Loading...
HomeMy WebLinkAbout710003_Plan of Action_20180215201 �-go/ (P PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Charles Wooten#1 71-3 2. Current liquid volume In 25 yr.124 hr. storm storage 8 structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr.124 hr. storm 8 structural freeboard 1g.0 Inches c. line b - line a (inches in red zone) = 2.0 Inches d. top of dike surface area according to design (area at below structural freeboard elevation) 723,545R e. line ell x line d x 7.48 gallons/ft' 908258 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 330480 fe h. current herd # 480 certified herd # 3872 actual waste produced = current herd # x line g = 43200 fe certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h+1+j)x 7A8x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1/1212018 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121100 L �Jfe 37,188 f 100217 gallons 2.85 Ibs11000 gal. 2672.5 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YR.124 HIM STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Charles Wooten #1 71-3 2. Structure ID: Charles Wooten #2 71-3 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines 1+2+3+4+5+8= line in = 2672.5 lb PAN line in = lb PAN line in = lb PAN line m = Ib PAN line in = lb PAN line m = lb PAN 26725 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN -__.__ ....� ....�..�...n r"^ uRUI^U nA W AAuunT RC ARRI ion MIRING TNIR An nAY PERIOD. rrnvv. vv 0. tract # ov. �......����.�..... p. field # _...__. Q. crop _. ____.. r. acres 9. remaining IR0. 2 PAN balance (Ib/eae) L TOTAL PAN BALANCE FOR FIELD pbs.) solumn r x s u. application xindow' 7061 1 Small Grain 3.77 63.70 240.1 Oct -April 15 3 ^ 4.46 80.50 359.0 " 5 ^ 5.16 48.00 247.7 " g ^ 5.18 25.40 131.1 " 7 " 5.07 75.70 383.8 " g ^ 3.24 43.30 140.3 " g • 4.041 76.90 310.7 " 1 " 4.32 89.70 387.5 " 12 " 2.80 100.00 280.0 " 13 " 3A7 100.00 347.0 " 14 " 2.40 100.00 100.0 " 15 ^ 5.37 78.00 418.9 " 18 " 6.00 84.90 120.0 " 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3466A lb. PAN IV. FACILITY'S POA OVERALL PAN BALANCE Total PAN to be land applied (line n from section II) = 2672.5 lb. PAN W. Crop's remaining PAN balance (line v from section III) = 3466.1 lb. PAN x. Overall PAN balance (w - x) = - 994 lb. PAN POA (30 Day) 2121100 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to another permitted facility, provide information regarding the hard population and lagoon freeboard levels at the receiving facility. Wooten called on 1-1&18 to report that he had this lagoon out of freeboard compliance. Information was rived to complete the 30 day PDA on 2-12-18 by email from Chuck Wooten. POA completed on 2-18-18 by on Turner PSWCD Techn. N lagoon can not be lowered by normal means, pump & haul or animal copulation made be needed on this lagoon. PoA (30 Day) 2121/00