Loading...
HomeMy WebLinkAbout710003_Plan of Action_201807304Vb19 01105 11-3 - Turw -0611g- PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifer(ID): lChades Woolen#1 2. Current liquid volume in 25 yr./24 hr. storm storage 8 structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d, top of dike surface area according to design freeboard F 622692 fe (area at below structural elevation) a. line N72 x line d x 7.48 gallonse 388146 gallons 3. Projected volume of waste liquid produced during draw down period I. temporary storage period according to structural design r 180 days g. volume of waste produced according to structural design 495720 fta Jr. current herd # 3600 certified herd #F 3672 actual waste produced = current herd # x line g = 486000 hs certified herd # i, volume of wash water according to structural design I. excess rainfall over evaporation according to design k.(lines h+i+j)x 7.48x 30 daysAinef= 4. Total PAN to be land applied during draw down period I. current waste analysis dated r 7113/20 81 m. ((lines e + 1k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) to 53956 fta 673148 gallons 1.09 Ibs/1000 gal. 1166.8 lbs. PAN PoA (30 Day) 2121/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Charles Wooten #2 line m = lb PAN 2. Structure ID: Charles Wooten #1 line m = 1156.8 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN S. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1+2+3+4+5+6= 1156.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # p. field # q. Crop r. acres s. remalniig IRR 2 PAN balance (Iblam) 1. TOTAL PAN BALANCE FOR FIELD (Ibs.) u. applicatlon Wmlow' 7061 P1 Bermuda 3.77 253.80 956.8 April -Oct P2 " 3.39 214.20 726A " P3 " 4.46 96.70 431.3 " P4 " 4.45 101.40 451.2 " P5.. 5.16 112.80 582.0 " P6 " 5.16 108.70 560.9 " P7 " 5.07 246.00 1247.2 " P8 " 3.24 201.50 652.9 " P9.1 4.04 143.90 581.4 " P10 " 2.80 49.40 138.3 " Pi 1 " 4.32 138.60 598.8 " P12 " 2.80 27.20 76.2 " P13 " 3.47 187.60 651.0 " P14 " 2.40 83.50 200A " P15 " 5.37 200.70 1400.0 " P16 " 6.00 192.70 1156.2 " 'State Current crop ending application date Or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of Column t) = 10410.E Up. PAN IV, FACILITY'S FDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1156.8 lb. PAN PDA (30 Day) 2121100 x. Crop's remaining PAN balance (line v from section III) = 00410.6 lb. PAN y. Overall PAN balance (w - x) _ -9254 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course olfaction here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the Vooten called on 7-30-18 to report that he had a high lagoon. Information was received to complete the on 7-30-18 by email from Chuck Wooten. PDA completed on 7/3012018 by Jason Turner PSW CD Techn. PoA (30 Day) 2121100