HomeMy WebLinkAbout20170683 Ver 1_17BP_9_R_62 Old NC 109 culvert_20190528Wanucha, Dave
From:
Euliss, Amy
Sent:
Friday, May 24, 2019 10:19 AM
To:
Roden Reynolds, Bryan K CIV (US); Wanucha, Dave
Cc:
Sawicki, Jeremy; Shaver, Larry B
Subject:
17BP.9.R.62 Old NC 109 culvert
Attachments: Old 109 culvert looking downstream Old 109 culvert looking upstream
Bryan and Dave,
The culvert project on old NC 109 in Davidson County is a double barrel culvert. Our structure plans were designed with
the high flow barrel and 2' sill on the right (north) when looking downstream and low flow barrel and V sill on the
left. Our permit drawings had it flipped. The sills were poured in accordance with the structure plans. I went to look at
it today. There are a couple pictures attached looking up and downstream from the inlet from the same location. The
culvert is much better aligned with the culvert as its been built. The impacts haven't changed. We plan to leave the low
flow on the left (south) side and the high flow on the right (north). If you have any objections, let me know.
USACE Action ID 2017-01197
DWR no. 20170683
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
to r
it all correspondence Co and fror�r ffils soirder is sulcjec. �o Hie IN C I':"ulc Ic. IRcc;ords I ow and i°r ay be disclosed Sxo ffili'd Icartio;,,,