HomeMy WebLinkAbout710003_Plan of Action_20180215201 �-go/ (P
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Charles Wooten#1 71-3
2. Current liquid volume In 25 yr.124 hr. storm storage 8 structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr.124 hr. storm 8 structural freeboard 1g.0 Inches
c. line b - line a (inches in red zone) = 2.0 Inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 723,545R
e. line ell x line d x 7.48 gallons/ft' 908258 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 330480 fe
h. current herd # 480 certified herd # 3872
actual waste produced = current herd # x line g = 43200 fe
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h+1+j)x 7A8x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1/1212018
m. ((lines e + k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121100
L �Jfe
37,188 f
100217 gallons
2.85 Ibs11000 gal.
2672.5 lbs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YR.124
HIM STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Charles Wooten #1 71-3
2. Structure ID: Charles Wooten #2 71-3
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n. lines 1+2+3+4+5+8=
line in =
2672.5 lb PAN
line in =
lb PAN
line in =
lb PAN
line m =
Ib PAN
line in =
lb PAN
line m =
lb PAN
26725 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
-__.__ ....� ....�..�...n r"^ uRUI^U nA W AAuunT RC ARRI ion MIRING TNIR An nAY PERIOD.
rrnvv. vv
0. tract #
ov. �......����.�.....
p. field #
_...__.
Q. crop
_. ____..
r. acres
9. remaining IR0.
2 PAN balance
(Ib/eae)
L TOTAL PAN
BALANCE FOR
FIELD pbs.)
solumn r x s
u. application xindow'
7061
1
Small Grain
3.77
63.70
240.1
Oct -April 15
3
^
4.46
80.50
359.0
"
5
^
5.16
48.00
247.7
"
g
^
5.18
25.40
131.1
"
7
"
5.07
75.70
383.8
"
g
^
3.24
43.30
140.3
"
g
•
4.041
76.90
310.7
"
1
"
4.32
89.70
387.5
"
12
"
2.80
100.00
280.0
"
13
"
3A7
100.00
347.0
"
14
"
2.40
100.00
100.0
"
15
^
5.37
78.00
418.9
"
18
"
6.00
84.90
120.0
"
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3466A lb. PAN
IV. FACILITY'S POA OVERALL PAN BALANCE
Total PAN to be land applied (line n from section II) = 2672.5 lb. PAN
W. Crop's remaining PAN balance (line v from section III) = 3466.1 lb. PAN
x. Overall PAN balance (w - x) = - 994 lb. PAN
POA (30 Day) 2121100
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to
another permitted facility, provide information regarding the hard population and lagoon freeboard levels at the
receiving facility.
Wooten called on 1-1&18 to report that he had this lagoon out of freeboard compliance. Information was
rived to complete the 30 day PDA on 2-12-18 by email from Chuck Wooten. POA completed on 2-18-18 by
on Turner PSWCD Techn. N lagoon can not be lowered by normal means, pump & haul or animal
copulation made be needed on this lagoon.
PoA (30 Day) 2121/00