Loading...
HomeMy WebLinkAbout710003_Plan of Action_20180223uy - 671 4�G ab�� 001uR- PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTESTRUCTURE 1. Structure Name/lderitifier ID : ( ) � CFiarles'1Noafen#2J.�`3�" - 2. Current liquid volume in-25 yr,124 hr.-storm storage & structural freeboard a., current liquid level according -to marker, 13.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches C. line b,- line a (inches in red zone) = 6.0 inches d. top of dike surface, -area according to design (area at below structural freeboard elevation) 991,538 fe e, line c/12 x, line d x.7.48 gallons/W S708352 gallons 3. Projected volume of wasteliquid. produced during draw -down period f. temporary storage period according to structural design 180 days _g. volume of waste produced according to structural design 495720 ft3 h. current herd # F �4880 certified herd # 4896 actual waste produced = current herd # x line g 4941-00 ft° certified herd # -- i, volume of'wash water according to structural design j. exce"ss rainfall overevaporatiori according to design' k: (lines h + i +J) x-7.48-x 36 "days/line f= 4. Total PAN to. be -land applied during draw down period I. current waste analysis dated 1/12/2018 m-. ((lines e + k)/1.000) x- line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON 'SITE. (Click on -the next.Structurertab.shown below), =1.�Jft3 -53958 ft3 ,683246 gallons 1.9Q Ibs/1000-gal. 8344.0 Ibs. PAN PoA (30 Day),2121/00 INY If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Charles Wooten #1 71-3 line m = 2672.5 lb PAN 2. Structure ID: Charles Wooten #2 71-3 line m = 8344.0 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = -lb PAN 5. Structure ID: line m = Ib PAN 6. Structure ID: line m = . Ib PAN n. lines 1 +2+3+4+5+6= 11016.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPLIFn wRINr; THIS -An nnv P1=RInn o. tract # P. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application windows 7061 1 Small Grain 3.77 56.60 213.4 Oct -April 15 3 " 4.46 74.10 330.5 " 5 " 5.16 34.80 179.6 " 6" 5.16 14.80 76.4" 7 " 5.07 _ 75.70 383:8 " 8- " 124 43.30 140.3 " 91, 4.04 76.90 310.7 " 11 " 4.32 89.70 387.5 " 1211 2.80 100.00 280.0 " 13 " 3.47 100.00 347.0 " 14 " 2.40 100.00 100.0 " 1511 5.37 71.20 382.3 " 16 " 6.00 67.70 120.0 " 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum .of column t) = 3251.4 lb. PAN IV. FACILITY'S PoA OVERALL -PAN BALANCE Total PAN to be land applied (line n from section 11) = 11016.5 lb. PAN w: Crop's remaining PAN balance (line v from section III) = 3251.4 Ib. PAN x. Overall PAN balance (w - x)- 7765.1 lb. PAN PoA (30 Day) 2/21/00 !d Line y must show as a deficit. If line y does not -show as a deficit, list,course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul.and herd reduction options, recalculate new PAN based.on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the, PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Mr. Wooten called on 1-16-18 to report that he had this lagoon out of freeboard compliance. Information was received to complete the 30 day POA on 2-23-18 by email from_'C6uck Wooten- Updated-POA from S=daY to"3.0 'ay:wasrcompleted:on_2-23a1:8-by Jason_Turner.-PSWCD-Tec n. If lagoon can not be lowei^ed by normal means, pump &haul or animal depopulatio aile be needed on this lagoon. PoA (30 Day) 2/21/00