HomeMy WebLinkAbout710003_Plan of Action_20170908�c �- 2Q1`'pol9(o
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Namelidentifier(ID): Charles Wooten#271-3
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 3.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) F 991,538 fe
e. line c/12 x line d x 7.48 gallons/W 1854176 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design F.. 495720 ft'
h. current herd # 4880 certified herd # 4898
actual waste produced = current herd # x line g = 494100 ft'
certified herd #
i. volume of wash water according to structural design
j, excess rainfall over evaporation according to design
k.(lines h+i+j)x 7.48x 30 daysiline f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 9/812017
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0fe
53958 R3
683246 gallons
1.35 Ibs/1000 gal.
3425.5 lbs. PAN
PoA (30 Day) 2121/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Charles Wooten#1 71-3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
18.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard
19.0 inches
c. line b - line a (inches in red zone) =
1.0 inches
d. top of dike surface area according to design
freeboard
728,549 fe
(area at below structural elevation)
a, line c/12 x line d x 7.48 gallonstft'
454129 gallons
3. Projected volume of waste liquid produced during draw down period
I. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design F 330480 ft'
h. current herd # F 3000 certified herd # 3672
actual waste produced = current herd # x line 9 = 270000 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k.(lines h+i+j)x 7.48x 30 dayslline f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 9/8/2017
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121 /00
to
37,188 ft'
382961 gallons
1.67 Ibs/1000 gal.
1397.9 lbs. PAN
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Charles Wooten #1 71-3
2. Structure ID: Charles Woolen #2 71-3
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
line m =
1397.9 lb PAN
line In =
3425.5 lb PAN
line In =
lb PAN
line In =
lb PAN
line In =
Ib PAN
line In =
lb PAN
4823.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
ne Tn urulru owu rwuunT RC eDPI IFn n11RINld TN@ 20 neV PFRlrin
O. tract #
p. field #
Q. crop
r. acres
s. remaining IRR
2 PAN balance
(Ib/acre)
I. TOTAL PAN
BALANCE FOR
FIELD JIW.)
column r x 9
u, application win400l
7061
1
Small Grain
3.77
100.00
377.0
Oct -April 15
2
"
3.39
3
"
4.46
100.00
446.0
'
4
"
4.45
5
"
5.16
7
"
5.07
8.1
3.24
97
4.04
100.00
404.0
"
10
"
2.80
11
"
4.32
100.00
432.0
"
12
"
2.80
100.00
100.0
"
131,
3.47
100.00
347.0
"
14
"
2.40
100.00
120.0
"
15
"
5.37
100.00
268.5
"
16
"
6.00
100.00
300.0
"
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2794.5 Ib. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
Total PAN to be land applied (line n from section II) = 4823.4 lb. PAN
w. Crop's remaining PAN balance (line v from section III) = 2794.5 lb. PAN
x. Overall PAN balance (w -x) = 2028.9 Ib. PAN
FDA (30 Day) 2121100
Y-
Line y must show as a deficit. It line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Wooten called on 1-16-18 to report that he had this lagoon out of freeboard compliance. Information was
jived to complete the 30 day POA on 1-16-18 by email from Chuck Wooten. POA completed on 1-22-18 by
on Turner PSWCD Techn. If lagoon can not be lowered by normal means, pump & haul or animal
copulation made be needed on this lagoon.
PoA (30 Day) 2/21/00