1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifer(ID): lChades Woolen#1
2. Current liquid volume in 25 yr./24 hr. storm storage 8 structural freeboard
a. current liquid level according to marker
18.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard
19.0 inches
c. line b - line a (inches in red zone) =
1.0 inches
d, top of dike surface area according to design
freeboard
F 622692 fe
(area at below structural elevation)
a. line N72 x line d x 7.48 gallonse
388146 gallons
3. Projected volume of waste liquid produced during draw down period
I. temporary storage period according to structural design r 180 days
g. volume of waste produced according to structural design 495720 fta
Jr. current herd # 3600 certified herd #F 3672
actual waste produced = current herd # x line g = 486000 hs
certified herd #
i, volume of wash water according to structural design
I. excess rainfall over evaporation according to design
k.(lines h+i+j)x 7.48x 30 daysAinef=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated r 7113/20 81
m. ((lines e + 1k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
to
53956 fta
673148 gallons
1.09 Ibs/1000 gal.
1166.8 lbs. PAN
PoA (30 Day) 2121/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES
FOR FACILITY
1.
Structure ID: Charles Wooten #2
line m =
lb PAN
2.
Structure ID: Charles Wooten #1
line m = 1156.8 lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
S.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1+2+3+4+5+6= 1156.8 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE
APPLIED DURING
THIS 30 DAY PERIOD.
O. tract #
p. field #
q. Crop
r. acres
s. remalniig IRR
2 PAN balance
(Iblam)
1. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
u. applicatlon Wmlow'
7061
P1
Bermuda
3.77
253.80
956.8
April -Oct
P2
"
3.39
214.20
726A
"
P3
"
4.46
96.70
431.3
"
P4
"
4.45
101.40
451.2
"
P5..
5.16
112.80
582.0
"
P6
"
5.16
108.70
560.9
"
P7
"
5.07
246.00
1247.2
"
P8
"
3.24
201.50
652.9
"
P9.1
4.04
143.90
581.4
"
P10
"
2.80
49.40
138.3
"
Pi 1
"
4.32
138.60
598.8
"
P12
"
2.80
27.20
76.2
"
P13
"
3.47
187.60
651.0
"
P14
"
2.40
83.50
200A
"
P15
"
5.37
200.70
1400.0
"
P16
"
6.00
192.70
1156.2
"
'State Current crop ending application date Or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of Column t) = 10410.E Up. PAN
IV, FACILITY'S FDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1156.8 lb. PAN
PDA (30 Day) 2121100
x. Crop's remaining PAN balance (line v from section III) = 00410.6 lb. PAN
y. Overall PAN balance (w - x) _ -9254 lb. PAN
Line y must show as a deficit If line y does not show as a deficit, list course olfaction here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
Vooten called on 7-30-18 to report that he had a high lagoon. Information was received to complete the
on 7-30-18 by email from Chuck Wooten. PDA completed on 7/3012018 by Jason Turner PSW CD Techn.
PoA (30 Day) 2121100