Loading...
HomeMy WebLinkAbout710003_Plan of Action_20180220PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldentifler (ID): 71-3 Wooten #2 2. Current liquid volume in structural freeboard a. current liquid level according to marker 12.0 inches b. designed structural freeboard zone 19.0 inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = 7.0 inches d, top of dike surface area according to design (area at below structural freeboard elevation) 728,549 /t' e. line c/12 x line d x 7.48 gallons/fl' 3178902 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 495720 ft' h. current herd # 484D certified herd # 4898 actual waste produced = current herd If x line g = 490050 fl' certified herd # i. volume of wash water according to structural design ft' j. excess rainfall over evaporation according to design F 73500 it' k. (lines h + i + j) x 7.48 x 5 days/line f = 117093 gallons 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 3295995 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) POA (5 Day) 2/21 /00 It. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 71-3 Wooten #2 line I = 3295995 gallons 2. structure ID: line I = gallons 3. structure ID: line l= gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1 + 2 + 3 + 4 + 5 + 6 = 3295995 gallons o. line n 127154 = 121.38 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD'' 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to recelve waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining I RR-2 PAN balance (Ib/ecre) v. maximum application mle (Im1rc) w. maximum applicallon ammnt(inches) 7061 1 Small Grain Overseed 3.77 63.7 0.5 1 3 4.46 80.5 0.5 1 5 5.16 48 0.5 1 6 5.16 14.8 0.5 1 7 5.07 75.7 0.5 1 8 3.24 43.3 0.5 1 91 4.04 76,91 0.5 1 11 4.32 89.71 0.5 1 12 2.80 100 0.5 1 13 3.47 100 0.5 1 14 2.40 100 0.5 1 15 5.37 78 0.5 1 16 6.00 84.9 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 55.20 acres IV. FACILITY'S���PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE Y) 212' PoA y Da M 2.20 Inches per acre to be applied within 5 days to line x If unable to land apply hydraulic load listed in line y, list course of action here Including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, Depopulation of houses maybe needed. Pump and haul may is needed due to irrigation system on the farm can not be used due to wetness of the fields. 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation are wet and irrigation equipment can not be used. and amount DATE: 18, 2018 if soil conditions oar irrigation event; changes made in gun sizes, nozzles, V rings, AMOUNT: at Inches time, travel speed, etc. to rings and short application times will be used with faster travel speeds. Pump and haul may be used or , system used to land inject Wooten called in on 2-19-18 to report new freeboard and minfall data. No change in animal units. eted by Jason Tumer 2-20-18 PoA (5 Day) 2I21100