' RT. 50.21' RT. 3 -L- +76.47 -L- POT Sto. 15+88.32= / DO NOT DISTURB VAULT MTL CANOPY C 70.75' & 61.29' RT. =RAB - POC Sto. 10 00.00 • 0 R -Yl - PC Sto. 16 +18.35 "T -L- + 2 A r-1 L T 0 Yl POT Sto. 16+ 04}2 P o'` -Yl- +25.00 72.65' RT. Z -L- +34.37 SOHAM OF INC, LLC o p -RAB- POC Sta. 89.1 60' LT. 0 70.98' RT. DB 678 PG 182 N 2 + R RONALD W. HUGGINS PB B156 PG 1561 / � \ C`p END PROP. CONC. Nco m CLASS I RIP RAP / ��_/ 4' APRON & 1.5' C&G DB 675 PG 89 0� EST 20 TONS / / PB B52 PG 514 Ln MANLEY �. CAROL BRISSON EST 39 SY GF / / / / -Yl- STA. 17+25.98 LT. wu� z EARTH PETROLEUM S•, / W/ SPEC. CUT DITCH CLASS B RIP RAP ( I ATM DB IV, INC 749 DB 497 PG 61 -Yl - PRC Sto. 18+46.20 / SEE DETAIL 1 EST 2 TONS MTL CANOPY I SPEC. CUT V DITCH �// / X \ PROP. CONC. EST 7 SY GF ISBKBUS wo 0 PB B156 PG 1561 SEE DETAIL 2 MONOLITHIC ISLAND o CONC -Y1 + 10.00 60' L.� END PROP. C C. -L- PI Sto 14 +15.29 PI Sto l8 +75.76 z�s = 7.44' 29.2" (LT) 0 = 7.44' 29.2" (LT) D = 2.5/' 53.2" D = 2° 5/' 53.2" L = 270.23' L = 270.23' T = 155.52' T = 135.32' R = 2,000.00' R = 2,000.00" Pl Sto 13 +00.00 PI Sto 14 +58.05 0 = 8. 26' 51.0" (RT) 0 = I9. 56' 09.1" (LT ) D = ll• 27' 33.0" D = ll• 27' 33.0" L = 73.72' L = 173.97' T = 56.93' T = 87.87' R = 500.00' R = 500.00' PI Sto 17 +56.47 PI Sto 19 +14.75 0 = 37.18' 09.1" (RT) A = l5. 36' 46.8" (LT) D = 16.22' 12.8" D = ll• 27' 33.0" L = 227.87' L = 136.25' T = 118.14" T = 68.55' R = 350.00' R = 500.00' PI Sto 21 +70.17 p = 4. 08' 05.7" (RT ) D = l• 06' 06.6" L = 375.27' T = 187.72' R = 5,200.00' 4' APRON & 1. C + 0&G -Y1- STA. 18 1.4, RT. 14 DETAIL 2 SPECIAL CUT DITCH ( Not to Scale) Front t Ditch Natural 15 'I Slope Ground 3 7 D\� Min. D=1.0 Ft. FROM STA. 17 + 20 TO STA. 20 + 00 -L- LT FROM STA. 14 + 00 TO STA. 15 + 70 -L- LT 15" / / ' / FROM STA. 13 + 50 TO STA. 15 + 00 -Y1- LT FROM STA. 18 + 00 TO STA. 19 + 50 -L- RT SPEC. LAT. V DITCH FROM STA. 15+00 TO STA. 15+30 -Y1- LT FROM STA. 19+00 TO STA. 22+00 -Y1- RT SEE DETAIL 5 FROM STA. 17+20 TO STA. 18+00 -Y1- LT -Y1- +45.00 / 48.59' LT. REMOVE R / / / / / PRC Sto. 19 +82.45 15" / •O / n3 0 LT N 80°I7'33" E 91.46, 24" CONC C&G 3�" W LT 319.97' 1111111, DETAIL 4 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural 1 of Fill Ground 3.7 D\at;et Slope F L B= Min. D=2.5 Ft. B = 2.0 Ft. RONNIE & WANDA SKINNER FROM STA. 12+55 TO STA. 14+50 -L- RT � s! � � / FROM STA. 12 + 00 TO STA. 12 + 55-L- RT 1 //c Q- •O / DB 643 PG 498 FROM STA.12+50 TO STA.13+50 -Yl- LT PB A81 PG 813 REMOV O ry SPEC. LAT. V DITCH �� S //��� SEE DETAIL 3 -Yl - POC Sto. 22 +40.00 EIP END CONSTRUCTION 35� I� 800 4,200 4,900 NC 41 350 ('600 2,900 2016 AVERAGE DAILY TRAFFIC FROM 3TA.21+00 TO STA.22+25 -T I- LT DETAIL 5 SPECIAL LATERAL 'V' DITCH ( Not to Scale) t Natural �•N Ogt Fill Ground i.7\pt� D Slope 1 Min. D=2.5 Ft. FROM STA. 18 + 00 TO STA. 21 + 00 -Y1- LT DETAIL 6 DETAIL 7 C\\ LATERAL 'V' DITCH STANDARD 'V' DITCH �2 a ( Not to Scale) ( Not to Scale) Natural '\ Ott Fill Ground .7 ID ate Slope Min. D=1.0 Ft. FROM STA. 12 + 50 TO STA. 14 + 00 -L- LT FROM STA. 14 + 90 TO STA. 15 + 70 -Y1- RT Natural Natural Ground 37 .\ Ground D Min. =2.0 Ft. FROM STA. 17+50 -L- RT TO A. 17+20 -Y1- LT NOTE: / SEE SHEET 5 FOR -L- PROFILE SEE SHEET 5 FOR -YI- PROFILE SEE SHEET 6 FOR -RAB- PROFILE PK ■■■�■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■�■■�■■■■■■I ��������������������������������������������������������������������������������������������������������I ■■■�■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■�■■■■■■■■■■■■■■■■�■■�■■■��■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ��������������������������������������������������������������������������������������������������������I ■■■�■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■�■■■■■■■■■■■��■■■�■■�■■■�■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■�■■■�■■■��■■■�■■�■�■��■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■�■■■■■■■■■1 ��������������������������������������������������������������������������������������������������������I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■��■■��■■��■■■�■■�■■■��■I ��������������������������������������������������������������������������������������������������������I �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��■�■■■�����■■■■■�■■��■■�I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■��■■�■■■��■■■■■■■■■■�■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■I ■■■�■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■�■�■�■■�■■■■■■��■■■■�■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■�■■■■��■■■■■■■■I ■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■�■�■�■■�■■■■■■■�■I ■■■�■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■�■■�■■■■■■■■■■■■■�■■�■■■��■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ��������������������������������������������������������������������������������������������������������I ��������������������������������������������������������������������������������������������������������I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■�■■■■■■■■■1 ■■■�■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■�■■■��■■��■■��■■■�■■�■■■��■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■�■■■�■■■■�■■�■■■�■■I ��������������������������������������������������������������������������������������������������������I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■��■■■■■■�■��■■■�■■�■�■�■■I ■■■■■■■■■■■■�■■■��■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■�■■■■■■■■■■■■■�■■�■�■■■■�■■■■■■■■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��■■■�■■■■■■��■I ■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ��������������������������������������������������������������������������������������������������������I ■■■�■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■�■■■■■■■■■■■��■■■�■■�■■■��■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I ��������������������������������������������������������������������������������������������������������I ■■■�■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■�■■�■■■■■■■■��■■■�■■�■■■�■■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■��■■��■■�■■■■�■■�■■■��■I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■�■■■■■■■■■I ��������������������������������������������������������������������������������������������������������I ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�■■■�■■■■■■■■■■■�■■■�■■■I ��������������������������������������������������������������������������������������������������������I