Loading...
HomeMy WebLinkAbout20140698 Ver 2_Sampson Road Trout Waiver Revision2 05312019_20190531ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality May 31, 2019 Mr. Kevin Hining Division Environmental Officer NCDOT Division 11 801 Statesville Road North Wilkesboro, NC 28659 Subject: Revised Trout Buffer Waiver (Revision #2) SR 1526A, Sampson Road TB-WATAU-2017-005 Watauga County Dear Mr. Hining: This office has received your second revised plan for improvements to SR 1526A, Sampson Road, in Watauga County, North Carolina. Your plan was submitted to this office for approval because of the proposed encroachments into the buffer zone of designated trout waters. In accordance with NCGS 113A-57(1) and Title 15A NCAC 4B .0125(c), this letter will serve as written approval to encroach an additional 474 feet on the buffer zones of Joe's Creek and into unnamed tributaries of Joe's Creek in Watauga County (Class: C; Trout). This authority has been delegated to me by the Director of the Division of Energy, Mineral, and Land Resources, in accordance with NCGS 143B-10. The following conditions will apply to this approval: This approval is based on the plan and supplemental information received via electronic mail on May 21, 2019. This approval is conditional upon compliance with your 401 and 404 approvals. (G.S. 113A-54.1 (a)). 3. No instream work (in streams with trout classifications) or land disturbing within the 25-foot trout zone may take place between October 15 and April 15 of each year. (G.S. 113A-54.1 (a)). North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27103 336,776.9800 Mr. Kevin Hining May 31, 2019 Page 2 4. Submit two (2) complete sets of the "final" plans to the Winston-Salem Regional Office (11" x 17" is preferred) for our files (15 NCAC 04B .0120). S. This approval does not absolve the permittee from compliance with the surface water quality turbidity standard. More protective erosion and sedimentation control measures may be required in order to comply with this water quality standard. (G.S.113A-54.1(a)). 6. All bank repairs, stabilization, grading, or any other disturbances within the 25-foot buffer zone shall be completed by the end of each day. Work shall be scheduled so that at the end of each day bare ground is not exposed and all disturbed areas including banks shall have an adequate temporary or permanent ground cover in place. 7. The Contractor shall install and maintain erosion control devices sufficient to contain sediment around any erodible material stockpile areas as directed. No earthen -material stockpile shall be located within the 25-foot buffer zone of any surface water classified as trout waters by the Environmental Management Commission. Your cooperation in protecting our environment is most appreciated. If you have any questions about this approval, please contact me at Matt.Gantt(@ncdenr.gov or (919) 707-9221. Sincerely, Matthew E. Gantt, PE Section Chief for Regional Operations Land Quality Section Cc: William E. Vinson, Jr., PE, CPM, CPESC, DEMLR Section Chief for Program Operations (via email) Julie Coco, PE, DEMLR, State Sedimentation Specialist (via email) Lon Snider, WSRO Water Quality Supervisor (via email)