PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTESTRUCTURE
1. Structure Name/lderitifier ID :
( ) � CFiarles'1Noafen#2J.�`3�" -
2. Current liquid volume in-25 yr,124 hr.-storm storage & structural freeboard
a., current liquid level according -to marker, 13.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches
C. line b,- line a (inches in red zone) = 6.0 inches
d. top of dike surface, -area according to design
(area at below structural freeboard elevation) 991,538 fe
e, line c/12 x, line d x.7.48 gallons/W S708352 gallons
3. Projected volume of wasteliquid. produced during draw -down period
f. temporary storage period according to structural design 180 days
_g. volume of waste produced according to structural design 495720 ft3
h. current herd # F �4880 certified herd # 4896
actual waste produced = current herd # x line g 4941-00 ft°
certified herd # --
i, volume of'wash water according to structural design
j. exce"ss rainfall overevaporatiori according to design'
k: (lines h + i +J) x-7.48-x 36 "days/line f=
4. Total PAN to. be -land applied during draw down period
I. current waste analysis dated 1/12/2018
m-. ((lines e + k)/1.000) x- line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON 'SITE.
(Click on -the next.Structurertab.shown below),
=1.�Jft3
-53958 ft3
,683246 gallons
1.9Q Ibs/1000-gal.
8344.0 Ibs. PAN
PoA (30 Day),2121/00
INY
If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Charles Wooten #1 71-3
line m =
2672.5 lb PAN
2. Structure ID: Charles Wooten #2 71-3
line m =
8344.0 lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
-lb PAN
5. Structure ID:
line m =
Ib PAN
6. Structure ID:
line m = .
Ib PAN
n. lines 1 +2+3+4+5+6= 11016.5 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIFn wRINr; THIS -An nnv P1=RInn
o. tract #
P. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application windows
7061
1
Small Grain
3.77
56.60
213.4
Oct -April 15
3
"
4.46
74.10
330.5
"
5
"
5.16
34.80
179.6
"
6"
5.16
14.80
76.4"
7
"
5.07
_ 75.70
383:8
"
8-
"
124
43.30
140.3
"
91,
4.04
76.90
310.7
"
11
"
4.32
89.70
387.5
"
1211
2.80
100.00
280.0
"
13
"
3.47
100.00
347.0
"
14
"
2.40
100.00
100.0
"
1511
5.37
71.20
382.3
"
16
"
6.00
67.70
120.0
"
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum .of column t) = 3251.4 lb. PAN
IV. FACILITY'S PoA OVERALL -PAN BALANCE
Total PAN to be land applied (line n from section 11) = 11016.5 lb. PAN
w: Crop's remaining PAN balance (line v from section III) = 3251.4 Ib. PAN
x. Overall PAN balance (w - x)- 7765.1 lb. PAN
PoA (30 Day) 2/21/00
!d
Line y must show as a deficit. If line y does not -show as a deficit, list,course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul.and herd reduction options, recalculate new PAN
based.on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the, PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Mr. Wooten called on 1-16-18 to report that he had this lagoon out of freeboard compliance. Information was
received to complete the 30 day POA on 2-23-18 by email from_'C6uck Wooten- Updated-POA from S=daY to"3.0
'ay:wasrcompleted:on_2-23a1:8-by Jason_Turner.-PSWCD-Tec n. If lagoon can not be lowei^ed by normal
means, pump &haul or animal depopulatio aile be needed on this lagoon.