Loading...
HomeMy WebLinkAbout20051503 Ver 1_Complete File_20050805 ;. Michael F, Easley, Governor William G. Ross Jr" Secretary North Carolina Department of Environment and Natural Resources Alan W, Klimek, P.E, Director Division of Water Quality August 15, 2005 DWQ Project # 05-1503 McDowell County Charles Abernathy, County Manager McDowell County 60 East Court Street Marion, NC 28752 Subject Property: Catawba River (EWP DSR 2005-15A) Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Abernathy: You have our approval, in accordance with the attached conditions and those Iisteq below, to place fill within or otherwise impact 350 feet of streams for the purpose of streambank stabilization at the subject properties, as described within your application received by the N.C. Division of Water Quality (DWQ) on May 18, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3376 (3376). The Certification(s) allows you to use Nationwide Permit(s) 37 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose (but not the design) that you described in you~ application. If you change your project beyond the approval here, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. ; The Additional Conditions of the Certification are: 101 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 !321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 'hone: 91g.733-1786/ FAX 919-733-6893/lnternet: htlo:/Ih2o.enr.state. nc. us/ncwetlands .-":"~T^. ,~:;.'.,II:.-" $JCI)E[o~3. \n Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper McDowell County: i(' Page 2 of6 August 15,2005 ( 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Stream Amount Plan Location or Reference Approved (Units) 350 (feet) Catawba River 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual, b, The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c, For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual, d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification, All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. " McDowell County: Page 3 of6 August 15,2005 4. No Sediment & Erosion Control Measures wIn Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable, If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC', 27699-1650. 6. Construction in this creek and disturbance within a 25-foot trout buffer should be avoided during the October 15 to April 15 trout spawning period to avoid adverse effects of sediment on eggs and larvae. However, Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service "urgent and compelling" sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: (1) using flow diversion structures such as sand bags, (2) placing large-sized rock toes and filter cloth backing for stabilization sites before backfilling, and (3) excavating new channel alignments in dry areas. Construction at the other non-"urgent and compelling" sites should not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout resources in this creek. 7. Sediment and erosion control measures must be implemented prior to construction and maintained on the sites to minimize sediment in downstream areas. Seeding for a temporary cover of wheat, millet, or similar annual grain or permanent herbaceous cover should occur on all bare soil within five (5) days of ground disturbing activities to provide long-term erosion control. The projects should be accomplished in stages instead of leaving large tracts exposed to further storm events. Erosion control matting should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples, stakes, or, wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. In addition. because of an anticipated difficulty in establishing ground cover during the winter, reseeding should be conducted, as necessary, in the spring-time with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. McDowell County: Page 4 of6 August 15, 2005 l' 8. Only clean, large, angular rock, large woody material, or other natural stream design materials and techniques should be used for bank stabilization. Rock should not be placed in the stream channel in a manner that constricts stream flow or that will impede aquatic life movements during low flow conditions. Filter cloth should be placed behind large rock that is used for bank stabilization. Properly designed rock vanes should be constructed wherever appropriate on bank stabilization and channel realignment stream reaches to improve channel stability and to improve aquatic habitat. Root wads should be installed low enough in the bank so that a significant portion (at least one-third) the root wad is inundated during normal flows. 9. The channel should be restored to a more stable condition. However, under no circumstances should river rock, sand or other materials be dredged from the stream channel under authorization of this permit except, if necessary, in the immediate vicinity of the eroding banks for the explicit purpose of anchoring stabilizing or flow/grade control structures or for reestablishing the natural and more stable stream channel dimensions. Stream bed materials are unstable in flowing-water situations and are unsuitable for bank stabilization. In stream dredging has catastrophic effects on aquatic life and disturbance of the natural form of the stream channel can cause downstream erosion problems. The natural dimension, pattern, and profile of the stream upstream and downstream of the permitted area should not be modified by widening the stream channel or changing its depth. 10. Stabilization measures should only be applied on or near existing erosion sites, leaving other stable stream bank areas in a natural condition. Grading and backfilling should be minimized and tree and shrub growth should be retained where possible to ensure long term availability of stream bank cover for aquatic life and wildlife. Backfill materials should be obtained from upland sites except in cases where excess stream bed materials are available. Berms should not be permitted because they block the floodplain, constrict and accelerate flood flows, and often fail and sometimes impede drainage during large flood events. 11. Repairs to eroded banks should be conducted in a dry work area where possible. Sandbags or other clean diversion structures should be used where possible to minimize excavation in flowing water. Channel realignments should be constructed by excavating the new channel from downstream to upstream before connecting it to the old channel. 12. Heavy equipment should be operated from the bank whenever possible. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids or other toxic materials. Equipment used in stream channel must be clean, neW or low hour equipment. 13. Disturbed stream banks and a 25-foot vegetated zone, or the widest width that is practical under the site conditions, should be restored where possible along the construction sites to natural riparian conditions with native trees and shrubs (e.g., silky dogwood, rhododendron, dog hobble, red maple, silky willow, tag ~Ider, black willow, sycamore) to proVide long-term bank stability and stre~m shading. Note, silky dogwood, silky willow and black willow can be planted as live stakes collected during the dormant growing season, Cuttings should be randomly planted on four (4) foot centers from the waters edge to the top of the bank. Trees should be planted on ten (10) to twelve (12) foot centers. Stream banks in these areas should also be ... McDowell County: Page 5 of6 August 15, 2005 seeded with a native annual and perennial seed mix with a temporary nursery crop of wheat, millet or other grain. . I 14. If pasture along the stream is to be used for grazing, a fence must be constructed outside of the riparian zone and the stream to prevent livestock from entering these areas. 15. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected riparian zones such that it will not re-concentrate before discharging into a stream. If this is nqt possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. 16. Riparian Zone Replanting Replanting of vegetation within disturbed areas located within 30 feet of the streambank associated with any land disturbing activity, repair, replacement and/or maintenance must be done in a manner consistant with the Guidelines for Riparian Buffer Restoration immediately following construction. (Please . see attached.) 45. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective woody riparian zones in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate, A sample deed notification can be downloaded from the 401NVetlands Unit web site at http://h20.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 17. Turbidity Standard The turbidity standard of 10 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 28. .0200. Appropriate sediment and erosion control practices must be used to meet this standard. 18. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. McDowellCounty: ~ Page 6 of6 August 15, 2005 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions. of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C, 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. . This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Mr, Kevin Barnett in the DWQ Asheville Regional Office at 828-296-4657. Sincerely, cc: Mike Osborne, CH2MHill 4820 Parkway Plaza Blvd, Suite 20 Charlotte, NC 28217 USACE Asheville Regulatory Field Office DWQ '401 Central Office DLR Asheville Regional Office File Copy Central Files i(~t ~ . k&v-c~~ ~ Alan W, Klimek, P.E., Director Division of Water Quality " @@I\'\IJ@~ \Q\,~ @ \ ~t) ~ 'L '1 l~ ~\JG :'i'{ :\"'C:\<. Ql.lj\~ 'Ow..HC'rI I)c\'\\<" -~~\OR~lfl,\C . '~\DS 10.1-. 'Nt.\V'" AWK/khb Enclosures: GC 3376 Certificate of Completion Guidelines for Riparian Buffer Restoration Filename: 05-1503.EWP,CatawbaRiver.Approval Triage Check List Kevin Barnett, Asheville Regional Office f~lE c~rv Project Name: McDowell County EWP 200S-1SA DWQ #:O?-lS03 County: McDowell Date: 08/10/05 To: 60-day Processing Time: 8/5/05 to 10/3/05 From: Cyndi Karoly Telephone: (919) 733-9721 , The file attached is being forwarded to you for your evaluation. Please call if you need assistance. o Stream length impacted o Stream determination O Wetland determination and distance to blue-line surface waters on USFW topo maps Minimization/avoidance issues o Buffer Rules (Neuse, Tar-Pamlico, Catawba, Randleman) o Pond fill O Mitigation Ratios Ditching o Are the stream and or wetland mitigation sites available and viable? o Check drawings for accuracy o Is the application consistent with pre-application meetings? Cumulati ve impact concern o o o Comments: As per our discussion regarding revision of the triage and delegation processes, please review the attached file. Note that you are the first reviewer, so this file will need to be reviewed for administrative as well as technical details. If you elect to place this project on hold, please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim procedure as we slowly transition to electronic applications. Please apprise me of any complications you encounter, whether related to workload, processing times, or lack of a "second reviewer" as the triage process in Central had previously provided. Also, if you think of ways to improve this process, especially so that we can plan for the electronic applications, let me know. Thanks! nlt COPV Office Use Only: , Form Version May 2002 20051503 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/ A".) I. Processing 1. Check all of the approval(s) requested for this project: [gI Section 404 Permit 0 D Section 10 Permit D [gI 401 Water Quality Certification Riparian or Watershed Buffer Rules Isolated Wetland Permit from DWQ 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 37 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 0 ' 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: D 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of C~~~fflll,~~p.agrm(mL;u-ea of Environmental Concern (see the top of page 2 for further details)':J~heckher.~:, IOJ; t~:; lW/,] Lu ~ II, Applicant Information AUG 5 2005 1. Owner/Applicant Information Name: Charles Abernathy /McDowell County Manager Mailing Address: 60 East Court Street Marion. NC 28752 H OEr~Ji1 ~ \'//\r;,:r~ Oll.~ LI" hETUJilY I'D C-'-"'''', ,~.-:;' iY V{~.. vli.),\j;"/~I'uEa BRlJJCIl . Telephone Number: 828-652-7121 E-mail Address: Fax Number: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mike Osborne Company Affiliation: CH2M HILL Mailing Address: 4824 Parkway Plaza Blvd. Suite 20 Charlotte, NC 28217 Telephone Number: 704-329-0073 ext 252 Fax Number: 704-329-0141 E-mail Address:mike.osborne@ch2m.com Page 1 of 10 . III. Project Information Attach a vicinity map (Exhibit 1) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan (Exhibit 2) showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. i 1. Name of project: EWP 2005-15A 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): 078100149577 4. Location County: McDowell Nearest Town: Old Fort Subdivision name (include phase/lot number): NA Directions to site (include road numbers, landmarks, etc.): From 1-40, go N on US 70 approximately 7 miles. The site is approximately 3 miles north of Old Greenlee Road on the right. See attached map for site locations. 5. Site coordinates, if available (UTM or LatILong): SEE SITE DESCRIPTIONS (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 65.81 7. Nearest body of water (streamlriver/sound/oceanllake): Catawba River 8. River Basin: Catawba (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h20,enr.state.nc.us/admin/maps/.) Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application (see Exhibit 1): The proposed site consists of light residential and agricultural uses. The stream and stream banks were heavily impacted during Tropical Storms Frances and Ivan. Extensive stream bank erosion threatens agricultural property. Page 2 of 10 9. Describe the overall project in detail, including the type of equipment to be used: EWP 200S-1SA This project area includes approximately 250 linear feet of the Catawba River south of US 70. The project area is located at 35040'7"N 82005'31" W. High-water flows eroded the stream bank and washed over a section of an agricultural field. In this section of river the I resulting conditions threaten the stability of existing banks. ' Repairs in this reach of stream will involve the following: - Remove any woody debris from floodplain - Reseed and plant woody vegetation. The techniques that will be utilized for the proposed repairs at the EWP site ~isted above are described below. ! Removal of Organic and Rocky Debris Fallen trees, limbs, and non-native material within the cross section of the existing or original channel up to and including the debris line shall be removed. Any foreign debris (e.g. trash appliances) will also be removed. Trees leaning over the channel whose near term fall is apparent will be removed. These rooted trees will be cut three feet above the ground surface and the root masses will be . left in place. Disturbance of channel bottom and banks and equipment access shall be held to the minimum necessary to allow the construction equipment to remove the debris. All areas disturbed due to debris removal and equipment access shall' be reshaped and reseeded. Access to the channel will be perpendicular to the channel so that cutting of trees is held to a minimum with precaution taken to protect mast production and stream canopy trees. These trees will be cut off at ground level so re- sprouting may occur after construction. Dead trees and small brush piles that provide den habitat and are determined to pose no hazard to the channel will be protected. Woody debris will be chipped and disposed of in upland areas or hauled offsite. Rocky material within the floodplain will be removed using an excavator. The removal of rocky debris will proceed from the stream channel back toward the stream bank allowing the excavator to work on the debris pile. The reconstructed floodplain will be shaped in a manner intended to restore hydraulic capacity of the stream system. Rocky debris removed from the floodplain will be used to stabilize the streambank or will be hauled offsite. At sites where there is no eroded streambank in the immediate vicinity, the excavated material will be used to strengthen the natural berm of the streambank or will be hauled offsite. In n<~ case shall the deposited material be placed at an elevation higher than the existing streambanks. Rocky rn,aterial will not be removed below pre-existing elevations such as rock bars within the channel width. Streambank Repair When possible, excavation equipment will access streambank repair areas from the dry and will not track into the stream channel. An existing cross section is included for each of the impacted channel sections requiring stabilization (Exhibit 3). i Page 3 of 10 Drainage areas of project areas are also listed on Exhibit 4. The drainage area is used to determine the design storm (lO-year or 25-year for trout streams) peak flow using USGS Rural Regression equations for the Blue Ridge-Piedmont. Design storm velocity and shear stress values were also calculated. This information, in conjunction with the field investigation analysis, DSR notations, and agency guidance and regulations, are used to develop an appropriate streambank stabilization design. I Equipment that may be used to accomplish the above listed tasks includes; rubber tired skidders, 15 ton dump truck, hydraulic track mounted excavator with thumb, and chainsaws. 10. Explain the purpose of the proposed work: The work addressed in this application is intended to improve post flood hydraulic capacity of the stream reaches discussed and stabilize severely eroded streambanks tha~ are threatening structures or other property. The proposed actions are not intended to enhance existing conditions or restore stream reaches using natural channel design techniques. Such activities would require detailed engineering evaluation and design, which are beyond the intent of the EWP program. IV. Prior Project History I If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. NA V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated ~ork, and provide justification for the exclusion of this work from the current application. i NO Page 4 of 10 provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown: on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: ! Proposed impacts include limited streambed disturbances, debris removal, and streaIll;bank stabilization. : 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type ofWetland*** : * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill. excavation, flooding, ditching/drainage. etc, For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at hUo:/Iwww,fema.gov. i *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh. forested wetland, beaver pond. Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). ! List the total acreage (estimated) of all existing wetlands on the property: None . Total area of wetland impact proposed: N A 3. Individually list all intermittent and perennial stream impacts below: : Stream Impact Length of Average Width Perennial or Site Number Type of Impact* Impact Stream Name** of Stream Intermittent? (indicate on map) (linear feet) Before Impact (please specify) Bank EWP 2005-15A Stabilization 250 Catawba R 40 ft Perennial Planting EWP 2005-15A Debris removal 100 Catawba R * i . List each impact separately and identify temporary impacts, Impacts include. but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain). stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Page 5 of 10 , ** Stream names can be found on USGS topographic maps, If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www,usgS,gov. Several internet sites also allow direct download and printing of USGS maps (e.g" www.tol1ozone,com, www.maPQuest.com, etc.). I ! Cumulative impacts (linear distance in feet) to all streams on site: 250 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: ; Open Water Impact Area of Name of Water body Type of Water body I Site Number Type of Impact* Impact (lake, pond, estuary, sound, (indicate on map) (acres) (if applicable) bay, ocean, etc;) i i i * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dr~dging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application.. ! Pond to be created in (check all that apply): D uplands D stream D wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): NA Size of watershed draining to pond: NA Expected pond surface area: NA , Page 6 of 10 ! VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. ; When at all possible equipment will be kept out of the stream channel, stream crossings will!be minimized, and no excavation will be below the existing channel bed. When at all possible i stream material will be moved from dry areas to banks, minimizing the movement of wet (o~ below water line) stream material. Creating wide, shallow channels will be avoided. Temporary and/or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of ground disturbing activities. Rocky material shall not be used for bank stabilization above the normal high water mark. Large rocky material will be brought in to stabilize the toe of impacted streambanks where necessary. I VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable in~lude, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any appli~ation lacking a required mitigation plan or NCWRP concurrence shall be placed on ho~d as incomplete. An applicant may also choose to review the current guidelines for stream resto~ation in DWQ's Draft Technical Guide for Stream Work in' North Carolina, available at http://h20.enr.state.nc.us/ncwetlands/stnngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions Page 7 of 10 and/or map, if offsite), affected stream and river basin, type and amount (acreagellinearifeet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan yiew, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. NA 2. Mitigation may also be made. by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at htto:/1h20.enr.state.nc.us/wro/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): NA Amount of buffer mitigation requested (square feet): NA Amount of Riparian wetland mitigation requested (acres): NA Amount of Non-riparian wetland mitigation requested (acres): NA Amount of Coastal wetland mitigation requested (acres): NA IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ~ No D If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPAlSEPA)? Note: If you are not sure whether a NEPAlSEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes D No ~ If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEP A or SEP A final approval letter. Yes D No D Page 8 of 10 x. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be showq on a map, whether or not impacts are proposed to the buffers. Correspondence from the l?WQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes D No [g] If you answered "yes", provide the following informatfon: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (sauare feet) Multiplier Required Mitigation 1 2 Total 3 1.5 * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (Le., Donation of Property, Conservation Easement, Riparian Buffer Restoration I Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. . Page 9 of 10 XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Imperviousness will not change. Erosion and sedimentation prevention and control will be maintained throughout this project primarily through: proper water management, construction sequencing, proper staging and stockpiling of materials, and the maintenance, at all times, of suitable channel capacity for expected flow events. Equipment, fuels, lubricants, or other potential sources of water pollution will not be stored in areas that could be flooded during this project. . XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Portable facilities shall be provided at the work site. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes 0 No [8] Is this an after-the-fact permit application? Yes 0 No [8] XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant" may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). NA I ~~ / ~0r . AP~Ii~ignature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 (-;) "ill Cc-rl2MHILL o I 1,250 2,500 I 5,000 Feet I ~~c - ""<:1> ;e.N , /"00, ~~ \ \ r.:-:-..... \ ~;-~} \ "....~J) i , , I ! ~(---' --:s~ ~-;..........-.-,_..,.._--_.-.. '-;::F:'~ ..-'.....-..--C;-..: -.- m_ ,- ~; r:~~ (~C~' "'~') .' (---/ '<.: f~."""" I I i I ; ~---- ~I ~ ~ ! 1 . '. , ~~f~", r:'I~' . I ~,.t_ '... ",,_;... ._"_. ....._ __ ".... .... "..... \ \ ' '--"1'-'" ' @y o ~ ~'''' ''''~b '-"J' - ::~ ~.~ - ,qi-~ ~ -- - .... ,...... \S.~) '-.1',-- '~~"l '~ \4-.,t~~ , \ ii :~f~ .. g \ \ \ \ \-A ..~..~._" \\ f") .. ~ (Xl \'fh ~ ? \, - . -:' W 3 . .:-:~,t:.~,.... Wro ~ Gf 1'. I ~'~---=-J/" :~i ~ <:::! y, <:0 ~ I \ ~. / \ \ v 9. Q . -". ;fa ~ '".,~. ~ :% /,;/,~- \ ~ \\\\. \1.1;' \ v N \ ~ .. ~ !~~\ \ .... T "<'..::'1 Y ",' ) . ' ~ 0:: w a. o 0:: a. ~ o o OJ I <( I.C) ~ 0:: CJ) o .. o ~ ~ II l::: ~ a. <( :E o w w o I N ?- m ::r: >< w McDowell Co. , Catawba River, DSR 15A Design Parameters Apply to Site Note: x X X X X X X X X X X X Figure 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Title BANK STABILIZATION TYPICAL SECTION BANK STABILIZATION WITH ROCK TOE TYPICAL SECTION STREAM CHANNEL BENCH TYPICAL SECTION TYPICALJ HOOK DETAIL TYPICAL CROSS VANE DETAIL SUGGESTED VEGETATION LIST STABILIZATION PLANTING PLAN BENCH PLANTING PLAN LIVE STAKE DETAIL DEAD STOUT STAKE DETAIL EC FABRIC INSTALLATION DETAIL EC FABRIC ANCHOR DETAIL STABILIZATION CONSTRUCTION ENTRANCE DETAIL TEMPORARY SILT FENCE DETAIL TEMPORARY STREAM CROSSING DETAIL LAND QUALITY STOCK PILE LAYOUT LAND QUALITY STREAM CROSSING LAYOUT LAND QUALITY DEBRIS REMOVAL LAYOUT 1.) 100 yd3 of woody debris removal. Notes anellor Measurements 250 LF of left bank EC fabric = 4.5 Ib/tf L.R.M. 7/18/2005 ~, ;271 2CO~ 2.) Smooth out the rough surfaces and vertical slopes (light grading) before planting and installing EC fabric so EC fabric lays on ground. 3.) Any damage caused by the contractor shall be repaired at the contractors expanse. Legend A DSR Project Site - Interstate Highway - Major Road - Major Hydrography D Subwatershed CJ Municipality D County Boundary c ~ -" N A RUTHERFORD (/~'\ . CEHl2MHILL o I 1.25 2.5 I 5 Miles I EXHIBIT 4 - CATAWBA McDowell County Drainage Area Map ~, Photo 1 - Bank erosion. Photo 2 - Bank erosion. Photo 3 - Channel braiding. EXHIBIT 5 Photo 4 - Woody debris (background). I DSR 15A - Biddix Catawba River This Access Agreement is made between McDowell County and: ACCESS AGREEMENT Property Owner: John R. & Janice Biddix Street Address: C/O Metal Industries City/State: Marion, N.C. 28752 McDowell County is requesting access to the property for the purpose of assessing and repairing damage to the streambank, stream channel, and floodplain that was caused by hurricanes Frances and Ivan. The repair efforts are being funded by the United States Natural Resource Conservation Service through the emergency watershed protection (EWP) program. The repair work will include some or all of the following elements: · Streambank Stabilization . Channel Relocation to Pre-Flood Location . Re-vegetation Debris Removal . McDowell County and the Property Owner agree: 1. Property owner grants pennission to McDowell County and its contractors and agents to, enter upon our land for the purpose of assessing and repairing the flood damage caused by Hurricanes Frances and Ivan. Additionally, this agreement includes the right of ingress and egress on the land for the purpose of maintaining the emergency works for the period of one year from the date of completion. Property owner grants pennission to McDowell County and its contractors and agents to conduct stream stabilization measures, which may include debris removal, stream bank ; stabilization using rocks, wood, and/or, mulching and seeding, and/or channel relocation) McDowell County agrees to comply with local, state and federal laws applicable to the ' work, and further agrees to exercise due care and caution in the perfonnance of all work on the Property. This Agreement constitutes the entire understanding between the parties. All prior agreements or understandings, whether oral or written, are superseded. This Agreement may be amended only by a written document duly executed by the parties, Emergency Watershed Protection measures are intended to repair flood damage to the , stream and to return affected areas to pre-flood conditions. Repair and/or improvements to structures are not part of this EWP project. Damaged bridges, driveways, and eroded fields are not addressed by EWP measures. McDowell County and its contractors will strive to minimize impacts to adjacent properties. However, some impact may be unavoidable. The Property owner releases McDowell County and its contractors from liability for any damage incurred as a result of this work. This agreement does not provide confinnation that the subject site is eligible for Emergency Funds, nor does it encumber funds for any repair work at this site. Property owner agrees not to remove or modify constructed repairs, including vegetation, for one year from the date of completion. 2. 3. 4. 5. 6. 7. ::~~;(~ Date: (P- ;2L:J- 0 S By: A:\Access Agreement (streams)rev 2.doc 6/16/2005 - - - ---------------- ------- ------------------------------------------------------ MAP--------BLK---L6T----------------(A:c:D:I~R~S~CF)-UPDATE-ABST-(y7N)----NBH--- 0781 . 00 - 14 - 9577 A~TiO~: I N ~UNT:-000~4967086 COMMENTS EXIST OWN~~__:________. ~~8~~ITt~:~I~U~T~~~CE MARION NC 28752 PRIOR OWNER: UNKNOWN USE: 50 RURAL HOME SITE MODEL: ~ SFR CONSTRUCTION SALE? T/S BOOK /PAGE DEED PATE INST 00496 0195 08/23/1996 WD - - - NUMB DIR STREET NAME HWY 70 TWNSHIP: 10 ~Tr: CTY: 0000 NBH: CARDS: STAMPS PROPERTY vALUES: BUILDING: OBXF: LAND: MARKET: ASSESSED: DEFERRED: 00100 OLD FORT 1 NEW NOTICE CODE: ABBREVIATED LEGAL DESCR 65.81 AC MUNT- 208590 23B10 129980 362380 290630 71750 14.00 TYPE.S'I'REET SUFFIX EXEMPT: ~EMPT DATE: . U/M:5001 UPD:-03/1372003 16:11 Al~GIE TAXBILL ~ <:::! V) 0. 20051503 CH2MHILL TRANSMITTAL To: From Liane Morgan North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Wetlands Unit, 1650 Mail Service Center Raleigh, North Carolina 27699-1650 4824 Parkway Plaza Blvd, Ste 200 Charlotte, NC 28217 AUn: Date: August 4, 2005 Re: McDowell County EWP PCNs - DSR Sites 3, 15A \, We Are Sending You: Method of shipment: X Attached Under separate cover via Shop Drawings X Documents Tracings Prints Specifications Catalogs Copy of letter Other: Quantity Description 5 McDowell County EWP PCN; DSRs 3 and 15A ~'_,"I" F::{ (r'0 r:~ ;if I:'.::,;" I.r} ~~1~ ',:\'"" ,~,_..' ! U : ,\ '".I AUG fj Z005 Dr)\~;:{ ~ \;\;/\'1 ~_'-r-{ cu/\cnV \\~EIUS-.iJS tJHJ ~n {K~\~V!tJLi~ t~FJlj"JCH If the material received is not as listed, please notify us at once. Remarks: Copies have been sent to the appropriate agencies. Copy To: file COPYRIGHT 2005 BY CH2M HIll, INC,. COMPANY CONFIDENTIAL r