PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): jCharles Wooten#2 71-3
2. Current liquid volume In 25 yr124 hr. storm storage 8 structural freeboard
a. current liquid level according to marker
17.5 inches
b. designed 25 yrJ24 hr. storm 8 structural freeboard
19.0 inches
c. line b - line a (inches in red zone) =
1.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
991,538 le
a, line c/12 x line d x 7.48 gallons/ft'
927088 gallons
3. Projected volume of waste liquid produced during draw down period
I. temporary storage period according to structural design 180 days
g, volume of waste produced according to structural design 495720 fe
h. current herd # 4498 cerl8ied herd # 4896
actual waste produced = current herd # x line g = 455220 it'
certified herd #
I. volume of wash water according to structural design
I. excess rainfall over evaporation according to design
k.(lines h+i+j)x 7.48x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated F 1/1212018
m. ((lines a + ku1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
�fe
53958 fe
634775 gallons
1.90 Ibs11000 gal.
2967.5 lbs. PAN
PoA (30 Day) 2/21/00
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YRn4
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Charles Wooten #1 71-3
line m =
Ib PAN
2. Structure ID: Charles Wooten #2 71-3
line m =
2967.5 lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line In =
lb PAN
n. lines 1+2+3+4+5+6=
2967.5 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFPInn Inn NlnT I IRT FIFI nS Tn WHICH PAN CANNOT RF APPI IFn MIRING THIR a0 DAY PERIOD_
O. tract #
D. field #
q. Crop
r. acres
s. remaining IRR
2 PAN balance
(W.")
t TOTAL PAN
BALANCE FOR
FIELD fibs.)
column r x s
u. appllwllon winclow'
7061
1
Coastal Berm
3.77
275.00
1036.8
April -Oct 15
2-
3.39
244.00
827.1
"
3
"
4.46
238.30
1062.8
"
4
"
4.45
267.60
1190.8
"
5.
5.16
245.40
1266.3
"
6
"
5.16
244.60
1262.1
"
7
"
5.071
275.00
1394.3
"
8.
3.24
275.00
891.0
"
9.
4.04
76.90
310.7
"
10
"
2.80
237.40
664.7
11
"
4.32
246.10
1063.2
"
12
"
2.80
222.30
622.4
"
13
"
3.47
264.70
918.51
14
"
2AO
154.20
370.1
"
15
"
5.37
273.90
1470.8
"
16
"
6.00
255.80
1534.8
"
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) 16886.4 Ill. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
PoA (30 Day) 2/21100
Total PAN to be land applied (line n from section II) = 2967.5 lb. PAN
w. Crop's remaining PAN balance (line v from section III) = 15886 4 lb. PAN
x. Overall PAN balance (w - x) _ -12919 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new Information. If new fields are to be Included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide Information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Wooten celled on 3-26-18 to report that he had this lagoon still out of freeboard compliance. Information
received to complete the 30 day POA on 3-26-18-18 by email from Chuck Wooten. Updated 30 day POA
completed on 3-26-18 by Jason Turner PSW CD Techn. If lagoon can not be lowered by normal means,
np & haul or animal depopulation made be needed on this lagoon.