HomeMy WebLinkAbout710003_Plan of Action_20180803-i'. - _ ,i,
'11-3
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO -BE LAND APPLIED PER WASTE STRUCTURE
1. Structure_Name/ldentifier (ID): Charles Wooten #2
2. Current liquid volume in 25'yr.i24 hr. storm storage & *structural freeboard
a. current liquid level according to marker 18.01 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.01 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 660960 ft?
e, line c/12 x line d,x 7.48 gallons/ft3 411998 gallons
�-
3. Projected'volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 330480 ft3
h. current herd # 4800 certified herd,# 4896
actual waste produced = current herd # k line g = 324000 ft'
certified herd #
i. volume of wash water according to structural design
j: excess rainfall over evaporation,according to design
k. (lines h + i +j)'x 7.48 x. 30 days/line f
4. Total PAN to be land applied`during draw down period
I. current waste analysis dated 7/13/2018
m. ((lines e + k)/1000)_x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click,on the next Structure tab shown. below)
PoA (30 Day) 2/21 /00
L�J ft3
37;188 ft3
450281 gallons
1.28 Ibs/1000 gal.
1103.7 lbs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL -FREEBOARD AND/OR 25 YRJ24
HR-. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Charles Wooten #2 line m = 1103.7 lb PAN
2. Structure ID: Charles Wooten #1 line m = 1156.8 lb PAN
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
n.lines 1+2+3+4+5+6= 2260.5lbPAN'
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN 'CAMMOT RF APPI mn ni IRIAIL. Ywic 4n nev ocoinn
o: tract #
p. field #
q, crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
7061
. P1
Bermuda
3.77
253.80
956.8
April -Oct
P2
"
3.39
214.20
726.1
"
P3
"
4.46
96.70
431.3
"
P4
"
4.45
101.40
451.2
"
P5
"
5.16
112;80
582.0
"
P6
"
.5.16
108.70
560.9
"
P7
"
5.07
246.00
1247.2
"
P8
"
3.24
201.50
652.9
"
P9
"
4.04
143.90
581.4
"
P10
"
2.8049.40
138.3
"
P11
"
4.32
138.60
598.8
"
P12
"
2.80
- 27.20
76.2
"
P13
"
3.47
187.60
651.0
"
P14
"
2.40
83.50
200.4
"
P15
"
5.37
260.70
1400.0
"
P16
"
6.00
192.70
1156.2
"
.orate current ur❑p eiming appncation aaie or next crop application oeginning date for available
receiving crops during 30 day draw down period,
v. Total PAN available for all fields (sum of column t) = 10410.6 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 2260.5 lb. PAN
PoA (30 Day) 2/21 /00
Aw
x. Crop's remaining PAN balance (line v from section III) = 10410.6 lb. PAN
y. Overall PAN balance (w - x) _ -8150 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here -including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Mr. Wooten called on 8-3-18 to report that he had a high lagoon on CW2. Information was received to complete
the POA on 8-3-18 by phone from Chuck Wooten. POA completed on 8/03/2018 by Jason Turner PSWCD
Techn.
PoA (30 Day) 2121 /00